Broadband Developments Road Map Release AI 15 th July 2013 Release AJ 16 th September 2013 CP action needed No CP action needed CP Changes recommende d FTTP: Product Withdrawal (BB940- 13) WBC: Abortive Visit Charges (BB955-13) IPS, WBC & FTTx: Visibility of Openreach KCI notes via B2B & Portal (BB940-13) I can be found at www.btwholesale.com FTTP: Launch of FTTP product (BB899-13) IPstream and WBC: Self Serve Repair – Port Flex (BB831- 13) WBC: MSE migration IP test (BB831-13) IPS, WBC FTTC: Amend order to earlier date /Preponement (BB940- 13) FTTC: Self Install GEA service test (BB940-13) FTTC: Select OR or CP modem in FTTC PCP only Self Serve Trial (BB832-13) FTTC: Self Install Standard or Flexible Appt for PCP only (BB941-13) FTTP On Demand: New Dialogue Service for Distance Based Charging (BB832- 13) FTTP On Demand: Out of Term EUA charges (BB832-13)

Broadband Developments Road Map

  • Upload
    donar

  • View
    32

  • Download
    0

Embed Size (px)

DESCRIPTION

I can be found at www.btwholesale.com. Broadband Developments Road Map. Release AI 15 th July 2013. Release AJ 16 th September 2013. IPS, WBC FTTC: Amend order to earlier date / Preponement (BB940-13). FTTP: Launch of FTTP product (BB899-13). FTTP: Product Withdrawal (BB940-13). - PowerPoint PPT Presentation

Citation preview

Page 1: Broadband Developments Road Map

Broadband Developments Road MapRelease AI

15th July 2013Release AJ

16th September 2013

CP

act

ion

ne

ed

ed

No

CP

a

ctio

n

ne

ed

ed

CP

Ch

an

ge

s re

com

me

nd

ed

FTTP: Product Withdrawal (BB940-13)

WBC: Abortive Visit Charges (BB955-13)

IPS, WBC & FTTx: Visibility of Openreach KCI notes via

B2B & Portal (BB940-13)

I can be found at www.btwholesale.com

FTTP: Launch of FTTP product (BB899-13)

IPstream and WBC: Self Serve Repair – Port Flex

(BB831-13)

WBC: MSE migration IP test (BB831-13)

IPS, WBC FTTC: Amend order to earlier date

/Preponement (BB940-13)

FTTC: Self Install GEA service test (BB940-13)

FTTC: Select OR or CP modem in FTTC PCP only

Self Serve Trial (BB832-13)

FTTC: Self Install Standard or Flexible Appt for PCP only

(BB941-13)

FTTP On Demand: New Dialogue Service for

Distance Based Charging (BB832-13)

FTTP On Demand: Out of Term EUA charges

(BB832-13)

Page 2: Broadband Developments Road Map

Broadband Release Schedule 2012/13

Release Date

Release AI 15th July 2013

Release AJ 16th September 2013

Release AK 17th November 2013

Release AL 20th January 2014

The above dates are not confirmed until 90 day legal notification has been published