COST Action INTREPID: Interdisciplinary research and collaboration, Ljubljana 6.12.2018
BROWNFIELDS REGENERATION; WORK BETWEEN THE URBAN PLANNING INSTITUTE'S INTERDISCIPLINARY PROJECTS AND FACULTY TEACHING
Boštjan Cotič, univ.dipl.inž.arh, Urban Planning Institute of the Republic of Slovenia
TAKING COOPERATION FORWARD 2
SETTINGE THE SCOPE: WHAT IS A BROWNFIELD
Brownfields are sites that have been affected by the former uses of the site or surrounding land, are derelict or underused, and may have contamination problems. They often have a bad image and are often not competitive compared to greenfields without public intervention. These sites often have to be the remediated of hazards to human beings, groundwater and ecosystems, and need to be put back to the property market. (by Cabernet network)
TAKING COOPERATION FORWARD 3
HOW DID THEY OCCUR
Post industrial society Post socialist society (Central and Eastern Europe)
problem of competitivenes, markets Higher environmental standards -> Transfer of “dirty”
industries to other countries Higher labour costs -> Transfer of labour intensive
industries Other reasons
TAKING COOPERATION FORWARD 4
HOW DO THEY OCCUR –BROWNFIELDS DYNAMICS
New brownfield sites will be created all the time Change in industry standards Change in living standards Change in shopping habits, ... A non-stop process
Bath model (UK version), developed by CABERNET (www.cabernet.org.uk)
TAKING COOPERATION FORWARD 5
TYPES OF BROWNFIELDS
Location (micro, macro) Level of pollution Image of the area Other factors
ABC Graph, developed by CABERNET (www.cabernet.org.uk)
TAKING COOPERATION FORWARD 6
Source: Dimitrovska Andrews et al, 2008
CHALLENGE: (RE)URBANISATION PROCESSES
TAKING COOPERATION FORWARD 7
SOIL SEALING IN EUROPE
Source: European Environment Agency, dec 2017, Percentage soil sealing by country
TAKING COOPERATION FORWARD 8
8
Arable land (% of land area) – Europe
Source: Food and AgricultureOrganization (FAO), graphics: www.indexmundi.com)
LIMITED ARABLE LAND
TAKING COOPERATION FORWARD 9
9
Estimation of soil erosion on cultivated land through rainsplash, sheetwash and rill erosion as calculated from the Revised Universal Soil Loss Equation (1 km grid cells) and CORINE 2006 Land Cover database. White areas are not considered as cultivated land in the Corine classification system. Source: JRC/Bosco et al., 2012
EROSION BY WATER ON ARABLE LANDS
TAKING COOPERATION FORWARD 10
BROWNFIELDS IN SLOVENIA
Source: Lampič, B., et al., 2016. CRP V6-1510 Celovita metodologija za popis in analizo degradiranih območij, Univerza v Ljubljani, Filozofska fakulteta, Ljubljana.
TOTAL: 3.422,70 HECTARS OF BROWNFIELDS,
only brownfields bigger then 2000 m2 in urban areas and 5000 m2 outside)
Estimated regeneration costs 10 billion EUR
TAKING COOPERATION FORWARD 11
• Heavy impact of financial crisis from 2008 on (some new BF)
• Stabile growth after 2013• Main generator of growth is export
(of goods and services)• Successful companies seek space
for expansion• Pressure for greenfield
development in vicinity of active industrial zones
• Competitivness betweenMunicipalities: lack of widerperspective in locating newbusiness zones
RAPID GROWTH OF INDUSTRIAL SECTOR – NEWPRESSURE FOR GREENFIELD DEVELOPMENT
TAKING COOPERATION FORWARD 12
LACK OF KNOWLEDGE: WHO MANAGESSPATIAL DEVELOPMENT IN MUNICIPALITIES
Source: Bizjak, I., 2014. Medmrežni model javne participacije v procesu urbanističnega planiranja : doktorska disertacija = Webmodel for publicparticipation in thespatial-planningprocedures : doctoralthesis.
TAKING COOPERATION FORWARD 13
GOALS
TAKING COOPERATION FORWARD 14
14
Vir: Cities for a small planet, Richard Rogers,1997
GOALS: SUSTAINABLE DEVELOPMENT
Sustainable City
Cities must be viewed as ecologicalsystems. Their design and mangementshould be a circular ‘metabolism’process, where consumption is reducedby implementing efficiencies and wherere-use of resources is maximised. Toachieve this a new form ofcomprehensive holistic urban planningapproach is needed.The concept of a ‘Compact City’ model,a dense and socialy diverse city whereeconomic and social activities overlapcan bring major ecological benefits.
TAKING COOPERATION FORWARD 15
ZERO LAND TAKE CHALLENGE
TAKING COOPERATION FORWARD 16
OUR GOALS
More type A More type B Less type C Greenfield=brownfield
for investors (byattractivness)
Effective management of Brownfieldregeneration
ABC Graph, developed by CABERNET (www.cabernet.org.uk)
TAKING COOPERATION FORWARD 17
SOLUTIONS
TAKING COOPERATION FORWARD 18
(BROWNFIELDS) REGENERATION – THE FUTURE OF URBAN PLANNING IN EU?
TAKING COOPERATION FORWARD 19
MANAGE BROWNFIELDS REGENERATION
Co-operation of stakeholders ofdifferent levels:• Investitors (type A)• Municipalities (type A, B)• FUA level (LUMAT proposal)• Regional level• State level (ministries and
agencies)Source: http://www.mop.gov.si/fileadmin/mop.gov.si/pageuploads/zakonodaja/graditev_objektov/PREDSTAVITEV_ZUreP-2.pdf
and projectCOBRAMAN
Co-o
pera
tion
ofal
llev
els
TAKING COOPERATION FORWARD 20
TRAINING AND EDUCATION
TAKING COOPERATION FORWARD 21
21
Project COBRAMAN (Central Europe)
New professional profile for brownfieldregeneration
VODENJE PROCESOV PRENOVE DUO, RAZVOJ PROJEKTOV NA DUO
TAKING COOPERATION FORWARD 22
22
POTREBNE VEŠČINE IN ZNANJA
TAKING COOPERATION FORWARD 23
23
POTREBNE VEŠČINE IN ZNANJA
TAKING COOPERATION FORWARD 24
24
STUDENT‘S WORK
TAKING COOPERATION FORWARD 25
25
TAKING COOPERATION FORWARD 26
26
TAKING COOPERATION FORWARD 27
PVNU 2016/17, VAJA 1 (minimalni obseg):
I. Analiza:
I.A Prostorski kontekst - umeščenost v širši prostor- dostopnost- okoliški programi- morfološko-strukturne značilnosti- okoljske in prostorske kvalitete
I.B Zakonodajni okvir – določila veljavne prostorske dokumentacije: tekstualno; navedba dokumentov in kratek povzetek bistvenih določil
I. C Deležniki urejanja – prepoznavanje ključnih akterjev v procesu urbane regeneracije, njihovih vlog in interesov (sektorji urejanja, soglasodajalci, interesne skupine): tabelarično
I.D Definiranje ključnih izhodišč za regeneracijo območja: zbirna karta z opisi
II. Definiranje razvojnih ciljev
1. Splošni cilji: alinejsko navedeni2. Posebni cilji: grafično in opisno
Format: A3, vezano v špiraloMerilo: poljubno – glede na prikazano vsebinoObvezna oprema kartografskih prikazov:
navedba prikazane vsebine, navedba merila, legenda, kratek opis prikazane vsebine
Oddaja: 9.11.2015
Kontakt: [email protected], [email protected]
STAKEHOLDERS MANAGEMENT
TAKING COOPERATION FORWARD 28
PVNU 2016/17, VAJA 2 (minimalni obseg):
III. Osnutek načrta urbane regeneracije
III.A Vsaj dve variantni rešitvi možnega razvoja območjanivo obdelave: idejni osnutek - grafični prikaz v malem
merilu (nepodrobno) s kratkim opisom predlagane rešitve, iz česar bo med drugim razvidno:
- opredelitev prehodov skozi območje- umeščenost, gabariti in tipologija objektov- horizontalno in vertikalno razporejanje programov
III.B Vrednotenje variantnih rešitev- kvantitativni urbanistični kazalci: faktor zazidanosti
območja, faktor izrabe območja, faktor prostornosti območja itd.- kvalitativni urbanistični kazalci: kontekst, prehodnost, berljivost itd.
I. C Izbira najboljše rešitvena podlagi III.B imenujte najboljšo rešitev
III. D OSNUTEK NAČRTA URBANE REGENERACIJE Z UTEMELJITVIJO (ang. Urban Design Rationale)
Grafični prikaziUrbanistični kazalci
Format: A3, vezano v špiraloMerilo: poljubno – glede na prikazano vsebinoObvezna oprema kartografskih prikazov: navedba
prikazane vsebine, navedba merila, legenda, opisi prikazane vsebine
Oddaja: 23.11. - obvezna korektura variant. reš.: 7.12. - končna oddaja s predstavitvami
Kontakt: [email protected], [email protected]
TAKING COOPERATION FORWARD 29
PVNU 2016/17, VAJA 3skupinska vaja, skupine določene 21.12.2016
NAČRT URBANE REGENERACIJEminimalni obseg: 1. Razlagalne skice razvoja ideje (t.i. rationale)2. Načrt regeneracije
Grafični prikaz z opisom predlagane rešitve, iz česar bo med drugim razvidno: - upoštevanje konteksta prostora- opredelitev prehodov skozi območje- umeščenost, gabariti in tipologija objektov- horizontalno in vertikalno razporejanje programov- kvadrature predlaganih programov (npr. poslovni,
stanovanjski itd.) - vhodi in vstopi v objekte in garaže- razmejitev med javnim in zasebnim prostorom- ukrepi za izboljšanje berljivosti/čitljivosti prostora
3. Izračun ekonomske upravičenosti predlagane rešitve – se izdela skupaj na vajah s prof. Dimitrovsko Andrews
4. Faznost izvedbe z navedbo deležnikov in njih. vlog5. Načrt monitoringa
Format: vsaka skupina izdela 2 plakata 70/100 cm (pokončni format) in maketo
Merilo: - razlagalne skice (t.i. rationale): poljubno merilo- ureditvena situacija celotnega območja: 1:750- podroben prikaz urejanja izbranega ožjega območja
na Bratovževi ploščadi: 1:150- maketa celotnega območja 1:750
Obvezna oprema plakatov:plakati se pripravijo kot razstavni – skupine uskladijo način zapisa osnovnih podatkov (leto izdelave, člani ekipe, mentorji itd.) in uporabljene tipografije
Obvezna oprema kartografskih prikazov: navedba prikazane vsebine, navedba merila, legenda, opisi prikazane vsebine
Material za maketo: poljuben
Obvezne korekture in oddaja:- 11.1.2017 – preverjanje ekonomske upravičenosti predlagane
rešitve; obvezna korektura plakatov- 18.1.2017 - končna oddaja s predstavitvami
Kontakt: [email protected], [email protected]
TAKING COOPERATION FORWARD 30
30
TAKING COOPERATION FORWARD 31
31
TAKING COOPERATION FORWARD 32
Boštjan Cotič [email protected] +386 (0)1 420 13 21
Urbanistični inštitutRepublike SlovenijeTrnovski pristan 2, p.p. 4717SI-1127 Ljubljana, Slovenija
http://www.uirs.si