LOCATION:
PROJECT:
7/20/11
Lobby Art
SG
1
DATE
PLATE NUMBER:
DRAWING NAME
SCALE:
ORIG DATE:DESIGN:
DRAFT: ACCOUNT EXEC:
PROJ. NO. :
OF________
1
WB
FILE:
7/20/11
WHEN PRINTED @ 24x36
REVISIONS:DESCRIPTION
SURVEY ALLMEASUREMENTS ON SITEBEFORE CONSTRUCTION
THIS DRAWING REPRESENTS VISUAL CONCEPTS AND CONSTRUCTION SUGGESTIONS ONLY. IT DOES NOT REPLACE THE KNOWLEDGE AND ADVICE OF A LICENSED STRUCTURAL ENGINEER. THE DESIGNER IS UNQUALIFIED TO DETERMINE THE STRUCTURAL APPROPRIATENESS OF THIS DESIGN AND WILL NOT ASSUME RESPONSIBILITY FOR IMPROPER ENGINEERING OR USE.
SURVEY ALLMEASUREMENTS ON SITEBEFORE CONSTRUCTION
THIS DRAWING REPRESENTS VISUAL CONCEPTS AND CONSTRUCTION SUGGESTIONS ONLY. IT DOES NOT REPLACE THE KNOWLEDGE AND ADVICE OF A LICENSED STRUCTURAL ENGINEER. THE DESIGNER IS UNQUALIFIED TO DETERMINE THE STRUCTURAL APPROPRIATENESS OF THIS DESIGN AND WILL NOT ASSUME RESPONSIBILITY FOR IMPROPER ENGINEERING OR USE.
BAMBrooklyn,NY
47457
108 W. 39th Street2nd Floor
New York, NY 10018
T: 877.398.0444T: 212.398.0444
www.onesourcevms.com
Design/Draft:[email protected]
Senior Director: Visual DisplayJohn Jeffreys
212.398.0444 x 255
Owner:Andrew Eisberg
Date
Client Approval
100'-0"
PLAN VIEW - BAM LOBBY
Brooklyn Academy of Music Lobby Art Installation
6'-10"
3'-1"
2'-0"
6'-3"
4'-1"
3'-0"
2'-7"
3'-8"1'-2"
2'-6"
4'-10"
TOP VIEW
SIDE VIEW
2'-10"
1/2" Steel PanelSupport Rods
Printed FabricPanels with
Steel Frames3" Steel Center Pole
Suspended From Ceiling
BAM Lobby Installation 3D Concept
Note: Fabric Panels: 66 (Final Quantity TBD)