TEST SCHEDULE GSM PHASE V – BSC, OMC-R, TC Document No TD/NS/GSM/Phase V.1/ ITI /TS/1602 No of Pages 8 Issue No. I Issued By: T&D Circle, Jabalpur Approved By: CGM T&D Circle Date of Issue: 15.01.09 Amendment No (If Any) No of Pages: Issued by: Date of Issue: T & D CIRCLE, JABALPUR “FIX IT RIGHT AT THE FIRST INSTANCE”

BSNL BSC_JMN1.doc

  • Upload
    mgraj7

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BSNL BSC_JMN1.doc

TEST SCHEDULE

GSM PHASE V – BSC, OMC-R, TC

Document No TD/NS/GSM/Phase V.1/ ITI /TS/1602No of Pages 8

Issue No. I

Issued By: T&D Circle, Jabalpur

Approved By: CGM T&D Circle

Date of Issue: 15.01.09

Amendment No (If Any) No of Pages:

Issued by:

Date of Issue:

Restricted use by BSNL Employees only

T & D CIRCLE, JABALPUR

“FIX IT RIGHT AT THE FIRST INSTANCE”

Page 2: BSNL BSC_JMN1.doc

TECHNICAL AND DEVELOPMENT CIRCLE

JABALPUR

GSM PHASE V.1 (ITI)

BSS TEST SCHEDULE

1

TEST SCHEDULE FOR GSM PHASE V.1

TEST SCHEDULE FOR BSS (ITI)

PART A

BSS

INFRASTRUCTURE TEST

PART B PRE SWITCH ON TEST

PART C POST SWITCH ON TEST

1. BSC

2. 0MC-R

3. TRANSCODER

TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 1 of 8 Issue –I Dated 15.01.09

Page 3: BSNL BSC_JMN1.doc

TECHNICAL AND DEVELOPMENT CIRCLE

JABALPUR

GSM PHASE V.1 (ITI)

BSS TEST SCHEDULE

TEST SCHEDULE

PART A. INFRASTRUCTURE TEST SITE Name ----------------------

S.No.TEST DESCRIPTION TEST PROCEDURE /

REFERENCE REMARKS

1 Raised floor and False ceiling or Antistatic flooring (as provided)

EI- AT-7010 (Digital E 10B)

2 Layout & floor Plan with Trunking and Dimensioning diagram

As per approved layout plan

3 Lighting and Power outlets

4 Check of earthing systems and its distribution as per Earth layout plan.

EI – Protection Earthing I-001 Issue III Dated 30.04.05

Earth resistance value should be £ 0.5 ohm

5 Check of Fire Detection System EI Protection – Fire AT – 7000

6 A.C. Plant EI Building AC T0002, T0003

7 Engine Alternator As per E/A test schedule

8 Power Plant & Batteries & Inverter/UPS

As per T & D test schedule

PART B PRE SWITCH ON TEST

1 Location, Alignment & Rigidity (LAR) As per Approved plan

2 Cable laying & Terminations & marking on cables

Visual check as per cable diagram

3 Voltage drop test for DC input for system operating on DC,For AC systems, the proper gauge of cable is to be ensured with proper circuit breakers.

Voltage drop < 1V from Battery point to equpt. input

4 QA certificate of all equipment For imported items factory test report is to be submitted

TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 2 of 8 Issue –I Dated 15.01.09

Page 4: BSNL BSC_JMN1.doc

TECHNICAL AND DEVELOPMENT CIRCLE

JABALPUR

GSM PHASE V.1 (ITI)

BSS TEST SCHEDULE

5 Check of Documentation, Hard / soft copy.

As per P.O. Latest version documentation with certificate.

6 DDF: LAR, Cable laying and check of protective devices & earthing

Visual check as per DDF layout

7 General Check points Visual check, sign writing etc.

8 Connectivity diagram Connectivity diagram of all elements of BSC

PART C (I) BSC TEST

S.No. TEST ITEM REFERENCE REMARK

1Hardware Conformity Check Doc Ref no.: 3BK

17422 3122 RJZZA page No 8 & 9.

2 Software Conformity Checks Doc Ref no.: 3BK 17422 3122 RJZZA page No 24.

3 Start up of the BSC with 3.1 System Power OFF/ ON 3.2 Command from OMC-R3.3 Backup and Restoration Test

AI-TECH-WI013AI-TECH-WI014AI_TECH_WI023

4 Network synchronization Test N/A 5 Functionality Check Doc Ref no.: 3BK

17422 3122 RJZZA page No 18 & 21.

5.1 Location Update AI-TECH-WI024

5.2 Mobile originated / Mobile terminated calls AI-TECH-WI024

5.3 SMS Calls AI-TECH-WI024

5.4 Intra BSC Handover AI-TECH-WI024 Verify call handover in Inter BTS

6.5 GPRS, EGPRS & MMS Testing AI-TECH-WI024

TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 3 of 8 Issue –I Dated 15.01.09

Page 5: BSNL BSC_JMN1.doc

TECHNICAL AND DEVELOPMENT CIRCLE

JABALPUR

GSM PHASE V.1 (ITI)

BSS TEST SCHEDULE

7 BTS ManagementCheck that BSC supports various BTS configuration

AL-TECH-WI021

8 Diagnostic Tests Doc Ref no.: 3BK 17422 3122 RJZZA page No 18 & 21.

Verify & check the successful completion report.

9 Redundancy Test

Check that system has hot standby redundancy of processors

AL-TECH-WI020Should follow ALU Document

10 Alarm Handling and Recovery

i) System Alarm

ii) Tx Link alarm

iii) Infrastructure Alarm

AL-TECH-WI022

Verification of proper functioning of Internal and external alarms.

11 OMC-R Related Tests 3BK 17422 3122 RJZZA Ed04 Sec: 2.6.2

Verify the accessibility of BSC from OMC

12 Support of Encryption - Ciphering

AL-TECH-WI021Verify the setting of Algorithm

13 Subscriber Identity Confidentiality- TMSI generation

N/A

14 Inter working with LBS Verify that LBS is integrated

15 Check the interface of BSC to CBC should be x.25/TCPIP- SMS Cell broadcast AI-TECH-WI024

Verify that a message can be transmitted to several cell simultaneously as defined by operator/user

16 BSC PCM Loop Back Test AL-TECH-WI022

Verify loop back of 10% termination of each tag block in DDF

17 Test of Codec’s17.1 Call on enhanced full rate17.2 Call on full rate17.3 Call on Adaptive Multi Rate

AI-TECH-WI024

Ensure that pools for FR, EFR, AMR exists

18 Password management OMCR Related test.

User and terminal measurement. Check

TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 4 of 8 Issue –I Dated 15.01.09

Page 6: BSNL BSC_JMN1.doc

TECHNICAL AND DEVELOPMENT CIRCLE

JABALPUR

GSM PHASE V.1 (ITI)

BSS TEST SCHEDULE

of user domain securityVerify creation / modification / deletion of Users & service authorization of user

19 Signalling Link Management AI-TECH-WI025

Verify Link redundancy

20 Check that it is possible to display number of calls and occupancy for a given group of circuit/devices

AI-TECH-WI015

21 Check System status AI-TECH-WI022

TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 5 of 8 Issue –I Dated 15.01.09