Municipal Infrastructure Support Agent ____________________________________________________ The Approach to Distribution Asset Management (ADAM). Briefing to Energy Portfolio Committee Date:Friday, 1 November 2013, Parliament, Cape Town. CONTENTS. INTRODUCTION BACKGROUND ON MINI ADAM - PowerPoint PPT Presentation
Citation preview
Municipal Infrastructure Support Agent____________________________________________________
The Approach to Distribution Asset Management(ADAM)
Briefing to Energy Portfolio Committee
Date: Friday, 1 November 2013, Parliament, Cape Town
CONTENTS
1. INTRODUCTION
2. BACKGROUND ON MINI ADAM
3. ROLE OF MISA ON ADAM
4. MISA CURRENT SUPPORT ON ENERGY
5. FUTURE ROLE OF MISA ON ADAM
6. CONCLUSION & WAYFORWARD
23-04-19 MISA Briefing to Energy PC 2
23-04-19 MISA Briefing to Energy PC 3
• The Portfolio Committee on Energy previously invited the Municipal Infrastructure Support Agent (MISA) to provide a briefing on the pilot project on the Approach to Distribution Asset Management (ADAM).
• ADAM is a programme initiated by the Department of Energy (DOE) with the aim of getting municipalities to address increasingly high levels of backlogs on maintenance and refurbishment of their electricity distribution assets.
• Since its establishment, MISA has been supporting low capacity municipalities to address key problems on their infrastructure for key services, including electricity distribution. The nature and extent of support is intended to assist municipalities realise ADAM objectives.
Background to ADAM
• In 2012 DoE, adopted a strategy called the Approach to Distribution Asset Management (ADAM).
• This multi phased programme is intended to address the electricity distribution challenges, and aimed at addressing the backlog in maintenance, refurbishment and upgrading of the Electricity Distribution networks.
• The initial work undertaken in implementing ADAM focused on addressing the capital and skills shortage that exists in the electricity distribution industry which was driven by the Electricity Distribution Industry (EDI) Holdings.
• The establishment of the Regional Electricity Distributors (REDs) was aimed as an institutional mechanism to address these challenges.
• Although EDI has since been disestablished and Regional Electricity Distributors (REDs) have been discontinued, there is still a need to address poor infrastructure maintenance and weak management capacity in electricity distribution
23-04-19 MISA Briefing to Energy PC 4
ROLE OF MISA ON ADAM PROGRAMMEBackground to ADAM
23-04-19 MISA Briefing to Energy PC 5
Currently MISA is a member of the National Steering Committee on the MINI ADAM
Programme.
The National Steering Committee chaired by DOE was established as governance
structure that should enable all the relevant key stakeholders to participate on the piloting
of the mini ADAM programme.
In September 2013, the National Steering Committee held its 1st meeting co-ordinated and
chaired by DOE where MISA together with other stakeholders were present.
At this meeting the DOE tabled the TORs for the National Steering Committee and role
this structure would provide regarding the programme.
The role was crafted as the provision of a national oversight , programme and project
management to the MINI ADAM Programme.
FUNCTION OF THE MINI ADAM STEERING COMMITTEE
• The Steering Committee is responsible for;– approving budgetary strategy, – defining and realising benefits, – monitoring risks related to the programme, – ensuring quality and – adherence to timeframes by the local municipalities
that received the allocation
23-04-19 MISA Briefing to Energy PC 6
MANDATE OF MINI ADAM STEERING COMMITTEE (MASC)
considers and recommends approval of the business plans and achievement of outcomes.
ensures the project's scope aligns with the requirements of the stakeholder groups
provides those directly involved in the project with guidance on project business issues
ensures effort and expenditure are appropriate to stakeholder expectations
addresses any issue that have major implications for the project keeps the project scope under control as emergent issues force
changes to be considered reconciles differences in opinion and approach, and resolves
disputes arising from them reports on project progress to those responsible at a high level.
23-04-19 MISA Briefing to Energy PC 7
MISA CURRENT DEPLOYMENT MODEL
23-04-19 MISA Briefing to Energy PC 8
LOW CAPACITATED MUNICIPALITY (108 )
Individual Technical Experts (65)
Professional Services Providers (25 PSP)
CAPACITY BUILDING PROGRAMME
CURRENT SUPPORT TO MUNICIPALITIESTechnical Support
• MISA currently has 65 technical (engineering and planning) professionals deployed to support a total of 107 municipalities throughout the country.
• In addition to the deployed professionals a total of 25 Professional Service Providers (PSPs) have been contracted and assigned to support prioritised municipalities.
• The main role of PSPs is to assist each municipality in addressing specific issues pertaining to the infrastructure and service delivery backlogs and effective maintenance of existing infrastructure.
23-04-19 Briefing to CoGTA PC on MISA 9
CURRENT SUPPORT TO MUNICIPALITIES
• A total of 91 municipalities have been assisted to develop and adopt Integrated Support Plans; these are part of the 108 municipalities prioritised by CoGTA for LGTAS support.
• Included among these 108 municipalities are the 23 (+1) districts selected by cabinet for focussed support towards the reduction of their high service backlogs.
• An Integrated Support Plan (ISP) for each municipality was informed by the outcome of a diagnostic assessment conducted.
• The approach is to ensure that support provided is tailor-made for each municipality to respond to its peculiar challenges identified during the assessment.
• Support being provided to these municipalities is intended to mainly address their respective weaknesses in infrastructure and service provision.
CURRENT SUPPORT ON ENERGYMunicipal Capacity Building: Electricity Supply
MISA’s initiative aimed at strengthening the capacity of municipalities to perform the electricity distribution function entails the following:•Placement of electrical apprentices for operation and maintenance of distribution infrastructure.•Training of officials in municipalities’ electricity/ technical departments focusing on the electricity distribution and solar/renewable energy supply.•Supporting municipal officials and unemployed graduates qualified in the electricity field to register with relevant professional bodies.•Supporting and facilitating the trade testing for both municipal officials and unemployed graduates.•Granting of bursary to students in electrical engineering and related fields. •Currently a total of 234 Electrical Apprentices are placed in 25 municipalities under 6 Provinces (EC, KZN, LM, MP, NC and NW), for experiential learning. •In addition 29 candidates are undergoing experiential learning in municipalities across all nine provinces towards qualifying as Artisans in the electricity sector.
23-04-19 MISA Briefing to Select Committee on ED 11
CURRENT SUPPORT ON ENERGYMunicipal Capacity Building: Electricity Supply Cont…
23-04-19 MISA Briefing to Select Committee on ED 12
PROVINCE MUNICIPALITY NO. OF ELECTRICAL APPRENTICES
Eastern Cape Meletswai, Senqu, King Sabata Dalindyebo, Mnquma
8
Kwazulu-Natal Msunduzi, Mpofana, Mandeni, Newcastle, Kwadukuza
69
Limpopo Blouberg, Modimolle, Polokwane 17
Mpumalanga Albert Luthuli, Lekwa, Thaba Chweu, Umjindi, Nkomazi
39
Northern Cape Sol Plaatjie, Kamiesberg, Kareeberg, Kai!Garib
11
North West Rustenburg, Madibeng, Matlosana 10
Total 134
LIST OF MINI ADAM PROJECTS
Name of Municipality Scope of Work Allocation “000
Nelson Mandela Metro Upgrading of two Substations and Switch Gears
35 000
Mangaung Metro Upgrading of 132kv lines Feeder lines
25 000
Msunduzi LM Upgrading of Primary Network and substations
100 000
Sol Plaatje LM Upgrading of Substation 20 000
Tlokwe LM Replacement of 11KV line 20 000
Moqhaka LM New Over Head Line 66kv 20 000
Nala LM Substation and new infrastructure construction
20 000
Ngwathe LM Upgrading of bulk supply 20 000
King Sabata Dalindyebo Upgrading to a CBD Sub station
60 000
MISA SUPPORT TO MINI ADAM PROGRAMME
MISA plans to support identified municipalities in the following areas;
23-04-19 MISA Briefing to Energy PC 14
Development of Asset Registers
Maintenance and Operations
Project Management
Investment, Networks &
Master Planning
Energy Losses Management Pricing and Tariff
Structure
Technical Skills Development
(Capacity Building Programme)
Technical Standards Improving
Efficiency in Procurement
CONCLUSION & WAYFORWARD
• The support indicated will only be provided to local municipalities where MISA has Technical Experts.
• MISA has also put in place plans to recruit 9 additional Electrical Engineers that will be deployed to each province to augment the existing limited support.
• Through the capacity building programme MISA will be training addition 29 candidates are undergoing experiential learning in municipalities across all nine provinces towards qualifying as Artisans in the electricity sector.