Upload
brent-gardner
View
220
Download
4
Embed Size (px)
DESCRIPTION
A representation of my architectural and graphic design work at Norwich University
Citation preview
Brent Mark GardnerWo r k Ex p E r i E n c E
Norwich University Architecture and Art Department - Northfield, VT: Employed: Fall 2008 - Spring 2010 Graphic Designer for the Norwich University Architecture and Art Lecture Series, Student Media Advertisement Advisor, Exposed to a Wide Variety of Current Architects and Artists, and Learned to Be Self Motivated and Self Critical with My Own Work
Watershed Studio - White River Junction, VT:Employed/Interned: Summer 2011 Internship with jobs allocated to drafting with AutoCAD, Rendering,Photoshop, InDesign, and Client Relations Involving Code Regulations.
Plymouth Area Renewable Energy Initiative (PAREI) - Plymouth, NH:Employed/Interned: Summer 2010 Installation of Solar Thermal Collector Systems, Design of Solar Informational / Advertisement Posters, House Weatherization, Green Home Carpentry, Practical Application of Cheap Solutions for Sustainable Design
The Rocks Estate - Bethlehem, NH:Employed: Fall 2003 - Summer 2010 Management of Other Laborers, Assisted in Management of Weddings Operations, Framing, Roofing, and Siding of Simple Structures, Tree Topping / Shearing / Shaping, Tractor and OHRV Repair.
Sk i l l S
Ad o b e Ph o t o s h o P
Ad o b e In d e s I g n
Ad o b e I l l u s t r A t o r
MI c r o s o f t of f I c e Pr o g r A M s
Au t ocAd Ar c h I t e c t u r e
Au t o d e s k re v I t
go o g l e sk e t c h-uP
Ar t l A n t I s
rh I n o
br A z I l
3
On-Site Assembly:
Starts at 8AM
Solar Decathlon 2011rEA(V) HouSE - rEnEWAblE EnVironmEntAl AdAptAblE VErmont HouSE
reA(v) house desIgned to be AsseMbled In 8 hours, under $110,000 wIth cArbonIzed wood sIdIng, A concePt of sIMPle box lIvIng sPAce covered wIth An outdoor enveloPe (double skIn) thAt serves As covered functIonAl sPAces, And utIlIzes A 2kw PhotovoltAIc systeM, solAr therMAl collectors, AllowIng the buIldIng to be self-sustAInIng. the Project concePt Is Also beIng reused for the 2013 solAr decAthlon.
cArbonIzIng heMlock for PArt of exterIor of reA(v)
InterIor
kItchen+lIvIng
sPAce
REA(V) 2010
4
On-Site Assembly:
Completed by 4PM
InterIor
kItchen+lIvIng
sPAce
tHESiS projEctElEctric cAr intEgrAtion
electrIc vehIcles sell theIr energy to locAl electrIc grId
durIng hIgh PeAk hours of the dAy
tHE dESign
the pArking FAcility Is desIgned to utilizE the EnErgy gEnErAtEd For And StorEd in ElEctric VEHiclES so thAt EnErgy cAn tHEn bE Sold bAck to tHE locAl grid durIng the PeAk hours of the dAy wIth the orgAnIzAtIon of the SmArt grid. thIs Allows EnErgy to comE From locAl rEnEWAblE SourcES And tHE EmployEES oF tHE buSinESSES WitHin tHoSE toWnS
The Charging Infrastructure
When Parking an Electric Vehicle in the Garage, one would Park as Normal in between the set lines
WheN oNe leaves Their vehicle and is out of the way, the charge sTaTioN is triggered To DesceND from the ceiliNg joint between floor panels, in line with the parking spots. For each
line there are two charge station posts
Once the charge station post has came up into position, one can selecT a time and scheDule aND Walk aWay
While the elecTric vehicle recharges
If one Parks on the roof of the eV Facility, because there is No roof, the charge sTaTioN post is locaTeD iN
the floor
Charging Rules of eV Facility
All EnErgy that is not used to ChArgE ElECtriC VEhiClEs is sold to thE loCAl EnErgy grid
At ‘high PEAk’ hours, thE EnErgy from fully ChArgEd ElECtriC VEhiClEs’ is sold to the loCAl EnErgy grid
for a highEr Profit
The EnErgy gEnErAtEd by the EV fACility is only usEd to ChArgE ElECtriC VEhiClEs when a mAjority of them are
not fully ChArgEd
To LocAL ELEcTric GridTo LocAL ELEcTric Grid
When not ‘high PEAk’ hours, ElECtriC VEhiClEs can alsobe ChArgEd by the loCAl EnErgy grid
From LocAL ELEcTric Grid
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
The Charging Infrastructure
When Parking an Electric Vehicle in the Garage, one would Park as Normal in between the set lines
WheN oNe leaves Their vehicle and is out of the way, the charge sTaTioN is triggered To DesceND from the ceiliNg joint between floor panels, in line with the parking spots. For each
line there are two charge station posts
Once the charge station post has came up into position, one can selecT a time and scheDule aND Walk aWay
While the elecTric vehicle recharges
If one Parks on the roof of the eV Facility, because there is No roof, the charge sTaTioN post is locaTeD iN
the floor
Charging Rules of eV Facility
All EnErgy that is not used to ChArgE ElECtriC VEhiClEs is sold to thE loCAl EnErgy grid
At ‘high PEAk’ hours, thE EnErgy from fully ChArgEd ElECtriC VEhiClEs’ is sold to the loCAl EnErgy grid
for a highEr Profit
The EnErgy gEnErAtEd by the EV fACility is only usEd to ChArgE ElECtriC VEhiClEs when a mAjority of them are
not fully ChArgEd
To LocAL ELEcTric GridTo LocAL ELEcTric Grid
When not ‘high PEAk’ hours, ElECtriC VEhiClEs can alsobe ChArgEd by the loCAl EnErgy grid
From LocAL ELEcTric Grid
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
Parking Garage
Local Energy Grid
Electric Vehicle(s)
Home(s) of Electric Vehicle(s)
Midnight
Noon
5 7
9Low Peak
Hours
High Peak Hours
Mid Peak Hours
Mid Peak Hours
PARKING GARAGE ELECTRIC
VEHICLE(S)
ELECTRIC VEHICLE HOMES
LOCAL ENERGY GRID
East Building160 EV Parking Capacity1.2 MW Avg. Power/Day
West Building390 EV Parking Capacity1.5 MW Avg. Power/Day
Building Energy Generation vs Parking Capacity
810 KW/Hour ToTAl ArrAy x 3-5 Hours of MAxiMuM ExPosurE 2.4 - 4 MW AVErAgE PoWEr gEnErATion / DAy
4AM 8AM 10AM 12PM 2PM 4PM 6PM 8PM 12AM 2AM
100% Capacity
75%
50%
25%Electric Car Charging load
eV facility solar generating Capacity
ToTAl CAr loAD AT100% CAPACiTy = 5 MW
EV fACiliTy EnErgy gEnErATED - 1 DAy = 2.4 - 4 MW
1-2.5 MW DiffErEnCE CAn BE offsET WiTh EnErgy froM griD Duringoff PEAk hours
The Charging Infrastructure
When Parking an Electric Vehicle in the Garage, one would Park as Normal in between the set lines
WheN oNe leaves Their vehicle and is out of the way, the charge sTaTioN is triggered To DesceND from the ceiliNg joint between floor panels, in line with the parking spots. For each
line there are two charge station posts
Once the charge station post has came up into position, one can selecT a time and scheDule aND Walk aWay
While the elecTric vehicle recharges
If one Parks on the roof of the eV Facility, because there is No roof, the charge sTaTioN post is locaTeD iN
the floor
Charging Rules of eV Facility
All EnErgy that is not used to ChArgE ElECtriC VEhiClEs is sold to thE loCAl EnErgy grid
At ‘high PEAk’ hours, thE EnErgy from fully ChArgEd ElECtriC VEhiClEs’ is sold to the loCAl EnErgy grid
for a highEr Profit
The EnErgy gEnErAtEd by the EV fACility is only usEd to ChArgE ElECtriC VEhiClEs when a mAjority of them are
not fully ChArgEd
To LocAL ELEcTric GridTo LocAL ELEcTric Grid
When not ‘high PEAk’ hours, ElECtriC VEhiClEs can alsobe ChArgEd by the loCAl EnErgy grid
From LocAL ELEcTric Grid
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
The Charging Infrastructure
When Parking an Electric Vehicle in the Garage, one would Park as Normal in between the set lines
WheN oNe leaves Their vehicle and is out of the way, the charge sTaTioN is triggered To DesceND from the ceiliNg joint between floor panels, in line with the parking spots. For each
line there are two charge station posts
Once the charge station post has came up into position, one can selecT a time and scheDule aND Walk aWay
While the elecTric vehicle recharges
If one Parks on the roof of the eV Facility, because there is No roof, the charge sTaTioN post is locaTeD iN
the floor
Charging Rules of eV Facility
All EnErgy that is not used to ChArgE ElECtriC VEhiClEs is sold to thE loCAl EnErgy grid
At ‘high PEAk’ hours, thE EnErgy from fully ChArgEd ElECtriC VEhiClEs’ is sold to the loCAl EnErgy grid
for a highEr Profit
The EnErgy gEnErAtEd by the EV fACility is only usEd to ChArgE ElECtriC VEhiClEs when a mAjority of them are
not fully ChArgEd
To LocAL ELEcTric GridTo LocAL ELEcTric Grid
When not ‘high PEAk’ hours, ElECtriC VEhiClEs can alsobe ChArgEd by the loCAl EnErgy grid
From LocAL ELEcTric Grid
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
Fro
m E
v F
Ac
iLiTy
7
8
Poster Designs
Stephen KieranApril 19 at 5 PM
Chaplin Hall Gallery
P o s t e r D e s i g n s
CNC SYMPOSIUM
nathan king steve sanderson philip beesley
march 9, 2012 chaplin hall
g a l l e r y
THE LEAD RESEARCHER AT GSD DESIGN ROBOTICS GROUP OF
THE HARVARD GRADUATE SCHOOL OF DESIGN
FOUNDING PRINCIPAL OF PHILIP BEESLEY ARCHITECT INC.
AND PROFESSOR AT UNIVERSITY OF WATERLOO
FOUNDER AND PARTNER AT CASE DESIGN INC AND LEAD BUILDING PERFORMANCE AND
TECHNOLOGY STRATEGIST
o n e fivethreep m p m p m
O P E N T O T H E P U B L I C S P O N S E R E D B Y NORWICH SCHOOL OF ARCHITECTURE+ART