17
BRIEF OF THE ORGANIZATION An ISO 9001 : 2015 Certified Company CRISIL RATING : SE 2B # Plan # Co ordinate # Trouble shoot # Implement # Control MRC Prism Projects Pvt. Ltd. 2 nd . Floor , Amrita , 131/56 , N.S.C.Bose Road , Kolkata – 700 040 September 2018 Phone : ( 033 ) 2381 9067, ( 033 ) 2381 8516 EMail : [email protected] , Website : www. prismkolkata.com 1

BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

BRIEF OF THE ORGANIZATION

An ISO 9001 : 2015 Certified CompanyCRISIL RATING : SE 2B

# Plan  # Co ordinate  # Trouble shoot  # Implement  # Control 

MRC Prism Projects Pvt. Ltd.2nd. Floor , Amrita , 131/56 , N.S.C.Bose Road ,  Kolkata – 700 040

September ‐ 2018

Phone : ( 033 ) 2381 9067,  ( 033 ) 2381 8516E‐Mail :  [email protected] , Website :  www. prismkolkata.com

1

Page 2: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

# Complete Consultancy # Project  Management # Third party quality assurance # Quantity  survey  # Quality  assurance # Tender & 

Contract Management # Cost  control  # Geodetic Survey                      # Procurement & Sourcing Management

# Customized Software 

2

Page 3: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Just completed Project :Just completed Project : 

Fortune Park Pushpanjali at Durgapur, West Bengal

Profile of the project

# Mixed use building comprising of 5 star Hotel , Offices & Retails

# 2B + G + 12 storied # 2.50 Lakh SFt. # Swimming pool on Terrace

# Platinum rated Green Building

3

Page 4: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Some notable success stories   :

The Gems Akademia International Schoolwas developed on a land of around 24acres. The total project value was aroundRs 90 crores The main challenges wereRs. 90 crores. The main challenges werehuge land filling and fast buildingconstruction. The main academic block wasa PEB / Steel structure building.

The Kinley Factory at Salap, Howrah, isan ultra‐modern factory. The entireproject was executed as per thestandards of international brand CocaCola. Apart from the technicalfeatures, the EHS aspects in thisproject were very high. Pre‐engineeredbuildings have been executed.

The Dehradun State General Hospitalunder the World Bank fund was anunique medical infrastructure project.The new POD, Operation Theatre, IPD,, p , ,Trauma, Blood Bank and Mortuary weredeveloped keeping the existing facilitiesoperational.

4

Page 5: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

More Projects to mention :More Projects  to mention   :

1) Talpuri Twin City at Durg, Chattisgarh

Profile of the project# Mega township Project# 135 acres of land# 35 Lakh SFt. Build up areap# Highrises, Bunglows and complete infrastructure

2) Expansion of Aranya Bhawan at Kolkata , West Bengal Bengal

Profile of the project# Administrative HQ of Forest Dept Govt of West Bengal# Administrative HQ of Forest Dept. , Govt. of West Bengal# Vertical expansion keeping the office in operation

5

Page 6: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

3) Mizoram state road project , Mizoram

Profile of the project# Strengthening & upgrdation of mountain highway# Aizwal to Lunglei

4) New Dibrugarh Airport Terminal building

Profile of the project# New terminal building# State of art Architecture

6

Page 7: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Experienced In Pre Engineered Building :

The organization have sound experience in co‐ordination of Design & Executionof Pre Engineered Building and or Hybrid Structured Building using StructuralSteel Frame and brick or modular walls.

The above 1.50 Lacs SFt. Accademic Block of a School building completedwith Structural Steel frame and brick walls. The right hand portion showsthe Steel frame with brick work in progress, the middle portion with plaster

l d l f h d i i h i i lcomplete and left hand portion with painting complete.

7

Page 8: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Our Overseas Assignment :Our Overseas Assignment    :

Complete QS service for Altair tower at Colombo, Srilanka

• Two towers – one 70 storied and one 67 storied• One tower inclined on the other

Profile of the Project

• Structural BOQ of the project• Architectural BOQ of the project

• MEP BOQ of the project

Scope in the Project

Approach taken

• Around 1,500 drawings studied in details• Backup calculations prepared• Abstract report prepared

Approach taken

8

Page 9: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Versatile list of Projects  :

A.  Hospitality

• ITC Hotel “Fortune Resort Bay Island” at Port Blair, Andaman & Nicobar Island• ITC Hotel “Fortune Park Pushpanjali” cum office building at City Centre, Durgapur, WB• Hotel Mark Sundarban, at Sundarban, South 24 Parganas, WBH t l BNR Ch k t R hi Jh kh d• Hotel BNR Chanakya at Ranchi, Jharkhand

B.     Health Care

• 200 bedded hospital at Dehradun, Uttaranchal• 100 bedded hospital at Champai, Mizoram• 575 bedded multispeciality hospital at Gangtok Sikkim575 bedded multispeciality hospital at Gangtok, Sikkim• Touch Heal Hospital at Midnapore, Paschim Medinipur, WB

C.     Education

• Goethe Institute at Park Mansions, Kolkata, WB• Gems Akademia International School at Thakurpukur, Kolkata, WBp , ,• Prafulla Pratap Vidyatan at Ultadanga, Kolkata, WB• Science block of St John's Diocesan School at Kolkata, WB

D.  Real Estate

• GEMS City at Bakrahat Road, South 24 Parganas, WB• Aastha Arcade at Jamshedpur, Jharkhand• Aastha Aakar at Jamshedpur, Jharkhand• Multi storied building Project at Alipore, Kolkata, WB• Panchawati Plaza at Ballygunge, Kolkata, WB• Chitrakuth at Ballygunge, Kolkata, WB• Urbana at Anandapur, Kolkata, WBSh lb i G 14 t i d b ildi t B l hi K lk t WB• Shalboni, G + 14 storied building at Belgachia, Kolkata, WB

• Aastha Space Town at Jamshedpur, Jharkhand• Hi Tech City at Jamshedpur, Jharkhand• Talpuri Twin City, Durg, Chattisgarh• Andromida, office building at Salt Lake City, Kolkata, WB• NTPC Township at Barh, Bihar• Eden City at Maheshtala South 24 Parganas WB

9

Eden City at Maheshtala, South 24 Parganas, WB

Page 10: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

• Abo Tani Colony and S & G Resort at Bhatt village, Itanagar, Arunachal Pradesh• IT SEZ Park at Rajarhat, Kolkata, WB• Altair Project (70‐storied) at Colombo, Sri Lanka

E.  Government Establishment

• Fossil Park of Bankura Forest Corporation Division at Illambazar, Birbhum, WB• Administrative building at Debgram, Jalpaiguri of Siliguri Forest Department,  Government of WB  

• Mizoram Guest House of Mizoram Government at Newtown, Rajarhat,  Kolkata, WB

• Office building at Salt Lake Kolkata of Forest Department Government of WBOffice building at Salt Lake, Kolkata of Forest Department, Government of WB• Extension of 'Aranya Bhawan', Central Administrative building of Forest Department, Government of WB

F.  Industrial Infrastructure

• Expansion of Jamuria Plant at Jamuria, Bardhaman, WBp , ,• Expansion of Sial Ghogri Coal Mines of Chhindwara, MP• Expansion of IFB plant at Noorpur, South 24 Parganas, WB• Industrial buildings at Naptha Cracking Plant at IOCL at Panipath, Hariana• Air separation plant for Inox Air at Bokaro, Jharkhand• Factory shed & office at Mango, Jamshedpur, Jharkhand• Kalyani Yeast at Kalyani, WB• Terminal building of Dibrugarh Airport at Dibrugarh, Assam• Taxi metre testing centre at Salt Lake City, Kolkata, WB

G.  Social Sector

• Hope House —Women home & nurses training institute at Thakurpukur, K lk t WBKolkata, WB

• Building Project of YMCA, Wellington branch, Kolkata, WB

H.  Transportation Infrastructure

• Road project at Mizoram• 6 km bicable jigback passenger ropeways at Gangtok Sikkim

10

6 km bicable jigback passenger ropeways at Gangtok, Sikkim

Page 11: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

li f liGlimpses of our Clients   :

11

Page 12: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Corporate  :

MRC Prism Projects Pvt. Ltd. was founded in the Year 2000 by Mr. Arnob Roy and

Mr. Sanjay Majumder, two generic thinking Engineering and Management

Professionals.

MRC Prism Projects is a Professionally Managed Company, the founder

Directors being technically qualified professionals, with proven management

skill and passionate about the business. The Core Management team is a

combination of experienced aged and energetic youthcombination of experienced aged and energetic youth.

12

Page 13: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

The human resource strength :

The organization as on September, 2018 , is a team of around 30qualified and experienced engineering , construction & relatedprofessionals . The team comprises of Civil , Electrical , MEP Engineers &Supervisors , Surveyors , Materials & Inventory experts and Systemsprofessionals.Th b i i d d iThe team members are on constant training and updation programs.

Project level leadership at site office Regular training & development

Close  monitoring  by  Director   Quality  supervision

13

Survey  &  setting out Inhouse Project management software

Page 14: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

We also expertise

14

Page 15: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

h ‘ f ’ hThe ‘Software’ strength :

The organization have very strong inhouse construction management software wing .This gives edges to the entire management control and MIS related to the projects .

‘Builder Shield’ and ‘Construction Shield’ are two ERP softwares designed , developedand implemented by the Company . There is a good Client base for the softwares inp y p y geastern India .

‘Builder Shield’ ‐ Complete management softwarefor Real Estate Development projects

‘Construction Shield’ Complete management software‘Construction Shield’ ‐ Complete management softwarefor EPCC contracts

15

Page 16: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

Certificate of appreciation :

16

Page 17: BRIEF OF THE ORGANIZATIONSteel Frame and brick or modular walls. The above 1.50 Lacs SFt. Accademic Block of a School building completed with Structural Steel frame and brick walls

ISO 9001 – 2015 certified Company :ISO 9001 2015 certified Company :

17