Upload
melody
View
28
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Information System for Registration, Monitoring and Preventive Control of Disaster Risk (Risk Manager Version1.0). Boyan Bontchev Dep. of Software Engineering Sofia University “St. Kl . Ohridski ”. Project Scope. - PowerPoint PPT Presentation
Citation preview
Information System Information System for Registration, for Registration, Monitoring and Monitoring and Preventive ControlPreventive Controlof Disaster Riskof Disaster Risk(Risk Manager (Risk Manager Version1.0)Version1.0)
Boyan BontchevDep. of Software EngineeringSofia University “St. Kl. Ohridski”
Project ScopeProject ScopeDesign and development of Information
System for Registration, Monitoring and Preventive Control of Disaster Risk(Risk Manager Version1.0)
Deployment of Risk Manager at ASDE and pilot usage of the system at several municipalities in Republic of Bulgaria
Validation of the system requirements and evaluation based on the end user
Map view of risk levels at town-councils 2Risk Manager 1.0, 2008
Data ModelData ModelSupported Disaster Types
◦Floods◦Forest fires◦Earthquakes
Territorial regions and allocated objects◦At the level of district, municipality and
town councils◦Object allocated to risk zones within town
councilsTypes of technical installationsTechnical installation support actions
3Risk Manager 1.0, 2008
Methodology of Risk Methodology of Risk EvaluationEvaluationDeveloped by RFMEA (Dowel
Ltd.)Based on:
◦Risk vulnerability◦Risk probability◦Financial expert evaluation of the
damages◦Effect of the risk control◦Budget of the risk control measure
4Risk Manager 1.0, 2008
User RolesUser Roles
Operator (at town-council level)Manager (at municipality level)Administrator (at global level)Visitor (right for data view only)
5Risk Manager 1.0, 2008
Screenshot of the Disaster Screenshot of the Disaster ViewView
6Risk Manager 1.0, 2008
Administration View 1/2Administration View 1/2
7Risk Manager 1.0, 2008
Administration View 2/2Administration View 2/2
8Risk Manager 1.0, 2008
Administration FacilitiesAdministration FacilitiesControl over data capturing
◦Estimation of reliability◦Time limits of risk reporting
Log filesControl over system users
(lock/unlock)Edit of all nomenclature tablesSetting other system parameters
9Risk Manager 1.0, 2008
Future workFuture work
Deployment of Risk Manager at ASDEPilot usage of the system at several
municipalities in Republic of BulgariaMap view of risk levels at town-councils Validation of the system requirementsSystem evaluation based on the end userFuture extension of system
functionalities
10Risk Manager 1.0, 2008
Possible Future ExtensionsPossible Future ExtensionsGeneration of report filesViews of various data inquiresExport of risk data towards
external systemsDetailization of technical
installation descriptions and installation support actions
Specialized risk assessments
11Risk Manager 1.0, 2008
Q & AQ & A
Thank you for the attention!
12Risk Manager 1.0, 2008