Upload
piolinwalls
View
218
Download
0
Embed Size (px)
Citation preview
7/29/2019 Break Out Tank So Cc 2011
1/63
Oklahoma Corporation
CommissionandOklahoma Gas AssociationPipeline Safety Conference
Breakout Tanks
7/29/2019 Break Out Tank So Cc 2011
2/63
Part 195.2 Def in i t ions
Break out t ank m eans a t ankused t o :
a) re l ieve surges in a HL PL Syst em ,or
b) rec e ive and s t ore hazardous
l iqu id t ransport ed by a p ipe line fo rre injec t ion and c on t inuedt ranspor t a t ion by p ipe l ine
7/29/2019 Break Out Tank So Cc 2011
3/63
Amendments to Part
195195.1 Applicability
195.3 Matters incorporated by reference
Amdt. 195-94 Revised Aug. 11, 2010
7/29/2019 Break Out Tank So Cc 2011
4/63
195.132
Des ign and Const ruc t ion o f
Aboveground Break out Tank s
7/29/2019 Break Out Tank So Cc 2011
5/63
195.132 Des ign and c onst ruc t iono f aboveground breakout t ank s
(a ) Eac h aboveground b reak out t ankm ust be des igned and c ons t ruc t ed t o
w i t hst and t he int e rnal p ressureproduc ed by t he hazardous l iqu id t obe s to red t here in and any an t ic ipa ted
ex t e rna l loads .
7/29/2019 Break Out Tank So Cc 2011
6/63
(b ) ABT p lac ed in serv ic e a ft e rOc t ober 2 , 2000, c om pl ianc e w i t h
paragraph (a) o f t h is sec t ionrequ i res one o f t he fo l low ing:
195.132 Design andc onst ruc t ion of aboveground
b reakou t t ank s
7/29/2019 Break Out Tank So Cc 2011
7/63
(1 ) API Spec i f i ca t i on 12F
shop-fabr ic at ed,
ver t ic a l ,
c y l indr ic a l ,
c losed t op,
w elded st ee l t ank s w i t h nom inal c apac i t iesof 90 t o 750 barr e ls (14.3 t o 119.2 m 3)
195.132 Design andc ons t ruc t ion o f aboveground
b reak out t ank s
and with internal vapor spacepressures that are
approximately atmospheric
7/29/2019 Break Out Tank So Cc 2011
8/63
(2 ) API Standa rd 620
w elded,
low -pressure (i .e ., in t ernal vapor spac epressure not great er t han 15 psig (103.4 k Pa)),
c arbon s t ee l t ank s t hat have w al l shapes t hatc an be genera ted by a s ing le ver t i c a l ax is o f
revo lu t ion
195.132 Design andc ons t ruc t ion o f aboveground
b reak out t ank s
7/29/2019 Break Out Tank So Cc 2011
9/63
(3 ) API St andard 650
ver t ic al ,
c y l indr ic al ,
w elded st eel t ank s w i t h int ernalp ressures a t t he tank t op approx im at ing
at m ospher ic pressures
195.132 Design andc ons t ruc t ion o f aboveground
b reak out t ank s
7/29/2019 Break Out Tank So Cc 2011
10/63
(4 ) API Standa rd 2510
high pressure s t ee l t ank s (i .e ., in t erna l gas or vapor spac e pressures great er t han 15 ps ig
(103.4 k Pa)) w i t h a nom ina l capac i t y o f 2000gal lons (7571 l i t ers) or more of l iquef ied
pet ro leum gas (LPG)
195.132 Design and
c ons t ruc t ion o f aboveground
b reak out t ank s
7/29/2019 Break Out Tank So Cc 2011
11/63
195.205 Repair , a l t erat ion and
rec onst ruc t ion o f abovegroundb reak out t ank s t hat have been in serv ice .
7/29/2019 Break Out Tank So Cc 2011
12/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
(a ) ... m ust be capab le of w i ths tanding
t he in terna l p ressure produced by t hehazardous l iqu id t o be s t ored t here inand any ant ic ipa ted ex t erna l loads .
7/29/2019 Break Out Tank So Cc 2011
13/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
(b ) A ft e r Oc t ober 2 , 2000, c omp l ianc e
w i t h paragraph (a) o f t h is sec t ionrequ i res the fo l low ing fo r t he tank sspec i f ied :
7/29/2019 Break Out Tank So Cc 2011
14/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
(1) API St andard 65 3.
For t ank s des igned for approx im at e lya tm ospheric p ressure c onst ruc t ed ofc arbon and low a l loy s tee l ,
w elded or r ivet ed, and
7/29/2019 Break Out Tank So Cc 2011
15/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
non-ref r igerat ed and
t ank s bu i l t t o API St andard 650 or i t spredec essor St andard 12C, repai r ,
a l te ra t ion , and recons t ruc t ion
repai r , a l t erat ion, andrec ons t ruc t i on m ust be in
acc ordance w i th API
St andard 653.
7/29/2019 Break Out Tank So Cc 2011
16/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
(2 ) Fo r t ank s bui l t t o API Spec i f ic a t ion
12F or API St andard 62 0, t he repair ,a l te ra t ion , and rec onst ruc t ion mus t bein ac c ordance w i th t he des ign , w e lding,exam inat ion, and m ater ia l
requ i rement s o f t hose respec t ives tandards .
7/29/2019 Break Out Tank So Cc 2011
17/63
195.205 Repair , a l t erat ion andrec onst ruc t ion of aboveground
b reak out t ank s t hat have been in serv ice .
(3 ) Fo r high p ressure t ank s bui l t t o API
St andard 2510, repai rs , a l t erat ions, andrec ons t ruc t ion mus t be in acc o rdanc ew i th API 510.
http://e/Documents%20and%20Settings/stgermaw/Desktop/Alaska%202004/The%20Show/E3-195_262%20Pumping%20Equipment2002.ppt7/29/2019 Break Out Tank So Cc 2011
18/63
195.264 Im poundm ent , p ro tec t ion aga ins tent ry , norm al /em ergenc y vent ing or
pressure/vac uum re l ie f for abovegroundbreak out t ank s .
Impoundm ent , p ro tec t i on agains tent ry , norm al /em ergenc y vent ing
(a ) A m eans m ust be p rovided forc ont a in ing hazardous l iqu ids in t heevent o f sp i l lage or fa i lure o f anaboveground break out t anks .
7/29/2019 Break Out Tank So Cc 2011
19/63
195.264 (b ) A ft e r Oc t obe r 2 , 2000, com p li ance w i t h
paragraph (a) o f t h is sec t ion requi res thefo l low ing for t he aboveground break out t anksspec i f ied:
(1) For t ank s bui l t t o API Spec i f ic at ion 12F, APISt andard 620, and ot hers (such as API Standard650 or i t s predec essor St andard 12C), t he
inst a l la t ion o f impoundment m ust be inacc ordance w i th t he fol l ow ing sec t ions o f NFPA30:
(i ) Im poundm ent around a break out t ank m ust be
ins ta l led in acc ordanc e w i t h sect ion 4 .3 .2 .3 .2 ;and (i i ) Im poundm ent by drainage t o a rem ot e
impounding area m ust be ins ta l led in acc ordanc ew i t h sect ion 4.3.2.3.1.
7/29/2019 Break Out Tank So Cc 2011
20/63
195.264
(2) For t ank s bui l t t o API 2510, t heinst a l lat ion of impoundm ent m ust be inacc ordance w i t h sec t ion 5 o r 11 of API2510 (inc orporat ed by referenc e, see
195.3).
(c ) Aboveground b reak out t ank sareas m ust be adequate ly p ro t ec t ed
aga inst unaut hor ized ent ry .
7/29/2019 Break Out Tank So Cc 2011
21/63
195.264
(d ) Norm a l /emergenc y rel ief ven t ingm ust be p rov ided for eac hat m ospheric p ressure b reak out
t ank . Pressu re/vac uum -re l i ev ingdevic es m ust be p rov ided for eac hlow -pressure and h igh-pressureb reak out t ank .
7/29/2019 Break Out Tank So Cc 2011
22/63
195.264
(e ) For norm al /em ergenc y re l ie fvent ing and pressure /vac uum -re l iev ing dev ic es ins t a l led on
aboveground break out t ank s a ft e rOc t ober 2 , 2000, c om pl ianc e w i t hparagraph (d) o f t h is sec t ionrequ i res the fo l low ing fo r t he t ank sspec i f ied :
7/29/2019 Break Out Tank So Cc 2011
23/63
195.264
(1) Norm al /em ergenc y re l ief vent inginst a l led on a t m ospheric p ressure t anksbu i l t t o API Spec i f ic a t ion 12F(inc orporat ed by referenc e, see 195.3)
m ust be in acc ordance w i th Sec t ion 4 ,and Append ic es B and C, of APISpec i f ic a t ion 12F (inc orpora t ed byreferenc e, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
24/63
195.264
(2) Norm al /em ergenc y re l ief vent ingins ta l led on a t m ospher ic pressure tank s(suc h as those bui l t t o API St andard 650or i t s predec essor St andard 12C) m ust
be in ac c ordanc e w i t h API St andard2000 (inc orporat ed by referenc e, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
25/63
195.264
(3) Pressure-re l iev ing and em ergenc yvac uum -re l iev ing devic es inst a l led onlow pressure t anks bu i lt t o APISt andard 620 (IBR, see 195.3) m ust be
in acc ordance w i t h sec t ion 9 of APISt andard 620 ( IBR, see 195.3) and i t sre ferenc es to t he norm al andem ergenc y vent ing requ i rement s in APISt anda rd 2000 (IBR, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
26/63
195.264
(4) Pressure and vac uum -rel iev ingdevic es insta l l ed on h igh pressuret ank s bui l t t o API St andard 2510 (IBR,see 195.3) m ust be in acc ordanc e
w i t h sec t ions 7 or 11 o f API St andard2510 (IBR, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
27/63
195.307 Pressuret es t ing aboveground
b reak out t ank s
(a) For aboveground break out t ank s
bu i l t t o API Spec i f ic a t ion 12F and f i rs t p lac ed in serv ic e af t er Oc t ober 2 ,2000, pneum at ic t es t ing m ust be in ac c ordance w i t h sec t ion 5 .3 o f API Spec i f ic a t ion 12 F (inc orporat ed byreferenc e, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
28/63
195.307
(b) For abovegr ound break out t ank s bu i l t t o API St andard 620 andf i rst p laced in serv ic e a ft e r Oc t ober
2 , 2000, hydrosta t ic and pneum at ic t est ing m ust be in acc o rdance w i th sec t ion 7.18 of API St andard 620
(inc orpora ted by re ferenc e, see195.3).
7/29/2019 Break Out Tank So Cc 2011
29/63
195.307
(c ) For aboveground break out t anks bu i l t t o API St andard 650(inc orporat ed by re ferenc e, see 195.3 and f i rst p lac ed in servic e a f t e r Oc t ober 2 , 2000, t es t ing m ust be in acc ordanc e w i t h Sec t ion 5 .2 o f API St andard 650 (inc orporat ed
by refe renc e, see 195.3).
7/29/2019 Break Out Tank So Cc 2011
30/63
195.307
(d) For aboveground at m ospher ic
pressure break out t ank sc ons t ruc t ed o f ca rbon and low a l loy s t ee l , w e lded or r ivet ed, and non-
re fr igera t ed and t ank s bu i l t t o API St andard 650 or i t s p redec essor St andard 12C t hat are ret urned t o serv ic e a f t e r Oc t ober 2 , 2000, t he nec essi t y fo r t he hydros ta t ic t es t ing o f repai r , a l t e ra t ion , andrecons t ruc t ion i s covered in sec t ion
10.3 of A PI St andard 653.
7/29/2019 Break Out Tank So Cc 2011
31/63
195.307
(e) For abovegr ound break out t anks bu i lt t o API St andard 2510and f i rs t p lac ed in serv ic e a ft e r Oc t ober 2 , 2000, pressure
t est ing m ust be in ac c ordance w i t h ASME Boi ler and PressureVessel Code, Sec t ion VI I I ,
Div is ion 1 or 2.
195 405 Prot ec t ion aga inst ign i t ions
7/29/2019 Break Out Tank So Cc 2011
32/63
195.405 Pro t ec t ion aga inst ign i t ionsand safe ac c ess/egress invo lv ing
f loa t ing roofs
(a ) A f te r Oc t ober 2 , 2000,prot ec t ion p rov ided aga inst
ign it ions a r ising ou t o f s t a t ice lec t r ic i t y , l ight n ing , and s t rayc ur ren t s dur ing operat ion and
m a int enanc e ac t i v it i es involv ingaboveground break out t anks m ustbe in ac c ordance w i t h APIRec om m ended Prac t ic e 2003,
7/29/2019 Break Out Tank So Cc 2011
33/63
195.428 Overpressure safet ydevic es and over f i l l p ro t ec t ion
sys tems
(b) In t he c ase of re l ie f va lves on
pressure break out t ank s c ont a in ingh igh ly vola t i le l iqu ids , eac h opera t or shal l t es t each va lve at in t e rvals no t
ex c eeding 5 years .
7/29/2019 Break Out Tank So Cc 2011
34/63
195.428
(c ) Aboveground b reak out t ank s t hat
a re c ons t ruc t ed or s ign i f i c ant l ya l t e red ac c ord ing t o API St andard2510 a ft e r Oc t ober 2 , 2000, m ust have
an overf i l l p rot ec t ion sys tem ins ta l ledac c ord ing t o sec t ion 5 .1 .2 o f APISt andard 2510.
7/29/2019 Break Out Tank So Cc 2011
35/63
195.428
Ot her aboveground b reak outt anks w i t h 600 gal lons (2271l i t e rs) o r m ore o f s t orage
c apac i t y t ha t a re cons t ruc t ed o rs igni f i c an t ly a l t e red a f te rOc t ober 2 , 2000, m ust have anover f i l l pro t ec t ion sys temins ta l led ac c ording t o APIRec om m ended Prac t ic e 2350.
7/29/2019 Break Out Tank So Cc 2011
36/63
195.428
How ever , opera t ors need not c om p ly w i t h any par t o f API Rec om m ended Prac t ic e 2350
for a par t i c u lar b reak out t ank i f t he opera t o r no t es in t he m anual requi red by 195.402w hy comp l ianc e w i t h t ha t par t i s no t nec essary fo r sa fet y o f t he t ank .
7/29/2019 Break Out Tank So Cc 2011
37/63
195.428
(d ) A ft e r Oc t ober 2 , 2000, t herequ i rem ent s o f paragraphs (a)and (b) o f t h is sec t ion fo rinspec t ion and t es t ing o f
p ressure c on t ro l equipm entapply to t he inspec t ion andt es t ing o f over f i l l pro t ec t ion
sys tems.
7/29/2019 Break Out Tank So Cc 2011
38/63
195.432 Inspec t ion of in-serv ic e
b reak out t ank s .
(a ) Ex c ep t f or b reak out t ank sinspec t ed under paragraphs (b)and (c ) o f t h is sec t ion , eac h
opera tor sha l l , a t in t erva ls notex c eeding 15 mont hs , bu t a t leastonc e eac h c a lendar year , inspec t
each in -servic e b reakout t ank .
7/29/2019 Break Out Tank So Cc 2011
39/63
195.432
(b ) Each ope ra to r m ust i nspec t t hephys ic a l in tegr i t y o f in-serv ic ea t m ospheric and low -pressure s t ee l
aboveground break out t ank sac c ord ing t o API St andard 653(inc orpora ted by re ferenc e, see
195.3).
7/29/2019 Break Out Tank So Cc 2011
40/63
195.432
How ever , i f s t r uc t u ra l c ond it i onsp revent acc ess to t he t ank bot t om,t he bot t om in t egr i t y may be
assessed ac c ording t o a p laninc luded in t he opera t ions andm ain tenanc e m anua l under
195.402(c)(3).
7/29/2019 Break Out Tank So Cc 2011
41/63
195.432
(c ) Each ope ra to r sha l l i nspec t t hephys ic a l int egr i t y o f in -serv ic e s t ee laboveground break out t ank s bu i l tt o API St andard 2510 ac c ord ing t osec t ion 6 o f API 510.
7/29/2019 Break Out Tank So Cc 2011
42/63
195.432
(d ) The int e rvals o f inspec t ionspec i f ied by doc um ents re fe rencedin paragraphs (b) and (c ) of t h is
sec t ion begin on May 3, 1999, or ont he operat o r 's last rec orded da te o ft he inspec t ion , w h ic hever is ear l ie r .
7/29/2019 Break Out Tank So Cc 2011
43/63
195.565 How do I ins ta l l c a t hodicp ro tec t ion on b reak out t ank s
A fte r Oc t obe r 2 , 2000, w hen you ins ta l l ca thodicprot ec t ion under Sec . 195.563(a) t o pro tec t t hebot t om o f an aboveground breakout t ank o fm ore than 500 barre ls (79.5m 3) c apaci t y bu i l t t o
API Spec if i c at ion 12F, API St andard 620, or APISt andard 650 (or i t s predec essor St andard 12C),you mus t inst a l l t he sys tem in acc ordanc e w i thAPI Rec om m ended Prac t ic e 651.
7/29/2019 Break Out Tank So Cc 2011
44/63
195.565
How eve r, i ns ta l l at i on of t he syst emneed no t c om ply w i th APIRec om m ended Prac t ic e 651 on anyt ank for w h ic h you not e in the
c or ros ion c ont ro l p roceduresest abl ished under Sec . 195.402(c )(3)w hy c omp l ianc e w i th a l l or ce r ta in
prov is ions o f API Rec om m endedPrac t ic e 651 is no t nec essary for t hesafet y o f the tank .
7/29/2019 Break Out Tank So Cc 2011
45/63
(d ) B reak out t ank s . You m ustinspec t eac h c a thodic p ro tec t ionsys t em used to c ont ro l co r ros ion on
t he bo t t om o f an abovegroundbreak out t ank t o ensure t hatopera t ion and m a in tenance o f t he
sys t em a re in ac c ordanc e w i t h APIRec om m ended Prac t ic e 651.
195.573 What must I do t o m on it o r ex t e rna l c o r rosion c ont ro l?
7/29/2019 Break Out Tank So Cc 2011
46/63
195.573
How ever , t h is inspec t i on is no trequ i red i f you not e in t hec or ros ion c on t ro l p roceduresest ab l ished under Sec .
195.402(c )(3 ) w hy c om pl ianc e w i t ha l l o r c er ta in opera t ion andm ain t enanc e prov is ions o f API
Rec om m ended Prac t ic e 651 is notnec essary fo r t he safe ty o f t het a n k .
7/29/2019 Break Out Tank So Cc 2011
47/63
195.573
(e ) Co rrec t i ve ac t ion . You m ust
c or rec t any iden t i f ied de fic iency inc or ros ion c ont ro l as requ i red bySec . 195.401(b). How ever, i f t he
def ic ienc y invo lves a p ipel ine in anin t egr it y m anagem ent p rogramunder Sec . 195.452, you m ust
c o rrec t t he def i c iency as requ iredby Sec . 195.452(h).
7/29/2019 Break Out Tank So Cc 2011
48/63
195.573
How ever , t h is inspec t i on is no trequ i red i f you not e in t hec or ros ion c on t ro l p roceduresest ab l ished under Sec .
195.402(c )(3 ) w hy c om pl ianc e w i t ha l l o r c er ta in opera t ion andm ain t enanc e prov is ions o f API
Rec om m ended Prac t ic e 651 is notnec essary fo r t he safe ty o f t het a n k .
7/29/2019 Break Out Tank So Cc 2011
49/63
195.573
How ever , t h is inspec t i on is no t
requ i red i f you not e in t hec or ros ion c on t ro l p roceduresest ab l ished under Sec .
195.402(c )(3 ) w hy c om pl ianc e w i t ha l l o r c er ta in opera t ion andm ain t enanc e prov is ions o f API
Rec om m ended Prac t ic e 651 is notnec essary fo r t he safe ty o f t het a n k .
195 579 What m ust I do t o
7/29/2019 Break Out Tank So Cc 2011
50/63
195.579 What m ust I do t o
m i t iga t e in te rnal c orros ion?
(d ) B reak out t anks . A ft e r Oc t obe r 2 ,2000, w hen you ins ta l l a t ank bo t t oml in ing in an aboveground break out
t ank bu i l t t o API Spec i f i c a t ion 12F,API St andard 620, or API St andard650 (or i t s p redec essor St andard
12C), you m ust ins t a l l t he l in ing inac c ordance w i t h API Recom m endedPrac t ic e 652.
7/29/2019 Break Out Tank So Cc 2011
51/63
195.579
How ever, i ns ta l la t i on o f t he l in ingneed not c om p ly w i t h APIRec om m ended Prac t ic e 652 on anyt ank for w h ich you no te in t he
c or ros ion c on t ro l proc eduresest ab l ished under Sec .195.402(c )(3 ) w hy c om pl ianc e w i t ha l l o r c er t a in prov is ions o f API
Rec om m ended Prac t ic e 652 is notnecessary fo r t he safe ty o f t het a n k .
7/29/2019 Break Out Tank So Cc 2011
52/63
Now le ts c ons ide r som e sc enar ios oft ank inst a l la t ions
What is and w hat isn t a regu la tedbreak out t ank
7/29/2019 Break Out Tank So Cc 2011
53/63
7/29/2019 Break Out Tank So Cc 2011
54/63
7/29/2019 Break Out Tank So Cc 2011
55/63
7/29/2019 Break Out Tank So Cc 2011
56/63
7/29/2019 Break Out Tank So Cc 2011
57/63
7/29/2019 Break Out Tank So Cc 2011
58/63
7/29/2019 Break Out Tank So Cc 2011
59/63
7/29/2019 Break Out Tank So Cc 2011
60/63
7/29/2019 Break Out Tank So Cc 2011
61/63
7/29/2019 Break Out Tank So Cc 2011
62/63
C
7/29/2019 Break Out Tank So Cc 2011
63/63
Contact Information
Wallace McGaugheyPipeline Safety Specialist
U.S. Department of TransportationPHMSA Office of
Inspector Training and Qualifications
Main (405) 954-7219
Office (405) 954-6806
Fax (405) 954-0206