Brussels, 2013

Lisbon Pilot implementation:IST Taguspark

CARLOS SILVAIST- LISBON

• IST Taguspark Campus• Co-creation process• IEMS measures• Baseline results• Savings • Working timeline

LISBON PILOT Presentation structure

• IST – largest engineering school in Portugal• 10.000 students• 900 faculty members• 400 employees• 3 campi

• IST - Taguspark campus• 1100 students (ICT oriented degrees)• 100 faculty members• 100 employees• 1 building from 2009

• 30,000 m2

• BMS (HVAC and Lighting)

LISBON PILOT Taguspark

Goal: minimize energy consumption and maximize

user comfort through an intelligent interaction

between users and BMS

Approach: Test different platforms and levels of

interactions in different locations

• Energy laboratory

• Nucleus 14

• Amphitheatre A4

• Library

• PC room

LISBON PILOT Test locations

0

1

2

• Workshops with students, faculty and staff• Surveys• Meetings with campus management, energy management team

LISBON PILOT Co-creation

SPACE APPLICATION TECHNICAL SOLUTION

Library Smart automatic control of lighting conditions Daylight sensors

Amphitheatre A4

Scenario management for lighting and video projector Web app that interacts with the IEMS

Cooperative HVAC settingWeb app to achieve cooperative HVAC setting, incorporating user preferences, occupancy, CO2 and humidity sensors

PC Room Automatic PC shut down Computer utility software

Smart automatic control of lighting conditions Daylight sensors, blinds mechanical control

Energy Laboratory

Smart automatic control of lighting conditions Daylight sensors; movement sensors; blinds mechanical control

Innovative energy visualization tools LCD displaying energy consumption information

Smart management of HVAC Computer utility software

Nucleus 14 Smart management of HVAC and lighting systems

Web app incorporating temperature preferences and room occupancy.

Computer utility softwareDaylight and motion sensors.

Efficient lighting of the corridors Lighting timer

LISBON PILOT Intelligent Energy Management System

LISBON PILOT Energy Lab

Installed Equipment:

Investment: aprox. 12 k€

• KNX solution covering:- 8 lighting control circuits with dimming- 1 HVAC control module- 12 power sockets (ON/OFF)

• Bluetooth detection system• PV generation system with batteries

USER INTERACTION EXAMPLESa) Automatic HVAC and Lighting set-point

• Internal and external temperature• Internal and external illuminance

b) Personalized HVAC and Lighting set-point for each user

c) Pre-programmed scenariosd) Energy visualization tools

1

LISBON PILOT Nucleus 14

Equipments to be installed:

Nucleus 14, 2nd Floor (13 office spaces)

Expected Investment: aprox. 10k€

• KNX solution covering- 13 offices (individual and group)

- 1 HVAC control module- 2 lighting circuits (ON/OFF)- RFID detection

• Corridor and Hall- 3 lighting circuits(ON/OFF)• 3 movement sensors

USER INTERACTION EXAMPLESa) Automatic HVAC set-point in every room b) Personalized user preferences

2

LISBON PILOTAmphitheatre A.4

Equipments to be installed:

Expected Investment: aprox. 7,5k€

iLIGHT Solution covering:- 18 DALI Ballasts- iCAN Module- Relays Interface- Temperature, humidity and CO2 sensors- Scenario selection panel

USER INTERACTION EXAMPLESa) Mobile application with

a) Display of energy consumption and room conditions

b) Pre-programmed scenarios managed by facultyc) User engagement through voting system

Lecture Hall “A.4”, Ground Floor Room capacity of 130 people.

0

Equipments to be installed:

Expected Investment: aprox. 7,5k€

iLIGHT Solution covering:- 40 DALI Ballasts (36W)- 16 DALI Ballasts (18W)- iCAN Module- Relays Interface- Temperature, humidity and CO2 sensors

USER INTERACTION EXAMPLESa) Automatic daylight harvesting control based on users

locationa) Users identify its location on web/mobile

applicationb) Advising system to assign location

Library, Ground Floor - Reading Room;- Study Room (open 24 hours/7 week days)

LISBON PILOTLibrary 0

1

Equipments to be installed:

Expected Investment: aprox. 6k€

iLIGHT Solution covering:- 8 DALI Ballasts- iCAN Module- Relays Interface- Temperature, humidity and CO2 sensors- Automatic blinds

USER INTERACTION EXAMPLESa) Automatic power down of computers based on

computer usageb) Automatic lighting scenarios (zoning within the room)c) Automatic blind controls based on outside lighting

conditions

PC room “1.19” 1st floorRoom capacity 20 people.

LISBON PILOTPC room 1.19

1

LISBON PILOT Co-design

LISBON PILOT Learning about the users

EnergyPlus Modeling

Temperature Conditions Users Preferences

MOGA approach

January

February

March

April

May

June Ju

ly

August

Septe...

October

November

December

020406080100120140160180

IST Taguspark Electricity Consumption

2009

2010

2011

2012

En

erg

y co

nu

msp

tio

n(M

Wh

)

Year Consumption IST Taguspark values

Taguspark characteristic consumption

[kWh/m3]

2009Electricity 1.618 MWh 8

Natural Gas n.a. -Water 5.220 m3 25

2010Electricity 1.496 MWh 7

Natural Gas 489 MWh 2Water 8.542 m3 41

2011Electricity 1.362 MWh 7

Natural Gas 1.119 MWh 5Water 7.833 m3 38

2012Electricity 1.470 MWh 7

Natural Gas 1.319 MWh 6Water 3.951 m3 19

LISBON PILOTOverall campus baseline

LISBON PILOTTest locations baseline

HDD Occupancy Day Light Hours Irradiance CCD

Energy laboratory + + +

Nucleus 14 + ++ +

Library + +

Amphitheatre A4 + ++ +

PC room + +

Approach:

• Periodic Baseline Period Consumption / Periodic Test Period Consumption

• Model during a Baseline Period with Predictor Variables in a regression equation

• We may use control groups

LISBON PILOTExpected savings

Reference: at least 15% from previous projects

• Behavior user transformation only

• Maximizing Comfort and minimizing consumption maybe conflicting goals

• Rebound effects are expected (up to 20%)

Baseline(kWh/a)

Savings

Energy laboratory 672 5%-15%

Nucleus 14 3450 15-20%

Library 60500 20-25%

Amphitheatre A4 7303 25-40%

PC room 2982 10-15%

LISBON PILOT Expected chronogram