4
Breathing Buildings NVHR+ The incorporation of a heater into the NVHR system allows room pre-heating, and enhanced control over the temperature of air being delivered to the space during occupancy. The combined LTHW heating and ventilation unit means the two services are integrated and optimised for the most efficient use of heating and electrical energy. Heating duty 1.65 kW per NVHR+ unit (3.3 kW per pair) Heating medium Water entering @80 °C leaving 60 °C @ 0.018 l/s LTHW connections 15 mm copper tubing Heating valve 2-port modulating motorised valve Air flow rate 80 l/s – 130 l/s fresh air per NVHR+ unit (depending on requirements) Frost protection (full re-circ) If Text < 5 °C or Tint < 12 °C Morning pre-heat (full re-circ) If Tint < 18 °C hour before occupancy Occupied-day heating If Tint < target temp while occupied Specific Fan Power 0.1 – 0.4 W/l/s (depending on grille / ducting arrangement and required flow) Air flow rate per unit (l/s) External static pressure (Pa) Frequency (Hz) Sound power level Lw dB(A) Free field dB(A) @ 3m (spherical radiation) Predicted room sound pressure level dB(A) (with 1 unit) Predicted room sound pressure level dB(A) (with 2 units) 63 125 250 500 1K 2K 4K 8K 160 6 40 47 42 37 31 27 25 25 39 19 28 31 The low energy heating and mixing ventilation system makes the most of free internal heat gains to temper incoming fresh air in winter, while also providing: Frost protection Pre-occupancy space heating Enhanced control over mixed air delivery temperature Quick-response heating compared to other heating methods Avoidance of over-supplying heat to the space Negates requirement for other sources of heating in the room Integral controller and sensors to run feedback loop Set-points adjustable via BMS Automatic with user override Winter mixing Summer boost Automatic summer night cooling Typically work as single units in small offices (<10 occupants), multiple units in large offices and pairs of units in standard classrooms Morning pre-heat Occupied day heating Issue 1.1 / Apr 16 For full details regarding acoustic tests and data see NVHR datasheet Issue 2.0/Sept 15

Breathing Buildings NVHR+ · breathing buildings reserve the right to change product design without prior notification. NVHR+ INSTALLATION WALL GA Confidential: This document is for

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Breathing Buildings NVHR+ · breathing buildings reserve the right to change product design without prior notification. NVHR+ INSTALLATION WALL GA Confidential: This document is for

Breathing Buildings NVHR+

The incorporation of a heater into the NVHR system allows room pre-heating, and enhanced control over the

temperature of air being delivered to the space during occupancy. The combined LTHW heating and ventilation unit

means the two services are integrated and optimised for the most efficient use of heating and electrical energy.

Heating duty 1.65 kW per NVHR+ unit (3.3 kW per pair)

Heating medium Water entering @80 °C leaving 60 °C @ 0.018 l/s

LTHW connections 15 mm copper tubing

Heating valve 2-port modulating motorised valve

Air flow rate 80 l/s – 130 l/s fresh air per NVHR+ unit (depending on requirements)

Frost protection (full re-circ) If Text < 5 °C or Tint < 12 °C

Morning pre-heat (full re-circ) If Tint < 18 °C hour before occupancy

Occupied-day heating If Tint < target temp while occupied

Specific Fan Power 0.1 – 0.4 W/l/s (depending on grille / ducting arrangement and required flow)

Air flow rate per unit (l/s)

External static

pressure (Pa)

Frequency (Hz) Sound power

level Lw dB(A)

Free field dB(A) @ 3m

(spherical radiation)

Predicted room sound pressure

level dB(A) (with 1 unit)

Predicted room sound pressure

level dB(A) (with 2 units)

63 125 250 500 1K 2K 4K 8K

160 6 40 47 42 37 31 27 25 25 39 19 28 31

The low energy heating and mixing ventilation system

makes the most of free internal heat gains to temper

incoming fresh air in winter, while also providing:

Frost protection

Pre-occupancy space heating

Enhanced control over mixed air delivery

temperature

Quick-response heating compared to other

heating methods

Avoidance of over-supplying heat to the space

Negates requirement for other sources of

heating in the room

Integral controller and sensors to run feedback

loop

Set-points adjustable via BMS

Automatic with user override

Winter mixing

Summer boost

Automatic summer night cooling

Typically work as single units in small offices

(<10 occupants), multiple units in large offices

and pairs of units in standard classrooms

Morning pre-heat

Occupied day heating

Issue 1.1 / Apr 16

For full details regarding acoustic tests and data see NVHR datasheet Issue 2.0/Sept 15

Page 2: Breathing Buildings NVHR+ · breathing buildings reserve the right to change product design without prior notification. NVHR+ INSTALLATION WALL GA Confidential: This document is for

TOLERANCES EXCEPT WHERE OTHERWISE STATED

XX.XXANGLES

0.5MM0.05MM0.5

900

FRONT(DAMPER)

800

3

65

355

960

1000

40 WATER FLOW AND RETURN

CONNECTIONS

14

THRU HOLE

PLAN

1310

1710

170

8

0

60

175

235

RIGHT

HATCHED AREAFOR CABLE ENTRY

16

BACK(GRILLE)

400X250SINGLE DELFECTIONGRILLE

300

280

LEFT

DO NOT DRILLIN DASHED AREAON ALL SIDES

A

400

2

08.5

0 1

200

UNDERSIDE

A

ISOMETRIC

REMOVABLEPANEL FORMAINTENANCEACCESS

REVERSE ISOMETRIC

A

4NO. 50X50 FIXINGBRACKETS(BY BREATHINGBUILDINGS)

NOTES:

WATER FLOW AND 1.RETURN CONNECTIONS TYPE A SHOWN (TYPE B AVAILABLE).GRILLE EFFECTIVE FREE 2.AREA APPROX. 0.063M^2.

WATER FLOW AND RETURN CONNECTIONS(15MM COPPERPIPES)

REMOVABLEPANELS FORMAINTENANCEACCESS

REVISIONS

REV. DESCRIPTION DATE DRAWN

1 UPDATE WEIGHT

12/08/2016 CC

2REVISED BRACKET POSITION

05/09/2016 CC

PRINTED 05/09/2016

2

IF IN DOUBT, ASK!DO NOT SCALE

65431

F

E

D

C

B

A

7

FINISHSATIN WHITE

MATERIAL:

RIDGID FOAM PVC, CLASS 1Y FIRE RETARDANT

MASS WITHOUT PACKAGING

80KG

15 STURTON STREET, CAMBRIDGE, CB1 2SNT: 01223 450060 F: 01223 450061www.breathingbuildings.com/products

BR

EA

THIN

G B

UIL

DIN

GS

CO

NTI

NU

OU

SLY

WO

RK

TO

IMP

RO

VE

OU

R P

RO

DU

CTS

. TO

EN

SU

RE

UP

TO

DA

TE D

RA

WIN

GS

, PLE

AS

E C

ON

TAC

T B

RE

ATH

ING

BU

ILD

ING

S

1601_9001

SCALE 1:20

SURFACE TEXTURE TO BE 1.6 UMRA OR BETTER

DE-BURR ALL SHARP EDGES AND HOLESITEM MUST BE FREE FROM SCRATCHES, DENTS AND

OTHER BLEMISHES.

DIMENSIONS IN MILLIMETRES

SHEET 1 OF 1

TITLE:

DRAWING NO:

DATEDRAWN CHK'DDATE

A3

2 CC 05/09/2016

REV

CONFIDENTIAL: THIS DOCUMENT IS FOR THE USE OF THE MAIN CONTRACTOR, ARCHITECT, M&E DESIGN CONSULTANT AND M&E SUBCONTRACTOR FOR THE PROJECT NAMED IN THIS DOCUMENT OR ACCOMPANYING CORRESPONDENCE. THE CONTENTS SHOULD NOT BE DISCLOSED TO THIRD PARTIES, INCLUDING OTHER EQUIPMENT SUPPLIERS WITHOUT THE PRIOR CONSENT OF BREATHING BUILDINGS. BREATHING BUILDINGS LTD ©.BREATHING BUILDINGS RESERVE THE RIGHT TO CHANGE PRODUCT DESIGN WITHOUT PRIOR NOTIFICATION.

NVHR+ TYPE A

Page 3: Breathing Buildings NVHR+ · breathing buildings reserve the right to change product design without prior notification. NVHR+ INSTALLATION WALL GA Confidential: This document is for

TOLERANCES EXCEPT WHERE OTHERWISE STATED

XX.XXANGLES

0.5MM0.05MM0.5

190

555

1355

960

A

A

SECTION C1-C1

B

B

C

C

A

B

SECTION A-A

INTERNAL SIDE

EXTERNAL SIDE

B MINIMUM 100MM CLEARANCE REQUIRED BETWEEN UNDERSIDE OF UNIT AND CEILING GRID/BULKHEAD

SOFFIT INDICATIVE LOADBEARING SUPPORTS(BY OTHERS)

B

1070 STD

470

S

TD

SECTION B-B

MIXED AIR DELIVERY400X250MM DEFLECTION GRILLE EFFECTIVE FREE AREA APPROX. 0.063M^2(BY BREATHING BUILDINGS)

WALL SLEEVE(BY BREATHINGBUILDINGS)

2UNIT MUST BEINSTALLED ONTHE HORIZONTALPLANE

40

CO

PP

ER

PIP

ES

190

555

960

C L

920S/O 10

100

0

600MIN

14 CLEARANCE

FIXING BRACKETS

800

A

A

SECTION C-C

NVHR SUPPLIED WITH 10X320X500MM FOAMALUX SHEET TO BE MOUNTED VERTICALLY IN DUCT TO MAINTAIN AIR SEPARATION FROM DAMPER TO LOUVRE(BY BREATHINGBUILDINGS)

ACCESS MUST BE PROVIDEDTO REMOVABLE PANELSFOR MAINTENANCE OF UNIT

SECTION A-A

320S/O 10

105 WALL SLEEVE

MIN 85MM IFWALL SLEEVEFULL HEIGHT

210 DETAIL A

SCALE 1 : 10

EXTERNALWEATHERLOUVRE (OPTIONAL,CAN BE SUPPLIEDBY BBL)PIR/PUR

INSULATIONBOARD(BY OTHERS)

>209 ATO ENSURE AIR PATHTO GRILLE ONUNDERSIDE OF UNITIS MAINTAINED

ENSURE EFFECTIVE SEAL,USE EITHER BG1 EXPANDING FOAM TAPE OR "NO NAILS" ADHESIVE OR SIMILAR(BY OTHERS)

10MM FOAMALUX WALL SLEEVEFOR BUILDERS OPENING. MATERIAL CAN BE CUT ON-SITE TO SUIT. INTERNAL DIMENSIONS 901X301MM

SUITABLE FOR BONDING TO INTERNAL WALL(BY BREATHING BUILDINGS)

ENSURE EFFECTIVE AIR-TIGHT SEAL RECOMMEND CLEAR SILICONE SEALANT(BY OTHERS)

A

290

350

200

80

250

DETAIL BSCALE 1 : 10

TERMINAL PANELLID, ACCESS MUSTBE PROVIDED FORMAINTENANCE

2X 15COPPER PIPESFOR WATERMAINS CONNECTION

HATCHED AREAFOR FIELD WIRINGONLY

NOTES:NVHR+ TYPE B SHOWN.1.WALL FRAME CAN BE CUT ON-2.SITE TO SUIT. STRUCTURAL OPENING OF 920X320MM IS REQUIRED.WALL FRAME TO BE ATTACHED 3.TO INTERNAL WALL. FIXING HOLES DRILLED AS REQUIRED ON-SITE.INSULATED DUCT SLEEVE 4.THROUGH WALL TO SUIT STRUCTURAL OPENING, TYP. PIR/PUR INSULATION BOARD.LOAD BEARING SUPPORTS 5.MUST BE SIGNED OFF BY THE STRUCTURAL ENGINEER FOR THE PROJECT.SUSPENDED CEILINGS - 1 NO. 6.600X600 EGG CRATE GRILLES REQUIRED.10X320X500 FOAMALUX 7.SPLITTER NOT REQUIRED IF UNIT FITTED AGAINST REAR OF EXTERNAL WEATHER LOUVRE. NVHR FRONT FACE (DAMPER SIDE) MUST NOT EXTEND INTO FINISHED INTERIOR WALL MORE THAN 150MM.LEAVE PLASTIC PACKAGING ON 8.DURING INSTALLATION.

REVISIONS

REV. DESCRIPTION DATE DRAWN

1 ADDED WEIGHT 12/08/2016 CC

2REVISED BRACKET POSITION

05/09/2016 CC

PRINTED 05/09/2016

2

IF IN DOUBT, ASK!DO NOT SCALE

65431

F

E

D

C

B

A

7

FINISH

MATERIAL:

MASS WITHOUT PACKAGING

NVHR+ 80KG

15 STURTON STREET, CAMBRIDGE, CB1 2SNT: 01223 450060 F: 01223 450061www.breathingbuildings.com/products

BR

EA

THIN

G B

UIL

DIN

GS

CO

NTI

NU

OU

SLY

WO

RK

TO

IMP

RO

VE

OU

R P

RO

DU

CTS

. TO

EN

SU

RE

UP

TO

DA

TE D

RA

WIN

GS

, PLE

AS

E C

ON

TAC

T B

RE

ATH

ING

BU

ILD

ING

S

1604_9001

SCALE 1:20

SURFACE TEXTURE TO BE 1.6 UMRA OR BETTER

DE-BURR ALL SHARP EDGES AND HOLESITEM MUST BE FREE FROM SCRATCHES, DENTS AND

OTHER BLEMISHES.

DIMENSIONS IN MILLIMETRES

SHEET 1 OF 1

TITLE:

DRAWING NO:

DATEDRAWN CHK'DDATE

A3

2 CC 05/09/2016

REV

CONFIDENTIAL: THIS DOCUMENT IS FOR THE USE OF THE MAIN CONTRACTOR, ARCHITECT, M&E DESIGN CONSULTANT AND M&E SUBCONTRACTOR FOR THE PROJECT NAMED IN THIS DOCUMENT OR ACCOMPANYING CORRESPONDENCE. THE CONTENTS SHOULD NOT BE DISCLOSED TO THIRD PARTIES, INCLUDING OTHER EQUIPMENT SUPPLIERS WITHOUT THE PRIOR CONSENT OF BREATHING BUILDINGS. BREATHING BUILDINGS LTD ©.BREATHING BUILDINGS RESERVE THE RIGHT TO CHANGE PRODUCT DESIGN WITHOUT PRIOR NOTIFICATION.

NVHR+ INSTALLATION WALL GA

Page 4: Breathing Buildings NVHR+ · breathing buildings reserve the right to change product design without prior notification. NVHR+ INSTALLATION WALL GA Confidential: This document is for

Confidential: This document is for the use of the Main Contractor, Architect, M&E Design Consultant and M&E Subcontractor for the project named in this document or accompanying correspondence. The contents should not be disclosed to third parties, incl uding other equipment suppliers without the prior written consent of Breathing Buildings © BBL 2014

Based on First Fix Template 0.13

IF IN DOUBT ASK!

Ident Device Cable Description Power Rating

D Internal Temperature/ CO₂ Sensor5 core shielded (24vdc, 0v, 10vdc signal 1, 10vdc signal 2, shield) or Trend cable

TP/2/2/22/HF/200

3W at 24V DC

F Fire Healthy Signal FP200 (24vdc switch supply, Fire Signal, Earth Nom

I User Interface – 1s3 core (24V, 24vdc switch position Auto, 24vdc switch position Test) or Trend

cable3W at 24V DC

II User Interface – 2s7 core (24v, 0v, 24vdc switch position max Vent, 24vdc switch position Disable,

24vdc switch Temp Up, 24vdc switch Temp Down, 24vdc signal Window Indicator,

Earth) or Trend cable

3W at 24V DC

L Single phase mains power 3 core (230vac, N, PE). 10amp at 230V AC N+PE

M Modbus Cat 5 with RJ45 straight through N/A

N1 NVHR+ Slave Damper 3 core (24vdc, 0v, 24vdc signal 1) 3W at 24V DC

N2 NVHR+ Slave Fans 4 core (10vdc signal 1, 0v signal 1, 10vdc signal 2, 0v signal 2) 3W at 24V DC

N3 NVHR+ Slave Fans Feedback 4 core shielded (Feedback signal 1 & 0v, Feedback signal 2 & 0v, shield) 3W at 24V DC

N4 NVHR+ Slave Duct Sensor 4 core shielded (10vdc signal, 0v, 24vdc, spare, shield) 3W at 24V DC

R1 Two Port Radiator Valve Power Valve Actuator Dependant (TBC) TBC

R2 Two Port Radiator Valve Signal 3 core (10vdc signal, 0vdc, Earth) 3W at 24V DC

R2 JW 07/03/16

R1 JW 08/02/16

REV DRAWN DATE CHKD DATE

DL

T°C+CO2

NVHR+ Master Unit(6 amp supply)

NVHR+ Slave Unit(6 amp supply)

N1

N2

M

M

To next Breathing Buildings master unit

L

Must be the Same Phase as the Master Unit

I

M

ATLAS PANEL REQUIRED TO CONTROL NVHR+ UNITS

BMS CAT5 Modbus routing to be determined by BMS provider

N3

R1 R2

N4

Master Unit Heater Control Valve See notes

Breathing Buildings Modbus Network

TITLE

Wiring Diagram for NVHR+ pair

PROJECT

16-04-18

DRAWING NO.

-160418-01

mjb

SHEET 1 OF 1

Notes:

• Grilles to be removed by others / not fitted before Final

Inspection

•Cable size and voltage drop to be calculated by others

• Cable not marked “shielded” can be site PVC mains

rated LSF Cable

• Mains Fused Isolator External to E-Stack and approx.

2mt above room floor

• Fire Healthy signal supply shut off NB Damper will

remain in position at time of power removal.

• Two Port Modulated Motorised Valve to be confirmed.

• N1 and N2 may be combined into a single cable.

•N3 and N4 must be screened in order to maintain signal

integrity.

• Trend Screened cable may be used – See Data sheet

• Cables and terminations to be fully identified and

numbered

II

NVHR+ Master and Slave Units:

F