9
Brite Group An evolution in plastics BRIGHT BROTHERS LIMITED

Brite Group

Embed Size (px)

DESCRIPTION

Brite Group. BRIGHT BROTHERS LIMITED. An evolution in plastics. Heritage. 59. Years of Innovation. On July 11,1947 Bright Brothers Limited was incorporated in Mumbai. In 1948 - pioneered Injection Molding technology in the India. Brite Group. Brite’s office at tardeo , Mumbai. - PowerPoint PPT Presentation

Citation preview

Page 1: Brite Group

Bri

te G

rou

p

An evolution in plastics

BRIGHT BROTHERS LIMITED

Page 2: Brite Group

HeritageB

rite

Gro

up

59

A turning point in history of Indian plastic industry

Brite’s office at tardeo , Mumbai

OnOn July 11,1947 July 11,1947 Bright Brothers Bright Brothers LimitedLimited was incorporated in Mumbai. was incorporated in Mumbai.

In 1948- pioneered Injection Molding technology in the India

Page 3: Brite Group

Integrated Design & Engineering

Services offered New Product Design and DevelopmentPrototypingMould MakingMaterials and Product Testing

Value Engineering

Plant EngineeringProduct engineering

Program managementProduct delivery process

Engineering change managementBri

te G

rou

p

Page 4: Brite Group

Product Development PortfolioB

rite

Gro

up

Page 5: Brite Group

Product Development PortfolioB

rite

Gro

up

BudgetaryManagement

Product Development

Tool Development

Process Development

I

Process Development

II

ChangeManagement

SupplyManagement

Service Support

Product launch Management

Level 1

Level 3

Page 6: Brite Group

Product Development PortfolioB

rite

Gro

up

Concepts oCreation

oSelection oPresentation

Reverse EngineeringBench Marking

Product Development

Material SelectionDetailed Design

oGeometry modeling

oDrafting oDesign Automation Design Review

Prototypes Testing & fitment Analysis

Design Validation Part Analysis (CAE)

Design optimization &

Data ReleaseDevelop of Sp. Comp

Part Validation

Page 7: Brite Group

Product Development PortfolioB

rite

Gro

up

Vendor ManagementoSelection

oRating / Ranking

Tool Development

Data Release for Toolingo2D / 3DTool Design

Design ReviewMould analysis (CAE)

ManufacturingStage Follow-upoPhysical checking

oProgress chartTrial (T1)

Modification (Rectification)

Trial (T2)Texturing

Tool Certification

Page 8: Brite Group

Product Development PortfolioB

rite

Gro

up

Final Inspection Surface CoatingFull Assembly

Raw material planningMachine Planning

Process Chart

Process Development

ProcessingCooling Fixtures

Degating / Deflashing

Sub AssemblyIntermediate inspection

Finishing operations

I II

Page 9: Brite Group

Thank you

B

rite

Gro

up