Republic of the PhilippinesDEPARTMENT OF LABOR AND EMPLOYMENT
Intramuros, Manila
2013 BUB STATUS OF IMPLEMENTATION
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
National Capital Region
Capability Building for the Protection of the Small &
Medium Scale Enterprises and Informal Sector
Caloocan 560 574 140,000.00 140,000.00 Completed
Policy Development PWD Employment in Different
Establishments
Formation of Two (2) Cooperatives
Marikina
50
100
50
100
50,750.00
262,250.00
50,750.00
262,250.00
Completed
Special Program for the Employment of Students and
Out of School Youth of Quezon City (Replacement project for Skills Registry
Project/Formation of Worker’s Guilds)
Quezon City 388 388 2,525,000.00 2,525,000.00 Completed
Jobs Fair Muntinlupa Variable 1,278 300,000.00 300,000.00 Completed
NCR Sub Total - 560 3,278,000.00 753,000.00
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
DOLE- Region I
Nego Kart Project Bauang, La Union 17 21 310,000.00 310,000.00 Projects were launched on July 16, 2013Goat Breeding Bauang, La Union 363 363 120,000.00 120,000.00
2 Bancas and Fishing Paraphernalia
Bauang, La Union 25 47 200,000.00 -On the process of completion of documentary requirements
2 Bancas and Fishing Paraphernalia
Bauang, La Union 54 54 200,000.00 -
Turmeric (Yellow Ginger) Processing
Bauang, La Union 25 27 170,000.00 -
RO 1 Sub Total 484 512 1,000,000.00 430,000.00
DOLE-Cordillera
Administrative Region (CAR)
Repair/Rehabilitation of Various Irrigation System
Talubin, Bontoc, Mountain Province
67 Still to be reported
300,000.00 - On-going project
Construction of Single Barrel Box Culvert
Brgy. Turod, Luna, Apayao 70 Still to be reported
91,439.00 - On-going project
Construction of 2 Lines Road Cross Drains
Capagaypan Road, Brgy. Poblacion, Luna, Apayao
44 Still to be reported
44,424.50 - On-going project
Construction/Rehabilitation of Canal Lining
Brgy. Poblacion Luna, Apayao
42 9 164,136.50 164,136.50
Individual check prepared, ready for
releaseConstruction of Canal Lining Purok Sampaguita, brgy. Poblacion, Luna, Apayao
CED on Handicraft Production and Loom Weaving
Poblacion, Luna, Apayao 60 60 500,000.00 500,000.00 Livelihood Assistance released thru DOLE Apayao
Satellite OfficeCAR Sub Total 283 69 1,100,000.00 664,136.50
DOLE- Region 4A
Promotion and Development of a Sustainable Bamboo and Waterlily Industry in Cardona through the Establishment of Bamboo Primary Processing
Centers and Waterlily Livelihood Project (A Shared
Service Facility)
LGU Cardona 377 (F-229) - 1,000,000.00
For endorsement of project proposal with complete documents to the RO from RPO
Luntiang Arenda Project (Waterlily Handicraft, Organic Farming, Livestock, Fishcage,
Homecare products
For identification of qualified ACP as DOLE’s partner in the implementation of the project
25 CSOs - 6,000,000.00
The LGU Taytay is not a recipient of Seal of Good Housekeeping which
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Production) is one of the BuB requirements.
SMAW NC II Training Program
LGU Real 80 - 200,000.00
Awaiting for the approval of the SB Resolution authorizing the LCE to sign into a MOA with DOLE.
RO 4A Sub Total 482 - 7,200,000.00 -
DOLE- Region 4B
Handicrafts MakingLGU- Naujan/Sitio Cido, Brgy.
Caburo, Naujan Oriental Mindoro
60 70,000.00 70,000.00 For release
Banana/Cassava Chips Production
LGU Naujan/Brgy. Talon Motoderazo, Naujan, Oriental
Mindoro50 157,000.00 157,000.00 For release
Sack Production LGU Naujan/Brgy. Santiago, Naujan, Oriental Mindoro 131 350,000.00 350,000.00 For release
Organic Fertilizer LGU Naujan/Brgy. Santiago, Naujan, Oriental Mindoro 507 350,000.00 350,000.00 For release
Hollow Blocks MakingLGU Naujan/Brgy. General Escosoro, Naujan, Oriental
Mindoro 64 250,000.00 250,000.00
Obligated/submission of lacking
documentary requirements
Soap Making LGU Naujan/Brgy. San Andres, Naujan, Oriental Mindoro 15 150,000.00 150,000.00 For Obligation
RO 4B Sub Total - 827 1,327,000.00 1,327,000.00
DOLE- Region 5
Livelihood Economic Development Project
(Coco Fiber Twinning Project)
LGU Guinobatan, Albay 150 - 1,500,000.00 - Preparatory Stage
LGU not qualified due to no Seal of Good Housekeeping (SGH). Project to be implemented through Direct Administration by DOLE- Albay.
Program orientation was conducted for the
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
beneficiaries.
Documents on process subject for submission on May 24, 2013.
Entrepreneurs and Employment (Bamboo Handicraft Production)
LGU Bato, Camarines Sur 38 - 1,000,000.00 -
Preparatory Stage
Project Proposals were returned to LGU Proponent for revision based on the prescribed format.
Provision of Livelihood Trainings LGU Bula, Camarines Sur - - 1,000,000.00 - Proposal for revision
Technical and Vocational Program (Manpower and Livelihood Devt. Program)
LGU Iriga City, Camarines Sur - - 4,500,000.00 -
Preparatory Stage
For submission. Complying with liquidation of previous project.
IntegratedLivelihood Employment Program
(Shared Service Facility/Tools for OTOP Softbroom Making)
LGU Lagonoy, Camarines Sur 62 - 500,000.00 -
Preparatory Stage
For revision.
Livelihood Assistance to SACADA (Goat Dispersal) LGU Pili, Camarines Sur 250 - 1,000,000.00 -
Not yet started
With new LCE. For reorientation.
Livelihood Assistance cum Training LGU Sipocot, Camarines Sur - - 400,000.00 -
Not yet started
Provision for Trainings for Additional Livelihood
Opportunities:
DKSKNego Kart
Common Service Facility
LGU Labo, Camarines Norte
25050
200
-
1,750,000.00750,000.00
2,520,000.00
- Preparatory Stage
All projects for finalization and submission of documentary requirements.
Provision of Alternative Source of Livelihood: DOLE
LGU Mercedes, Camarines Norte
171 1,197,000.00 - Preparatory Stage
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Kabuhayan Starter Kit
All projects for finalization and submission of documentary requirements.
Nego Kart LGU Mercedes, Camarines Norte 50 750,000.00 -
Production of Organic Fertilizer
LGU Mercedes, Camarines Norte 40 46,075.00 -
Provision of Floating Fish Cages for Grouper to the
Local Divers
LGU Mercedes, Camarines Norte 20 726,990.00 -
Garments Production LGU Mercedes, Camarines Norte 15 349,935.00 -
Installation of Municipal Fish Aggregating Device
LGU Mercedes, Camarines Norte 100 1,930,000.00 -
Emergency Employment Assistance/Cash for Work
Program on Brgy. Infrastructure Maintenance
LGU Sorsogon City 1,960 - 4,900,000.00 -
On going
LGU not qualified due to no Seal of Good Housekeeping (SGH). Project to be implemented through Direct Administration by DOLE- Sorsogon. For implementation July-Aug. 2013.
Conduct of Skills/Livelihood/ Entrepreneurship and Products Development
LGU Bulan, Sorsogon - - 1,000,000.00 -
Preparatory Stage
With new LCE but committed to push through with the project.
Livelihood Integrated Development program LGU Juban, Sorsogon - - 1,700,000.00 -
Not yet started
With new LCE and PESO. For follow-up.
Establishment of Manpower Development Center LGU Matnog, Sorsogon - - 1,300,000.00 -
Not yet started
Invited LGU for a consultative meeting with DOLE last May 5, 2013. LGU did not appear in the meeting.
Livelihood and Entrepreneurship
LGU Pto. Diaz, Sorsogon - - 1,000,000.00 - Not yet started
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Development Program/Project
Submitted proposal which is construction of a building for training center which is not within the menu of DOLE. Awaiting for the recommendation of the new elected LCE.
SPES LGU Pandan, Catanduanes - - 80,000.00 -
Preparatory stage
With initial 20 beneficiaries. For completion of the 30 target beneficiaries. For submission of proposal.
RO 5 Sub Total 3,356 - 29,500,000.00 -
DOLE- Region 6
Cleaning and Clearing of Open Canals and Waterways
LGU-Brgy. To-oy, Himamaylan City, Negros Occidental 60 - 249,300.00 -
Check is pending for release due to COMELEC or election ban
Cleaning and Clearing of Open Canals and Waterways
LGU-Brgy. Aguisan, Himamaylan City, Negros
Occidental60 - 249,300.00 -
Check is pending for release due to COMELEC or election ban
Cleaning and Clearing of Open Canals and Waterways
LGU-Brgy. Sara-et, Himamaylan City, Negros Occidental 60 - 249,300.00 -
Check is pending for release due to COMELEC or election ban
Cleaning and Clearing of Open Canals and Waterways
LGU-Brgy. Caradio-an, Himamaylan City, Negros
Occidental60 - 249,300.00 -
Check is pending for release due to COMELEC or election ban.
Cleaning and Clearing of Open Canals and Waterways
LGU- Himamaylan City, Negros Occidental 240 - 997,200.00 -
Proposal is approved in principle subject to submission of pertinent documents.
Skills Training on Plumbing, Tile Setting & CP Repair
LGU- Bago City, Negros Occidental 75 - 800,000.00
- Proposal is approved in principle subject to submission of pertinent documents.
Goat Production LGU- Brgy. Pantao, Calatrava 40 - 400,000.00 - Proposal is approved in principle subject to
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
submission of pertinent documents.
Goat Production LGU- Brgy. Malatas, Calatrava 40 - 400,000.00- Proposal is approved in
principle subject to submission of pertinent documents.
Goat Production LGU- Brgy. Winaswasan, Calatrava 40 - 400,000.00
- Proposal is approved in principle subject to submission of pertinent documents.
Goat Production LGU- Brgy. Cambayobo, Calatrava 40 - 400,000.00
- Proposal is approved in principle subject to submission of pertinent documents.
Pedicab Livelihood Program LGU- Calatrava 40 - 480,000.00- Proposal is approved in
principle subject to submission of pertinent documents.
TCP on Hollow Blocks Making LGU- Brgy. Suba, Calatrava 50 - 500,000.00 -Proposal is approved in principle subject to submission of pertinent documents.
TCP on Hollow Blocks Making LGU- Brgy. Minapasok, Calatrava 25 - 250,000.00 -
Proposal is approved in principle subject to submission of pertinent documents.
TCP on Hollow Blocks Making LGU- Brgy. Tigbao, Calatrava 25 - 250,000.00 -
Proposal is approved in principle subject to submission of pertinent documents.
Community Infrastructure Rehabilitation and
ConstructionLGU- Calatrava 40 - 243,760.00 -
Proposal is approved in principle subject to submission of pertinent documents.
Developing Diversified Livelihoods for the Sugarcane plantation Workers and other Disadvantaged Households of
Murcia Negros Occidental
LGU Murcia, Negros Occidental 154 - 935,942.00 -
Proposal is approved in principle subject to submission of pertinent documents.
RO 6 Sub Total 1,049 - 7,054,102.00 -DOLE Region
8Livelihood Projects: San Isidro, Northern Samar 45 2,900,000.00
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Organic Vegetable Production
Cassava Production
Hybrid Rice Production
Corn Production
Brgys. Palanit, Mabuhay, Alegria Seven Hills, Veriato, San Roque, san Juan, Salvacion
Brgys. Palanit, Balite, Alegria Seven Hills, Happy Valley, San Roque, San Juan, Poblacion Norte
Poblacion Sur, Poblacion Norte, Brgy. San Juan, Brgy. Palanit
Brgys. Palanit, Balite, Alegria Seven Hills, Happy Valley, San Roque, San Juan
100
15
100
206,225.00
440,000.00
271,050.00
659,800.00
Due for release
Due for release
Due for release
Due for release
Livelihood Projects Hilongos, Leyte 1,980,000.00 No proposal submitted yet to the RPMT. However, PFO are working closely with the LGU for the submission of the proposal under the BuB.
Livelihood Projects Zumaraga, Samar
500,000.00
RO 8 Sub Total 260 2,900,000.00 1,577,075.00
DOLE Region 9
Livelihood and Emergency Employment Program for Displaced Workers
A. Emergency EmploymentLGU- Zamboanga City(thru:CSWDO/PESO)
300 60
5,000,000.00
499,800.00
Pre-implementation PhaseB. Livelihood Formation for
Skilled and Unskilled Displaced Workers (Kabuhayan Starter Kits)
C.
230 46 489,440.00
Kabuhayan Starter Kits LGU- SominotZamboanga del Sur - 16 125,000.00 125,000.00 Pre-implementation
PhaseRO 9 Sub Total 530 126 5,125,000.00 1,114,240.00
DOLE Region 10
Bangus-Based Fish Production
LGU- Tubod, Lanao del Norte 155 150 1,780,000.00 1,780,000.00 Turned over the check to LGU on July
2, 2013.
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Livelihood Projects: Ginger Production; Food Processing; Goat Raising; Vegetable Production; Bamboo Production;; Emergency Employment
LGU- Baungon, Bukidnon
Emergency Employment for Displaced Workers
Livelihood Projects -Ginger Production -Fish Water Production -Goat Raising -Bamboo Production
230
105
12530504542
215
100
1152546440
2,700,000.00
500,000.00
2,200,000.00788,000.00
440,000,000672,000.00300,000.00
2,400,000.00
500,000.00
1,900,000.00788,000.00440,000.00672,000.00
0 The proposal is being revised
Livelihood Program for Displaced Workers (DW)
LGU- Valencia City, Bukidnon 116 - 1,000,000.00 -
On preparation stageEmergency Employment Program for Displaced
Workers
LGU- Valencia City, Bukidnon 116 - 1,000,000.00 -
Livelihood and Emergency Employment Program for
Displaced Workers
LGU- San Fernando, Bukidnon 30 - 200,000.00 - On the process of preparing the project proposal and other requirements.
Skills Training on the Production of Tiger Grass and
Processing into Soft Broom
LGU- Quezon, Bukidnon 41 41 250,000.00 250,000.00 On the process of preparing the project proposal and other requirements.
Starter Kits for Massage Therapist
LGU- Malaybalay, Bukidnon 80 80 400,000.00 400,000.00
Fish Vending; Additional Capital to Marginal Market Vendors and Habal-habal
Drivers; Rice Trading; Parish Youth Canteen; Displaced
OFWs Pangkabuhayan Fund
LGU- Sapang Dalaga, Misamis Occidental
-Livelihood Assistance -Rice Trading -Canteen Services -Banana Production -Meat Processing
153
2525285025
158
2029305425
800,000.00
100,000.00200,000.00100,000.00200,000.00200,000.00
800,000.00
100,000.00200,000.00100,000.00200,000.00200,000.00
RO 10 Sub Total 1,666 - 8,130,000.00 -
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
DOLE- Region 11
Emergency Employment Maco, Compostela Valley Province 100 165 499,999.00
870,000.00
Fully implemented:
Provided employment and livelihood assistance to survivors of Typhoon Pablo.
Livelihood Assistance for the Brgy. Council of Women and
& other Informal Sector
Maco, Compostela Valley Province 74 74 370,001.00
Emergency Employment and Livelihood Assistance San Isidro, Davao del Norte 580 441 2,900,000.00 1,494,990.00
Balance will be used for Livelihood Projects.
Candle Making & Furniture Making Enhancement Caraga, Davao Oriental 30 - 150,000.00 - For Implementation
Emergency Employment Lupon, Davao Oriental 50 - 250,000.00 - For Implementation
Emergency Employment and Livelihood Assistance Malita, Davao del Sur 400 - 2,000,000.00 - For Implementation
RO 11 Sub Total 1,234 680 6,170,000.00 2,364,990.00
DOLE Region 12
Starter Kits to support Small Business formation/DOLE Kabuhayan Nego-Kart for
Ambulant Vendors
Municipality of malapatan, Sarangani Province 120 700,000.00
Fund not yet released
For release on the month of August 2013
Emergency Employment for Diaplaced Workers
Municipality of Lebak, Sultan Kudarat province 100 500,000.00 Fund not yet
release-d
For release on the month of August 2013
RO 12 Sub Total - 220 1,200,000.00
DOLE Region 13
SPES Employment LGU- Dinagat PDI 20 - 100,000.00 -Livelihood and Emergency Employment Program for
Displaced WorkersLGU- Hinatuan, Surigao del Sur 158 158 500,000.00 500,000.00 Implemented
Livelihood and Emergency Employment Program for Displaced Workers (Fish
Culture Production)
LGU- Lianga, Surigao del Sur 90 90 577,000.00 577,000.00 Implemented
Skills and Manpower Development cum Livelihood
Project
LGU- Buenavist, Agusan del Norte
220 - 1,145,000.00 - For submission of complete documentary requirements
Regional Office Name of Project
Project Partner(Local Government Unit/
Barangay)
No. of Beneficiaries Budget for the Project Status of Implementation/
RemarksTarget Total Allocated (P) Utilized (P)
Provision of Livelihood for the Displace Workers in the
Forestry Sectors and its Allied Economic Activitires
LGU- Butuan City 100 - 7,150,000.00 -
For submission of complete documentary requirements.
Bamboo Nursery and Plantation, Enhancement of
Capitalization of Existing Broiler Production of Villa Ecleo Youth Association
LGU- Basilisa PDI50
- 300,000.00 300,000.00
For submission of complete documentary requirements.
Enhancement of Capitalization of Existing
Catering Services of BLGU- MOC, Enhancement of
Capitalization of Existing Egg Layer Production of Sering
Youth Assocition
Fish Culture LGU- San Jose, PDI 40 - 200,000 200,000.00
For submission of complete documentary requirements.
RO 13 Sub Total 678 - 9,972,000.00 1,577,000.00DOLE-ARMM Lumba-Bayabao, Lanoa del Sur - - 1,500,000.00 - To be downloaded to
DOLE RO 12 for full implementation
Parang, Maguindanao - - 5,770,000.00 -
ARMM Total 7,270,000.00*
GRAND TOTAL 9,762 2,014 83,956,102.00 9,054,441.5
*funds released from DBM to the Central Office