2016 UNDERWATER
BRIDGE INSPECTION REPORT
BRIDGE #
DISTRICT: COUNTY: CITY/TOWNSHIP:
Date of Inspection:
Equipment Used:
Inspected By:
Report Written By:
Report Reviewed By:
Final Report Date:
24542
LAKEVIEW BLVD over FOUNTAIN LAKE
District 6 Freeborn Albert Lea
06/16/2016
Forsyth, Roy
Roy Forsyth
City or Municipal Highway AgencyOwner:
MinnesotaSTATE:
UNDERWATER SUMMARY 3
UNDERWATER INSPECTION 4
UNDERWATER INSPECTION PROCEDURES 6
STRUCTURE INVENTORY 7
ELEMENTS 8
PICTURES 12
DRAWINGS 14
TABLE OF CONTENTS
PAGE NUMBER
Contractor:
(A) Reinspect the submerged substructure units at the normal maximum recommended (NBIS) interval of sixty (60) months.
Collins Engineers, Inc.
9687Contractor Job Number:
RECOMMENDATIONS
REPORT SUMMARY
UNDERWATER INSPECTION
The substructure units inspected at Bridge No. 24542, Piers 1 and 2, were found to be in good condition. The steel piles exhibited only light surface corrosion with no structural deficiencies. The channel bottom material consisted of silty sand with scattered 6 inch to 24 inch diameter riprap.
(A) The steel pile casings typically exhibited loss of paint coating and light surface corrosion from waterline to the channel bottom.
(B) The channel bottom material typically consisted of silty sand with 2 inches of probe rod penetration and scattered 6 inch to 24 inch diameter riprap.
INSPECTION FINDINGS
Page 3 of 15
The bottom of the pier cap on the upstream nose of Pier 1.Water Level Reference:
WATERLINE DATUM
Waterline Elevation (feet):
The waterline was approximately 3.2 feet below reference.Description:
1215.72
4.
Piers 1 and 2 Substructure(s) Inspected:
SUBSTRUCTURE INSPECTION DATA
General Shape:
4.8Maximum Water Depth at Substructure(s) Inspected (feet):
The abutments each consist of a reinforced concrete breastwall and two perpendicular reinforced concrete wingwalls. The piers each consist of a single line of 8 steel encased Cast-In-Place concrete piles.
Code:Item 62: Culvert:
8
Y 48 06/2016Code:Item 92B: Underwater Inspection:
Code:
(Minnesota specific codes are used for 92B and 113)
NBIS CODING INFORMATION5.
Item 60: Substructure:
Item 61: Channel and Channel Protection:
7Code:
District 6District:
LAKEVIEW BLVD
County:
The bridge consists of three spans of precast concrete double-tees. The superstructure is supported by two reinforced concrete abutments and two steel encased pile bents. The bents are labeled Piers 1 and 2 starting from the westerly direction.
Bridge Description:
024 - Freeborn
Facility Carried:
BRIDGE DATA1.
UNDERWATER INSPECTION
Bridge #:
FOUNTAIN LAKEFeature Intersected:
24542
Underwater Visibility (feet):
Cloudy, 60°FWeather Conditions:
0.5 ft
3.
None/Negligible Waterway Velocity (ft/sec):
06/16/2016
Professional Engineer/Team Leader:
INSPECTION DATA2.
Roy A. Forsyth
Date of Underwater Inspection:
Marc SternInspection Diver:
Page 4 of 15
885 Scour 1 EA 1
STRUCTURAL ELEMENT CONDITION RATING
Conditions
6.
L
Bridge is scour critical because abutment or pier foundation is rated as unstable due to observed scour at bridge site.
Item 113: Scour Critical Bridge: Code:
No (Mark your selection with an X)Yes X
225
CS3 CS4
Cast-In-Place (CIP) Piling 1616 EA
CS2ELEM # Unit CS1Element Description Quantity
Page 5 of 15
The routine underwater inspection of Bridge 24542 (Lakeview Blvd. over the Fountain Lake) was completed on June 16, 2016. The underwater inspection was conducted from shore. The inspection was conducted by a team consisting of a PE-Diver with a valid MnDOT Team leader certification, a backup diver and a dive tender. Due to waterway conditions at the time of inspection, the inspection could be accomplished by wading in accordance with OSHA regulations. Profiles were taken along the upstream and downstream faces of the bridge and around the periphery of substructure units to determine the presence, location and area of scour.The bridge elements inspected consisted of 2 piers with 8 CIP piles each. According to the bridge inventory or design drawings, Piers 1 and 2 were founded on CIP piles. Inspection procedures followed FHWA guidance and the MnDOT Bridge and Structure Inspection Program Manual with channel bottom probing to search for bottom foundations. The routine underwater inspection frequency is recommended to remain at 60 months based on those findings and risk factors. Also, inspection procedures should continue to follow the above approach and standard guidance with 100% Level I and 10% Level II intensity efforts.
INSPECTION PROCEDURES
UNDERWATER INSPECTION
Page 6 of 15
Spec. Feat.Pier Foundation (Material/Type)
8 - CIPCantilever ID
+ W A T E R W A Y +Number of Spans Historic Status
4 - PILE BENT
Underwater 60Culvert Type 3 - FTG PILE
Pinned Asbly.
06/16/2016
Barrel Length
93.6 ft. Navigation Control
Waterway Opening (sf.) 312Structure Length
ft. Year Painted
0 - No nav. control on waterwayDeck Width (Out-to-Out) 58.3
+ P A I N T +
APPR: 0 TOTAL:5 - Not eligible
MAIN: 3
Main Span Length 36.0 ft.Drainage Area (sq. mi.) 37.5
B R I D G E D A T A +Main Span Detail
N - NOT REQUIRED+ M I S C.
Appr. Span Type Structure Flared
GR Termini N - NOT REQUIRED
Appr. Guardrail
Main Span Type 2 - Concrete Continuous Median Width On Bridge
ft. Bridge Railing 1 - MEETS STANDARDS
N - NOT REQUIRED
Main Span Design 09 - Slab Span
ft. GR Transition
Skew 0
Y/N Freq Date
Abutment Foundation (Material/Type)
1 - CONC Frac. Critical
D E P T H I N S P. +Appr. Span Design
0 - No flare+ I N
Appr. Span Detail Field Conn. ID
Parallel Structure N - No parallel structure
Pier Protection
0 - Not Required
Rating Date 4/1/20093372 sq. ft. Traffic
ft. 50B. Rt 10.00Sidewalk Width 50A. Lt 10.00
Roadway Area (Curb-to-Curb)
Posted Load 0 - Not Required
PostingStructure Area (Out-to-Out) 5473 sq. ft.
DBL:VEH: SEMI:
Rt 01 ARail Type Lt 01 C N - N/AN - N/A B N - N/A
N - Not Applicable Overweight Permit CodesCurb Height Lt
ft. Horizontal 0 - Not Required
0.66 ft. Vertical0.66 ft. Rt
0Wear Surf Install Year
sq. ft. Nav. Vert. Lift Bridge Clear. (ft.)
L - STBL - LOW RISK
Year 2004Primer Type MN Scour Code
Painted Area
Unsound Paint % Nav. Clr. (ft.)
1 - Not required
Deck Material 1 - Concrete Cast-in-Place 0.0Wear Surf Type 1 - Monolithic Concrete
(concurrently placed with stru
Vert. 0.0 Horiz.
S I G N S +Operating Rating 2 - HS TRUCK
1 - Epoxy Coated Reinforcing + B R I D G E
Inventory Rating 2 - HS TRUCK 22.1
40.3Deck Rebars Install Year 2004
Deck Rebars
Finish TypeWear Course/Fill Depth ft.
0 - None
Design Load A - HL 93
+ C A P A C I T Y R A T I N G S +Deck Membrane
43 ° 39
Inspector Name Forsyth, Roy
Latitude Control Section (TH Only) Status' 40.82 ''
2 - 2-way traffic
Routine Inspection Frequency 24
Sect., Twp., Range
0.6 MI S OF JCT CSAH 20 Level of Service 1 - MAINLINE
- 21W Roadway Type5 - 102N
Detour Length 1.0 mi.R A T I N G S +
Custodian 04 - City or Municipal Highway Agency
Owner 04 - City or Municipal Highway Agency
Deck 6 Unsound Deck %
C O N D I T I O N° 23 '
A - Open
Longitude 93 000+00.970 + N B I 7.63 '' Reference Point
Crew
+ I N S P E C T I O N +
Agency Br. No. 129
District 06
Bridge Match ID (TIS) 0 Userkey
LAKEVIEW BLVD over FOUNTAIN LAKE
Minnesota Structure Inventory Report
Bridge ID: 24542
+ G E N E R A L + + R O A D W A Y +
Date: 07/25/2016
Sufficiency Rating 98.7Roadway Name or Description
111
City Albert Lea
Routine Inspection Date 05/12/2016
Desc. Loc.
Township LAKEVIEW BLVD(MSAS 111)
Number
NRoadway O/U Key Route On StructureMaint. Area 6B Structurally Deficient
NRoute Sys 05 - MSASCounty 024 - Freeborn Functionally Obsolete
Lanes
Waterway Adequacy 9Max. Vert. Clear.
ft.Legislative District 27Aft.Potential ABC 2 - N/A ft.
ft.On - Off System Roadway Width 36.00 ft.
Vertical Clearance ft.1 - ON
Underclearances N
Service On 5 - Highway-pedestrian Appr. Surface Width+ S A F E T Y F E A T U R E S +
5 - Waterway Bridge Roadway Width 36.0
36.0 ft.
Service Under
ft.
ft. Approach Alignment 8Horizontal Clear.
ft.
ft.+ S T R U C T U R E + Lateral Clearance
HCADT ADTT7
Year Built 2004
MN Year Reconstructed Functional Class
%Channel 8
Substructure
0Superstructure 6
ON 2 UNDER
3594 YEAR 2008BMU Agreement ADT
Structure Evaluation 6If Divided
D I M E N S I O N S +Bridge Plan Location 4 - MUNICIPAL
Deck Geometry 5NB-EB SB-WBDate Opened to Traffic
+ R D W Y
FHWA Year Reconstructed
MN Temporary Status
16 - Urban - Minor ArterialCulvert N
A P P R A I S A L R A T I N G S +N - Not Applicable + N B I
Page 7 of 15
County:
City:
Township:
Township:Section: Range:
Span Type:
NBI Deck: Super: Sub: Chan: Culv:
Appraisal Ratings - Approach: Waterway:
Required Bridge Signs - Load Posting:
Horizntal:
Traffic:
Vertical:
MN Scour Code:
Open, Posted, Closed:
Location:
Route:
Control Section:
Local Agency Bridge Nbr.:
Ref. Pt.:
Maint. Area:
Length:
Deck Width:
Rdwy. Area/ Pct. Unsnd:
Paint Area/ Pct. Unsnd:
Culvert:
Freeborn
Albert Lea
102N5 21W
2 - Concrete Continuous 1 - Slab
6 6 7 8 N
8 9
0 - Not Required
0 - Not Required
0 - Not Required
N - Not Applicable
L - STBL - LOW RISK
0.6 MI S OF JCT CSAH 20
05 - MSAS 111 000+00.970
6B
93.6
58.3
3372 sq. ft. / %
sq. ft. / %
N/A
A - Open
ft.
ft.
Postings:List:
MINNESOTA BRIDGE INSPECTION REPORT
09/14/2016
Inspector: CO Bridge
BRIDGE 24542 LAKEVIEW BLVD OVER FOUNTAIN LAKE
Unofficial Structurally Deficient N
NUnofficial Functionally Obsolete
Unofficial Sufficiency Rating 98.7
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4REPORT TYPE
Reinforced Concrete Slab 07/25/2016 5473 SF 5445 28 0 038 Underwater
05/12/2016 5473 SF 5445 28 0 0Routine
Notes: All three spans have full length longitudinal cracks beneath the deck with leeching.[2014] - cracks are 0.016" in width[2016] - 28sf of leaching cracks (0.016" in width)
510 - Wearing Surfaces 3372 SF 3372 0 0 0
Notes: Concrete Slab with Cathodic Protection System Notes: There are no spalls, delaminations, or patches noted in the surface of the deck.[2014, 2016] - no change
Underwater 07/25/2016
3372 SF 3372 0 0 0Routine 05/12/2016
Reinforced Concrete Abutment 07/25/2016 160 LF 150 10 0 0215 Underwater
05/12/2016 160 LF 150 10 0 0Routine
Notes: North Abutment[2012] - 2 vertical cracks in the NW wing.[2014] - 4 minor cracks (<.002" in width) in face of abutment[2016] - no change
South Abutment[2012] - 1 vertical crack in the SW wing. 1 vertical / 1 diagonal crack in the SE wing.[2014] - 3 minor cracks (<.002" in width) in face of abutment[2016] - no change
Steel Pile 07/25/2016 16 EA 0 16 0 0225 Underwater
05/12/2016 16 EA 0 16 0 0Routine
Notes: Pier # 1 - all CIP piling were in good condition at the time of this inspection with only a few small minor chips. CIP pilings 1, 2, 4, 6 & 8have small 2" diameter patched holes on both north and south sides located approximately 2' down from the bottom of the cap, the holes wereplaced and patched during the construction to aid in the construction of the cap.[2014] - no change[2016] - no structural damage or section loss
Pier # 2 - all CIP piling were in good condition at the time of this inspection with only a few small minor chips. CIP pilings 1, 2, 4, 6 & 8 havesmall 2" diameter patched holes on both north and south sides located approximately 2' down from the bottom of the cap, the holes were placedand patched during the construction to aid in the construction of the cap.[2014] - no change[2016] - no structural damage or section loss
515 - Steel Protective Coating 250 SF 125 125 0 0
Notes: [2016] - minor paint deterioration on bottom half of CIPs
Underwater 07/25/2016
250 SF 125 125 0 0Routine 05/12/2016
Page 8 of 15
Reinforced Concrete Pier Cap 07/25/2016 114 LF 114 0 0 0234 Underwater
05/12/2016 114 LF 114 0 0 0Routine
Notes: There are no cracks or spalls in the pier caps.
[2014, 2016] - no change
Pourable Joint Seal 07/25/2016 76 LF 76 0 0 0301 Underwater
05/12/2016 76 LF 76 0 0 0Routine
Notes: The pourable joints are the approach panel joints.
[2016] - all joints are sealed
Reinforced Concrete Approach Slab 07/25/2016 1440 SF 1436 4 0 0321 Underwater
05/12/2016 1440 SF 1436 4 0 0Routine
Notes: North Approach - There are no signs of approach panel settlement. There is one full length unsealed longitudinal crack and scatteredrandom cracks all unsealed.
South Approach - There are no signs of approach panel settlement. There is one full length unsealed longitudinal crack. The curb along thewest side has a cracked and delaminated area approximately 3 feet in length and a small delaminated area along the end of the deck. [2014] -curb has been replaced
[2014, 20160 LF of moderate sized, sealed cracks on both approaches.
Metal Bridge Railing 07/25/2016 235 LF 212 23 0 0330 Underwater
05/12/2016 235 LF 212 23 0 0Routine
Notes: The railing is 28" high concrete base with a 26" high painted steel rail attached to the concrete.
[2016] - N structural damage to railing. Anchorages are secure.
515 - Steel Protective Coating 430 SF 430 0 0 0
Notes: [2016] - paint on railing and posts is slightly faded but in good condition.
Underwater 07/25/2016
430 SF 430 0 0 0Routine 05/12/2016
Reinforced Concrete Bridge Railing 07/25/2016 265 LF 240 25 0 0331 Underwater
05/12/2016 265 LF 240 25 0 0Routine
Notes: The railing is 28" high concrete base with a 26" high painted steel rail attached to the concrete.
East Side Rail - There are 5 scattered vertical cracks in the concrete rail. There is an area of short random cracks and a small delamination atthe top of the concrete rail under the 8th steel rail post counting from the south end of the bridge.[2014] - There are 23 scattered vertical cracks in the concrete rail.[2016] - no change
West Side Rail - There are up to 2 vertical cracks per rail section.[2014] - There are up to 2 vertical cracks per rail section. There is a small area of delam under the 4th post from the south[2016] - no change
Critical Deficiencies or Safety Hazards 07/25/2016 1 EA 1 0 0 0800 Underwater
05/12/2016 1 EA 1 0 0 0Routine
Notes: [2014, 2016] - No critical findings were observed at the time of this inspection.
Concrete Decks - Cracking & Sealing 07/25/2016 250 LF 250 0 0 0810 Underwater
05/12/2016 250 LF 250 0 0 0Routine
Notes: Deck cracks were open again at the time of this inspection.[2012] - deck cracks are open.[2014] - 260 LF of moderately sized, sealed and unsealed cracks.[2016] - 250 lf of moderately sized, sealed cracks.
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 24542 LAKEVIEW BLVD OVER FOUNTAIN LAKE
REPORT TYPE
Page 9 of 15
Approach Relief Joint 07/25/2016 76 LF 4 8 64 0816 Underwater
05/12/2016 76 LF 4 8 64 0Routine
Notes: North End[2016] - 34lf of joint is missing and filled with bituminous
South End[2016] - 8lf of lost adhesion. 30lf of joint is missing and filled with bituminous
Scour 07/25/2016 1 EA 1 0 0 0885 Underwater
Slopes & Slope Protection 07/25/2016 1 EA 1 0 0 0892 Underwater
05/12/2016 1 EA 1 0 0 0Routine
Notes: There is a 4' X 8' area along the north slope under the bridge where the rip-rap has been displaced.[2014, 2016] - most riprap is present and in good condition
Deck & Approach Drainage 07/25/2016 1 EA 1 0 0 0894 Underwater
05/12/2016 1 EA 1 0 0 0Routine
Notes: [2014, 2016] - There is no ponding of water on the deck. All deck drains were open at the time of inspection.
Sidewalk, Curb, & Median 07/25/2016 1 EA 1 0 0 0895 Underwater
05/12/2016 1 EA 1 0 0 0Routine
Notes: All sidewalk cracks were sealed in 2007. The west sidewalk has scattered areas of scaled concrete.2012 - open cracks in sidewalks.[2014] - 12"x6" area of crack/spall on SE approach sidewalk. sidewalk is settled 1/2". NW approach sidewalk is cracked and settled. soundslike a possible void under the 1st panel off of the bridge.[2016] - NW sidewalk and curb has been patched. Random cracks in both sidewalks have been sealed.
Miscellaneous Items 07/25/2016 1 EA 1 0 0 0899 Underwater
05/12/2016 1 EA 1 0 0 0Routine
Notes: [2014] - there are 4 lights under the center span for boat traffic
Protected Species 07/25/2016 1 EA 0 1 0 0900 Underwater
05/12/2016 1 EA 0 1 0 0Routine
Notes: [2016] - Swallow nests are present
General Notes: Bridge 24542
Bridge was built in 2004 and replaced Bridge 90495.
All spans and piers and numbered from the south.
Channel - NBI 8 Banks were well protected at the time of this inspection.
Bridge is inspected by MN/DOT personnel.
[2010] - inspected by Robert Pyfferoen. An extra inspection was done off the ice on 2/3/2010 by Brian Haugen and PeteMcFarland.[2012] - inspected by Tom Miles.[2014] - inspected by Tom Miles and assisted by Tony Bale[2016] - inspected by Robert Pyfferoen
58. Deck NBI:
36A. Brdg Railings NBI:
36B. Transitions NBI:
36C. Appr Guardrail NBI:
36D. Appr GuardrailTerminal NBI:
[2014] - moderate sized cracks
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 24542 LAKEVIEW BLVD OVER FOUNTAIN LAKE
REPORT TYPE
Page 10 of 15
ELEMNBR ELEMENT NAME INSP. DATE QUANTITY
QTYCS 1
QTYCS 2
QTYCS 3
QTYCS 4
BRIDGE 24542 LAKEVIEW BLVD OVER FOUNTAIN LAKE
REPORT TYPE
Inspector's Signature Reviewer's Signature
Inventory Notes:
59. Superstructure NBI:
60. Substructure NBI:
61. Channel NBI:
62. Culvert NBI:
71. Waterway Adeq NBI:
72. Appr RoadwayAlignment NBI:
[2014] - minor cracking on underside and railings.
[2014] - minor sized cracks
[2014] - well protected
[2016] - no speed reduction required
Page 11 of 15
Photo 2 - View of West Abutment, looking west.
Photo 3 - View of East Abutment, looking east.
Pictures
Page 12 of 15
Pictures
Photo 4 - View of Pier 1, looking east.
Photo 5 - View of Pier 2, looking west.
Page 13 of 15