Upload
jeremy-webster
View
244
Download
0
Tags:
Embed Size (px)
Citation preview
Breathing Air• Scott-RevolveAir Charge station with X4 controller. Storage
Auto-fill capable. Unit can fill 2 SCBA bottles at a time behind a burst shield.
• Scott- Hush 15 hp Multi stage, 23.5 cfm Compressor.• 480v 3 phase Motor in the Starboard VSP room. • 6000 psi system.• Bank of 4 DOT/ASME Air Storage Tanks located near the
compressor in the Starboard VSP room. Not a Cascade sys.• A Crossover Air Control/Regulator panel (High to Low) for
Emergency air needs.• Circuit Breaker located in Main Electrical Panel under MCC
control panel.• www.scottsafety.com
Breathing AirComponents Scott-Hush model. 15 hp 23.5 cfm Compressor Unit
Low Oil sensorOil Fill/Dipstick
5 Quarts of I/R XL-700 Compressor Oil.
Breathing AirComponents
480v 3ph 15hp Motor
Hinge Point
Note: The Vee-belts are tensioned bythe Weight of the Motor bearing down on the drive pulleys.
Breathing AirComponents
The Compressor Circuit Control Box. The E-Stopwas added for a Lock-Out to protect the safety of any service personnel.
Breathing AirComponents
Multistage Pressure Gages
Every 15 minutes of operation the dump valve will open and the condensation will be forced into two collection jars and ultimately into the reservoir. When this happens you will see a momentary drop in pressure on the 2-3-4 stage’s pressure gages. Normal.
Breathing Air Components
Compressor Output Pressure Gage
Breathing AirComponents
Condensation Collection Jars
Condensation Reservoir
The Compressor will cycle during its operation toremove condensation. You will notice a pressureDrop in the 3 higher stages. This is Normal.
Breathing AirComponents
Condensation Collection Jars and Reservoir
Breathing AirComponents
Purification Filters are located behind the unit. A little tight in this location.
Breathing AirComponents
Intake Air Cleaner
Each Stage has a Pressure Relief Valve
Breathing AirComponents
Bank of 4-Air Storage Bottles Located in the Starboard VSP room. System likes to fill one bottle at a time.
Two more forward
Breathing AirComponents
RevolveAir with X4 Controlled Charge Station
Breathing AirSafety Tip: Watch your fingers here as you rotate the cylinders in and out. Definite Pinch Point.
Breathing AirComponents
SCBA Bottles simply thread into this fitting and hang free on the SCBAs valve body.
When removing a filled bottle this is your pressure drain valveto free up the threads.
There is 1 adapter hose for filling SCUBA tanks
Breathing Air
Good Look at the Revolving Door Fill Station.Do not forget to close your Bleed valve beforeyou rotate it close. If you do forget, you will hear it Immediately after you push down the lock/unlock lever.
This locking Lever also controls an internal air fill valve.
Breathing AirComponents
Control Panel
Breathing AirControl Screen
Breathing Air
Air Sources: Compressor or the Bank of Cylinders
Breathing Air
Set your Bottle Fill Pressure Here
Open/Close Fill Valve
Bottle Pressure
Breathing AirCross-Over Control Box
Forward Starboard ER bulkheadJust to the Starboard side of the service air compressors.
On/Off Isolation/ Flow Control Valves
Pressure Regulator and Outlet Pressure Gage.
Hi pressure
Low Pressure
Breathing Air• The X4 Control Screen functions are being sent
to Mike Lorton. They are copies of the Scott manual pertaining to its functions. He will post them with this Power Point. They are much better explained than by me. Easy system to use. The Compressor is relatively quit.
• Note: Before we begin to fill bottles the VSP room Ventilator Fan must be turned on and BOTH ventilation Vent hatches opened. (intake and exhaust) Located P&S at the Main deck Doorways.