BOWIE STATE UNIVERSITY FINE AND PERFORMING ARTS CENTER Building and Plant Energy Analysis Report Technical Report 2 Zack Lippert – Mechanical Advisor: Steve Treado Location: Bowie, MD

Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Bowie State university fine and performing arts center

Building and Plant Energy Analysis Report

Technical Report 2

Zack Lippert – Mechanical

Advisor: Steve Treado

Location: Bowie, MD

Page 2: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

ContentsExecutive Summary.....................................................................................................................................2

Building Overview........................................................................................................................................2

Room Categories.....................................................................................................................................2

System Design Load Estimation...................................................................................................................3

Model Inputs...........................................................................................................................................3

Load Calculation Results and Comparison...............................................................................................3

System Energy Consumption and Operating Costs......................................................................................5

Energy Cost..............................................................................................................................................7

Environmental Impact.............................................................................................................................8

Energy Analysis Conclusion......................................................................................................................9

References.................................................................................................................................................10

Appendix A: Sample Templates.................................................................................................................11

Appendix B: AHU System Schematic..........................................................................................................14

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 3: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Executive SummaryThe objective of this technical report is to perform a building HVAC load calculation and

energy analysis for the Bowie State University (BSU) Fine and Performing Arts Center. Several computer programs were considered including, Trane Trace, Carrier HAP and EnergyPlus. Ultimately Trane Trace 700 was chosen because of its accurate results, ease of accessibility and use, as well as familiarity with it from previous projects. Most of the inputs for the analysis were obtained from the building specifications and drawings, but when information was unattainable the values of typical spaces from ASHRAE standards were used.

The load calculations varied significantly from the designed documents, but the discrepancy could be due to safety factors and differences in the model. The cost analysis determined that the BSU Fine and Performing Arts building costs approximately $68,000 per year for energy. The majority of cost was from electricity and the highest electrical demand was from the lighting.

Building OverviewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot

mixed use building that contains a 400 and 200-seat theatre, a recital hall, class rooms, offices, an art gallery, a large atrium and shops for creating scenery. The north side of the building has a large expanse of glass with different colored panes spaced in a pattern to look like sheet music. The numerous acoustical considerations have made this a wonderful building to enjoy musical and theatrical performances.

There are 3 MAUs with enthalpy wheels that provide ventilation air to the 16 AHUs, which provide conditioned air to the building through VAV systems. There is two 1,712 MBH gas-fired boilers and there is one 305 ton air cooled chiller on site.

Room CategoriesThe BSU Fine and Performing Arts building is a multiuse building and therefore has

several different types of spaces in it. Each of these spaces has to be modeled differently because they have different requirements and internal loads. All of the rooms have been categorized into the labels in Table 1.

Room CategoriesBreak Room Class Room Computer Lab CorridorDock Equipment Room Gallery Laundry RoomLecture Hall Lobby Office Rest RoomStage/Studio Storage Theatre Wood/Metal Shop

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 4: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Table 1: Room Categories

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 5: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

System Design Load EstimationIn order to estimate the heating and cooling loads for the Fine and Performing Arts

building Trane Trace 700 was used. The program used numerous inputs to calculate the heating and cooling loads for an entire year in order to determine the peaks for both. Each room was modeled and assigned a template for Internal Loads, Airflow, Thermostat, Construction and Room. Examples of each of these templates can be found in Appendix A.

Model InputsThere were numerous inputs for the model. For the Internal Loads templates the

density for each room was found by using the furniture plans. It was assumed that at full capacity each desk and work station was occupied. The heat gain from lighting loads were found from the electrical drawings when available and Table 9.6.1 of ASHRAE 90.1-2007 was used when the heat gain for a room was not provided. Miscellaneous loads were calculated from the architectural drawings and from Trace recommendations for certain spaces.

The Airflow template used ASHRAE Standard 62.1-2007 for the ventilation rates for each space type. The infiltration type was set to Neutral, Tight Construction, which allows for 0.3 air changes per hour. The thermostat settings were set to match the building operating settings. The Construction template values were found in the structural drawing and the building specifications. Since the building has dozens of ceiling heights between eight and twelve and half feet high, an average value of ten feet was used for the majority spaces. However, in certain areas that had much higher ceilings (such as the main theatre) exact values were entered. All of the schedules were set to 100% available in order to determine the absolute peak loads for heating and cooling.

The weather information for the analysis uses ASHRAE Climate Data from Baltimore, Maryland which is only thirty miles away from Bowie, which is why it was selected. Table 2 shows the design temperatures used.

Design Outside Air TemperaturesDry Bulb Wet Bulb

Summer 91°F 77 °FWinter 13°F N/A

Table 2: Design OA Temperatures

Load Calculation Results and ComparisonThe results from the load calculations compared to the actual designed values are

provided in Table 3. The peak heating and cooling loads from the Trace calculations are both much less than the equipment in the building is sized for. This could be due to several reasons.

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 6: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

The Trace model only calculated the load that the AHUs were handling, but the boilers and chillers must also provide conditioned water for domestic services since there is a kitchen, bathrooms and showers. Also, the Trace model did not consider the MAUs and preheat coils. Another reason that the actual designed equipment is larger than the calculated loads is because it most likely has a safety factor built in to make sure that it can always meet the design conditions.

The supply air for the model is slightly higher than the designed supply air. The Trace model has the AHUs that condition the main theatre supplying much more air to the space than what is designed. One reason for this is that the Trace model is supplying air to all four stories of the main theatre, but in reality only the first two stories are occupied. That could explain the discrepancy between the model and the designed supply air.

The Trace model calculated the ventilation air to be a bit less than the actual design as well. This could be due to the designers modeling certain spaces in a different way or simply by adding in a large safety factor, since several of the rooms could have noxious fumes present.

Peak Heating(MBH)

Peak Cooling(tons)

Supply Air(cfm)

Ventilation Air(cfm)

BSU Trace Model 749.3 211.3 95,012 23,777BSU Designed 3424 304.9 81,635 42,635

Table 3: Load Calculation Results vs. Actual Design Conditions

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 7: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

System Energy Consumption and Operating CostsTrace was once again used to calculate the energy consumption of the HVAC system.

The AHUs were modeled as variable volume reheat with 30% minimum flow. All of the air is preconditioned by an enthalpy wheel before reaching the AHUs; therefore a total-energy wheel has been added to each AHU. A schematic of the typical AHU layout is in Appendix B. The chiller was modeled as a 305 ton air cooled chiller with a 10.7 EER rating. Two boilers were also added. They are both 1712 MBH gas fired water boilers with an efficiency of 81.5 percent. The schedule that the equipment was set to for the energy analysis is shown in table 4.

Start Time End Time PercentageMidnight 6 a.m. 0

6 a.m. 8 a.m. 508 a.m. Noon 100Noon 1 p.m. 301 p.m. 5 p.m. 1005 p.m. 6 p.m. 506 p.m. Midnight 0

Table 4: Weekday Schedule

The results of the energy analysis are in charts 1 and 2. Chart 1 shows that natural gas consumption peaks in the winter and drops to zero in the summer. This is because only the boiler uses natural gas and the building does not need heated in the summer. Also, the electric consumption peaks in the summer and decreases in the winter but only by about half. The chiller has an electric condenser which consumes most of the energy for space cooling, which is why the electric consumption peaks in the hottest months. Unlike the gas however, it doesn’t drop to zero when it’s not cooling because there are still lighting and receptacles loads. Chart 2 shows how the total energy consumed in the year is distributed. Lighting is the largest, which seems reasonable considering the large amount of lights required for the several performing arts spaces.

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 8: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Chart 1: Monthly Energy Consumption

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 9: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

28.4%

17.9%

5.4%

38.0%

10.4%

Percent of Total Building Energy

Primary Heating

Primary Cooling

Pumps

Lighting

Recptacles

Chart 2: Building Energy Consumption

Energy CostThe rates that were used for the cost estimate were obtained from Baltimore Gas and

Electric (BGE). The rates were used to determine the monthly energy cost for both gas and electric. Chart 3 shows the total monthly energy cost broken up into electric and gas. The electric clearly dominates the total monthly costs.

Rate DemandNatural Gas $0.20/therm N/AElectricity $0.0927/kWh $3.95/kW

Table 5: Energy Rates

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 10: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Chart 3: Monthly Utility Costs

Environmental ImpactAn environmental impact analysis was performed as well. Table 6 has the result,

showing the total value for the entire year. It considers three greenhouse gases; CO2, SO2 and NOX.

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 11: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Environmental ImpactCO2 1,035,798 lbm/yearSO2 8,840 gm/year

NOX 1,872 gm/yearTable 6: Environmental Impact Analysis

Energy Analysis ConclusionThe total amount of energy that the BSU Fine and Performing Arts building uses is 2.73 million

kBTU/year. The natural gas is mainly used for the boiler which provides hot water to the heating coils. Therefore the natural gas consumption peaks in the winter when heating is needed. Likewise, the electricity consumption peaked in the summer when the chiller was working the hardest. The cost analysis showed that the yearly cost for energy in the building is just under $68,000. The vast majority of the cost comes from electricity which accounts for not only cooling, but also the lights, receptacles and equipment.

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 12: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

References

ASHRAE.2007, ANSI/ASHRAE, Standard 62.1-2007, Ventilation for Acceptable Indoor Air Quality. American Society of Heating Refrigeration and Air-Conditioning Engineer, Inc. Atlanta, GA.

ASHRAE.2007, ANSI/ASHRAE, Standard 90.1-2007, Energy Standard for Building Except Low-Rise Residential Buildings. American Society of Heating Refrigeration and Air-Conditioning Engineers, Inc. Atlanta, GA.

Baltimore Gas and Electric. <www.bge.com>

EYP Architecture & Engineering, P.C. Architectural Construction Documents. EYP Architecture & Engineering, Washington D.C.

EYP Architecture & Engineering, P.C. Electrical Construction Documents. EYP Architecture & Engineering, Washington D.C.

EYP Architecture & Engineering, P.C. Mechanical Construction Documents. EYP Architecture & Engineering, Washington D.C.

"Natural Gas Prices - Energy Explained, Your Guide To Understanding Energy." U.S. Energy Information Administration (EIA). U.S. Department of Energy, 17 Dec. 2010. Web. 22 Oct. 2011. <http://www.eia.gov/energyexplained/index.cfm?page=natural_gas_prices>.

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 13: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 14: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Appendix A: Sample Templates

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 15: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 16: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert

Page 17: Bowie State university fine and performing arts center · Web viewBowie State University’s new Fine and Performing Arts Center is a 123,000 square foot mixed use building that contains

Appendix B: AHU System Schematic

BSU Fine and Performing Arts Center 10/22/2011 Zack Lippert