15 February 2021
Briefing / Information Session for the Campus Infrastructure
Master Plan – Sourcing of Multi-Disciplinary Professional Team
RFB No: T11/2021
Presented by:
Leonard Swana
Executive Director : Operations and Logistics
Briefing Overview• Introduction
• Arial Photos of Consolidation Sites/Campuses
• High Level Scope
• Multi-Disciplinary Professional Team
• Project Deliverables
• Design Standards
• Detailed Project Scope
• Communication Plan
• Functionality/Quality Scoring
• Pricing
• Questions and Answers
1. Introduction
• VUT currently has about 5 campuses
• VUT has around 20 000 students
• A decision to consolidate campuses has been taken
• Three campus: Ekurhuleni, Secunda & Upington Campus to phase out
• Consolidation/Transfer of all Programs, Students and Staff to Vanderbijlpark and Sebokeng Campuses.
• A need for an Infrastructure Master Plan identified for this consolidation.
• CIMP to included Educational Infrastructure, Admin, Residences, Services (Bulk/Internal), Social , Support Facilities, etc.
Main Campus and Residences
Total Land Area = 648 128,00 Square Metres
Main Campus
Sebokeng Campus
Total Land Area = 1 721 489 Square Metres
Quest Conference
Total Land Area = 38 253 Square Metres
3. High Level Scope
• The Campus Infrastructure Master Plan for the Vanderbijlpark, Quest
Conference and Eductiy (Sebokeng) Campuses is the desired end product
for the engagement of the Professional Team of consultants.
• The Team shall be led by a Professionally Registered Principal and
supported by other required Professionals in the complementing built-
environment disciplines.
• The project scope includes assessing, investigating, planning and
developing Product Qualifications Mix (PQM) specific facility concept
plans, infrastructure requirements and cost estimates for a window of 10 to
30 years.
4. Multi-Disciplinary Professional Team
a. Professional Architects – as a Project Leader (Lead consultant)
b. Professional Quantity Surveyors – as Cost Consultant
c. Professional Engineers – as Civil and Electrical Specialists
d. Professional Town and Regional Planners – Planning and Development
Consultants
e. Other Sub-Consultants to be sourced as need arises (Environmental,
Health and Safety, Geohydrological, Geotechnical, etc.)
5. Project Deliverables • A complete Campus Infrastructure Master Plan document that addresses
o Current and Future needs of Learning Facilities for a long-term period of at least 10-30
years.
o Current and Future needs of Support Facilities and amenities including landscaping that
are informed by the learning facilities.
o Current and future infrastructure services, both on bulk supply and internal reticulation as
informed by growth trends.
o Current and future needs for student accommodation that is informed by projected
enrolment figures and phased development of the facilities and Product Qualifications Mix
(PQM).
o Complete high level cost estimates for all proposed facilities and infrastructure, arranged
in a phased approach of three year cycles.
• Proposed funding options/models for each type of infrastructure/facility proposed.
• Proposed alternative material/value engineering document including the concepts on
renewable energy options.
6. Design Standards• Regulations and Standards from the Emfuleni Local Municipality
• All relevant SABS Standards
• The OHS Act
• SABS 0246:1993: Accessibility of buildings to disabled persons
• The latest Green Building Standards etc.
• Government Gazette No. 39238, Policy on the Minimum Norms and Standards for Student Housing at Public Universities, as
promulgated on the 29 September 2015.
• National Building Regulations and Building Standards Act, Act 103 of 1997
• All Department of Higher Education and Training infrastructure-related policies need to be adhered to, including but not
limited to the following:
o DHET Spatial Planning Guidelines
o DHET Guide to ICT Norms and Standards
o DHET Universal Design Guidelines
o DHET Building Cost Units (2017 to 2021)
7. Detailed Scope• Investigation into the bulk infrastructure supply, capacity and future
improvements by the Municipality and the Province in and around
Vanderbijlpark and Sebokeng areas.
• An analysis report on the Spatial Development Plans (SDPs) and
development nodes by both the Municipality and Province in the
concerned areas.
• Investigate/conduct assessment on the infrastructure services available
and future opportunities in the Main Campus, Quest Conference and
Sebokeng Campuses and Produce a status report on infrastructure.
• Conduct assessment of all Academic facilities, usage status and present
optimum use of these facilities. Produce a report on the facilities, including
the high level status quo/conditions.
7. Detailed Scope Cont…• Analyze the Enrolment projections per each faculty for the defined term
and provide infrastructure requirements to meet the demand in a phased
approach.
• In line with the enrolment projections that inform the facilities, an analysis
of the support infrastructure such as staff offices, Clinics, Technology area,
Cafeteria, library etc. must be identified for infrastructure provisions.
• An analysis report of the current student accommodation and future
student accommodation needs including models and costing of concept
plans in a phased approach.
• Advise on the infrastructure requirements for upgrading/augmenting of
services to meet the demand on each piece of land identified/Campus to
be developed.
7. Detailed Scope Cont…• Develop high level cost estimates for concept plans to assist the budgeting
process.
• Develop a concept document/plan including the discussion/narrative and
3D visual concepts.
• Produce and present to the VUT a walk through visualization concept.
• Engage specialist consultants where a need arises to understand a
complex problem so as to develop well informed concept plans.
• Investigate alternative construction material to bring construction costs
down/value engineering.
• Confirm title and land – use rights of properties at the campus, planning
zone restrictions, surveyor general documentation and identify the need for
additional Land.
7. Detailed Scope Cont…• Interpret enrolment growth targets (FTE’s) and reconcile space
requirements as per HEMIS norms.
• Consultation with local authority to be engaged regarding supply of bulk
services, not limited to electricity, water supply, sewer, storm water, logistics
to the campus.
8. Communication Plan• Consultants Planning Meetings held bi-monthly. These meetings will deal with all
planning issues and integration of design aspects of the different disciplines. The Lead
Consultant (Architect) chairs these meetings.
• CIMP Task Team Meetings and attended by Service Provider, held on monthly basis.
These meetings will be chaired by the ED-Operations and Logistics. The purpose is to
report to the VUT Management on the progress, discuss challenges and the strategies,
performance and quality.
• Consultants and Faculty Meetings: These meetings will deal with issues directly
affecting faculty requirements that need to be incorporated into the CIMP. The
frequency will be on need basis. The meetings will be called and chaired by
Consulting Team.
• Consultants and Departments Meetings : These meetings will deal with the different
and specific requirements per department, such as Residences, Quest Conference ,
etc so as to extract all needed information to inform the CIMP. The frequency will be
on need basis. These individual meeting will be chaired by the Consulting Team.
9. Functionality/Quality Scoring
Evaluation of Professional Architect
CRITERIA SUB-CRITERIA SCORING MAXIMUM
POINTS
Track Record
of Bidder on
similar type
and sizes (or
more) of
projects
previously
executed
Points allocated for track record similar type and scale of previous projects
executed by bidder in consideration:
1. Appointment letter from client
2. Contact details of client 3. Portfolio of work done
(presentation in power point)
Proof of 3 projects and above = 20
Proof of 2 projects
= 15
Proof of 1 project = 10
20
Qualifications ,
Registrations
and
Competencies
Points allocated for qualifications and
professional registration, For each
Category as detailed below.
1. Certified qualifications 2. Certified professional
registration
3. CV B Degree (B Tech, B Eng, BSc, BSc Town and Regional
Planning, B Arch ) plus 15 years
of experience and
B Degree (B Tech, B Eng, BSc, BSc Town and Regional
Planning, B Arch and ) plus 10
years of experience and above B Degree (B Tech, B Eng, BSc,
BSc Town and Regional
Planning, B Arch ) plus 6 years of experience and above
Project
Leader/
Principal
Member
Points allocated for qualifications and
professional registration, for the Professional Architect
15 years = 20
10 years = 15
6 years = 5
Less than 6=0
20
Project Team
Members
Cost Consultants (Quantity Surveyor)
=10
15 years = 10
10 years = 7.5
6 years = 5
Less than 6=0
10
Project Team
Members
Engineers (Civil & Electrical ) = 10
15 years = 10
10 years = 7.5
6 years = 5
Less than 6=0
10
Project Team
Members
Planning and Development Consultants
(Town Planners ) = 10
15 years = 10
10 years = 7.5
6 years = 5
Less than 6=0
10
Functionality Scoring Cont…Approach and
Methodology
Points allocated for submission of Methodology that is detailed, project
specific and have milestones
Submission of approach and
methodology plus
1. Detailed 2.
Project Specific 3. Milestones = 20
Submission of approach and
methodology plus
1. Detailed and any
1 of 2. Project Specific or 3.
Milestones = 17
Submission of
approach and
methodology plus any 2 of the three
requirements met
1. Detailed 2.
Project Specific or 3. Milestones = 15
Submission of approach and
methodology plus
any of 1. Detailed 2. Project Specific
or 3. Milestones =
10
Submission of 1
requirement = 5
20
Locality Means of verification: Either
proof of residence, Utility bill or Lease agreement to the name of
the tendering firm.
Vaal area=10
Gauteng
province=5
Other provinces=2
10
Professional Team Sub-total 100
10. Pricing
• Consultants will claim based on the government gazette fees structure.
• The appointment of other Service Providers (e.g. Environmental Assessment
consultants, OHS specialists etc.) will be on quotation basis and sourced
from VUT data base, their claim will be a disbursement under principal
agent to the project.
• Please refer to Envelope B (Pricing Document)
Pricing Cont…• All travelling costs to the all Campuses of the Vaal University of Technology
for information gathering.
• The Cost of Producing Preliminary Investigations (Existing Infrastructure)
Status Quo Report
• The Cost of producing Spatial Development Plans (SDPs) for each VUT
property as indicated in the scope
• The cost of producing Concept Plans and 3D Models for desired Facilities
• The cost of Producing Fly Through Models for the concepts
• The Cost of Producing the final Campus Infrastructure Master Plan and
Report
Thank You
The End
Questions and Answers