Bottom Driven Steel Cased Mini Piling Why Mini Pile? Unsuitable ground conditions for standard foundations Risk of undermining or damaging existing services and/or foundations Restricted access for piling equipment Minimise cost of installing a hardcore base for the piling rig Low headroom situation Eliminates fumes in confined areas When a low vibration solution is required Minimal noise levels Minimal disruption Ideal for small to medium sized jobs Upgrading foundations/floors for increased loadings No spoil created Why Use Larsen Foundations Cost effective & efficient installation of mini piles by fully certified Piling Operatives to latest codes and standards Conveniently based Belfast and Dublin Minimum access required from 600mm wide Low vibration solutions Fast and efficient service Full complement of rigs for most situations Company Background Larsen Foundations have provided cost effective solutions for foundation problems since 1987. We have a first class reputation for meeting the needs of both domestic and industrial clients throughout Ireland. Air Power Grundomat Remote powered rigs Self propelled rig

Bottom Driven Steel Cased Mini Piling - Larsen Pilinglarsenpiling.com/fs/doc/product/0-mp-brochure.pdf · Bottom Driven Steel Cased Mini Piling Why Mini Pile? • Unsuitable ground

  • Upload
    lamhanh

  • View
    233

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bottom Driven Steel Cased Mini Piling - Larsen Pilinglarsenpiling.com/fs/doc/product/0-mp-brochure.pdf · Bottom Driven Steel Cased Mini Piling Why Mini Pile? • Unsuitable ground

Bottom Driven Steel Cased Mini Piling

Why Mini Pile?

• Unsuitable ground conditions forstandard foundations

• Risk of undermining or damagingexisting services and/or foundations

• Restricted access for pilingequipment

• Minimise cost of installing ahardcore base for the piling rig

• Low headroom situation• Eliminates fumes in confined areas• When a low vibration solution is

required• Minimal noise levels• Minimal disruption• Ideal for small to medium sized jobs• Upgrading foundations/floors for

increased loadings• No spoil created

Why Use Larsen Foundations

Cost effective & efficient installation of minipiles by fully certified Piling Operatives tolatest codes and standards

• Conveniently based Belfast andDublin

• Minimum access required from600mm wide

• Low vibration solutions• Fast and efficient service• Full complement of rigs for most

situations

Company Background

Larsen Foundations have provided costeffective solutions for foundation problemssince 1987. We have a first class reputationfor meeting the needs of both domestic andindustrial clients throughout Ireland.

Air Power Grundomat

Remote powered rigs

Self propelled rig

Page 2: Bottom Driven Steel Cased Mini Piling - Larsen Pilinglarsenpiling.com/fs/doc/product/0-mp-brochure.pdf · Bottom Driven Steel Cased Mini Piling Why Mini Pile? • Unsuitable ground

Belfast4 West Bank RoadBelfastBT3 9JLTel: 028 9077 4000Fax: 028 9077 6945

DublinBishopswood The WardCo DublinTel: (01) 834 8255Fax: (01) 834 8277

Power Pack Min Width Min Height Pile Sizes AvailableRig Type mm M 100mm 150mm 219mm

Grundomat Compressor 600 2.2 Yes Yes xT750 Remote 720 2.3 x Yes xT1000 Remote 750 2.6 x Yes Yes

TD500T Remote 750 2.3 x Yes YesPile Ace Onboard 2000 3.0 x Yes Yes

Pile Ace 2 Onboard 2000 4.0 x x Yes

Some projects we have installed Mini Piles for:-

Internal drophammer

Plug of dryconcrete

Leadingcasing

Fullywelded

joint

Additionalsections added

as required

On completion ofdriving, casing is filled

with concrete andreinforced

Mini Piling Rig

Christchurch, Centre of Excellence,Belfast

Connswater Shopping Centre,Belfast

Central Station, Belfast Customs House, Dublin Christchurch, Dublin

McHughs Bar, Belfast City Hall, Dublin Trinity College, Dublin

Bottom Driven Steel Cased Mini Piling