TrueNorthSteel.com | [email protected] Aluminized Steel Type II Coated CSP and Headwalls Owner Pembina County Highway Department Contractor Pembina County Highway Department Consulting Engineer KLJ Application Replacement of bridge with corrugated steel pipe and headwalls Why corrugated steel pipe from TrueNorth Steel? A cost effective solution for a low volume bridge crossing Project challenges Delivering the pipe to a flood ravaged area Special project elements Pembina County Highway Department crew did the installation Other TNS products used Corrugated steel headwalls Boulio Bridge Replacement | Cavalier, ND TrueNorthSteel.com | [email protected] TRANSPORTATION PROJECT PROFILE BEFORE AFTER

Boulio Bridge Replacement - True North Steel

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

TrueNorthSteel.com | [email protected]

PROJECT PROFILE

Aluminized Steel Type II Coated CSP and HeadwallsOwner Pembina County Highway Department

ContractorPembina County Highway Department

Consulting EngineerKLJ

ApplicationReplacement of bridge with corrugated steel pipe and headwalls

Why corrugated steel pipe from TrueNorth Steel?A cost effective solution for a low volume bridge crossing

Project challengesDelivering the pipe to a flood ravaged area

Special project elementsPembina County Highway Department crew did the installation

Other TNS products usedCorrugated steel headwalls

Boulio Bridge Replacement | Cavalier, ND

TrueNorthSteel.com | [email protected]

TRANSPORTATION PROJECT PROFILE

BEFORE

AFTER