BPS HYDRO Maintenance Italy

Embed Size (px)

Citation preview

  • 8/12/2019 BPS HYDRO Maintenance Italy

    1/23

    Best Practice SharingHydro Generation Maintenance Italy

    Roncovalgrande, January 19 th , 2011

  • 8/12/2019 BPS HYDRO Maintenance Italy

    2/23

    Uso: Aziendale

    2

    Workgroup MaintenanceAgenda

    Workgroup theme Organization

    Maintenance policies

    What is PMO?

    Plant monitoring

    Main maintenance intervention scheduling IT tools

    Maintenance costs

  • 8/12/2019 BPS HYDRO Maintenance Italy

    3/23

    Uso: Aziendale

    3

    Workgroup Maintenance

    Workgroup themes

    Maintenance policies of hydro plants electro-mechanical components

    Tools to manage maintenance process

    Italian hydro plants

    225 plants (76% with reservoir)

    12.922 MW (net)

    23.874 GWh (including pumping stations generation)

    Water concessions last in 2029

    Plants Age (average age 58 years) :

    < 50 years 50 to 70 years 70 to 90 years > 90 years

    Number ofplants 59 98 57 11

    Percentage 26% 44% 25% 5%

  • 8/12/2019 BPS HYDRO Maintenance Italy

    4/23

    Uso: Aziendale

    4

    Organization - GEM Division

    PlantsOperation &Maintenance

    TechnicalSupport

  • 8/12/2019 BPS HYDRO Maintenance Italy

    5/23

    Uso: Aziendale

    5

    Business Area Generation (GEN)

    HDE100 %

    157

    Operation

    Maintenancepolicies

    (PAL PAP)

    Mainmaintenanceintervention

    execution(SMI)

    Developmentof hydro plant

    (PRI)

  • 8/12/2019 BPS HYDRO Maintenance Italy

    6/23

    Uso: Aziendale

    6

    Structure of Hydro Business Unit (UB)

    Controller

    Technical Support

    Hydro Area 1 Hydro Area 2

    Operation,Environmental and

    Safety

    Operation Unit 1

    Operation Unit 2

    Operation Unit ..

    Operation Unit 1

    Operation Unit 2

    Operation Unit ..

    Operation & MaintenanceActivities

    Business Unit

  • 8/12/2019 BPS HYDRO Maintenance Italy

    7/23

    Uso: Aziendale

    7

    Technical Area Development and Plants Aid (SAI/ASP)

  • 8/12/2019 BPS HYDRO Maintenance Italy

    8/23

    Uso: Aziendale

    8

    Maintenance policies

    Reference for Italian Plants

    Program 100x100 Project hydro plants maintenance (2001-2003)

    Target

    In order to reduce the unavailability (both planned and unplanned) and toimprove the reliability of hydro plants, we needed to choose the bestmaintenance policy for each electro-mechanical component of the plant.

    Tool

    PMO (simplified Plant Maintenance Optimization)

    PolicyCondition-based maintenance (CBM) for main components

    Corrective maintenance for other components

    Planned periodic maintenance only for few standard components (HV and MVequipment)

  • 8/12/2019 BPS HYDRO Maintenance Italy

    9/23

    Uso: Aziendale

    9

    What is PMO?

    PMO is a simplified version of the Reliability Centered Maintenance (RCM)Using PMO the best maintenance policy for each component is chosen using the followingrules:

    Is component critical? (effects of the failure)The component is critical if its failure causes:

    Safety damages

    Environmental damages Plant damages Law violations Unavailability of the generation unit

    Is component determining? (duration of the outage)The component is determining if:

    The time we need to spend to maintain the component increase the total duration ofthe maintenance outage

    The time we need to spend to monitor the component (with unit unavailable)determine the total duration of the planned outage

  • 8/12/2019 BPS HYDRO Maintenance Italy

    10/23

    Uso: Aziendale

    10

    What is PMO?

    Classification of the components is customized for each plant

    Result:

    For each plant a customized list of monitoring actions and frequencies onlyon selected components

    1 Critical only for unavailability of the generation unit, else CBM

    Critical Not critical

    Determining Condition-BasedMaintenanceCondition-Based

    Maintenance

    Not determining CorrectiveMaintenance 1Corrective

    Maintenance

  • 8/12/2019 BPS HYDRO Maintenance Italy

    11/23

    Uso: Aziendale

    11

    What is PMO?

    Tools for selection of the monitoring actions andfrequencies:

    Scadenzari di manutenzione MaintenanceSchedule Templates Lists of standard actionsand frequencies for main components (ASPtechnical documents)

    Other ASP technical documents (including PTR Relevant Technical Problems)

    Customization of old lists from GuideNazionali dei Controlli Sistematici, ed. 1996

    PMO exhaustive analysis on few referenceplants

    Experience and knowledge of plant operators

  • 8/12/2019 BPS HYDRO Maintenance Italy

    12/23

    Uso: Aziendale

    12

    Plant monitoring

    According to the lists of monitoring actions and frequencies :

    Plant operators monitor the plant during operation and check components duringplanned outages

    Specialized checks are normally performed by ASP technicians

    Some specialized checks are performed by third parts

    In case of failure plant operators check and repair faulted components.

    If a great failure happens on main components, ASP technicians are involved.

  • 8/12/2019 BPS HYDRO Maintenance Italy

    13/23

    Uso: Aziendale

    13

    Plant monitoring - automatic

    In main plants, some parameters are constantly monitored through automatic controlsystems. These parameters are:

    Temperature (bearings, electrical machinery)

    Oil gas level (transformers)

    Vibration (rotating machinery) Partial discharge (stator winding insulation)

    Vibration can be also remote monitored by ASP technicians through SMAV system

  • 8/12/2019 BPS HYDRO Maintenance Italy

    14/23

    Uso: Aziendale

    14

    Main maintenance intervention scheduling

    According to the results of monitoring actions, to the operation events, to new Grid Coderequirements and to the ASP technical suggestions (PTR), UB yearly elaborates thedocument Stato Impianto ( Plant Condition ) containing a synthetic judgement aboutthe condition of main plant components expressed in five degrees:

    1. Very bad condition (great maintenance intervention needed as soon as possible)

    2. Bad condition (great maintenance intervention needed in next 5 years)

    3. Bad condition (little maintenance intervention needed in next 5 years)

    4. Good condition (no maintenance intervention needed in next 5 years)

    5. Optimal condition (component is like a new one)

    The document is useful to aggregate maintenance interventions on different componentsin the same outage, minimizing planned unavailability

    1

    2

    3

    4

    5Vasche di carico

    Opera di presa

    0pere di adduzione

    Valvola a farfalla

    Condotta forzata

    Centrale, accesso, fabbricato

    Opere di scarico

    Valvole di macchinaTurbine

    Supporti

    A lterna to re

    Trasformato re elevatore

    M ontante di gruppo, stazione

    Sistema di controllo

    Sistemi ausiliari

  • 8/12/2019 BPS HYDRO Maintenance Italy

    15/23

    Uso: Aziendale

    15

    Main maintenance intervention scheduling

    Servizi di Manutenzione Idroelettrici (SMI) elaborates feasibility studies for interventionson components in bad condition, comparing different technical solutions and estimatingcost and time for each solution.

    UB economically evaluates the intervention using NPV method (according to Enelinvestments evaluation policies)

    Profitable interventions are included in Business Plan/Budget

  • 8/12/2019 BPS HYDRO Maintenance Italy

    16/23

    Uso: Aziendale

    16

    IT Tools SAP

    SAP is the official Enelsdatabase used for

    budgeting, costs analysisand obtaining economic

    results

    SAP is so used also formanaging maintenancecosts and information

  • 8/12/2019 BPS HYDRO Maintenance Italy

    17/23

    Uso: Aziendale

    17

    IT Tools SAP

    In SAP the plant isrepresented by a tree

    structure:

    technical units ( SediTecniche ) on six levels

    components ( Equipments )

  • 8/12/2019 BPS HYDRO Maintenance Italy

    18/23

    Uso: Aziendale

    18

    IT Tools SAP

    Maintenance Orders( Ordini di ManutenzioneOdM ) are SAP objects used

    for managing costinformation about

    maintenance

  • 8/12/2019 BPS HYDRO Maintenance Italy

    19/23

    Uso: Aziendale

    19

    IT Tools SAP

    Maintenance Notes ( Avvisidi Manutenzione AdM )are the SAP objects usedfor managing technical

    information aboutmaintenance ( Machine

    Book

    Diario diMacchina )

    AdMs also automaticallyregister safety blocks fromoperation database ESIM

  • 8/12/2019 BPS HYDRO Maintenance Italy

    20/23

    Uso: Aziendale

    20

    IT Tools SAP

    Maintenance Cycles ( Ciclidi Manutenzione ) are thetools to plan and manage

    the periodic maintenanceactivities (monitoring

    actions)

    Enel developed acustomized version of

    Maintenance Cycles moreflexible than the SAP one,

    used to manage actions

    lists obtained from PMOanalysis

  • 8/12/2019 BPS HYDRO Maintenance Italy

    21/23

    Uso: Aziendale

    21

    Maintenance costs

    Maintenance costs are available from SAP database.

    Cost details are available for each Sede Tecnica and Equipment of the SAP tree structure.

    Cost details are available for different kinds of maintenance according to theclassification available for OdMs (main kinds below):

    Corrective maintenance

    Planned maintenance:

    Preventive maintenance

    Predictive maintenance

    Monitoring actions with or without outage Extraordinary maintenance

  • 8/12/2019 BPS HYDRO Maintenance Italy

    22/23

    Uso: Aziendale

    22

    Maintenance costs: opex/capex

    Maintenance costs are normally opex .

    Main interventions costs can be classified as capex if the interventions:

    improve the availability and the reliability of the plant ( Stay in Business investments)

    are compulsory in order to conform the plant to Law or Grid Code new requirements(Mandatory investments)

    refurbish the plant (substitution of all electromechanical components: Development investments PRI interventions)

  • 8/12/2019 BPS HYDRO Maintenance Italy

    23/23

    Uso: Aziendale

    23

    Workgroup MAINTENANCE

    Workgroup members

    GEN: Poggi ([email protected])

    SAI: Giovannini ([email protected]) , Prado ([email protected])

    Subgroups

    GEN:

    BERNARDI, SUMAN, CIANCIAVICCHIA, FENU, CANNATA, CAMMISULI, RANIELLO

    SAI:

    LAURO, BETTONI