May 22, 2017 #70 We Build Futures ~ Communities ~ Confidence ~ We Build Your Business The Genuine. The Original. “We’re Not The Best Because We’re the Oldest... We’re The Oldest Because We’re the Best!” Overhead Door Company of Salinas 733 Sanborn Place • Salinas, CA 93901 Salinas (831) 422-3667 • Monterey (831) 375-3667 Fax (831) 422-1061 • Santa Cruz (831) 662-3122 Lic. #529655 Overhead Door Company of Santa Clara Valley 1266 Lawrence Expressway • Sunnyvale, CA 94089 Tel (408) 734-8010 • Fax (408) 734-3728 Lic. #215098 Bidding This Week... Builders Bulletin 5/22/17 Watsonville Watsonville Building A - Ahu Replacement 2:00 PM 5/22/17 San Luis Obispo Tule Removal Along Terminal Dam At Lopez Water Treatment Plant 3:00 PM 5/22/17 Arroyo Grande Sslocsd Cherry Avenue Pipe Bridge Maintenance Project 2:00 PM 5/22/17 Santa Cruz On-Call Construction Management 4:00 PM 5/22/17 * Oceano Oceano Drainage Improvement 3:00 PM 5/22/17 * Soledad Soledad Regional Recharge 11:00 AM 5/22/17 San Jose At&T Dealer Store Capitol Square (Online) 12:00 PM 5/23/17 Salinas Dot 05-1g3904 Cold Plane Ac Pavement, Place Hma (Typea), And Place Rumble Strips 2:00 PM 5/23/17 San Luis Obispo Cal Poly Lighting And Audio Upgrade 3:00 PM 5/23/17 * Greenfield New Apple Avenue Elementary School 2:00 PM 5/23/17 San Jose 80032 2017 Playground Modernizations Group 1 & Group 2 - Sjusd 2:00 PM 5/23/17 Monterey Citywide Street Resurfacing (Slurry), Phase 5 2:00 PM 5/23/17 Watsonville Upgrade And Re-Roof Administration/Visitor Center Buildings At Elkhorn Slough National Estuarine Research Reserve 2:00 PM 5/23/17 Palo Alto Fiber Optics Conduits Installation Storm Drain Monitoring Sites 3:00 PM 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District 2:00 PM 5/23/17 Salinas Proposition 39 Energy Services - Various Sites 2:00 PM 5/23/17 Monterey J Jill Del Monte Shopping Center 2:00 PM 5/24/17 San Jose 2017 Painting Maintenance-Sjusd 2:00 PM 5/24/17 Sunnyvale Cupertino Middle School Interim Housing Electrical & Low Voltage - Cupertino Union School District (Cusd) (Online) 2:00 PM 5/24/17 Morgan Hill 2017-2018 Parking Lot Seal Coat Project (Online) 11:30 AM 5/24/17 Santa Clara Tasman Drive Bicycle Lane Improvements Project 3:00 PM 5/25/17 Boulder Creek Boulder Creek Elementary And Redwood Heater Replacement 10:00 AM 5/25/17 San Jose 80031 2017 Painting Maintenance (3004)- Sjusd 2:00 PM 5/25/17 Pismo Beach Judkins Middle School Parking Lot Renovation 2:00 PM 5/25/17 San Luis Obispo Madonna - Los Osos Valley Road Rehabilitation Project 2:00 PM 5/25/17 Aptos Hidden Beach Pump Station Concrete Repairs 2:00 PM 5/25/17 Los Altos University Avenue Crosswalk Improvements 2:00 PM 5/25/17 Grover Beach Golden West Park Improvements 2:00 PM 5/25/17 San Jose Quarter Midget Parking Expansion & Shop Building Motorcycle County Park 2:00 PM 5/25/17 Santa Clara 2017 Micro-Surfacing Of County Roads Various Locations 2:00 PM 5/25/17 San Luis Obispo Rfq - Construction Inspection Services – Inspector Of Record (Ior) 3:00 PM 5/26/17 Nipomo Nipomo High School Ag Shop/Classroom Grading/Foundation/Utilities Rebid 2:00 PM 5/26/17 Carmel-By-The-Sea Storm Drain Repair - Junipero & Fifth Avenues 1:30 PM 5/26/17 Salinas Alisal Union School District Contractor Pre-Qualification Form 5:00 PM 5/26/17 Los Gatos Rfp Alma College Cultural Landscape Rehabilitation Project - Bear Creek Redwods Open Space Preserve 5:00 PM 5/26/17 Salinas Rfq For Remodeling Services - Granada Ave 2:00 PM 5/26/17 Salinas Rfq For Remodeling Services - La Mesa Dr 2:00 PM

Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

May 22, 2017 #70

We Build Futures ~ Communities ~ Confidence ~ We Build Your Business

The Genuine. The Original.

“We’re Not The Best Because We’re the Oldest...We’re The Oldest Because We’re the Best!”

Overhead Door Company of Salinas733 Sanborn Place • Salinas, CA 93901

Salinas (831) 422-3667 • Monterey (831) 375-3667Fax (831) 422-1061 • Santa Cruz (831) 662-3122

Lic. #529655

Overhead Door Company of Santa Clara Valley1266 Lawrence Expressway • Sunnyvale, CA 94089

Tel (408) 734-8010 • Fax (408) 734-3728Lic. #215098

Bidding This Week...

Builders Bulletin

Bid Time Project NameLocationBid Date

5/22/17 Watsonville Watsonville Building A - Ahu Replacement2:00 PM

5/22/17 San Luis Obispo Tule Removal Along Terminal Dam At Lopez Water Treatment Plant 3:00 PM

5/22/17 Arroyo Grande Sslocsd Cherry Avenue Pipe Bridge Maintenance Project2:00 PM

5/22/17 Santa Cruz On-Call Construction Management4:00 PM

5/22/17* Oceano Oceano Drainage Improvement3:00 PM

5/22/17* Soledad Soledad Regional Recharge11:00 AM

5/22/17 San Jose At&T Dealer Store Capitol Square (Online)12:00 PM

5/23/17 Salinas Dot 05-1g3904 Cold Plane Ac Pavement, Place Hma (Typea), And Place Rumble Strips

2:00 PM

5/23/17 San Luis Obispo Cal Poly Lighting And Audio Upgrade3:00 PM

5/23/17* Greenfield New Apple Avenue Elementary School2:00 PM

5/23/17 San Jose 80032 2017 Playground Modernizations Group 1 & Group 2 - Sjusd2:00 PM

5/23/17 Monterey Citywide Street Resurfacing (Slurry), Phase 52:00 PM

5/23/17 Watsonville Upgrade And Re-Roof Administration/Visitor Center Buildings At Elkhorn Slough National Estuarine Research Reserve

2:00 PM

5/23/17 Palo Alto Fiber Optics Conduits Installation Storm Drain Monitoring Sites3:00 PM

5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project -Cupertino Sanitary District

2:00 PM

5/23/17 Salinas Proposition 39 Energy Services - Various Sites2:00 PM

5/23/17 Monterey J Jill Del Monte Shopping Center2:00 PM

5/24/17 San Jose 2017 Painting Maintenance-Sjusd2:00 PM

5/24/17 Sunnyvale Cupertino Middle School Interim Housing Electrical & Low Voltage -Cupertino Union School District (Cusd) (Online)

2:00 PM

5/24/17 Morgan Hill 2017-2018 Parking Lot Seal Coat Project (Online)11:30 AM

5/24/17 Santa Clara Tasman Drive Bicycle Lane Improvements Project3:00 PM

5/25/17 Boulder Creek Boulder Creek Elementary And Redwood Heater Replacement10:00 AM

5/25/17 San Jose 80031 2017 Painting Maintenance (3004)- Sjusd2:00 PM

5/25/17 Pismo Beach Judkins Middle School Parking Lot Renovation2:00 PM

5/25/17 San Luis Obispo Madonna - Los Osos Valley Road Rehabilitation Project 2:00 PM

5/25/17 Aptos Hidden Beach Pump Station Concrete Repairs2:00 PM

5/25/17 Los Altos University Avenue Crosswalk Improvements2:00 PM

5/25/17 Grover Beach Golden West Park Improvements2:00 PM

5/25/17 San Jose Quarter Midget Parking Expansion & Shop Building Motorcycle County Park

2:00 PM

5/25/17 Santa Clara 2017 Micro-Surfacing Of County Roads Various Locations2:00 PM

5/25/17 San Luis Obispo Rfq - Construction Inspection Services – Inspector Of Record (Ior)3:00 PM

5/26/17 Nipomo Nipomo High School Ag Shop/Classroom Grading/Foundation/Utilities Rebid

2:00 PM

5/26/17 Carmel-By-The-Sea Storm Drain Repair - Junipero & Fifth Avenues1:30 PM

5/26/17 Salinas Alisal Union School District Contractor Pre-Qualification Form5:00 PM

5/26/17 Los Gatos Rfp Alma College Cultural Landscape Rehabilitation Project - Bear Creek Redwods Open Space Preserve

5:00 PM

5/26/17 Salinas Rfq For Remodeling Services - Granada Ave2:00 PM

5/26/17 Salinas Rfq For Remodeling Services - La Mesa Dr2:00 PM

Page 2: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Central Coast Builders Association

242 East Romie Lane (831) 758-1624 Salinas Salinas, CA 93901 (831) 423-5900 Santa Cruz Mon-Thurs 8-5 Fri 8-3 (831) 883-3933 Monterey

(831) 758-6203 Fax

[email protected]

Board of Directors

President: Clifford Fasnacht, Dougherty Pump & Drill Oscar Grijalva, OCG Plumbing, Inc

Vice President: Ken Steen, Steen Ass. Consulting Serv. Anka Hepper, WM. B Saleh Painting

Secretary/Treasurer: Kevin McIntosh, Blach Constuction Kate Rueter, AON Risk Services

Past President: Kristine O’Dell, Absolute HR Edwin Sargenti, PSC

Gabriel Torres, CCRB/CHISPA

John Vorwerck, Otto Construction

CCBA STAFFChristie Cromeenes

Executive Director

Amanda Young FInance/Office Mgr Ingrid Vierra Planroom Coordinator Shelly Verba SR. Planroom Coordinator Rikki Montejano Public Relations

DisclaimerAll information provided by CCBA is obtained from sources deemed to be reliable. It is the user’s responsibility to confirm the accuracy of

all facts. We assume no responsibility for errors and/or omissions.All information included is for the intended recipient only, we ask that

you do not share this information

Page 3: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

05/17/2017 BUSINESS UPDATES

New Federal Log 300 Rules Don’t Yet Apply in California; Change ComingIn 2016, the federal Occupational Safety and Health Administration (federal OSHA) issued a final rule relating to the tracking and reporting of workplace injuries. The final rule requires electronic submission of injury and illness data, also known as the Log 300, that employers currently report on paper forms. This rule also requires strict anti-retaliation protections for employees who report work-related injuries or illnesses.

The federal electronic reporting rule took effect on January 1, 2017, for states that federal OSHAregulates, and they had to start electronically submitting records.However, federal OSHA has given states that operate their own safety and health programs, such as California, extra time to implement the new requirements.

According to Cal/OSHA, California employers are not required to follow the new federal requirements and will not be required to do so until “substantially similar” state regulations go through the formal rulemaking, adoption and approval process.

Cal/OSHA drafted a proposed rulemaking package to conform to the revised federal OSHA regulations. The package is being reviewed internally before the formal rulemaking process and public comment period begins.

Until Cal/OSHA implements the federal changes here in California, the federal rules will not be enforced. Employers should be on the lookout for California’s implementation of these federal rules.

EMPLOYMENT LAW

California Supreme Court Set to Address Fate of Independent ContractingThe Future of Work: A Surging Demand for Independent ContractorsRecent years have seen tremendous growth in the sharing economy, aka, the “gig economy,” which reflects the technological ability to quickly summon goods or services through a smart phone. While the new economy has grown rapidly, the relevant legal standards have not. Yet business owners continue to invest heavily into business models that have created tens of thousands of flexible jobs for workers classified as independent contractors. In the absence of legislative guidance tailored to the realities of the new economy, California courts and administrative agencies have struggled to apply the law developed during an earlier age.The new economy is a powerful fact of life. According to Seyfarth’s “Future of Work” Outlook Survey,45% of respondents expect their company’s demand for independent contractors to grow in the next five years. Companies in the areas of information technology and telecommunications are among those most likely to experience these developments, as opposed to companies in the areas of real estate and consumer staples. (A deeper analysis of our survey’s findings appears here.)

Page 4: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

JOB DESCRIPTION

Home Repair Foreman

Minor Home Repair Program

Habitat for Humanity Monterey Bay

Habitat for Humanity Monterey Bay (HMB) is a local affiliate of Habitat for Humanity International. We build and repair homes for low-income households in the Santa Cruz and Monterey County area. HMB has been active in the community for 27 years. HMB is starting a Minor Home Repair program in the community of Pajaro located in north Monterey County across the Pajaro River from Watsonville. Monterey County has awarded HMB funds to finance the Minor Home Repair Program. HMB will be hiring a part-time Repair Foreman to manage this program. The Repair Foreman must be bilingual (speak Spanish and English) and will be responsible for running the many different aspects of the program. This will include outreach work in the community to encourage residents to apply to the program, site visits to determine the home repair needs of the applicants, preparing a cost estimate for the work to be done, and overseeing the actual repair work to be completed. Some repair jobs will need to be completed by the Repair Foreman, but whenever possible we will involve volunteers to assist in the repair work. The supervision of the volunteers will be the responsibility of the Repair Foreman. Minor home repairs will primarily be on the exterior of homes and may include: landscaping, yard clean-up, repairs to fences, porches, constructing wheel chair ramps, painting the exterior of homes and more. If there are critical repairs to be made to the inside of the house, the Repair Foreman may have to make those repairs him/herself, without volunteer assistance, or refer the work to private subcontractors.

We plan on assisting a minimum of 18 homeowners (not rentals) in the community of Pajaro, during a twelve-month period between July 1, 2017 and June 30, 2018. The program is initially funded for only one year of operation. We are hopeful that additional funding will allow us to continue and expand the program. We anticipate that the program will require 16 hours per week or 2 to 2 ½ days of work each week. Working on Saturdays is a requirement of the job because that is the best day for the participation of volunteers. A work truck and construction tools will be provided for use on the job.

Responsible to: Construction Manager and Program Manager

Page 5: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 6: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Lost Our Lease – Retirement Sale!

Boxes of Simpson Connectors, a Giant Shear and

Everthing In Between!

Equipment + Inventory + Trucks You Name It, We’ve Got It!

Aliano Iron Inc. 172 Castroville Road, Salinas 93907

831-422-3992 831-320-4992

[email protected]

Page 7: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To Bid

Weekly Projects Bidding 5/18/2017

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date Time Contract # EstimateLocationOPR#

Monterey County

Bidders:

Soledad $3,000,000

In general, the Project consists of:• Open cut construction of approximately 4,200 linear feet of reinforced concrete and/or polypropylene pipe along Gabilan Drive andSan Vicente Road in Soledad.• Installation of new precast manholes and cast-in-place manholes.• Removal and replacement of existing manholes.• Making storm drain pipe connections between the new system and the existing system.• Modifying the existing storm drain recharge basin by adding depth and re-grading.• Installation of pipe inlet at the recharge basin from the proposed storm drain line to feed the recharge basin.• Installation and grading of a 12 ft. wide access road from the top of the recharge basin to the bottom.• Installation of underground detention system.

Project Manager: Kyle Carbert [email protected]

PREVAILING WAGE

5/4 @ 10:30am- 248 Main Street, Soledad

17-01012

3

11:00 AM5/22/17

Addenda:SOLEDAD REGIONAL RECHARGE

Prebid Conf:

General Contractor Fax: 805-246-1583Office: 805-674-8135ABI General Engineering

General Contractor Fax: 408-970-9975Office: 408-970-9900Anderson Pacific Engineering, Inc.

General Contractor Fax: 805-473-2479Office: 805-489-7779Brough Construction, Inc.

General Contractor Fax: 831-449-0700Office: 831-444-4127Don Chapin Co.

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 559-434-6184Office: 559-434-6182Hobbs Construction

General Contractor Fax: 831-384-5078Office: 831-384-4081Monterey Peninsula Engineering

General Contractor Fax: 805-543-9341Office: 805-543-9340S. Chaves Construction Inc.

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction Inc.

General Contractor Fax: 831-758-2661Office: 831-758-9821West Valley Construction

General Contractor Fax: 805-226-4028Office: 805-226-4020Whitaker Construction Group Inc.

Bidders:

Plan Issuer:

Watsonville $80,000

Upgrade and re-roof administration/visitor center buildings and miscellaneous work.

PREVAILING WAGE

MAND 5/16 @ 10:30am- site

17-01048

0

2:00 PM5/23/17

Addenda:UPGRADE AND RE-ROOF ADMINISTRATION/VISITOR CENTER BUILDINGS AT ELKHORN SLOUGHNATIONAL ESTUARINE RESEARCH RESERVE

P1799010

Prebid Conf:

California Dept of Fish & Wildlife 916-323-1584 916-323-1622

General Contractor Fax: 310-457-6017Office: 310-925-8274Amerifix Repairs & Construction

General Contractor Fax: 408-613-2312Office: 408-561-6965Consteknik Builders

Bidders:

Salinas $980,000

Cold plane AC pavement, place HMA (TypeA), and place rumble strips In Monterey County Near Salinas From West Market Circle ToBlackie RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

17-00202

0

2:00 PM5/23/17

Addenda:DOT 05-1G3904 COLD PLANE AC PAVEMENT, PLACE HMA (TYPEA), AND PLACE RUMBLE STRIPS

05-Mon-183-R2.0/R8.6

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 8: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To Bid

Name Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Monterey $2,500,000

In general, the work consists of, but is not limited to, pavement spot repair of approximately 300,000 SF, crack sealing, placing ofapproximately 1,200,000 SF of slurry seal, associated striping removal and replacement, refreshing of existing painted street markings,traffic control and installation of necessary environmental pollution prevention requirements on various streets in the City of Monterey.

PREVAILING WAGE

5/18 @ 2pm- 601 Wave Street, Ste 100, Monterey

17-01168

0

2:00 PM5/23/17

Addenda:CITYWIDE STREET RESURFACING (SLURRY), PHASE 5

Prebid Conf:

City of Monterey-PW/Engineering [email protected] 831-646-3997 831-646-5686

General Contractor Fax: 408-293-3633Office: 408-293-9516Graham Contractors, Inc.

General Contractor Fax: 831-761-1042Office: 831-763-6100Granite Construction

General Contractor Fax: 916-714-9868Office: 775-722-3741Intermountain Slurry Seal

General Contractor Fax: 650-966-1946Office: 650-966-1926O'Grady Paving Inc.

General Contractor Fax: 916-313-3438Office: 916-642-1751Pavement Coatings

General Contractor Fax: 916-383-4084Office: 916-383-1756Telfer Pavement Technologies, LLC

General Contractor Fax: 916-373-1438Office: 916-373-2422VSS International, Inc.

Plan Issuer:

Salinas

The District’s Governing Board (“Board”) is seeking proposals from qualified firms for Proposition 39 Energy Services, includingdevelopment and implementation of a project or projects at schools within the District. The District has prepared an energy audit andenergy expenditure plan. The firm selected as a result of this Request for Qualification (RFQ) will assist the District designing and/orimplementing one or more projects using funds received under Proposition 39 (The Clean Energy Jobs Act of 2012). The selected firmmust have the capability to construct and implement Proposition 39 projects. The District intends to award the successful contractor(s)pursuant to the provisions of Government Code 4217.10 et seq.

PREVAILING WAGE

Refer any questions to Jim Koenig, Associate Superintendent, Business Services and Operations via email [email protected]

17-01172

1

2:00 PM5/23/17

Addenda:PROPOSITION 39 ENERGY SERVICES - VARIOUS SITES

In Studio Architecture - ISA [email protected] 831-320-2655

Bidders:

Plan Issuer:

Greenfield

JTS Construction invites you to bid New Apple Ave Elementary School on 05/16 at 2PM

This is a lease - leaseback project and bids are due to JTS Construction by 5 PM on Friday, May 12th.

All MEP trades must be prequalified prior to bid and the prequalification forms are due either to Fernando Nieto at the district or JTSConstruction by 5 PM Monday, May 8. All bidders must be registered with the DIR. All bidders whose contract amounts exceed ½ of1% of the overall project value must have at least 40% of their project workforce be Skilled and Trained as per Public Contract Codesection 2600.

17-01193

2

2:00 PM5/23/17

Addenda:NEW APPLE AVENUE ELEMENTARY SCHOOL

JTS Construction [email protected] 661-835-9270 661-835-8424

Casework / Millwork Contractor Office: 831-521-2938TMC

Electrical Contractor Fax: 831-758-9638Office: 831-422-7819JM Electric

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

General Contractor Fax: 661-835-8424Office: 661-835-9270JTS Construction

Page 9: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

NEW

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Monterey

Tri-North Builders is seeking the following sub trades: 02060 - Interior Demolition; 02060-T - Interior Demolition; 06200 - FinishCarpentry; 07530 - EPDM Roofing; 08110 - Steel Doors and Frames; 08700 - Hardware; 09250 - Drywall 09600 - Flooring;09640 - Wood Flooring; 09900 - Painting 13851 - Fire Alarm; 15000 - MECHANICAL; 15001 - Mechanical Contractor; 15300 - FireProtection (Sprinkler); 15400 - Plumbing; 15500 - HVAC; 16000 - ELECTRICAL; 16001 - Electrical Contractor.

Project Contact: Andy Rice [email protected]

17-01200

0

2:00 PM5/23/17

Addenda:J JILL DEL MONTE SHOPPING CENTER

Tri-North Builders, Inc. 608-204-7245 608-271-3354

General Contractor Fax: 608-271-3354Office: 608-204-7245Tri-North Builders, Inc.

Plan Issuer:

Salinas

The Alisal Union School District is pre-qualifying General Contractors to bid to perform construction work on District facilities for up to12 months. It is estimated that construction costs will range from $15,000 to $5,000,000 facility and/or per project. The District requiresprospective bidders to fully complete a pre-qualification questionnaire. Bids for construction projects will not be accepted unless aContractor is certified as pre-qualified by the District.

17-01095

0

5:00 PM5/26/17

Addenda:ALISAL UNION SCHOOL DISTRICT CONTRACTOR PRE-QUALIFICATION FORM

Alisal Union School District 831-753-5700 831-753-5552

Plan Issuer:

Salinas

The scope of work shall include necessary permits, labor, materials, tools, implements and appliances to do, perform and complete ina good workmanlike manner the following:

Fencing:• Remove and replace fence and gates on north and south sides of property;• Remove debris from property;• Include a workmanship warranty.Rain gutters:• Install rain gutters on house;• Include a workmanship warranty.Garage door:• Remove and replace single-car garage door;• Remove debris from property;• Include a workmanship warranty.Interior doors:• Remove and replace two interior doors;• Remove debris from property;• Include a workmanship warranty

MAND 5/19 1 pm - 3 pm @ site

17-01250

0

2:00 PM5/26/17

Addenda:RFQ FOR REMODELING SERVICES - GRANADA AVE

2016-12

Prebid Conf:

Rebuilding Together [email protected] 831-296-0473 831-740-3836

Page 10: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

NEW

Projects Out To Bid

General Contractor Fax: 831-641-0586Office: 831-915-6823Pueblo Construction , Inc.

Name Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Salinas

The scope of work shall include necessary permits, labor, materials, tools, implements and appliances to do, perform and complete ina good workmanlike manner the following:

Fencing:• Remove and replace fence on south side of property;• Remove and replace yard gate;• Remove debris from property;• Include a workmanship warranty.

Flooring:• Remove and replace bathroom flooring (2);• Remove and replace toilet seals (2);• Evaluate toilets for replacement;• Remove debris from property;• Include a workmanship warranty.

MAND 5/19 1 pm - 3 pm @ site

17-01252

0

2:00 PM5/26/17

Addenda:RFQ FOR REMODELING SERVICES - LA MESA DR

2017-8

Prebid Conf:

Rebuilding Together [email protected] 831-296-0473 831-740-3836

Plan Issuer:

Carmel-by-the-Sea

Installation of new storm drain, storm drain manholes, catch basin modification, filling storm drain pipe and manhole to be abandonedwith slurry cement, excavation for relocation of cable TV conduits and cables by others, trench restoration, reconstruction of curb rampand all other work shown on the plans.

PREVAILING WAGE

Questions: Sherman Low, Neill Engineers Corp @ 831-624-2110

17-01256

0

1:30 PM5/26/17

Addenda:STORM DRAIN REPAIR - JUNIPERO & FIFTH AVENUES

Neill Engineers Corp 831-624-2110 831-624-3693

NEW

Bidders:

Plan Issuer:

Monterey $641,000

Scope for Base Bid, in general, consists of: demolition of the existing glass roof and installation of a new roof in the lobby area withskylights, interior demolition, new metal stud framed walls, drywall, modifications to fire sprinklers, interior painting, ceramic tile, doorsand hardware, acoustical ceiling, finish flooring, toilet partitions and accessories, plumbing, HVAC, electrical, fire alarm in the Lobbyand Toilet Rooms. Work to be done for Additive Alternate #1 consists of: Board Room improvements which includes demolition of theexisting raised platform and installation of new sound treatments, new metal stud framed walls, drywall, modifications to fire sprinklers,interior painting, doors and hardware. Work to be done for Additive Alternate #2 consists of: improvements in the Closed SessionBoard Room and Remaining Offices. Lowest responsible and responsive bidder will be determined for the project based upon thelowest responsible and responsive Base Bid. Engineer’s Estimate for construction of base bid elements is $641,000. Work isscheduled to begin June 27, 2017, with final completion anticipated by December 13, 2017.

PREVAILING WAGE

All questions regarding the project during bidding process must be made in writing to the attention of the District’s ConstructionManager via E-mail, postal mail, or via facsimile (fax).Construction Manager Contact Info:

Roger MillerEagle Project Management LLC798 Lighthouse Ave. #319Monterey, CA 93940Phone (831) 521-9360Fax (831) 603-3058E-mail: [email protected]

MAND 5/12 @ 10am- site

17-01173

1

2:00 PM5/30/17

Addenda:DISTRICT HEADQUARTERS THIRD FLOOR RENOVATIONS

BID NO. 01

Prebid Conf:

Eagle Project Managament [email protected] 831-521-9360 831-603-3058

General Contractor Fax: 831-275-4188Office: 831-275-2103California Premier Restoration

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

Page 11: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Salinas

Notice is hereby given that the County Office has elected to participate in the California Uniform Public Construction Cost AccountingAct (CUPCCAA). Public projects, as defined by this Act and in accordance with the limits listed in Section 22032 of the Public ContractCode, will be let to contract by informal procedures as set forth in Section 22032-22045 of the Public Contract Code. All licensedcontractors are invited to submit the name of their firm to the County Office for inclusion in the County Office’s list of qualified biddersfor Calendar Year 2017 (July 1, 2017- June 30, 2018).

Any and all questions regarding this procedure shall be submitted via US Mail at the above address or can be faxed to 831/649-3530Attn: Lou Bartlett or emailed to [email protected].

17-01202

0

5:00 PM5/30/17

Addenda:MONTEREY COUNTY OFFICE OF EDUCATION BIDDERS LIST

Wald Ruhnke Dost Architects 831-649-4642 831-649-3530

Bidders:

Plan Issuer:

Monterey $472,900

In general, the work consists of, but is not limited to, clearing and grubbing, sawcutting, demolition of existing improvements, grading,curb and gutter, concrete parking stalls, asphalt conforms, Decomposed Granite walkway, pavement markings, erosion control, rampsand handrails, and construction of new colored concrete walking paths. Work also includes stormwater control, tree protection,benches, and picnic table.

PREVAILING WAGE

Project Contact: Jaci AbadillaTel: [email protected]

5/23 @ 2pm- Lower Presidio Park adjacent to Serra Monument, Monterey

17-01215

0

2:00 PM6/6/17

Addenda:LOWER HISTORIC PARK IMPROVEMENTS

Prebid Conf:

City Of Monterey 831-646-3877 831-646-3405

General Contractor Fax: 831-717-4315Office: 831-375-4777Property Restoration Services

Plan Issuer:

Greenfield

Project consists of: Selective Demo; Signage; Electrical; Telecommunications System; Fire Alarm System; Site Clearing; Earthwork;Trenching; Asphalt Paving; Chain Link Fences and Gates.

PREVAILING WAGE

MAND 5/23 @ 11am- site

17-01284

0

2:00 PM6/13/17

Addenda:GREENFIELD HIGH SCHOOL RELOCATABLE CLASSROOM BUILDINGS

16-10284

Prebid Conf:

Teter, LLP 559-437-0887 559-438-7554

NEW

Plan Issuer:

Marina

The Project consists of constructing approximately 40,000 linear feet of 24-inch transmission main pipeline in paved and non-pavedroadways and easements, connecting to existing facilities, pipeline valves and appurtenances, two bore and jack roadway crossings, a2.0 MG welded steel reservoir with potable water backup pumping system and associated appurtenances and electrical and SCADAimprovements, for a complete in-place operational system.

MAND 5/15 @ 10am- 2840 4th Avenue, Marina

17-01181

0

2:00 PM6/20/17

Addenda:REGIONAL URBAN WATER AUGMENTATION PROJECT-RECYCLED WATER PIPELINE ANDBLACKHORSE RECYCLED WATER RESERVOIR

CIP # RW-0156

Prebid Conf:

Marina Coast Water District - Engineering Office [email protected] 831-883-5929

Page 12: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Marina

Project consists of: Demolition; Concrete; Metals; Fiberglass Fabrications; Thermal and Moisture Protection; Hollow Metal Work;Overhead Coiling Doors; Finish Hardware; Louvers; Metal Support Systems; Gypsum Board; Painting; High-Performance Coatings;Identifying Devices; Building Specialties; Welded Steel Tanks; Metal Building Systems; Wet Pipe Fire-Suppression Sprinkler System;Clean Agent Fire-Suppression System; Plumbing; HVAC Distribution; FRP Duct and Accessories; HVAC Equipment; Commissioningof HVAC Systems; Electrical; Electronic Access Control and Intrusion Detection; Fire Alarm Control System; Earthwork; AsphaltPaving; Concrete Curbs, Gutters and Sidewalks; Irrigation System; Planting; Precast Concrete Utility Vaults; Precast ConcreteSectional Manholes; Drainage; Process Piping and Integration; Process Gas and Liquid Handling, Purification and Storage Equipment;Water Equipment.

PREVAILING WAGE

Project Contact: Yohana Vargas [email protected]

MAND 5/31 @ 10am- 14811 Del Monte Blvd, Marina

17-01318

0

3:00 PM6/29/17

Addenda:PURE WATER MONTEREY GROUNDWATER REPLENISHMENT-ADVANCED WATER PURIFICATIONFACILITY AND PRODUCT WATER PUMP STATION

Prebid Conf:

NEW

San Benito County

Bidders:

Plan Issuer:

Hollister

Open to Prequalified bidders only.This project is for the construction of a 25,000 sf expansion of the existing San Benito County Jail. This addition will be constructedimmediately east of the existing facility and will include new inmate housing for 72 beds, program space, medical area, intake/releasefunctions, and administrative offices.

MAND 5/22 @ 10am- 481 Fourth St, Hollister

17-01242

0

2:00 PM6/20/17

Addenda:SAN BENITO COUNTY JAIL ADDITION - AB900 PHASE II - OPEN TO PREQUALIFIED BIDDERS ONLY

PWB-1605

Prebid Conf:

County of San Benito 831-636-4170 831-636-4176

General Contractor Fax: 661-251-7405Office: 661-251-7401AMG & Associates Inc.

General Contractor Fax: 559-412-4744Office: 559-420-7505Bernards Bros. Inc

General Contractor Fax: 530-666-5723Office: 530-666-5635Broward Builders, Inc.

General Contractor Fax: 951-289-7112Office: 951-788-0703Hal Hays Construction, Inc

General Contractor Fax: 619-447-4192Office: 619-593-3527Halbert Construction Co Inc.

General Contractor Fax: 408-392-0908Office: 408-626-9090Layton Construction

General Contractor Fax: 702-739-9932Office: 702-739-8770Sletten Construction Company

General Contractor Fax: 951-684-3813Office: 951-684-9303Stronghold Engineering

San Luis Obispo County

Bidders:

Oceano $2,137,270

The proposed project consists of the construction of approximately 2,500 feet of storm drain pipe adjacent to Highway 1 in thecommunity of Oceano, to a new outfall pond (sedimentation basin) adjacent to Arroyo Grande Creek. The basin will collect storm flowsand allow debris and sediments to settle out prior to discharge through the Arroyo Grande Creek levee. Construction includes jack andbore operations at a railroad crossing, drainage improvements, utility relocations, and appurtenant work and improvements.

MAND 4/26 @ 10am- 1909 Delta Lane in Oceano

17-00942

5

3:00 PM5/22/17

Addenda:OCEANO DRAINAGE IMPROVEMENT

300465

Prebid Conf:

General Contractor Fax: 805-473-2479Office: 805-489-7779Brough Construction, Inc.

General Contractor Fax: 805-343-9360Office: 805-343-6897Butch Pope Construction

General Contractor Fax: 805-967-1431Office: 805-964-9951Granite Construction

General Contractor Fax: 805-474-8659Office: 805-478-0483J.J. Leon Construction Inc

General Contractor Fax: 805-489-1653Office: 805-489-8711R. Baker Inc

General Contractor Fax: 805-543-2521Office: 805-543-8568R. Burke Construction

General Contractor Fax: 805-461-0053Office: 805-461-0052Raminha Construction

General Contractor Fax: 805-543-9341Office: 805-543-9340S. Chaves Construction Inc.

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

General Contractor Fax: 805-546-8287Office: 805-546-8288Souza Construction Inc.

General Contractor Fax: 805-543-1722Office: 805-543-1706Specialty Construction Inc.

General Contractor Fax: 805-934-4432Office: 805-937-5859Spiess Construction Co. Inc.

Page 13: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 805-928-8262Office: 805-928-1198V Lopez Jr & Sons Genr'l Engineering

General Contractor Fax: 805-226-4028Office: 805-226-4020Whitaker Construction Group Inc.

Supplier Office: 805-994-9564Alliance Ready Mix Inc

Plan Issuer:

Arroyo Grande $149,000 $249,000

Pruning of vegetation and trees that obstruct access to the pipe bridge;• Construction of a containment system that fully contains all material removed from the pipe bridge, and any debris and/or hazardousmaterial that is generated during removal of the existing coatings and the application of new coatings. This containment system maybe suspended from the existing pipe bridge. This containment system may not be supported by a temporary structure founded in thestream channel.• Expose the buried portion of the carrier pipe at both ends of the bridge structure, completely remove the existing coating and re-coatwith a 3-layer zinc/epoxy/urethane coating system, wrap the painted pipe with a wax tape and fiberglass outer wrap, and re-bury thepipe;• Completely remove the existing coating from the structural steel members of the bridge and re-coat with a 3-layerzinc/epoxy/urethane coating system;• Monitor environmental impacts and comply with all environmental regulations and project-specific requirements;and all work necessary to render the facility complete and operational.

PREVAILING WAGE

MAND 5/15 9 am, @ the job site, see location Map

17-01080

1

2:00 PM5/22/17

Addenda:SSLOCSD CHERRY AVENUE PIPE BRIDGE MAINTENANCE PROJECT

to

Prebid Conf:

South San Luis Obispo County Sanitation District 805-489-6666

Plan Issuer:

San Luis Obispo

ELECTRONIC RESPONSES THROUGH PUBLIC PURCHASE ONLY.COMPLETION OF VENDOR REGISTRATION PROCESS CAN TAKE 24 HOURS.

San Luis Obispo County Flood Control and Water Conservation District is seeking bids for the removal of tule along the earthen dam.The work area is approximately 1000 linear feet of lake edge and dam face. The tule mass will need to be removed including its rootmass. The tule mass can be stockpiled at the water’s edge for offhaul by County staff.

17-01246

0

3:00 PM5/22/17

Addenda:TULE REMOVAL ALONG TERMINAL DAM AT LOPEZ WATER TREATMENT PLANT

3784-17

County of San Luis Obispo [email protected] 805-781-5216

Plan Issuer:

San Luis Obispo

ELECTRONIC RESPONSES THROUGH PUBLIC PURCHASE ONLY. COMPLETION OF VENDOR REGISTRATION PROCESSCAN TAKE 24 HOURS.California Polytechnic State University is requesting quotes from vendors on items of interest outlined below.This is a combined order consisting of items requested by three (3) departments at California State University, SLO:1. Christopher Cohen Center Moving Light Upgrade2. Lighting and Audio Upgrade for Rm 212 in Theater Department3. Spanos Theater lighing upgrade

17-01188

0

3:00 PM5/23/17

Addenda:CAL POLY LIGHTING AND AUDIO UPGRADE

2000013255

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Plan Issuer:

Grover Beach

Replacement of concrete, landscaping, and installation of park amenities.

PREVAILING WAGE

17-01142

0

2:00 PM5/25/17

Addenda:GOLDEN WEST PARK IMPROVEMENTS

CIP 1001

Blueprint Express 805-481-1655

Plan Issuer:

San Luis Obispo

California Polytechnic State University, San Luis Obispo (University), a campus of the California State University (CSU) system, isproposing to retain the services of an experienced Construction Inspector employed by an experienced firm (Service Provider) to serveas Inspector of Record for various projects. The anticipated timeframe is from May 2017 to December 2019.

17-01171

0

3:00 PM5/25/17

Addenda:RFQ - CONSTRUCTION INSPECTION SERVICES – INSPECTOR OF RECORD (IOR)

RFQ MAJ 15-MJ0061.IOR

Cal Poly Facilities Planning & Capital Projects 805-756-1299 805-756-7566

Page 14: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $3,200,000

AC base repairs, microsurfacing, and full depth reclamation with new overlay. Work ancillary to these maintenance and rehabilitationtreatments includes, but is not limited to, protection and/or adjustment of existing utility covers, upgrading of select utility frames andcovers, striping and markings, and traffic control. Additive alternatives extend the project limits and include additional microsurfacingand base repairs, curb, gutter, sidewalk, and ADA ramp improvements.

PREVAILING WAGE

17-01192

0

2:00 PM5/25/17

Addenda:MADONNA - LOS OSOS VALLEY ROAD REHABILITATION PROJECT

91511

City of San Luis Obispo 805-781-7200 805-781-7198

Bidders:

Plan Issuer:

Pismo Beach

The Lucia Mar Unified School District is accepting bids from qualified contractors for parking lot renovations at Judkins Middle School.Project consists of: Selective Demo; Metal Fabrication; Signage; Electrical; Earthwork; Exterior Improvements; Trenching, Backfilling,and Compacting; Storm Drainage Utilities.

PREVAILING WAGE

Project Contact: Cindy Naber 805-474-3000 ext. 1032

MAND 5/18 @ 9am- site

17-01239

1

2:00 PM5/25/17

Addenda:JUDKINS MIDDLE SCHOOL PARKING LOT RENOVATION

Bid No. 16-13/Project No.0428

Prebid Conf:

Lucia Mar Unified School District 805-474-3000 805-473-5594

Electrical Contractor Fax: 805-238-0996Office: 805-238-3502Rossi & Carr Electrical Inc

Plan Issuer:

Nipomo

Project consists of: Site Work; Concrete; Concrete Sealer and Finish; Metal Fabrications; Wet-Pipe Sprinkler Systems; Electrical;Intercommunication Systems; Integrated Electronic Communications System; Fire Alarm Detection Systems.

PREVAILING WAGE

MAND 5/19 @ 9am- site

17-01273

3

2:00 PM5/26/17

Addenda:NIPOMO HIGH SCHOOL AG SHOP/CLASSROOM GRADING/FOUNDATION/UTILITIES REBID

16-12

Prebid Conf:

ASAP Reprographics 805-772-6921

NEW

Plan Issuer:

San Luis Obispo $400,000

Install approximately 19,800 square feet of Urethane-Based Resinous Flooring and approximately 6,900 square feet of Epoxy-BasedWainscot Systems in three (3) buildings performed in accordance with the plans and specifications at the California Department ofCorrections and Rehabilitation, Inmate/Ward Labor Program, located at the California Men’s Colony.

Prevailing Wage

17-01000

0

2:00 PM5/31/17

Addenda:RESINOUS FLOORING INSTALLATION

C5607049-D

CA Dept of Corrections & Rehabilitation 916-229-0891 916-255-6187

Plan Issuer:

San Luis Obispo

High voltage overhead line maintenance and repair.Phase 1 – Contractor shall terminate 3 #2 15KV cables at the primary circuit bushings and 1 #6 ground at existing utility pole. A Noticeto Proceed will be issued for Phase 1 by the IWL Site Supervisor. Contractor shall begin work within five (5) calendar days and shall becompleted within five (5) calendar days.Phase 2 – Contractor shall perform high potential test on cables per specifications and provide a preliminary written report within five(5) calendar days to the IWL Site Supervisor.

PREVAILING WAGE

MAND 5/11 10 am @ site, to secure a Gate Clearance for admittance Dana Vance at (805) 543-5399

17-01003

0

2:00 PM5/31/17

Addenda:HIGH VOLTAGE TERMINATION, SPLICING AND TESTING

C5607046-D

Prebid Conf:

CA State Dept of Corrections & Rehabilitation 916-255-6163 000-000-0000

Page 15: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo $73,250

In general, the project is to install approximately 163 linear feet (contractor to verify) and rehabilitate another 166 linear feet of MissionStyle railing (see plans) adjacent to pedestrian walkways within Mission Plaza.

PREVAILING WAGE

17-01208

0

2:00 PM6/1/17

Addenda:MISSION PLAZA RAILING UPGRADE

91524

City of San Luis Obispo 805-781-7200 805-781-7198

Bidders:

Plan Issuer:

San Luis Obispo

Requesting sealed proposals for a Water Distribution System Cold Water Meters.

PREVAILING WAGE

17-01238

1

3:00 PM6/1/17

Addenda:WATER DISTRIBUTION SYSTEM COLD WATER METERS

91456

City of San Luis Obispo 805-781-7200 805-781-7198

Supplier Fax: 661-393-2288Office: 661-393-2288HD Supply Waterworks

Plan Issuer:

San Luis Obispo Co.

ELECTRONIC RESPONSES THROUGH PUBLIC PURCHASE ONLY.COMPLETION OF VENDOR REGISTRATION PROCESS CAN TAKE 24 HOURS.

The San Luis Obispo County Flood Control and Water Conservation District operates the Nacimiento Water Project Water Pipeline forseveral water contractors within the County of San Luis Obispo. One of the vertical turbine pumps at the Nacimiento Intake PumpFacility has seized and needs to be removed and sent to Weir Floway for repairs. The facility is located at the north side of the dam atLake Nacimiento and contains five (5) 3,700 GPM Model 16DKL Weir Floway Pumps with 450 HP motors. The pumps are situatedover a 20 ft. diameter wet well that is 180 ft. deep. The pump columns are in 20 ft. sections and there are 9 columns total per pump.

The San Luis Obispo County Flood Control and Water Conservation District is seeking proposals to remove one (1) vertical turbinepump, secure and load on a transport truck, ship to Weir Floway’s repair facility, and re-install the pump once repairs have been made.Weir Floway will provide transport from their facility back to the Intake Pump Station.

17-01316

0

3:00 PM6/1/17

Addenda:NACIMIENTO INTAKE PUMP REMOVAL AND RE-INSTALLATION

3786-17

County of San Luis Obispo [email protected] 805-781-5216

NEW

Plan Issuer:

Pismo Beach

The City of Pismo Beach (“City”) invites qualified consultants to submit a Proposal to conduct a Needs Assessment of the Fire andPolice Departments, conduct a Facilities Study to determine if the Old City Hall site will accommodate a new Fire Station andexpansion of the Police Department. If it is determined that the site will accommodate the proposed uses, the consultant shall thendevelop a conceptual design, including site plan, floor plan and elevations, of a new Safety Center that preserves the historic elementsof the building to the greatest extent possible.

17-01179

1

2:00 PM6/2/17

Addenda:RFP - NEEDS ASSESSMENT, FACILITIES STUDY AND CONCEPTUAL DESIGN FOR A NEW SAFETYCENTER

City of Pismo Beach . 805-773-4656 805-773-4684

Plan Issuer:

Arroyo Grande

Lucia Mar Unified School District will receive up to, but no later than 2:00 p.m. on Tuesday, June 6, 2017 sealed bids for the award of:Bid No. 16-15 DROPS Grant Storm Water Improvements at Ocean View Elementary School and Harloe Elementary School ProjectNo. 17199.

PREVAILING WAGE

MAND 5/30 @ 9am- site

17-01314

0

2:00 PM6/6/17

Addenda:DROPS GRANT STORM WATER IMPROVEMENTS AT OCEAN VIEW ELEMENTARY SCHOOL ANDHARLOE ELEMENTARY SCHOOL

Bid No. 16-15/Project No.17199

Prebid Conf:

ASAP Reprographics 805-772-6921

NEW

Page 16: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Nipomo

The County of San Luis Obispo (County) is currently soliciting proposals for Engineering Services for the provision of design,construction documents, environmental review, and permits, for the Nipomo Community Park Skate Park ("RFP").

The County of San Luis Obispo has established a 5% Local Vendor Preference. Vendors wishing to claim the Local VendorPreference should download and complete the attached document and upload it with their bid.

Bid Contact: Andrea Madrigal-Ramsey(805) [email protected]

17-01258

0

3:00 PM6/9/17

Addenda:ENGINEERING SERVICES FOR NIPOMO COMMUNITY PARK SKATE PARK

1427

NEW

Bidders:

Plan Issuer:

San Luis Obispo $200,000

The Contractor shall provide all labor, equipment, parts, materials, tools, licenses, permits, bonds, insurance, supervision, installation,inspection, including travel and per diem, necessary to perform Jacking and Casing Pipe Installation for the Central Services KitchenReplacement project, located at the California Department of Corrections and Rehabilitation Inmate/Ward Labor Program at theCalifornia Men’s Colony.

PREVAILING WAGE

MAND 5/18 1 pm @ site, for those potential bidders who attended the “first” Mandatory Walk-Through, the “Rebid 1”Mandatory Walk-Through is “optional.”

17-01254

0

10:30 AM6/12/17

Addenda:JACKING AND CASING PIPE INSTALLATION - RE-BID

C5606821-D, Re-bid #1

Prebid Conf:

CA State Dept. of Corrections & Rehabilitation 916-255-5666 916-255-6187

General Contractor Fax: 805-549-0702Office: 805-549-0667Sansone Company, Inc.

Atascadero $1,250,000 $1,400,000

Pavement rehabilitation, including full depth reclamation, reconstruction, overlay, and minor drainage improvements of roadways.

PREVAILING WAGE

17-01207

0

2:00 PM6/14/17

Addenda:MEASURE F14 PMP 2016/2017 REHABILITATION

2017-004 to

Plan Issuer:

San Luis Obispo

RESPONSES THROUGH PUBLIC PURCHASE ONLY.COMPLETION OF VENDOR REGISTRATION PROCESS CAN TAKE 24 HOURS.

The County of San Luis Obispo is currently soliciting proposals for Design Services for the Bob Jones Pathway Project.

17-01311

0

3:00 PM6/20/17

Addenda:BOB JONES PATHWAY DESIGN SERVICES

1429

County of San Luis Obispo 805-781-5200 805-781-1074

NEW

Page 17: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Luis Obispo

A Job Order Contract is a competitively bid, firm-fixed-price indefinite-quantity contract. It includes a collection of detailed repair andremodel tasks and specifications that have established unit prices. It is placed with a Contractor for the accomplishment of repair,alteration, modernization, rehabilitation, etc., of buildings, structures, or other real property. Ordering is accomplished by means ofissuance of a Job Order against the Contract. The Job Order will reference the Detailed Scope of Work and set forth the Job OrderCompletion Time and the Job Order Price. The Contractor, under the JOC Contract, furnishes management, labor, materials,equipment and engineering support needed to perform the work unless stated otherwise.

The JOC Contract includes a Construction Task Catalog®. This CTC is based on the use of experienced labor and high qualitymaterials. All of the unit prices incorporate prevailing local wage, equipment and materials cost data. The CTC is work segment based.The CTC also incorporates local activity, climate and geographic features.

The County selected The Gordian Group's Job Order Contracting Solution for their JOC Program. The Gordian JOC Solution includesproprietary eGordian® JOC Applications and Construction Task Catalog®, which shall be used by the Contractor to prepare andsubmit Job Order Proposals, subcontractor lists and other requirements specified by the County.

MAND 6/7 1:30 pm @ 1055 Monterey Street, Room D361 (3rd Floor)

17-01313

0

3:00 PM6/22/17

Addenda:2017 JOB ORDER CONTRACT FACILITIES JOC 17-A AND FACILITIES JOC 17-B

113R09JOC17

Prebid Conf:

County of San Luis Obispo [email protected] 805-781-4776

NEW

San Luis Obispo

The Contractor shall provide all labor, including travel, per diem, parts, materials, supplies, transportation, equipment, tools and everyother item of expense necessary to perform scheduled maintenance, repair, emergency repair and source test services to includeinspections, calibrations, mechanical and electrical repairs, adjustments with tuning and instrument components associated with theoperation of the boilers for the specified herein for the California Department of Corrections and Rehabilitation (CDCR), CaliforniaMen's Colony (CMC) located at Highway 1, San Luis Obispo, Ca. DVBE Participation.

17-01182

0

2:00 PM6/30/17

Addenda:BOILER INSPECTION, CALIBRATIONS, MAINTENANCE, REPAIRS AND SOURCE TESTING REBID

6000001892 REBID #1

Santa Clara County

Bidders:

Plan Issuer:

San Jose

Tenant renovation

Available ONLINE ONLY

17-01276

0

12:00 PM5/22/17

Addenda:AT&T DEALER STORE CAPITOL SQUARE (ONLINE)

TI Management Group [email protected] 408-402-5080

NEW

General Contractor Office: 408-402-5080TI Management Group

Plan Issuer:

Cupertino

Furnishing and installing approximately one thousand two hundred thirty five linear feet (1235’) of 8-inch HDPE SDR17 gravity sanitarysewer main within District easements at 19191 and 19333 Vallco Pky by pipe bursting, approximately one hundred and ninety linearfeet (190’) of 8-inch HDPE SDR11 sanitary sewer siphon across Calabazas Creek by directional drilling, approximately one hundredseventy (170) feet of 8” HPDE SDR 17 by open cut trenching, approximately one thousand twenty (1,020) feet by pipe bursting under I-280 and parallel to Tantau Avenue, three (3) new manholes and one junction box on the north parking lots of 19191 and 19333 VallcoPky; adjusting eleven (11) existing manholes to grade at various locations in the City of Cupertino and Saratoga; and allappurtenances required to complete the sanitary sewer, and includes abandonments and restoration of the existing conditions of theareas after the installation are completed.

Plans and specs are also available for review at Santa Clara Builders Exchange

17-00994

1

2:00 PM5/23/17

Addenda:CALABAZAS CREEK/TANTAU AVENUE SANITARY SEWER REHABILITATION PROJECT - CUPERTINOSANITARY DISTRICT

CU-16114

Mark Thomas & Co 408-477-7302

Page 18: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Palo Alto

Replace the existing copper wire connections and install conduits to install fibers that connects from the storm drain monitoring sites tothe City's fiber ring configuration.

Project Contact: Michael JeremiasEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-01068

0

3:00 PM5/23/17

Addenda:FIBER OPTICS CONDUITS INSTALLATION STORM DRAIN MONITORING SITES

168174

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

San Jose

Group 1: Replace existing poured in place rubber surfaces with new synthetic turf surfaces, rubber wear mats and small repairs toplayground equipment at Booksin ES, Empire Gardens ES, River Glen ES, Trace ES.

Group 2: Replace existing poured in place rubber surfaces with new synthetic turf surfaces, rubber wear mats and small repairs toplayground equipment at Almaden ES, Grant ES, Graystone ES, Horace Mann ES, Olinder ES, Randol ES & Reed ES.

Project Contact: Cristiaan Van Der Leij 669-200-8771Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/11 at 10AM (Trace ES, 651 Dana Ave)

17-01227

0

2:00 PM5/23/17

Addenda:80032 2017 PLAYGROUND MODERNIZATIONS GROUP 1 & GROUP 2 - SJUSD

3003C

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Plan Issuer:

San Jose

Repainting of entire exterior of Horace Mann Elementary School site.

Project Contact: Cristiaan Van Der Leij 669-200-8771Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/10 at 10AM (Admin Bldg)

17-01161

0

2:00 PM5/24/17

Addenda:2017 PAINTING MAINTENANCE-SJUSD

80031/3005C

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Plan Issuer:

Morgan Hill

The Project is located at two city owned locations: Paradise Park parking lot located at La Crosse Circle near Calle Enrique and theCentennial Recreation Center (CRC) located at 171 W. Edmundson Avenue. The CRC location includes the CRC parking lot, entrywaydrive lane from Edmundson Avenue to the Corporation Yard property, and the Morgan Hill Dog Park parking lot.

Project Contact: Cynthia Iwanaga 408-776-7383Email: [email protected]

Available ONLINE ONLY

17-01285

1

11:30 AM5/24/17

Addenda:2017-2018 PARKING LOT SEAL COAT PROJECT (ONLINE)

City of Morgan Hill DPW 408-778-6480

NEW

Page 19: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara

Removing 1 curb ramp at the Tasman Drive/Centennial Boulevard intersection and replacing it with City-standard curb, gutter andsidewalk, removing all existing striping on Tasman Dive between Calabazas Creek and Guadalupe Creek and restriping Tasman Driveto provide buffered bike lanes, application of slurry seal, and installation of bicycle detectors and vehicular loop detectors at 7signalized intersections along Tasman Drive.

Project Contact: Pratyush Bhatia 408-615-3026Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

17-01295

0

3:00 PM5/24/17

Addenda:TASMAN DRIVE BICYCLE LANE IMPROVEMENTS PROJECT

CE 16-17-02

City of Santa Clara - DPW 408-615-3000 408-985-7936

NEW

Bidders:

Plan Issuer:

Sunnyvale

Extend and connect six (6) modular buildings to school’s existing power, fire alarm and communication systems.

Available ONLINE ONLY

MAND 5/8 at 3:30PM

17-01307

0

2:00 PM5/24/17

Addenda:CUPERTINO MIDDLE SCHOOL INTERIM HOUSING ELECTRICAL & LOW VOLTAGE - CUPERTINOUNION SCHOOL DISTRICT (CUSD) (ONLINE)

17-IB06-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

NEW

General Contractor Fax: 000-000-0000Office: 510-357-2726ARAM Electric, Inc.

General Contractor Fax: 000-000-0000Office: 408-605-1779D-Electric (Duenkel Electric Inc.)

General Contractor Fax: 408-371-5069Office: 408-540-7730ER Brothers Co. Inc.

General Contractor Fax: 510-475-9411Office: 510-475-9400National Electric, Inc.

Bidders:

Plan Issuer:

Los Altos

Raised crosswalk, installation of ADA compliant curb ramps, sidewalk and crosswalks, signing and striping, rapid rectangular flashingbeacon system, installation of curb & gutter, storm drain, and detectable warning surface on University Ave & Lincoln Ave andUniversity Ave & Burke Road.

Plans and specs also available for review at Santa Clara Builders Exchange

17-01108

1

2:00 PM5/25/17

Addenda:UNIVERSITY AVENUE CROSSWALK IMPROVEMENTS

TS-01035

City of Los Altos - Engineering 650-947-2780

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Bidders:

Plan Issuer:

San Jose $588,000

Channel head cut repair, grading to create stable banks, removal of soil and placement in repository within Almaden QuicksilverCounty Park, replacement with clean soil, re-grading to form gentler slopes and revegetation and Hydroseeding of the disturbed area.

Project Contact: Tom McLauchlan 408-355-2208

Plans and specs also available for review at Santa Clara Builders Exchange

5/16 at 10AM (parking lot)

17-01146

0

2:00 PM5/25/17

Addenda:QUARTER MIDGET PARKING EXPANSION & SHOP BUILDING MOTORCYCLE COUNTY PARK

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Concrete/Masonry Contractor Office: 669-204-4478Innovate Engineering

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Page 20: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Santa Clara County

Resurfacing County roads with Type II micro-surfacing and all work needed to complete application.

Project Contact: Herbert Naraval 408-494-1308

Specs also available for review at Santa Clara Builders Exchange

5/11 at 1:30PM (101 Skyport Dr, SJ)

17-01154

1

2:00 PM5/25/17

Addenda:2017 MICRO-SURFACING OF COUNTY ROADS VARIOUS LOCATIONS

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

Plan Issuer:

San Jose

Repainting including misc. small repairs and replacement of building accessories at Galarza Elementary School and BooksinElementary School.

Project Contact: Cristiaan van der Leij 650-200-8771email: [email protected]

Plans & specs also available at Santa Clara Builders Exchange

5/11 @ 1pm

17-01186

0

2:00 PM5/25/17

Addenda:80031 2017 PAINTING MAINTENANCE (3004)- SJUSD

(3004C)

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Plan Issuer:

Los Gatos

The District is seeking the assistance of a team of professionals in the disciplines of historic landscape architecture, environmental,structural, and geotechnical engineering, and cultural resource interpretation, to advance preliminary design of the Alma CollegeCultural Landscape Rehabilitation Project through construction documentation and implementation.

Available ONLINE ONLY

MAND 5/5 at 11AM

17-01030

1

5:00 PM5/26/17

Addenda:RFP ALMA COLLEGE CULTURAL LANDSCAPE REHABILITATION PROJECT - BEAR CREEK REDWODSOPEN SPACE PRESERVE

Prebid Conf:

Midpeninsula Regional Open Space Dist 650-691-1200

Plan Issuer:

Palo Alto

Restoration of the Lucie Stern Community Center brick pathways.

Project Contact: Lam DoEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/10 at 9AM

17-01158

1

3:00 PM5/29/17

Addenda:LUCIE STERN BRICK PATHWAY RENOVATION

159138

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Plan Issuer:

Palo Alto

Construct curb extensions, concrete medians, raised crosswalks, raised intersections, traffic circles and mini-roundabouts; provideasphalt concrete milling; placing asphalt concrete overlay; microsurfacing; Portland cement concrete road base repair, removal andreplacement of sidewalk, curb, gutter and driveways; installing or replacing curb ramps; installing truncated domes; installing streetlights, installing drainage catch basins, installing landscaping; tree trimming; traffic control; surveying; signage; striping; placinglegends and pavement markers; site preparation; adjusting manholes, catch basins, utility boxes and vaults.

Project Contact: Chris CorraoEmail: [email protected]

Available ONLINE ONLY

5/15 at 2PM (250 Hamilton Avenue)

17-01210

0

3:00 PM5/30/17

Addenda:NEIGHBORHOOD TRAFFIC SAFETY & BICYCLE BOULEVARD PROJECT (ONLINE)

168185

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Page 21: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

San Jose

Repainting including misc. small repairs and replacement of building accessories at Willow Glen Elementary, River Glen Elementaryand Lowell Elementary School.

Project Contact: Cristiaan Van Der Leij 669-200-8771Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/16 at 10AM (Willow Glen ES, 1425 Lincoln Ave)

17-01225

0

2:00 PM5/30/17

Addenda:80031 2017 PAINTING MAINTENANCE WILLOW GLEN, RIVER GLEN, LOWELL ELEMENTARY SCHOOLS- SJUSD

3023C

Prebid Conf:

SJUSD-San Jose Unified School District 408-535-6071

Plan Issuer:

Santa Clara

The Work shall consist of various units of overhead maintenance construction to be done on a unit costs basis throughout the City ofSanta Clara.

Project Contact: Rocco Colicchia 925-348-1098Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/11 at 10AM

17-01018

0

3:00 PM5/31/17

Addenda:ELECTRIC UTILITY OVERHEAD FACILITIES MASTER CONSTRUCTION AGREEMENT

2420A

Prebid Conf:

City of Santa Clara - Silicon Valley Power 408-615-6604

Bidders:

Plan Issuer:

Cupertino $1,160,000

Demolition and removal of temporary parking lot paving, sub-base materials, and temporary fencing; re-establish field grades; addsdrainage and irrigation systems; install infield fines, warning track fines, sideline bullpens, pitcher’s mound areas; installs new naturalgrass field; installs perimeter fencing, gates, and outfield fencing with slats; constructs a maintenance and storage area at the end ofthe right field area; installs an artificial turf putting green; and installs miscellaneous ground cover (bark, graded dirt, etc).

Plans and specs also available for review at Santa Clara Builders Exchange

MAND 5/4 at 11AM (Admin Bldg, Room 106)

17-01113

1

2:00 PM5/31/17

Addenda:BASEBALL FIELD RESTORATION - DE ANZA COLLEGE

#1786

Prebid Conf:

Foothill De Anza College District (De Anza) 408-864-5888

General Contractor Fax: 000-000-0000Office: 510-728-2144Arktos Incorporated

General Contractor Fax: 408-253-4753Office: 408-253-4747Galeb Paving, Inc.

General Contractor Fax: 925-398-8245Office: 925-398-8290Integra Construction Services, Inc.

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.

General Contractor Fax: 000-000-0000Office: 408-985-7200Verde Design

Bidders:

Plan Issuer:

Gilroy

Construction of athletic field upgrades.

Project Contact: EJ Navarro, Gilbane 408-386-02553Email: [email protected]

Available ONLINE ONLY

MAND 5/2 at 2PM (Gilbane Construction Trailer)

17-01119

2

11:00 AM5/31/17

Addenda:GAVILAN COLLEGE ATHLETIC FIELDS UPGRADE (ONLINE)

Prebid Conf:

Gavilan Joint Community College District 408-846-4986 408-846-4988

Electrical Contractor Fax: 209-464-2615Office: 209-464-4878Bockmon & Woody Electric Company, Inc.

General Contractor Fax: 707-643-4581Office: 707-643-4580BHM Construction

General Contractor Fax: 408-866-0566Office: 408-821-7168California Plus Engineering

General Contractor Fax: 510-657-1810Office: 510-657-1800Calstate Construction

General Contractor Fax: 510-887-6501Office: 510-887-6500D.L. Falk Construction, Inc.

General Contractor Fax: 000-000-0000Office: 724-640-4537Frontier Construction Company, Inc.

General Contractor Fax: 209-835-9956Office: 209-835-9956Goodland Construction

General Contractor Fax: 408-924-0844Office: 408-924-0811IBI Group

Page 22: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 650-952-6851Office: 650-952-7333Interstate Grading & Paving

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.

General Contractor Fax: 530-229-0070Office: 530-229-0001Seward L. Schreder Construction Inc.

General Contractor Fax: 925-621-5799Office: 925-621-5703Teichert Construction

General Contractor Fax: 415-459-0665Office: 415-456-8972Thompson Builders Corp

General Contractor Fax: 000-000-0000Office: 408-985-7200Verde Design

General Contractor Fax: 510-236-4979Office: 510-236-9111Vila Construction

Sub-Contractor/SpecialtyContractor

Fax: 408-848-8778Office: 408-848-8700McKim Corporation

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Plan Issuer:

Palo Alto

Bollard Project for Utilities Gas Safety Program.

Project Contact: Javad GhaffariEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/17 at 2PM (3201 E. Bayshore Rd)

17-01248

0

3:00 PM5/31/17

Addenda:BOLLARD PROJECT FOR UTILITIES GAS SAFETY PROGRAM

167890

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Palo Alto

Removal, rehabilitation and reinstallation of the gearboxes from storm pumps #1 and #2.

Project Contact: Todd Seeley 650-496-5945Email: [email protected]

RFQ also available for review at Santa Clara Builders Exchange

MAND 5/17 at 11AM

17-01249

1

3:00 PM5/31/17

Addenda:RFQ ADOBE CREEK PUMP STATION GEARBOX REHABILITATION

167853

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

General Contractor Fax: 530-275-7949Office: 530-945-5677Gregory EQ Inc.

Bidders:

Plan Issuer:

Los Gatos $2,500,000 $3,000,000

Demolition of an existing asphalt pavement trail, grading work, realignment and reconstruction of a new trail approx. 1.3 mile x10 feetwide asphalt concrete trail, installation of a complete new irrigation system for the park.

Project Contact: Ubaldo Perez 408-355-2231

Plans and specs also available for review at Santa Clara Builders Exchange

5/19 at 10AM (Gateway Pavillion Group Area)

17-01132

0

2:00 PM6/1/17

Addenda:LOS GATOS CREEK TRAIL & IRRIGATION RECONSTRUCTION PROJECT

to

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

General Contractor Fax: 408-265-3576Office: 408-265-0904QLM

Supplier Fax: 408-294-2331Office: 408-391-0508River City Building Supply

Plan Issuer:

Santa Clara County

Pavement marking removal, Restriping, Microsurfacing (Type 2), sign Installation, installation of bike detection, Lighting and flashingbeacon installation. Minor excavation, construction of bike cut through.

Project Contact: Paul Pascoal 408-573-2485Email: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/9 at 9:30AM (101 Skyport Dr, SJ)

17-01155

1

2:00 PM6/1/17

Addenda:BICYCLE IMPROVEMENTS ON I-280/PAGE MILL ROAD

Prebid Conf:

County of Santa Clara - Roads & Airports 408-573-2440

Page 23: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

Santa Clara County

Pavement repair (removal and replacement), removal and replacement of curb & gutter, crack sealing, resurfacing of pavement with atype II & III micro-surfacing, replacement of detector loops damaged through pavement construction activities, restriping of expresswaywithin project limits, removal and replacement of signage, construction of ADA ramps, retrofit of ADA ramps.

Project Contact: Paul PascoalEmail: [email protected]

Plans and specs also available for review at Santa Clara Builders Exchange

5/24 at 10:30AM

17-01288

0

2:00 PM6/1/17

Addenda:LAWRENCE EXPRESSWAY PAVEMENT REHABILITATION BETWEEN QUITO RD & HOMESTEAD RD

Prebid Conf:

County of Santa Clara Roads & Airports 408-573-2440

NEW

Sub-Contractor/SpecialtyContractor

Fax: 209-529-9809Office: 209-544-3820Cal Pacific Curbs

Plan Issuer:

Los Altos

Extend and connect eight (8) modular buildings to school’s existing power, fire alarm, and communication systems.

Available ONLINE ONLY

MAND 5/22 at 3:30PM

17-01308

0

2:00 PM6/1/17

Addenda:MONTCLAIRE ELEMENTARY SCHOOL INTERIM HOUSING ELECTRICAL & LOW VOLTAGE-CUPERTINO UNION SCHOOL DISTRICT (CUSD) (ONLINE)

17-IB07-24

Prebid Conf:

Cupertino Union School District 408-252-3000 408-343-2802

NEW

Plan Issuer:

Campbell

Thermoplastic treatment for repainting traffic striping and may include any of thefollowing, 12" crosswalk lines, lanelines, no passing zones in two directions, two-way left turn lanes, right edgelines, and channelizinglines, bike lane lines, bike lane intersection lines, left edge lines, lane drops, as well as providing traffic control for all striping work.

Project Contact: Ron Taormina 408-866-2734Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

17-01323

0

2:30 PM6/5/17

Addenda:THERMOPLASTIC TRAFFIC STRIPING

City of Campbell [email protected] 408-866-2150 408-376-0958

NEW

Bidders:

Sunnyvale AndMountain View

$2,930,000

SB-dir polyester concrete and NB-dir structural concrete deck In Santa Clara County In Sunnyvale And Mountain View From FremontAvenue Undercrossing To 0.2 Mile North Of Stevens Creek BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.

17-00200

1

2:00 PM6/6/17

Addenda:DOT 04-4G8304 SB-DIR POLYESTER CONCRETE AND NB-DIR STRUCTURAL CONCRETE DECK

04-SCl-85-R19.9/ R20.2

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bidders:

Plan Issuer:

Palo Alto

Procure and install a parking counter system for Parking Structure #1 (PS1).

Project Contact: Perdee Gawaran 925-372-2314

Available ONLINE ONLY

17-01212

0

1:00 PM6/6/17

Addenda:PARKING COUNTER SYSTEM STRUCTURE #1 - VETERANS AFFAIRS PALO ALTO HEALTH CARESYSTEM (VAPAHCS) (ONLINE)

VA261-17-B-0375

Department of Veterans Affairs

General Contractor Fax: 000-000-0000Office: 805-620-1705BVB Construction

General Contractor Fax: 559-274-1555Office: 559-277-8555Cable Links Construction Group, Inc.

Page 24: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

General Contractor Fax: 334-532-3105Office: 334-532-3100Coburn Contractors, LLC

General Contractor Fax: 503-650-1902Office: 503-650-1720Glen Mar Construction

General Contractor Fax: 619-447-4192Office: 619-593-3527Halbert Construction Co Inc.

General Contractor Fax: 970-252-1487Office: 970-252-1477Hawk Contracting

General Contractor Fax: 858-277-7100Office: 858-277-7100Herman Construction Group, Inc.

General Contractor Fax: 916-783-8820Office: 916-783-3277J.R. Conkey & Associates, Inc.

General Contractor Fax: 760-432-0317Office: 760-432-0307Kevcon Inc.

General Contractor Fax: 000-000-0000Office: 707-642-6832Mar Nes, Inc.

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

General Contractor Fax: 000-000-0000Office: 808-853-2441Talion Construction

Plan Issuer:

Cupertino

Installation of approximately 1,000 feet of 18 inch reinforced concrete pipe, eight manholes, and drain inlets.

Plans and specs also available for review at Santa Clara Builders Exchange

5/17 at 10AM (Instersection of Cupertino/Foothill)

17-01233

0

2:00 PM6/6/17

Addenda:STORM DRAIN IMPROVEMENTS - FOOTHILL BOULEVARD & CUPERTINO ROAD

2017-10

Prebid Conf:

City of Cupertino 408-777-3354 408-777-3333

Bidders:

San Jose $1,700,000

PAVE NARROW AREAS FROM EDGE OF SHOULDERS TO SOUNDWALLS In Santa Clara County In San Jose At VariousLocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8, C-27.

17-00214

0

2:00 PM6/7/17

Addenda:DOT 04-4G9904 PAVE NARROW AREAS FROM EDGE OF SHOULDERS TO SOUNDWALLS

04-SCl-85-2.0/4.6

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Plan Issuer:

Palo Alto

Remove submerged aquatic vegetation from Boronda Lake and remove cattails in selected areas in order to improve conditions forrecreational fishing and boating while providing aquatic habitat for wildlife. Target species for removal include but are not limited to thecommon cattail (Typha latifolia), Pondweed (Elodea Canadensis), and Water Lilies.

Project Contact: Curt DunnEmail: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/24 at 8AM (3300 Page Mill Rd, Los Altos Hills)

17-01247

0

3:00 PM6/7/17

Addenda:OPEN SPACE TRAILS MAINTENANCE-BORONDA LAKE WEED REMOVAL

168100

Prebid Conf:

City of Palo Alto - DPW 650-329-2271

Bidders:

Plan Issuer:

Palo Alto $5,000,000 $10,000,000

Prepare site for construction operations, including demolition & removal of existing structure, landscapes, site improvements.Renovation to expand Emergency Facilities Department.

Project Contact: Ferdee Gawaran 925-372-2314

Available ONLINE ONLY

5/11 at 12:30PM

17-01013

1

1:00 PM6/8/17

Addenda:EXPAND EMERGENCY DEPARTMENT FACILITIES VA PALO ALTO HEALTH CARE SYSTEM (ONLINE)

VA261-17-B-0330 to

Prebid Conf:

Department of Veterans Affairs

Communications / TechnologyContractor

Fax: 209-239-6290Office: 209-239-6290Video Image Security

General Contractor Fax: 209-249-5301Office: 209-982-9900Patriot Construction

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Sub-Contractor/SpecialtyContractor

Fax: 408-413-4130Office: 408-848-4088R Titus Waterproofing

Page 25: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Bidders:

Plan Issuer:

San Jose

Demolition, clearing and grubbing, tree removal, earthwork and grading, storm drainage, utilities, rigid and flexible paving, irrigation,landscaping, play area with resilient surfacing and synthetic turf, concession/restroom/staff building, maintenance building, securitylighting, sports field lighting, PA system, netted backstops, spectator areas, fencing, natural turf planting, landscape, irrigation, andmiscellaneous site amenities.

Project Contact: Jose Balingit

Available ONLINE ONLY

MAND 5/8 at 10AM (200 E. Santa Clara St., 6th Fl, Rm T644

17-01124

3

3:00 PM6/8/17

Addenda:7620-ARCADIA SOFTBALL FACILITY (ONLINE)

7620

Prebid Conf:

City of San Jose - DPW 408-535-8300

Electrical Contractor Fax: 209-464-2615Office: 209-464-4878Bockmon & Woody Electric Company, Inc.

General Contractor Fax: 916-797-7400Office: 916-757-1000Flint Builders, Inc.

General Contractor Fax: 209-835-9956Office: 209-835-9956Goodland Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

General Contractor Fax: 510-562-5209Office: 510-632-7676McGuire & Hester

General Contractor Fax: 510-526-0990Office: 510-526-3424O.C. Jones & Sons Inc

General Contractor Fax: 408-279-2286Office: 408-279-2277Robert A. Bothman., Inc.

General Contractor Fax: 510-782-6065Office: 510-782-6065Suarez & Munoz Construction, Inc.

General Contractor Fax: 000-000-0000Office: 408-985-7200Verde Design

Sub-Contractor/SpecialtyContractor

Fax: 408-727-7051Office: 408-727-6999Mission City Rebar, Inc

Plan Issuer:

Santa Clara

Installation of electric utility substructures and aerial fiber optic cable and associated site work.

Project Contact: Deborah Barry 408-615-6607Email: [email protected]

Specs also available for review at Santa Clara Builders Exchange

5/31 at 10AM (881 Martin Ave)

17-01303

0

3:00 PM6/14/17

Addenda:ELECTRIC UTILITY SUBSTRUCTURE & AERIAL FIBER OPTIC CABLE MASTER CONSTRUCTIONAGREEMENT (ONLINE)

2004D

Prebid Conf:

City of Santa Clara - Silicon Valley Power 408-615-6604

NEW

Plan Issuer:

Cupertino

Renovations to the E-2 Building, including wall removal and additions, installation of observation windows, modifying mechanical andelectrical systems and adding to the existing electrical distribution, adding data and distribution, and some new finishes.

Available ONLINE ONLY

MAND 5/24 at 1PM

17-01274

0

2:00 PM6/15/17

Addenda:E2/HAAS GRANT DE ANZA COLLEGE - FDACCD (ONLINE)

#1772

Prebid Conf:

Foothill De Anza College District (De Anza) 408-864-5888

NEW

Plan Issuer:

San Jose $130,000

Renovate space for Adaptive PE program, includes accessibility, finishes, and electrical.

Project Contact: Sandy LottEmail: [email protected]

Available ONLINE ONLY

MAND 5/25 at 9AM (Building K)

17-01315

0

2:00 PM6/19/17

Addenda:RELOCATE ADAPTIVE PE SAN JOSE CITY COLLEGE (SJCC) (ONLINE)

G2010.0177

Prebid Conf:

San Jose Evergreen Community College [email protected]

408-270-6431 408-239-8807

NEW

Did you know that we offer free Notary

Page 26: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Santa Cruz County

Plan Issuer:

Santa Cruz

The City of Santa Cruz Water Department is soliciting Statement of Qualifications (SoQs) from consultants, individuals or firms, whoprovide construction management services with a focus on public infrastructure projects, including construction inspection and contractadministration. The City of Santa Cruz Water Department intends to award a one-year contract with options to renew annually forconstruction management services as needed. The purpose of awarding an on-call construction management contract is to augmentWater staff resources implementing Capital Improvement Program projects with a typical value of $1-3 million in scope. A detailedoutline of the Consultant’s potential services is given in Section 6 of the attached RFQ.

17-01111

1

4:00 PM5/22/17

Addenda:ON-CALL CONSTRUCTION MANAGEMENT

City of Santa Cruz 831-420-5327 831-420-5201

Bidders:

Plan Issuer:

Watsonville $260,000

Replace the Trane roof mount Air Handler Unit as per the project drawings and specifications. Base bid; prebalance the system,replace Air Handling Unit and rebalance system to established values. One add alternate for duct cleaning may or may not beexecuted depending on bid results. Reconnect to existing fire alarm system.

PREVAILING WAGE

MAND 5/10 @ 10am- site

17-01116

1

2:00 PM5/22/17

Addenda:WATSONVILLE BUILDING A - AHU REPLACEMENT

B17-15

Prebid Conf:

Cabrillo Community College District 831-477-5613 831-477-5640

General Contractor Fax: 831-728-2460Office: 831-728-2000Airtec Service

General Contractor Fax: 831-459-9297Office: 831-459-9270Cen-Con, Inc.

General Contractor Fax: 831-761-5513Office: 831-761-5511Coastwide Environmental Tech.

General Contractor Fax: 831-423-9903Office: 831-423-9522Geo. H Wilson, Inc.

HVAC Contractor Fax: 999-999-9999Office: 831-524-4484Otavilla Mechanical Contractors, Inc.

Plan Issuer:

Boulder Creek

Replacement of the Boulder Creek Elementary Multi Use Heater and replacement of two heaters at the Redwood Elementary site.

PREVAILING WAGE

MAND 5/11 @ 10am- 400 Lomond St, Boulder Creek

17-01039

0

10:00 AM5/25/17

Addenda:BOULDER CREEK ELEMENTARY AND REDWOOD HEATER REPLACEMENT

17-18-04

Prebid Conf:

San Lorenzo Valley Unified School District [email protected] 831-336-9679 831-336-9531

Plan Issuer:

Aptos $373,000

This project involves the repair of concrete of the interior floors and walls of the Hidden Beach Pump Station and the replacement ofthe roof membrane.

PREVAILING WAGE

MAND 5/11 @ 10am- site

17-01071

0

2:00 PM5/25/17

Addenda:HIDDEN BEACH PUMP STATION CONCRETE REPAIRS

Prebid Conf:

County of Santa Cruz 831-454-2160 831-454-2385

Plan Issuer:

Aptos $160,000

***InFormal Bid******PreQualified Contractors Only***

This project is an HVAC remodel with mechanical upgrades & retrofits to existing HVAC in Bldg 1300. Also includes abatement ofhazardous materials. See plans and specifications for complete details.

PREVAILING WAGE

MAND 5/18 @ 10am- PURCHASING DEPARTMENT BUILDING 2030

17-01257

0

2:00 PM5/31/17

Addenda:BUILDING 1300 HVAC RE-BID

B17-18

Prebid Conf:

Cabrillo Community College District 831-477-5613 831-477-5640

NEW

Page 27: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Scotts Valley

In general, the work to be done under this contract consists of, but not be limited to: Lengthening a westbound left-turn lane, modifyingsignal phasing; installation of bicycle loop detectors, bicycle boxes, Pedestrian signal faces, Accessible Pedestrian Signals (APS),anda Rectangular Rapid Flashing Beacon (RRFB); Reconstruction of a curb return; all other work shown on the Plans, Standard Plans oras required by the Special Provisions and the Standard Specifications. The area of work is: The intersection of Mount Hermon Road,Scotts Valley Drive and Whispering Pines Drive.

PREVAILING WAGE

17-01272

0

10:00 AM6/1/17

Addenda:SCOTTS VALLEY DRIVE/MOUNT HERMON ROAD INTERSECTION IMPROVEMENTS

City of Scotts Valley 831-438-5854 831-439-9748

NEW

Plan Issuer:

Aptos $75,000

Plumbing service and repair at Cabrillo College in Aptos, CA.

INFORMAL BID ***Pre-Qualified Contractors Only***

PREVAILING WAGE

17-01293

0

2:00 PM6/1/17

Addenda:PLUMBING SERVICE & REPAIR

B17-17

Cabrillo Community College District 831-477-5613 831-477-5640

NEW

Plan Issuer:

Aptos $100,000

HVAC service and repair at Cabrillo College in Aptos, CA.

INFORMAL BID ***Pre-Qualified Contractors Only***

PREVAILING WAGE

17-01294

0

1:30 PM6/1/17

Addenda:HVAC SERVICE & REPAIR

B17-16

Cabrillo Community College District 831-477-5613 831-477-5640

NEW

Plan Issuer:

Santa Cruz

The City of Santa Cruz Water Department in coordination with the Soquel Creek Water District and the Scotts Valley Water District, issoliciting Statements of Qualifications from consultants, individuals, or firms who can provide development and implementation of apipe loop study. The purpose of awarding a pipe loop study contract is to evaluate the compatibility of City of Santa Cruz surface waterwith distribution system pipes from neighboring groundwater systems and to provide recommendations to mitigate the potential forcorrosion or other adverse water quality changes. The City intends to award a pipe loop study contract for services that includes thedesign and implementation of a pipe loop corrosion evaluation, recommendations for system corrosion control strategies, andestimated corrosion control system costs.

Candidates will be evaluated on the information presented in the Statements of Qualifications, and a selection may be made from thisevaluation alone. The Scope of Work for the project under the contract will be agreed to between the parties prior to initiation. Thepreliminary estimated cost of the project, as of the date this solicitation is being released, is $500,000.

PREVAILING WAGE

17-01290

0

4:00 PM6/2/17

Addenda:PIPE LOOP STUDY

City of Santa Cruz 831-420-5327 831-420-5201

NEW

Plan Issuer:

Santa Cruz

Submit qualifications to perform an onsite condition survey of the Wastewater Treatment Facility infrastructure and major equipment.Document and analyze asset condition data in detailed asset database. Apply asset risk management strategies to develop long termCapital Improvement and maintenance programs.

17-01110

1

2:00 PM6/7/17

Addenda:DEVELOPMENT OF THE WASTEWATER TREATMENT FACILITY INFRASTRUCTURE AND MAJOREQUIPMENT STUDY

City of Santa Cruz [email protected] 831-420-5425 831-420-5161

Page 28: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Projects Out To BidName Bid Date Time Contract # EstimateLocationOPR#

Plan Issuer:

Capitola

The Capitola Art & Cultural Commission is requesting qualifications from muralists who will be selected to design and produce a muralat the McGregor Multi Use Park. The mural will be painted on the exterior walls of half pipe portion of the Monte Family Skate Park.This park is located on McGregor Road as you enter Capitola and adjacent to New Brighton State Beach Park.

17-01174

0

12:00 PM6/9/17

Addenda:SKATE PARK MURAL

City of Capitola 831-475-7300 831-479-8879

Plan Issuer:

Santa Cruz $600,000 $700,000

The work consists of construction of landscaping and other site improvements at the Bay Reservoir Tank Site, including, but not limitedto:1. Utility potholing2. Provide temporary traffic controls, fencing, and site security during construction3. Provide pollution controls4. Demolition5. Tree removal6. Backfill of abandoned underground vault7. Sorting demolition and grading materials8. Relocation of clean soil, rock, and concrete rubble around site9. Off haul and recycling or disposal of trash, debris, and other misc. materials not to be reused in the finished work.10. Concrete sidewalk, driveway and curb construction11. Asphalt conform repairs12. Furnish and install complete fence system13. Furnish and install irrigation system14. Furnish and install plantings15. Maintain landscape during warranty period

MAND 5/26 @ 1pm- 200 Cardiff Place, Santa Cruz

17-01271

0

2:00 PM6/9/17

Addenda:BAY RESERVOIR TANK SITE LANDSCAPING

2011-001 to

Prebid Conf:

City of Santa Cruz - Water Department 831-420-5211 831-420-5201

NEW

Plan Issuer:

Santa Cruz $115,000

Perform vegetation management in San Lorenzo River and Branciforte Creek.

Project Contact: Tony Lau [email protected]

MAND 6/14 @ 9am- 1125 River Street, Santa Cruz

17-00624

0

2:00 PM7/5/17

Addenda:ANNUAL SAN LORENZO RIVER FLOOD CONTROL MAINTENANCE

Prebid Conf:

City of Santa Cruz 831-420-5160 831-420-5161

Page 29: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 30: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Your Local Plan Room Just Got Better!! STATEWIDE ACCESS

Introducing the Golden State Plan Service

Single Statewide Plan Room - You choose the counties you want to see. No more searching multiple Plan Rooms for projects

Mobile Device Accessible - Take your plan room with you

Your local, community based Exchange has always been the best resource for the local con-struction industry. Now your local exchange just got BETTER and STRONGER. This new

plan room combines 14 of the best exchanges in the state, decades of local plan room experi-ence with our local relationship and resources to bring you the most comprehensive plan

room available. Our plans aren’t uploaded from one central location, rather each exchange cultivates its local relationships to bring the best projects from each region to our contractors.

LOCALLY GROUNDED - STATE POWERED

Keep the Plan Room You Know & Use Your company bidding history & saved projects are preserved Updated Plan Room Platform 2.0 - Increased functionality, ease of use & updated search options. You told us what you wanted - WE IMPROVED

More Private Projects- Our collaboration means more cultivation of private work

Page 31: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Be part of the solut ion, serve

on the Board

Board Openings

There are multiple positions available on the CCBA Board of Directors. If you are interested in serving, please send a letter of intent explaining why you think you would be a good candidate to [email protected] no later than April 30th

Page 32: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 33: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Now you see it, now you don’t? What’s the real news on business names and advertising? I will ‘synthesize’ the answer for a painting contractor, another gets the recipe for ‘proof’ pudding, and we ‘tear down’ the walls to expose the answer on a remediation contractor’s question…

Q: I was told that contractors did not have to put signs on their trucks if they don’t advertise, since a sign constitutes an advertisement. And plumbers, well drillers, and electrical sign installers had to also include their complete address on their truck sign. Your thoughts please?

A: Thank you for contacting Capitol Services. According to B&P Code Section 7029.5, every Plumbing contractor, Sign contractor, and drill rig used for drilling water wells, assuming the vehicle is used in their business and a commercial vehicle registration has been paid, must have his or her business name, permanent business address, and contractor’s license number, all in letters and numerals not less than 1 1/2 inches high, displayed on both sides of their vehicle.

All other contractors not mentioned above shall display their business name and license number in a clearly visible location on the vehicle in print type of at least 72-point font or three-quarters of an inch in height and width. This only applies if the contractor is using the vehicle for their construction business and a commercial vehicle registration fee has been paid.

So in your case, the key would be whether your vehicle(s) are registered as commercial.

Q: I am a Painting contractor with a “C-33” license. Can I install Fiberglass Reinforced Plastic (FRP) panels or do I need a different license?

A: The “C-33” Painting classification would not be appropriate to install FRP’s, the “C-61”/”D12” (Synthetic Products) would be most appropriate.

Q: I am applying for a second contractor’s license in Nevada and when I called the NV Board they informed me that in-order for me to be the Qualifier on more than one license I would need to document

I own at least 25% of each entity. I own 30% of each, but when they say “document”, what should I provide to show my ownership? The certificates of good standing from the Secretary of State don’t mention ownership.

A: For proof of ownership you can provide Stock Certificates, Secretarial Certificates, or the Operating Agreements (assuming they mention ownership). Typically, these are internal documents and not “filed” with any State agencies. I hope this was helpful.

Q: My husband has been working for a water remediation contractor for the past 10 years and wants to obtain his own license for removing drywall from water damaged properties. What type of license is required for removing the drywall only?

A: The “C-61”/”D-64” Non-Specialized classification for Water Remediation is required when water damaged drywall, flooring, baseboard, cabinets, or other wet material is removed from a structure.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services, Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

#

Page 34: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 35: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

City Building PermitsSalinas

Permit No. B16-0590 Permit Amount $25000.00

Owner(s) NAIK BNIPINCHANDRA R & PATEI219 JOHN ST City SALINAS

Builder CORIE CONSTRUCTIONProperty Address SAME Permit Type COMM

Permit No. B16-0609 Permit Amount $2259000.00Owner(s) 1400 CUSTITUTION

1492 CONSTITUTION BLVD City SALINASBuilder ENVISION CONSTRUCTIONProperty Address SAME Permit Type COMM

Permit No. B16-0643 Permit Amount $25000.00Owner(s) FLORES DE LEON ARACELI

1086 SHARON DR. City SALINASBuilder OWNERProperty Address SAME Permit Type RESS

Permit No. B17-0052 Permit Amount $60000.00Owner(s) BLAKEMAN JERRY LEE JR

106 SAN JUAN DR City SALINASBuilder BAGGETT CONSTRUCTIONProperty Address SAME Permit Type RES

Permit No. B17-0099 Permit Amount $110000.00Owner(s) QUINTERO JESSE

1217 CIRCLE DR City SALINASBuilder OWNERProperty Address SAME Permit Type RES ADD

Permit No. B17-0103 Permit Amount $32340.00Owner(s) AVALOS GABRIEL

1249 SAN ANGELO DR. City SALINASBuilder GOURLEY CONSTRUCTIONProperty Address SAME Permit Type RES ADD

Permit No. B17-0206 Permit Amount $40000.00Owner(s) WEST MARKETCENTER

825 W MARKET City SALINASBuilder JEFF PUTNEY CONSTRUCTIONProperty Address SAME Permit Type COM ALT

Permit No. R17-0319 Permit Amount $15000.00Owner(s) HUFFSTETLER MICHAEL

1662 ATHERTON WY City SALINASBuilder MONTEJANO ROOFINGProperty Address SAME Permit Type REROOF

Page 36: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 37: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Bid ResultsBid Results 5/22BB Boulder Creek 5/4 Reroof Redwood Charter Admin. Building Alameda Roofing apparent low Santa Cruz Co. 5/9 Destruction of Five Production Wells - Aptos, Capitola & Soquel Maggiora Bros. Drilling, Inc. apparent low Carmel 5/9 District Office Modifications at CUSD District Office Property Restoration Services $632,184 Kent Construction $635,606 Carmel 5/10 Gymnasium Exterior Painting at Carmel High School A Plus Painting $44,800 Athens Painting & Commercial Coating, Inc. $49,400 Speed Boy Painting $58,888 Carmel 5/10 Roof Replacement at Carmel High School Scudder Roofing $299,950 Legacy Roofing $369,589 Carmel 5/10 Roof Replacement at Carmel Middle School Scudder Roofing $74,180 Legacy Roofing $118,210 Carmel 5/10 Roof Replacement at Carmel River School Scudder Roofing apparent low Santa Cruz 5/10 Student Housing Telecommunications Upgrades College 9 & 10 3D Datacom $749,547 Wulff Electric $897,200 Sand City 5/10 Hickory Street Improvement Monterey Peninsula Engineering apparent low Salinas 5/12 Polyester Concrete Bridge Deck Overlay & Methacrylate Bridge Deck American Civil Constructors West Coast, Inc. apparent low Monterey Co. 5/16 NMCUSD Annual Painting of Classrooms – Summer 2017 Speed Boy Painting $53,880 Jeff Painting $58,000 Color New Co. $163,000

Page 38: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 39: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Notice of Completion

Mechanic’s Liens

Release of Lien

DATE GRANTOR GRANTEE CITY 05/08 BMC EG VILLAGE SAME EAST GARRISON 05/08 DEL MONTE PAUL DANIELS CONSTRUCTION CARMEL05/09 BMC EG GROVE SAME EAST GARRISON 05/10 BMC EG GROVE SAME EAST GARRISON 05/10 NINO HOMES AT ARBOLEDA NINO DEVELOPMENT KING CITY 05/10 BMC EG BLUFFS SAME EAST GARRISON 05/11 SOLEDAD 93 SAME SOLEDAD 05/11 CASAVERDE ASSOCIATES ICON BUILDING & DEV. MONTEREY 05/11 COUNTY OF MONTEREY PUEBLO CONSTRUCTION MONTEREY05/12 BMC EG BUNGALOW SAME EAST GARRSION

DATE CREDITOR DEBTOR AMOUNT 05/10 CINDERELLA CARPET ONE MARKET ST. PROPERTIES $15441.90

NONE THIS WEEK

Page 40: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 41: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo
Page 42: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Classified Ads

Page 43: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

Safety Tip of the WeekPROTECTIVE FOOTWEAR

Today we are going to talk about protective footwear. You may or may not have given this much thought. Dressing right for work is similar to dressing right for sports -- no professional football player would take the field wearing dress shoes. Wearing the right shoes will help you do a better job; and do it more safely. The first thing to think about is the type of foot protection you are going to need. Construction work requires you to walk, stand, bend, stoop and climb; therefore it is imperative that you wear sturdy, comfortable footwear. Leather shoes and boots provide the best protection. Tennis shoes, sandals and flip-flops are not acceptable footwear on a construction site. Remember, your feet and toes are made up of many small bones, and just one object dropped on your foot can cause a serious, painful injury.

Another potential jobsite injury ran occur by stepping on a nail or other sharp object. A protruding nail YAII puncture the top, side or sole of your boot in a split second I you are not careful. Safety boots come equipped with steel toes, heavy duty leather uppers and steel shanks to help prevent puncture wounds. Your footwear should fit your feet snugly and give your ankles adequate support. Good support will help prevent you from turning or twisting an ankle while moving around the job site.

Take a look at your feet right now. Are you wearing the right footwear for the job you are doing today? If you are working around protruding nails or other sharp objects, you should be wearing leather work boots with good soles. Are you working in concrete? If so, you need to be wearing rubber boots. Wet concrete on your feet will cause concrete turns. Make sure you wash your feet and put on a pair of clean socks if your feet come in contact with wet concrete. In cold weather it is important to keep your feet warm. Wear a comfortable pair of warm socks and keep a second pair available in case your feet get wet during the day. Get the message? Your feet take a beating every day. Make their job a little easier by wearing the right footwear

SAFETY FOOTWEAR HELPS YOU AT WORK, DON'T FORGET TO PROTECT YOUR FEET OFF THE JOB AS WELL.

Safety Recommendations:__________________________________________________________________________________

Job Specific Topics:_______________________________________________________________________________________

M.S.D.S Reviewed:_____________________________________________________________________________________

Attended By:

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

_____________________________________________________________________________________________

Page 44: Builders Bulletin - CCBA · 5/23/17 Cupertino Calabazas Creek/Tantau Avenue Sanitary Sewer Rehabilitation Project - Cupertino Sanitary District ... 5/25/17 2:00 PM San Luis Obispo

The Flyers Fuel Program offers member discounts of 2-5 cents per gallon at over 240,000 gas stations throughout the United States. In addition, you can utilize their Fleet Management System that helps members control costs, set limits on fuel services, and streamline reporting. Contact Irish Chapman to sign up today to sign up or to get your free fuel cost analysis.

• 5 cents per gallon discount at CFN sites