Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1920
2122
2324
2526
2728
2930
3132
3334
3536
37
38
39
40
41
42
43
44
45
46
47
48
49
50
52
53
54
53a
Ea
Eb
Wa
Wb
52a
51a
49a
48a
47a
1a 2a
50a
E.ABUT
W.ABUT
1.88
Fortov
RT SRo
Drawing Number:Scale @A1:
Project:
Title:
Rev:
Design Team:
Copenhagen Inner Harbour Bridge at Vester Voldgade
DO NOT SCALE THIS DRAWING.
Status:
Rev Description Date By Chk'd. App'd.
NOTES:
THE FOLLOWING:
WITH THE TYPES OF WORK DETAILED ON THIS DRAWING, NOTE
IN ADDITION TO THE HAZARDS/RISKS NORMALLY ASSOCIATED
GENERAL NOTES DRAWING NUMBER 033725-DRG-1010.
FOR GENERAL HEALTH AND SAFETY INFORMATION REFER TO
HEALTH AND SAFETY INFORMATION
ENGINEERS DRAWINGS FOR STRUCTURAL DETAILS
DRAWING SHOWS ARCHITECTURAL INTENT ONLY. REFER TO2.
SEF
Client:MAINTENANCE/CLEANING/OPERATION. DECOMMISSIONING/DEMOLITION.CONSTRUCTION. Joint Venture:
FOR GENERAL NOTES REFER TO DRG. No. HAP-GEN-10101.
06/12/17
©WilkinsonEyre.Architects Ltd
IFC - GENERAL REVISION
CONSTRUCTION
01 BRIDGE PLAN
N
- - -
Scale 1:250 @ A1
+2.13m
PIER 1 (FIXED)
PIER 2 (PIVOT)
PIER 3 (PIVOT)
PIER 4 (FIXED)
01
2010
STEEL EDGE BEAMTRIANGULAR SHAPED LONGITUDINAL
OF INFILL VARIES)MESH PARAPET INFILL (DEPTHSTAINLESS STEEL TENSION
CO-ORDINATION REQUIREDOF BLOX PROJECT JETTY.DASHED LINE DENOTES EXTENT
VARYING INCLINATIONPARAPET POST WITHTWINNED STAINLESS STEEL
2022
01
2022
02
2021
01
2021
02
4.5% MAX. GRADIENT
4.5%
MAX. GRADIE
NT
MIN. 4m WIDECYCLE PATH
MIN. 3m WIDE PEDESTRIAN PATH
2020
01
1:250
BRIDGE PLAN
PROVIDES ACCESS TO PIER 2 PEDESTRIAN EDGE PROTECTIONDECK WITH INTEGRATEDHINGED ACCESS HATCH IN
2041
02
+2.60m
+2.56m
+2.00m
01
3000
4% MAX. GRADIENT
3001
01
4% MAX. GRADIENT
REQUIREDBY OTHERS. COORDINATIONHOFOR DRAINAGE OUTLETPROPOSED LOCATION OF
m0.84 = 3 NAPS
m5.82 = 4 NAPS
m0.72 = 5 NAPS
m5.82 = 2 NAPSm3.72 = 1 NAPS
SEE DRAWING 2004TO NAVIGATION LIGHT.ACCESS THROUGH DECK
PILE, REFER TO DRAWING 2004NAVIGATION LIGHT MOUNTED ON
ON PILE, REFER TO DRAWING 2004NAVIGATION PASSAGE LIGHT MOUNTED
AVAILABLE WORKING AREA
PILE, REFER TO DRAWING 2004NAVIGATION LIGHT MOUNTED ON
REFER TO DRAWING 4510SHIP IMPACT PROTECTION RAIL,
S.O.P. 1
S.O.P. 2
S.O.P. 3
S.O.P. 4
NORTHINGS
S.O.P. 1
S.O.P. 2
S.O.P. 3
S.O.P. 4
SETTING OUT POINTS
NAME DESCRIPTION
CENTRE OF WESTERN FIXED PIER
CENTRE OF WESTERN PIVOT PIER
CENTRE OF EASTERN PIVOT PIER
CENTRE OF EASTERN FIXED PIER
EASTINGS
139,956.875
139,963.963
139,984.578
140,001.334-71,342.876
-71,319.874
-71,276.736
-71,249.179
PROVIDES ACCESS TO PIER 3 PEDESTRIAN EDGE PROTECTIONDECK WITH INTEGRATEDHINGED ACCESS HATCH IN
DRAWING 2004MOUNTED ON PILE, REFER TONAVIGATION PASSAGE LIGHT
HEIGHTS
+1.020m
+2.900m
+1.020m
+2.900m
WEA-ARC-2002
81°
113°
140,023.268-71,363.708 +1.600m
S.O.P. W1
S.O.P. W2
S.O.P. E1
S.O.P. E2
-71,368.690 140,017.898 +1.600m
-71,216.325 139,955.252 +1.650m
-71,225.397 139,944.327 +1.880m
S.O.P. W1
S.O.P. W2
S.O.P. E1
S.O.P. E2
2038 FOR DETAILS.INFILL. REFER TO DRAWING OF REMOVABLE PARAPET HATCHED AREA DENOTES EXTENT
DRAWING 6020 FOR DETAILS.MID-SPAN JOINT. REFER TOMOMENT CONNECTIONS AT
WIDTH 7.2mTOTAL CLEAR
INTERSECTION OF Wa & W. ABUT.
INTERSECTION OF Wb & W. ABUT.
INTERSECTION OF Ea & E. ABUT.
INTERSECTION OF Eb & E. ABUT.
2042
02
35m CLEAR WIDTH (BRIDGE IN OPEN POSITION)
TOTAL LENGTH OF BRIDGE = 1
59.3m
AND WARNING LIGHTSMAST CONTAINING CCTV CAMERA
DIMENSIONS: 1.048m x 0.350m x 0.385mMOUNTED ON STEEL BASE PLATE. INTEGRATED SPEAKER EQUIPMENT 2no. GATE MOTOR HOUSINGS WITH
DIMENSIONS: 1.048m x 0.350m x 0.385mMOUNTED ON STEEL BASE PLATE. INTEGRATED SPEAKER EQUIPMENT 2no. GATE MOTOR HOUSINGS WITH
WHITE DIVIDING LINE (SYSTEM: THERMOPLAST)
CAMERA AND WARNING LIGHTS MAST CONTAINING CCTV
(COLOUR: GUYANAN BAUXITE - LIGHT GREY) SURFACING TO DECKNON-SLIP EPOXY AGGREGATE
(SYSTEM: THERMOPLAST)ON PARAPET GRID LINES AT GATES CENTRED 300mm THICK WHITE STOP
(SYSTEM: THERMOPLAST)JOINTS AND STOP LINE COORDINATED AROUND LINE WITHIN CYCLE LANE DASHED WHITE DIVIDING
(SYSTEM: THERMOPLAST)ON PARAPET GRID LINES AT GATES CENTRED 300mm THICK WHITE STOP
(BRIDGE IN
CLOSED POSITI
ON)
20.0m x 5.4
m CLEAR W
IDTH
H
H
REFER TO DRAWING 2080DRAINAGE GULLY (8no.)
TO LIGHTING DRAWINGS)"SKY PARK" (REFER4no. LIGHT POLES