2
Thank you for purchasing a Bass Pro Shops rod/combo storage system. Throughout these assembly instructions, we have included helpful tips to make this assembly process easier. Tools required: Phillips Head Screwdriver Rubber Mallet Assembly Instructions: Compare your parts to the items in the diagram and parts listing. If you notice that a part is missing, there is no need to return the rack. Please call 1-800-BASS-PRO for a free replacement. Please be ready to provide the model number of the rack and the number or letter of the part from the parts listing to our customer service representative. 1. Find an appropriate location to hang the rack and locate the studs in the wall. Mark the wall to leave a reference point. Tip: Most studs are 16 in. apart. 2. Using the brass wood screws (Part A), attach Part 1 to the wall. If you cannot locate a stud, drywall inserts (Part B) have been provided. To use these inserts, tap a small hole through the wall using a drill bit or nail smaller than the package screw diameter. Tap the drywall insert (Part B) through the pilot hole. Insert brass wood screw (Part A) through the rod rack and into the dry wall insert. Screw in until tight. 3. Line up Part 2 [see illustration] under Part 1. 4. Check the distance between the butt of the rod and the first guide to determine proper spacing and place a mark on the wall. Tip: Generally 24-28 in. should be left in between. 5. Attach Part 3 to Part 2 using the brass wood screws (Part A). Tip: When attaching these parts, be sure that the beveled edge is facing away from the wall. 6. Pre-drilled holes have been placed on Part 2 to help the assembly process. 7. Line up Part 2/3 under Part 1 and affix to the wall using the brass wood screws (Part A). 8. Gently insert wooden plugs (Part C) using a rubber mallet. EIGHT ROD CAPACITY ROD LINK Owner’s Manual X1 X1 X2 X4 X8 X2 B A C 1 2 3 X2 D Bass Pro rod link is modular. It can be extended with the purchase of additional rod links. D D 仅供观看 (only for viewing) 勿打印 (do not print)

BP171368 BPS Rod Link Rack REVISION - Instructions...1. Trouvez le bon endroit pour accrocher la tringle de suspension et repérez les montants dans le mur. Marquez un point de repère

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BP171368 BPS Rod Link Rack REVISION - Instructions...1. Trouvez le bon endroit pour accrocher la tringle de suspension et repérez les montants dans le mur. Marquez un point de repère

Thank you for purchasing a Bass Pro Shops rod/combo storage system. Throughout these assembly instructions, we have included helpful tips to make this assembly process easier. Tools required:

Phillips Head Screwdriver Rubber MalletAssembly Instructions:Compare your parts to the items in the diagram and parts listing. If you notice that a part is missing, there is no need to return the rack. Please call 1-800-BASS-PRO for a free replacement. Please be ready to provide the model number of the rack and the number or letter of the part from the parts listing to our customer service representative.1. Find an appropriate location to hang the rack and locate

the studs in the wall. Mark the wall to leave a reference point. Tip: Most studs are 16 in. apart.

2. Using the brass wood screws (Part A), attach Part 1 tothe wall. If you cannot locate a stud, drywall inserts (Part B) have been provided. To use these inserts, tap a small hole through the wall using a drill bit or nail smaller than the package screw diameter. Tap the drywall insert (Part B) through the pilot hole. Insert brass wood screw (Part A) through the rod rack and into the dry wall insert. Screw in until tight.

3. Line up Part 2 [see illustration] under Part 1. 4. Check the distance between the butt of the rod and the �rst

guide to determine proper spacing and place a mark on thewall. Tip: Generally 24-28 in. should be left in between.

5. Attach Part 3 to Part 2 using the brass wood screws (Part A).Tip: When attaching these parts, be sure that the bevelededge is facing away from the wall.

6. Pre-drilled holes have been placed on Part 2 to help theassembly process.

7. Line up Part 2/3 under Part 1 and a�x to the wall using thebrass wood screws (Part A).

8. Gently insert wooden plugs (Part C) using a rubber mallet.

EIGHT ROD CAPACITY ROD LINKOwner’s Manual

X1

X1 X2

X4

X8 X2

B

A C

1

2 3

X2D

Bass Pro rod link is modular. It can be extended with the purchase of additional rod links.

D

D

仅供观看 (only for viewing)

勿打印 (do not print)

Page 2: BP171368 BPS Rod Link Rack REVISION - Instructions...1. Trouvez le bon endroit pour accrocher la tringle de suspension et repérez les montants dans le mur. Marquez un point de repère

Merci pour votre achat du système Bass Pro Shops pour rangement de cannes/combinés. Nous avons inclus des conseils utiles tout au long de ce manuel pour faciliter cet assemblage. Outils nécessaires : Tournevis cruciforme Maillet en caoutchouc Instructions d’assemblage : Comparez vos pièces aux articles sur le schéma et la nomenclature. S’il manque une pièce, il n’est pas nécessaire de renvoyer le porte-cannes. Veuillez bien appeler 1-800-BASS-PRO pour une pièce de remplacement gratuite. Nous vous prions de fournir le numéro de modèle du porte-cannes ou la lettre de la pièce sur la nomenclature au représentant du service à la clientèle.1. Trouvez le bon endroit pour accrocher la tringle de suspension et repérez les montants dans le mur. Marquez un point de repère sur

le mur. Conseil : La plupart des montants muraux ont un écart de 40,64 cm. 2. Attachez la Pièce 1 au mur avec les vis à bois en laiton (Pièce A). Si vous ne pouvez pas localiser de montant, des inserts pour plâtre sont inclus (Pièce B). Pour utiliser ces inserts, percez un petit trou dans le mur avec une mèche ou un clou, un trou plus petit que le diamètre de la vis dans le paquet. Enfoncez l’insert pour plâtre (Pièce B) dans le trou pilote. Insérez la vis à bois en laiton (Pièce A) dans le porte-cannes et dans l’insert à plâtre. Vissez jusqu’à ce qu’elle soit bien serrée. 3. Alignez bien la Pièce 2 (comme illustré) sous la Pièce 1.4. Véri�ez la distance entre le bout de la canne et le premier anneau pour déterminer le bon écart et faites une marque de repère sur le mur. Conseil : En général on devrait laisser de 61 cm à 121 cm d’écart. 5. Fixez la Pièce 3 et la Pièce 2 avec les vis à bois en laiton (Pièce A). Conseil : Lorsque vous �xez ces pièces, assurez-vous que le bord en biseau ne soit pas contre le mur.6. Il y a déjà des trous pré-percés sur la Pièce 2 pour faciliter l’assemblage.7. Alignez Pièce 2/3 sous la Pièce 1 et �xez-les au mur avec les vis à bois en laiton (Pièce A). 8. Enfoncez doucement les bouchons en bois (Pièce C) avec le maillet en caoutchouc.

TRINGLE DE SUSPENSION POUR HUIT CANNES Manuel du Propriétaire

X1

X1 X2

X4

X8 X2

B

A C

1

2 3

X2D

Le brin de canne à pêche Bass Pro est modulaire. On peut le prolonger en achetant des brins de canne à pêche supplémentaires.

D

D

仅供观看 (only for viewing)

勿打印 (do not print)