BRENT AREA
BRENT AREA
BRENT AREA
The Brent field is located 181km (112 miles) east of Lerwick, Scotland in a depth of 141m water and has four platforms - Alpha, Bravo, Charlie and Delta.
Alpha - steel jacket structure Bravo - gravity base structure with 16 storage tanks Charlie - gravity base structure with 32 storage tanks Delta - gravity base structure with 16 storage tanks
The Brent field is currently in the process of being decommissioned. Brent Delta reachedCessation of Production (CoP) on 31 December 2011; Alpha and Bravo reached CoP on1 November 2014. Charlie is still in production.
KEY FACTS Block
Approx distance to land
Water Depth
Hydrocarbons Produced
Export Method
Operated / Non-Operated
211/29a, 211/29b, 211/29c, 211/29d
181km (112 miles) North East of Lerwick
463ft (141m)
Oil and Gas
Exports gas directly into FLAGs. All liquids exported via Brent Pipeline System to Sullom Voe Terminal
Operated
Sector Northern North Sea
Graphics, Media & Publication Services (Aberdeen) ITV/UZDC : Ref. 021799 January 2015
BRENT AREA
INFRASTRUCTURE INFORMATION
HIGH LEVEL CAPACITY INFORMATION
Entry Specification:
Outline details of primary separation processing facilities:
Outline details of gas treatment facilities:
Disclaimer: All the above information is provided by Shell U.K. Limited (for itself, and other Shell group companies including Enterprise Oil U.K. Limited);- In good faith and without any liability- Without warranty, implied or express to its accuracy or relevance of use to any other party- That in any agreement or arrangement with Shell U.K. Limited its use shall be “Subject to Contract” Shell U.K. Limited reserves the right to update and change the data at any time
The basic capacity information is portrayed by colour coded 'traffic lights' that reflect thresholds of availability over the next 5 years
Available Capacities
Available capacity shown as <5% given preparations for decommissioning
Prospective users should contact the Operator (details below) to discuss their capacity requirements and the extent to which they can/cannot be provided.
Comment2015 2016 2017 2018 2019
CONTACT INFORMATIONShell For further enquiries regarding the above please contact Ian Crisp
+ 44 1224 88 4389 [email protected]
Last update: January 2015
>25% 5% to 25% <5% Unknown
In view of the current status and future plans for the offshore installations, prospective users should contact the Operator (details below) to discuss entry specification and available processing and gas treatment facilities.
Ullage as % of system capacityCapacity