TEST SCHEDULE
GSM PHASE V – BSC, OMC-R, TC
Document No TD/NS/GSM/Phase V.1/ ITI /TS/1602No of Pages 8
Issue No. I
Issued By: T&D Circle, Jabalpur
Approved By: CGM T&D Circle
Date of Issue: 15.01.09
Amendment No (If Any) No of Pages:
Issued by:
Date of Issue:
Restricted use by BSNL Employees only
T & D CIRCLE, JABALPUR
“FIX IT RIGHT AT THE FIRST INSTANCE”
TECHNICAL AND DEVELOPMENT CIRCLE
JABALPUR
GSM PHASE V.1 (ITI)
BSS TEST SCHEDULE
1
TEST SCHEDULE FOR GSM PHASE V.1
TEST SCHEDULE FOR BSS (ITI)
PART A
BSS
INFRASTRUCTURE TEST
PART B PRE SWITCH ON TEST
PART C POST SWITCH ON TEST
1. BSC
2. 0MC-R
3. TRANSCODER
TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 1 of 8 Issue –I Dated 15.01.09
TECHNICAL AND DEVELOPMENT CIRCLE
JABALPUR
GSM PHASE V.1 (ITI)
BSS TEST SCHEDULE
TEST SCHEDULE
PART A. INFRASTRUCTURE TEST SITE Name ----------------------
S.No.TEST DESCRIPTION TEST PROCEDURE /
REFERENCE REMARKS
1 Raised floor and False ceiling or Antistatic flooring (as provided)
EI- AT-7010 (Digital E 10B)
2 Layout & floor Plan with Trunking and Dimensioning diagram
As per approved layout plan
3 Lighting and Power outlets
4 Check of earthing systems and its distribution as per Earth layout plan.
EI – Protection Earthing I-001 Issue III Dated 30.04.05
Earth resistance value should be £ 0.5 ohm
5 Check of Fire Detection System EI Protection – Fire AT – 7000
6 A.C. Plant EI Building AC T0002, T0003
7 Engine Alternator As per E/A test schedule
8 Power Plant & Batteries & Inverter/UPS
As per T & D test schedule
PART B PRE SWITCH ON TEST
1 Location, Alignment & Rigidity (LAR) As per Approved plan
2 Cable laying & Terminations & marking on cables
Visual check as per cable diagram
3 Voltage drop test for DC input for system operating on DC,For AC systems, the proper gauge of cable is to be ensured with proper circuit breakers.
Voltage drop < 1V from Battery point to equpt. input
4 QA certificate of all equipment For imported items factory test report is to be submitted
TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 2 of 8 Issue –I Dated 15.01.09
TECHNICAL AND DEVELOPMENT CIRCLE
JABALPUR
GSM PHASE V.1 (ITI)
BSS TEST SCHEDULE
5 Check of Documentation, Hard / soft copy.
As per P.O. Latest version documentation with certificate.
6 DDF: LAR, Cable laying and check of protective devices & earthing
Visual check as per DDF layout
7 General Check points Visual check, sign writing etc.
8 Connectivity diagram Connectivity diagram of all elements of BSC
PART C (I) BSC TEST
S.No. TEST ITEM REFERENCE REMARK
1Hardware Conformity Check Doc Ref no.: 3BK
17422 3122 RJZZA page No 8 & 9.
2 Software Conformity Checks Doc Ref no.: 3BK 17422 3122 RJZZA page No 24.
3 Start up of the BSC with 3.1 System Power OFF/ ON 3.2 Command from OMC-R3.3 Backup and Restoration Test
AI-TECH-WI013AI-TECH-WI014AI_TECH_WI023
4 Network synchronization Test N/A 5 Functionality Check Doc Ref no.: 3BK
17422 3122 RJZZA page No 18 & 21.
5.1 Location Update AI-TECH-WI024
5.2 Mobile originated / Mobile terminated calls AI-TECH-WI024
5.3 SMS Calls AI-TECH-WI024
5.4 Intra BSC Handover AI-TECH-WI024 Verify call handover in Inter BTS
6.5 GPRS, EGPRS & MMS Testing AI-TECH-WI024
TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 3 of 8 Issue –I Dated 15.01.09
TECHNICAL AND DEVELOPMENT CIRCLE
JABALPUR
GSM PHASE V.1 (ITI)
BSS TEST SCHEDULE
7 BTS ManagementCheck that BSC supports various BTS configuration
AL-TECH-WI021
8 Diagnostic Tests Doc Ref no.: 3BK 17422 3122 RJZZA page No 18 & 21.
Verify & check the successful completion report.
9 Redundancy Test
Check that system has hot standby redundancy of processors
AL-TECH-WI020Should follow ALU Document
10 Alarm Handling and Recovery
i) System Alarm
ii) Tx Link alarm
iii) Infrastructure Alarm
AL-TECH-WI022
Verification of proper functioning of Internal and external alarms.
11 OMC-R Related Tests 3BK 17422 3122 RJZZA Ed04 Sec: 2.6.2
Verify the accessibility of BSC from OMC
12 Support of Encryption - Ciphering
AL-TECH-WI021Verify the setting of Algorithm
13 Subscriber Identity Confidentiality- TMSI generation
N/A
14 Inter working with LBS Verify that LBS is integrated
15 Check the interface of BSC to CBC should be x.25/TCPIP- SMS Cell broadcast AI-TECH-WI024
Verify that a message can be transmitted to several cell simultaneously as defined by operator/user
16 BSC PCM Loop Back Test AL-TECH-WI022
Verify loop back of 10% termination of each tag block in DDF
17 Test of Codec’s17.1 Call on enhanced full rate17.2 Call on full rate17.3 Call on Adaptive Multi Rate
AI-TECH-WI024
Ensure that pools for FR, EFR, AMR exists
18 Password management OMCR Related test.
User and terminal measurement. Check
TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 4 of 8 Issue –I Dated 15.01.09
TECHNICAL AND DEVELOPMENT CIRCLE
JABALPUR
GSM PHASE V.1 (ITI)
BSS TEST SCHEDULE
of user domain securityVerify creation / modification / deletion of Users & service authorization of user
19 Signalling Link Management AI-TECH-WI025
Verify Link redundancy
20 Check that it is possible to display number of calls and occupancy for a given group of circuit/devices
AI-TECH-WI015
21 Check System status AI-TECH-WI022
TD/NS/GSM/Phase V.1/ BSS/ ITI /TS/1602 Page 5 of 8 Issue –I Dated 15.01.09