BPA‐FCRPS Power Plant Modeling Collaboration Overview
By Gordon Kawaleyi‐PCGRID3/29/19
BPA Overview Bonneville Power
Administration (BPA) is a federal Power Marketing Agency in Pacific Northwest
BPA markets power from 31 Federal dams and the Columbia Generating Station Nuclear Plant
BPA operates more than 15,000 miles of transmission, including 4,735 miles of 500‐kV lines
BPA operates several large paths in the Western Interconnection – California Oregon AC Intertie (4,800 MW), Pacific HVDC Intertie (3,100 MW), Northern Intertie (3,100 MW), and Montana Intertie (2,200 MW)
2
BPA’s WIND PMU Coverage
18 wind power plants
Totaling more than 1,600 MW of generation
Mostly Siemens Type 4 and GE Type 3
Mandatory PMU installation on any new Wind generation connecting to BPA
More to be added
4
Model Validation – Power PlantsGeneral Electric was the first to implement disturbance play‐in capabilities in PSLF
BPA has many PMUs at POIs of power plants
BPA used the PSLF play‐in function for past 17 years to validate and improve generator models using PMU data, resulting in significant cost savings and improved efficiency
BPA used disturbance model validation for NERC Standard compliance
General Electric added model calibration functionality to deal with situations when simulations do not agree with reality
G
Record: ‐ POI bus voltage‐ POI bus frequency‐ Power plant MWs and MVARs
Point of Interconnection
V I
Power Plant
G
Substation
Successful power plant model verification
5
Model Validation – Power Plants
Today, PMU’s at the POI’s Bonneville, The Dalles, John Day, McNary, Lower Monumental, Chief Joseph, Grand Coulee and Columbia Generating Station
Use of Disturbance‐based model validation to complement baseline model development
Detecting Generator Control Mis‐Operations
Detecting Generator Control Mis‐Operations
Columbia Generating Station
John Day PH4
John Day PH3
Freq
uenc
y [H
z]Ac
tive
Pow
er [M
W]
Volta
ge [p
u]R
eact
ive
Pow
er [M
VAR
]
Grand Coulee Unit 22
Technical Contacts BPA
12
• Dmitry Kosterev – [email protected], power plant model verification, wind power plant modeling
• Steve Yang – [email protected], expert in disturbance monitoring equipment, power plant model verification
• Gordon Kawaley, [email protected], expert in dynamic modeling, model verification, compliance standards
• Tony Faris, [email protected], expert in anything you ever may want to know about PMUs – configuration, installation, data center architecture, data archiving, and real‐time applications