BUILDING SUCCESSFULLYWITH DRYVITRESIDENTIALSYSTEMS.

BUILDER’S REFERENCE GUIDE

Information contained in this brochure conforms to thestandard detail recommendations and specifications forthe installation of Dryvit Systems, Inc. products as of thedate of publication of this document and is presented ingood faith. Dryvit Systems, Inc. assumes no liability,expressed or implied, as to the architecture, engineeringor workmanship of any project. To ensure that you areusing the latest, most complete information, contactDryvit Systems, Inc.

Dryvit Systems, Inc.One Energy WayP.O. Box 1014West Warwick, RI 02893800-556-7752401-822-4100www.dryvit.com

©Dryvit Systems, Inc. 1996Printed in U.S.A. 8-08-5M R5-8-20-08

DS504

Page 2: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

BUILDER’S REFERENCE GUIDE

THE FOLLOWING IS A LIST OF MAJOR CONSIDERATIONS THAT WILL HELP ENSURE AQUALITY DRYVIT INSTALLATION.

SUBSTRATES (INSPECTION/WALK-AROUND)Prior to starting a job, it is important that the EIFS contractor and the builder orrepresentative walk around the project toinspect and check the structure – makingsure the walls and corners are in planeand that the approved substrate andflashing is in good condition and properlyinstalled per local building coderequirements.

TERMINATIONS/FOUNDATIONProvide adequate clearance so that theDryvit system can terminate a minimum of 203 mm (8") above grade or asrequired by local code. This is importantto allow for proper inspection by pestcontrol operators. All terminations requireback wrapping unless Starter Track™ withweep holes is used. Back wrapping isdefined as the continuation of thereinforced base coat across the face andedge of the insulation board. Thereinforcing mesh is continued onto theback side of the insulation board aminimum of 64 mm (2-1/2").

Page 3: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

DECK FLASHINGDeck flashing should be installed to precludewater entry. In addition, flash the top edge ofthe Dryvit system if it is cut to accommodatethe header joist. Use good constructionpractices for flashing and sealant installationto ensure watertightness. Dryvit details are forgeneral information and guidance only.

WINDOW FLASHINGNot all windows are created equal.It is important to use good quality code-compliant windows. Windows can be asignificant contributor to water intrusion.Windows should be flashed and caulked per window manufacturers’ recommendations to prevent water entry.

ROOF INTERSECTING VERTICAL WALLA kickout or diverter flashing must be installedas the first piece of flashing at the end of theroof where it intersects the wall. All diverterjoints must be soldered. Step flashing is toextend up the wall at least 152 mm (6"). Thepurpose of the flashing and diverter is to shedthe water off the roof and keep it out of thevertical wall beneath.

EXPANSION JOINTSDissimilar Materials – When the systemterminates against a dissimilar material,such as wood or concrete, the system shall be held back a minimum of 19 mm(3/4") to allow for an expansion joint andcaulking. Floor Lines – In wood-framed construction,expansion joints are installed at each floorline to allow for framing shrinkage. Minimumof 19 mm (3/4") recommended.Other – Expansion joints should be included at areas where there is a change in substrate that could result in differential movement, at areas withsignificant movement, as expansion joints in the substrate or building, or where the design professional requires. Minimum of 19 mm (3/4") recommended.

PENETRATIONSTerminations at penetrations, such aswindows, doors, light fixtures, hose bibs,dryer vents, wall receptacles, etc. requireback wrapping with reinforcing mesh andbase coat. The insulation board must beheld back from the opening a minimum of 12.7 mm (1/2") for proper sealantinstallation. A fillet bead of sealant ispermitted around small penetrations suchas hose bibs, etc.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 4: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

DECK FLASHINGDeck flashing should be installed to precludewater entry. In addition, flash the top edge ofthe Dryvit system if it is cut to accommodatethe header joist. Use good constructionpractices for flashing and sealant installationto ensure watertightness. Dryvit details are forgeneral information and guidance only.

WINDOW FLASHINGNot all windows are created equal.It is important to use good quality code-compliant windows. Windows can be asignificant contributor to water intrusion.Windows should be flashed and caulked per window manufacturers’ recommendations to prevent water entry.

ROOF INTERSECTING VERTICAL WALLA kickout or diverter flashing must be installedas the first piece of flashing at the end of theroof where it intersects the wall. All diverterjoints must be soldered. Step flashing is toextend up the wall at least 152 mm (6"). Thepurpose of the flashing and diverter is to shedthe water off the roof and keep it out of thevertical wall beneath.

EXPANSION JOINTSDissimilar Materials – When the systemterminates against a dissimilar material,such as wood or concrete, the system shall be held back a minimum of 19 mm(3/4") to allow for an expansion joint andcaulking. Floor Lines – In wood-framed construction,expansion joints are installed at each floorline to allow for framing shrinkage. Minimumof 19 mm (3/4") recommended.Other – Expansion joints should be included at areas where there is a change in substrate that could result in differential movement, at areas withsignificant movement, as expansion joints in the substrate or building, or where the design professional requires. Minimum of 19 mm (3/4") recommended.

PENETRATIONSTerminations at penetrations, such aswindows, doors, light fixtures, hose bibs,dryer vents, wall receptacles, etc. requireback wrapping with reinforcing mesh andbase coat. The insulation board must beheld back from the opening a minimum of 12.7 mm (1/2") for proper sealantinstallation. A fillet bead of sealant ispermitted around small penetrations suchas hose bibs, etc.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 5: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

Pecora CorporationSealant: Dynatrol llPrimer: Type 75 or 150*

Pecora CorporationSealant: 890 SiliconePrimer: P64*

Tremco, Inc.Sealant: Spectrem 1,

3 and 4Primer: TREMprime

Silicone Porous Primer*

SEALANTSExpansion joints and terminations at windows and otheropenings must be properly sealed. Use closed-cellbacker rod and sealant primer. Consult the followingmanufacturers to verify that they have tested theirsealants for compatibility with EIFS:

Sika CorporationSealant: Sikaflex 2CPrimer: Sikaflex 429*

Dow CorningSealant: Dow Corning 790, 791**, 795**Primer: Dow Corning 1200* Prime Coat

*Primer is for sealing Dryvit to Dryvit. For sealing Dryvit to other materials, consult with sealant manufacturer.

**Dow Corning 791 and 795 are intended to be used as perimeter seals and at penetrations. They are not intended to be used when sealing Dryvit to Dryvit.

SOFFIT RETURNS/GABLE ENDSWhen frieze boards are to be installed, install the Dryvit system first; the frieze boards are installed over the Dryvit system and sealed as required.

CRICKETS/CHIMNEY ENCLOSURECrickets are designed to deter theaccumulation of snow and ice and deflectwater around a chimney. To finish masonryenclosures, it is recommended that a skimcoat of base coat be applied prior toapplication of finish. Use of insulation is not recommended due to possible heatbuildup. The wood-enclosed chimney chase can be finished with a full Dryvitsystem with EPS insulation. Flashing shouldcontinue vertically 152 mm (6") above thecricket. Flashing at the top of the enclosuremust also be installed.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 6: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

Pecora CorporationSealant: Dynatrol llPrimer: Type 75 or 150*

Pecora CorporationSealant: 890 SiliconePrimer: P64*

Tremco, Inc.Sealant: Spectrem 1,

3 and 4Primer: TREMprime

Silicone Porous Primer*

SEALANTSExpansion joints and terminations at windows and otheropenings must be properly sealed. Use closed-cellbacker rod and sealant primer. Consult the followingmanufacturers to verify that they have tested theirsealants for compatibility with EIFS:

Sika CorporationSealant: Sikaflex 2CPrimer: Sikaflex 429*

Dow CorningSealant: Dow Corning 790, 791**, 795**Primer: Dow Corning 1200* Prime Coat

*Primer is for sealing Dryvit to Dryvit. For sealing Dryvit to other materials, consult with sealant manufacturer.

**Dow Corning 791 and 795 are intended to be used as perimeter seals and at penetrations. They are not intended to be used when sealing Dryvit to Dryvit.

SOFFIT RETURNS/GABLE ENDSWhen frieze boards are to be installed, install the Dryvit system first; the frieze boards are installed over the Dryvit system and sealed as required.

CRICKETS/CHIMNEY ENCLOSURECrickets are designed to deter theaccumulation of snow and ice and deflectwater around a chimney. To finish masonryenclosures, it is recommended that a skimcoat of base coat be applied prior toapplication of finish. Use of insulation is not recommended due to possible heatbuildup. The wood-enclosed chimney chase can be finished with a full Dryvitsystem with EPS insulation. Flashing shouldcontinue vertically 152 mm (6") above thecricket. Flashing at the top of the enclosuremust also be installed.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 7: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

WE AT DRYVIT ASK OUR EIFS CONTRACTORS TO INSIST ON THE FOLLOWING BEFORE STARTING AN EIFS INSTALLATION.

Water-resistive Barrier – A code-approved water-resistive barrier shall be installed horizontally overlapping the course below in a weatherboard fashion. The minimum overlap is dictated by the applicable building code.

Ambient Temperature Requirements – A minimum temperature of 4° C (40° F) and rising during installation and 24 hours thereafter shall be maintained.

Substrates – Wall sheathing shall be securely fastened perapplicable building code. There shall be no planar irregularitiesgreater than 6.4 mm (1/4 in.) within any 1.2 m (4 ft.) radius.

Flashing at Openings – All openings shall be properly flashed per project design documents. Individual windows, that are ganged to make multiple units, shall have continuous flashing and/or joints between them and shall be fully sealed.

Decks – Provisions shall be made to ensure that the Dryvit system can be properly terminated above grade and at patios,decks, landings, etc. and that the required flashing is in place.

Roof – Ensure that the roof has positive drainage, i.e., crickets or saddles. Metal roof flashing shall be installed in accordance with the guidelines set by the Asphalt Roofing Manufacturers Association (ARMA). Run-off diverters, i.e., kickouts, must be installed where required.

Utilities – Provisions must be made to ensure that the system terminates properly at lighting fixtures, electrical outlets, hose bibs, dryer vents, etc.

AVOIDING WATER

Water intrusion into the exterior wall of any structurecan lead to problems; therefore, attention must bepaid to following proper details to minimize the risks.

Traditional EIFS are barrier-wall systems designed to keep water out of the structure just like othercomponents that make up the exterior envelope.Dryvit offers an EIFS design that incorporates a water-resistive barrier and a drainage plane. Incidentalmoisture that may enter around the system reachingthe water-resistive barrier harmlessly drains out of thewall. However, the critical step with all exterior sidingin eliminating potential moisture problems is planningfor and executing properly the interfacing of theDryvit system with all other adjacent buildingcomponents.

It is important that the builder, EIFS contractor,roofer and framer together review all constructiondetails and documents that relate to the interfacingof the different exterior systems and components that make up the envelope of the house beforestarting construction.

Dryvit strongly urges EIFS contractors not to begin work on a project in which the constructionrequirements for EIFS application have not been fulfilled.

See next page.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 8: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

WE AT DRYVIT ASK OUR EIFS CONTRACTORS TO INSIST ON THE FOLLOWING BEFORE STARTING AN EIFS INSTALLATION.

Water-resistive Barrier – A code-approved water-resistive barrier shall be installed horizontally overlapping the course below in a weatherboard fashion. The minimum overlap is dictated by the applicable building code.

Ambient Temperature Requirements – A minimum temperature of 4° C (40° F) and rising during installation and 24 hours thereafter shall be maintained.

Substrates – Wall sheathing shall be securely fastened perapplicable building code. There shall be no planar irregularitiesgreater than 6.4 mm (1/4 in.) within any 1.2 m (4 ft.) radius.

Flashing at Openings – All openings shall be properly flashed per project design documents. Individual windows, that are ganged to make multiple units, shall have continuous flashing and/or joints between them and shall be fully sealed.

Decks – Provisions shall be made to ensure that the Dryvit system can be properly terminated above grade and at patios,decks, landings, etc. and that the required flashing is in place.

Roof – Ensure that the roof has positive drainage, i.e., crickets or saddles. Metal roof flashing shall be installed in accordance with the guidelines set by the Asphalt Roofing Manufacturers Association (ARMA). Run-off diverters, i.e., kickouts, must be installed where required.

Utilities – Provisions must be made to ensure that the system terminates properly at lighting fixtures, electrical outlets, hose bibs, dryer vents, etc.

AVOIDING WATER

Water intrusion into the exterior wall of any structurecan lead to problems; therefore, attention must bepaid to following proper details to minimize the risks.

Traditional EIFS are barrier-wall systems designed to keep water out of the structure just like othercomponents that make up the exterior envelope.Dryvit offers an EIFS design that incorporates a water-resistive barrier and a drainage plane. Incidentalmoisture that may enter around the system reachingthe water-resistive barrier harmlessly drains out of thewall. However, the critical step with all exterior sidingin eliminating potential moisture problems is planningfor and executing properly the interfacing of theDryvit system with all other adjacent buildingcomponents.

It is important that the builder, EIFS contractor,roofer and framer together review all constructiondetails and documents that relate to the interfacingof the different exterior systems and components that make up the envelope of the house beforestarting construction.

Dryvit strongly urges EIFS contractors not to begin work on a project in which the constructionrequirements for EIFS application have not been fulfilled.

See next page.

BUILDER’S REFERENCE GUIDE BUILDER’S REFERENCE GUIDE

Page 9: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

THE BUILDER SERIES:NINE CRITICAL AREAS THAT DESERVE A CLOSER LOOK

The following pages contain nineadvertisements that have appeared in BUILDER magazine as part of aneducational campaign by Dryvit.Each of these ads focuses on aspecific aspect of construction inwhich good planning andcoordination between trades isimportant to a quality buildingenvelope. Detailed drawings showhow to ensure a quality job. Otheralternatives, generated by designprofessionals, may be appropriate.Dryvit publishes comprehensivespecifications, application instructionsand details. This guide is not to be used in lieu of the morecomprehensive information. Copiesof those documents are available freeof charge by calling 1-800-556-7752or by visiting our web site atwww.dryvit.com. Technical Servicerepresentatives can also answer anyquestions concerning the applicationand details of the Dryvit products.

©Dryvit Systems, Inc. 1997

#1 in a Series

FIG. 2

FIG. 1

FIG. 3

ROOF SHINGLES

DIVERTERFLASHINGINSTALLS

HERE

DRIP EDGE FASCIA

SHEATHING AS SPECIFIED

DRAINAGEMEDIUM

CAULK

DRYVIT SYSTEM PLACED OVER

STEP FLASHING

ROOFINGFELT

SUCCESSFULBUILDERS SHARE THEIRKNOWLEDGEAll good builders knowhow important it is topay attention todetails. In this series,Dryvit focuses on keydetails that successfulbuilders follow wheninstalling exteriorinsulation and finishsystems. Use thesedrawings, along withDryvit’s completesystem specificationsand details, as ahelpful guide for you and yoursubcontractors inplanning andcoordinating thecritical interfacesbetween exteriorbuilding components.

DRYVIT’STECHNICALSUPPORT IS TOPSThroughout NorthAmerica, we have afield service staff toassist with technicalissues. Our corporateengineering staff isprepared to review yourDryvit plans, makesuggestions andsupport your efforts.Total customersatisfaction is our goal.Use our 800 numberand benefit from theDryvit Difference.

MAKE SUREIT’S A DRYVITSYSTEMWe are the NumberOne EIFS manufacturer.We offer a number ofexterior wall systemsincluding Outsulation®

RMD and Outsulation®

SMD Systems. You are off to a great startwhen you select aDryvit system.

FLASHING WHERE ROOF ANDVERTICAL WALL MEET

Fig. 1) A diverter flashing is installed asthe first piece of flashing at the end ofthe roof where it intersects the wall.

Fig. 2) This detail shows the installation of the diverter and step flashing. Thepurpose of the step flashing and diverteris to shed the water off the roof and keepit away from the vertical wall beneath.

Note: All diverter joints must be soldered.

Fig. 3) The Dryvit system is held aminimum of 2" off the roof and caulkedaround the diverter.

Building Successfully With Dryvit Residential Systems

For additional information,call 1-800-4-DRYVIT or visitwww.dryvit.com

BUILD IT WITHDRYVITBUILD IT WITHPRIDE

HOLD DRYVIT SYSTEM A MIN. OF 2" FROM ROOF

Details Are The Key To Success

STEP FLASHINGEXTENDS UPAT LEAST 6"

This detail is for general information and guidanceonly, and Dryvit disclaims any liability for the useof this detail and for the architecture, design,engineering or workmanship of any project.

WATER-RESISTIVEBARRIER

BUILDER’S REFERENCE GUIDE

Page 10: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 11: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 12: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 13: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 14: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 15: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 16: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 17: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 18: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH
Page 19: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

The Dryvit Outsulation® RMD System is engineered specifically for residential construction. It incorporates aspecially designed drainage plane to allow incidentalmoisture to drain out of the wall at the base of the system.The Outsulation® RMD System is mechanically fastened to a plywood or OSB substrate. It offers a transferable 10-year moisture drainage and materials warranty.

OUTSULATION® RMD SYSTEM COMPONENTS• Drainage Medium• Approved Mechanical Fasteners• Expanded Polystyrene Insulation Board (R-value = 3.85 per inch)• Reinforcing Mesh• Dryvit Genesis® or Genesis® DM™ Base Coat• Dryvit 100% Acrylic-Based Dirt Pickup Resistant Finish

The Dryvit Outsulation® SMD System was designed specificallyfor residential applications. In new construction, the insulationboard is quickly attached by mechanical fasteners over adrainage plane, which allows for incidental moisture to drain harmlessly out of the wall at the base of the system.Outsulation® SMD System is also perfect for remodeling ahome because the insulation board can be mechanically fastened to most types of siding found on older homes.

OUTSULATION® SMD SYSTEM COMPONENTS• Drainage Medium• Approved Mechanical Fasteners• Approved Polyisocyanurate Insulation Board (R-value = 5.6 per inch)• Reinforcing Mesh• Dryvit Genesis® or Genesis® DM™ Base Coat• Dryvit 100% Acrylic-Based Dirt Pickup Resistant Finish

DESIGN OPTIONSEach system permits three-dimensional detailing with the use of insulation board shapes.

OUTSULATION® SMD SYSTEM™

BUILDER’S REFERENCE GUIDE

OUTSULATION® RMD SYSTEM™

DRYVIT RESIDENTIAL SYSTEMSDRYVIT...THE COMPANY

As a leading manufacturer of EIF systems for over 35 years, Dryvit Systems, Inc. has providedproducts for hundreds of thousands of energy-efficient, durable and cost-effective walls forcommercial and residential buildings nationwide.

Dryvit systems are recognized by the design andbuilding community as the best engineeredsystems available – they offer design flexibilityand a cost-competitive alternative to othercladding materials. Dryvit systems offered for theresidential market include the Outsulation® RMDand the Outsulation® SMD Systems.

Dryvit’s commitment to continued research anddevelopment, testing and training, compliancewith national and local building codes and thestrictest quality control in the EIFS industry ensuresuperior products unmatched in the buildingcommunity. Also, every Dryvit manufacturingfacility is certified to ISO 9001:2000 and ISO14001:2004 standards, the worldwide commondenominator of product consistency andexcellence and environmental performance.

As quality conscious as Dryvit is, the ultimatesuccess and performance of the Dryvit system –and, in truth, any exterior wall cladding –depends on the skill and knowledge of thecontractor as well as the active involvement of the builder and other subcontractors.

BUILDER’S REFERENCE GUIDE

Page 20: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

The Dryvit Outsulation® RMD System is engineered specifically for residential construction. It incorporates aspecially designed drainage plane to allow incidentalmoisture to drain out of the wall at the base of the system.The Outsulation® RMD System is mechanically fastened to a plywood or OSB substrate. It offers a transferable 10-year moisture drainage and materials warranty.

OUTSULATION® RMD SYSTEM COMPONENTS• Drainage Medium• Approved Mechanical Fasteners• Expanded Polystyrene Insulation Board (R-value = 3.85 per inch)• Reinforcing Mesh• Dryvit Genesis® or Genesis® DM™ Base Coat• Dryvit 100% Acrylic-Based Dirt Pickup Resistant Finish

The Dryvit Outsulation® SMD System was designed specificallyfor residential applications. In new construction, the insulationboard is quickly attached by mechanical fasteners over adrainage plane, which allows for incidental moisture to drain harmlessly out of the wall at the base of the system.Outsulation® SMD System is also perfect for remodeling ahome because the insulation board can be mechanically fastened to most types of siding found on older homes.

OUTSULATION® SMD SYSTEM COMPONENTS• Drainage Medium• Approved Mechanical Fasteners• Approved Polyisocyanurate Insulation Board (R-value = 5.6 per inch)• Reinforcing Mesh• Dryvit Genesis® or Genesis® DM™ Base Coat• Dryvit 100% Acrylic-Based Dirt Pickup Resistant Finish

DESIGN OPTIONSEach system permits three-dimensional detailing with the use of insulation board shapes.

OUTSULATION® SMD SYSTEM™

BUILDER’S REFERENCE GUIDE

OUTSULATION® RMD SYSTEM™

DRYVIT RESIDENTIAL SYSTEMSDRYVIT...THE COMPANY

As a leading manufacturer of EIF systems for over 35 years, Dryvit Systems, Inc. has providedproducts for hundreds of thousands of energy-efficient, durable and cost-effective walls forcommercial and residential buildings nationwide.

Dryvit systems are recognized by the design andbuilding community as the best engineeredsystems available – they offer design flexibilityand a cost-competitive alternative to othercladding materials. Dryvit systems offered for theresidential market include the Outsulation® RMDand the Outsulation® SMD Systems.

Dryvit’s commitment to continued research anddevelopment, testing and training, compliancewith national and local building codes and thestrictest quality control in the EIFS industry ensuresuperior products unmatched in the buildingcommunity. Also, every Dryvit manufacturingfacility is certified to ISO 9001:2000 and ISO14001:2004 standards, the worldwide commondenominator of product consistency andexcellence and environmental performance.

As quality conscious as Dryvit is, the ultimatesuccess and performance of the Dryvit system –and, in truth, any exterior wall cladding –depends on the skill and knowledge of thecontractor as well as the active involvement of the builder and other subcontractors.

BUILDER’S REFERENCE GUIDE

Page 21: BUILDER’S REFERENCE GUIDE BUILDING SUCCESSFULLY WITH

Review All Details With EIFS Contractor, Roofer & Framer.

• Ensure all wall components, including windows, meet building code requirements

• Expansion joints at each floor line• System terminations are detailed per

EIF System Installation Instructions• Deck flashing properly installed• Wall sheathing properly installed• Proper installation of water-resistive barrier• Window and door heads properly flashed• Proper caulking at windows, expansion joints,

other openings• Proper flashing where roof intersects wall• Proper flashing at crickets and chimneys• Frieze boards installed over the Dryvit system• System is terminated above patios,

decks, landings• Insulation board is terminated a minimum of

203 mm (8") above grade• Ambient temperature 4° C (40º F) and rising

during installation and 24 hours thereafter• Follow Dryvit’s specifications, application

instructions and details

Dryvit...striving to help you eliminate call-backs

We are available at www.dryvit.com and 1-800-556-7752

15 KEYS TOSUCCESSFULLYBUILD ORREMODEL A HOME WITHDRYVIT

BUILDER’S REFERENCE GUIDE