Lay out of Hip & Valley RoofRoof Pitch = 25⁰

Page 3: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Hip & Valley RoofRoof Pitch = 25⁰

What Members define Creeper side cut

Page 4: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Hip & Valley RoofRoof Pitch = 25⁰

What Members define Creeper side cut

• Half Span•Common Rafter

What Members define Valley Creeper side cut

Page 5: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Hip & Valley RoofRoof Pitch = 25⁰

What Members define Creeper side cut

• Half Span•Common Rafter

What Members define Valley Creeper side cut

• Half Span•Common Rafter

Page 6: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Hip & V RoofRoof Pitch = 25⁰

What Members define Creeper side cut

• Half Span•Common Rafter

Page 7: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

No new bevels need to be developed

Page 8: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

All Bevels and edge cuts are the same as a hip roof

Broken Hip As Span is not the same the rise will not be the same

Page 9: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Common Rafter Major Span

Common Rafter Minor Span

Hip Rafter Major Span

Hip Rafter Minor Span

Valley Rafter Minor Span

Crown End Major Span

Crown End Minor Span

Centring Rafter Major Span

Centring Rafter Minor Span

Crippled Centring RafterBroken Hip

Gathering Point

Page 10: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

With the more complex roof a roof is. It is important to plan & determine as much of the roof offsite that you can

Page 11: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span =

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 12: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span

= Plan Length x Rafter Length / m= (1000 – 17.5) x 1.103= 982.5 x 1.103= 1084

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 13: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Common Rafter – Major SpanPlumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 14: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span =

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 15: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span

= Plan Length x Rafter Length / m= (675 – 17.5) x 1.103= 657.5 x 1.103= 725

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 16: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Common Rafter – Minor SpanPlumb Cut

• As Major & Minor Span are the same pitch the plumb cuts must be the same

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 17: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof

= (½ Span – ½ Ridge) x Rise / m

= (1000 – 17.5) x 0.466

= 982.5 x 0.466

= 458

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 18: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458

= (½ Span Major – ½ Ridge) x Rise / m

= (1000 – 17.5) x 0.466

= 982.5 x 0.466

= 458

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 19: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof =

= (½ Span Minor – ½ Ridge) x Rise / m

= (675 – 17.5) x 0.466

= 657.5 x 0.466

= 306

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 20: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 21: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

We recall that all hips & valleys bisect corners.

In this building it means that they are at 45⁰.

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

Page 22: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span

= Plan Length Crown End Rafter x Hip length/m

= (1000 – 17.5) x 1.489

= 982.5 x 1.489

= 1.463

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 23: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Hip Rafter – Major SpanPlumb Cut

1.103

√2

0.466

1.489

1.000

Plumb Cut

Page 24: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span =

= Plan Length Crown End Rafter x Hip length/m

= (0.675 – 17.5) x 1.489

= 657.5 x 1.489

= 979

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 25: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span =

= Plan Length Crown End Rafter x Hip length/m

= (0.675 – 17.5) x 1.489

= 657.5 x 1.489

= 979

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Valley is the same as the hip

Page 26: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Hip Rafter – Minor SpanPlumb Cut

• As Major & Minor Span are the same pitch the plumb cuts must be the same

1.103

√2

0.466

1.489

1.000

Plumb Cut

Page 27: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofDetermine Centreline LengthCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major

Plan Length = ½ Span – Spacing + Correction

= 1000 – 300 + (1.414 x -17.5 + 17.5)

= 693 x Rafter Length / m

= 693 x 1.103

= 764

1.103

√2

0.466

1.489

1.000

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Note these measurements are directional as it goes back towards the Top Plate it must be a negative

Page 28: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Creepers– Major SpanPlumb Cut

• Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 29: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Centreline LengthCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 406

Plan Length = ½ Span – Spacing + Correction

= 675 – 300 + (1.414 x -17.5 + 17.5)

= 368 x Rafter Length / m

= 368 x 1.103

= 406

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

1.103

√2

0.466

1.489

1.000

Page 30: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Creepers– Minor SpanPlumb Cut

• Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 31: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698

Plan Length = ½ Span + Valley Correction – ½ Ridge

= 675 - (1.414 x -17.5 + 17.5) – 17.5

= 633 x Rafter Length / m

= 633 x 1.103

= 698

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

1.103

√2

0.466

1.489

1.000

Page 32: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Edge Bevel for Valley Creepers

What Triangle forms the Bevel

Page 33: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Crippled or Valley CreepersPlumb Cut

• Creepers are the same pitch as the Common Rafters. They must have the same Plumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 34: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

Page 35: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

We recall that all hips & valleys bisect corners.

In this building it means that they are at 45⁰.

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

Page 36: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

1000-675 = 325

Hips at 45°

½ Span Major – ½ Span Minor

Page 37: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

We recall that all hips & valleys bisect corners.

In this building it means that they are at 45⁰.

Therefore where the Broken Hip intersects the Ridge Minor Span must be 325mm from the Centreline of the Ridge Major Span

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

Page 38: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

1000-675 = 325

Both Hips at 45°

½ Span Major – ½ Span Minor

Page 39: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

= (½ Major Span – ½ Minor Span) x 2

Or

= Major Span – Minor Span

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

This must be 2x

This

Page 40: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Crippled Centring Rafter

As the valley is at 45⁰ the intersection with the valley must be a further 325mm

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

To develop other Roofing Members we need to determine the plan length first

Page 41: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698Crippled Centring Rafter = 689

Plan Length = Major Span – Minor Span + Valley Correction – ½ Ridge

= 2000 – 1350 + (1.414 x -17.5 + 17.5) – 17.5

= 625 x Rafter Length / m

= 625 x 1.103

= 689

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

1.103

√2

0.466

1.489

1.000

Page 42: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Crippled Centring RafterPlumb Cut

• Crippled Centring Rafter is the same pitch as the Common Rafters.

• It must have the same Plumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 43: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Edge Bevel for Crippled Centring Rafter

What Triangle forms the Bevel

Page 44: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Simple Bevel Development

1. Plumb Bevel Rafter2. Level Bevel Rafter3. Edge Bevel Creeper4. Edge Bevel Purlin5. Plumb Bevel Hip6. Level Bevel Hip7. Edge Bevel Hip8. Face Bevel Purlin

From Previous

Page 45: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

Page 46: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

Page 47: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

Page 48: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

From previous calculations we determined the following

Page 49: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

Centreline length is the same as distance from the gathering point

Page 50: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Every Valley Creeper must have an opposing creeper

To determine true length Long Pt

Centreline length 325

+/- Long Point Correction -7.5(-17.5 x 1.414 + 17.5)

Deduct ½ Ridge 17.5

Plan Length = 325 + -7.5 - 17.5

Page 51: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698Crippled Centring Rafter = 689Crippled Creeper Matching = 331

Plan Length = ½ Span Major – ½ Span Minor + Valley Correction – ½ Ridge

= 1000 – 675 + (1.414 x -17.5 + 17.5) – 17.5

= 300 x Rafter Length / m

= 300 x 1.103

= 331

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

1.103

√2

0.466

1.489

1.000

Page 52: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Crippled Matching RafterPlumb Cut

• Crippled Matching Rafter is the same pitch as the Common Rafters.

• It must have the same Plumb Cut

1.103

√2

0.466

1.489

1.000Plumb Cut

Page 53: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698Crippled Centring Rafter = 689Crippled Creeper Matching = 331 Creeper Shortening = 331

Rafter Spacing x Rafter Length / m

= 300 x 1.103

= 331

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

1.103

√2

0.466

1.489

1.000

Page 54: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698Crippled Centring Rafter = 689Crippled Creeper Matching = 331 Creeper Shortening = 331

As both spans are the same pitch they are SIMILAR so Creeper Shortening is the same for both spans

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 55: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip Roof

So the roofing members we have previously looked at are determined the same way

Determine Required LengthsCommon Rafter Major Span = 1084Common Rafter Minor Span = 725Rise Main Roof = 458Rise Minor Roof = 306Hip Length Major Span = 1.463Hip Length Minor Span = 9791st Creeper Major = 7641st Creeper Minor = 4061st Valley Creeper = 698Crippled Centring Rafter = 689Crippled Creeper Matching = 331 Creeper Shortening = 331

Roof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35Rafter Spacing 300mm

Page 56: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Edge Bevel for Crippled Centring Rafter

Edge Bevel for Crippled Centring Rafter is the CREEPER EDGE BEVEL

The same is for•Valley Creepers•Crippled Creepers

Page 57: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Edge Bevel for Crippled Centring Rafter is the CREEPER EDGE BEVEL

The same is for•Valley Creepers•Crippled Creepers

It follows that all the The purlin bevels are The same as the hip end

Page 58: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Determine Centreline Length Broken Hip

Page 59: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Broken Hip Run325 x 1.414 = 460

1.103

√2

0.466

1.489

1.000

Determine Plan Centreline Length = 325

Page 60: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Broken Hip Run325 x 1.414 = 460

1.103

√2

0.466

1.489

1.000

Determine Plan Centreline Length = 325

Centreline True Length

= Plan Length x Hip Rafter / m

= 325 x 1.489

= 484

Page 61: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Broken Hip Edge CorrectionAt Base

Page 62: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Broken Hip Edge CorrectionAt Base

Page 63: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Valley at Base of Broken Hip

Page 64: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Valley at Base of Broken Hip

Page 65: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Broken Hip Edge Correctionat Top

Page 66: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Broken Hip Edge Correctionat Top

Page 67: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

Plumb cut is the same as the hipEdge Bevels are the same as the hip

1.103

√2

0.466

1.489

1.000

Page 68: Broken Hip Roof. Lay out of Hip & Valley Roof Roof Pitch = 25⁰

Lay out of Broken Hip RoofRoof Pitch = 25⁰

Rafter 90 x 35 @ 450 c to cHip Rafters 140 x 35Ridge 140 x 35

With the more complex roof a roof is. It is important to plan & determine as much of the roof offsite that you can