Community Liaison Committee September 28, 2015

Bow Lake Wind Project

Page 2: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Construction Activities

Phase I interconnection to the provincial

electrical grid completed communications system commissioning

completed testing and commissioning of the wind

turbines completed site restoration works initiated 17 bat roosting boxes were installed on

the project site this phase of the project was

commissioned in August

Page 3: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Construction Activities

Phase II Negick Creek Bridge upgrade

completed (replaced old wooden bridge)

project roads completed wind turbine erection completed and

commissioning works nearing completion

collector and communications systems installation completed

O&M building construction initiated

Page 4: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Transformer Station

Page 5: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

O&M Building

Page 6: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Project Roads Negick Bridge

Page 7: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Viewscape Changes

Page 8: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Viewscape Changes

Page 9: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Public Roads

• public use / access via Dump Rd. will be possible once the project is commissioned – this is a shared public road so as always use with caution

• It is not presently the project’s intention to plough and sand Dump Rd. during the heart of winter, unless operational or safety needs require such

• The intersection of 67 Rd and Trim Lake Rd will not be ploughed

Page 10: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Project Site

Page 11: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Hunting Restrictions

A hunting restriction, approved by the Ministry of Natural Resources and Forestry, was enacted in the vicinity of the Project

Hunting is prohibited from September 15 to December 31, 2015 in the areas adjacent to the project

Page 12: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Thank You!

• As this will be the final meeting of the Bow Lake CLC, we wanted to express our thanks!

• We appreciate your participation and contributions over the past two years!

Page 13: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Contact

1-844-214-2578 [email protected]

We remain committed to being a good neighbour. If you have any questions or comments about the project as we move in to the operations phase, please feel free to contact us.

Page 14: Bow Lake Wind Project - BluEarth Renewablesbluearthrenewables.com/wp-content/uploads/2018/12/Bow...September 28, 2015 Bow Lake Wind Project Construction Activities Phase I interconnection

Questions?