119

both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 2: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[2]

both of the Crown dumps top will reduce from 85 m (ASL) to 52 m (ASL).The revised conceptual plan and sections are enclosed as Enclosure I & IIrespectively.

Q.3. The Committee also desired that the two quarries be mined insequence to reduce the extent of OB to be stored externally andincrease concurrent backfilling

Ans. An exercise was taken up to find out whether the outside dump (surfacedump) OB quantity requirement can be reduced by dividing the quarriablearea into two quarries and mining them in sequence rather thansimultaneously as adopted in the approved Mining plan. It was found thatthe volume required to be dumped does not reduce in the suggestedalternative. However – in the spirit of the query / suggestion – an exercisewas done to accommodate all the material in the backfill after the end of 4th

year in approved Mining plan alternative and it was found that the said OBcan be accommodated in the crown dumps of 85 m height above surfacelevel (ASL) which was previously kept at 60m and 70 m (ASL) in East andWest backfill crown dumps respectively. Now in the post mine closure stage(end of 28th year) the void will be filled with the 22.4 mm3 (L) and 24.23 mm3

(L) of OB from East and West Crown dumps respectively of the backfilledarea so that the depth of the terminal void reduces to 40 m below surfacelevel. As a result the crown dumps top levels of both the dumps will reduceto 52 m from the 85 m RL (ASL).

Thus, the requirement of land for outside dump get reduced to 32.66 Ha toaccommodate first four years OB (26.31 mcum (B) only. RevisedConceptual Plan & Sections are at Enclosure I & II respectively.

Q.4. The Committee sought a copy of the recent Order issued by Govt. ofOdisha

Ans. Copy of the order issued by Govt. of Odisha is enclosed as Enclosure III

Q.5. The Committee desired that the design of the embankment should begot approved by the State Water Resources Department.

Ans. The work order for Design of Embankment has been awarded to M/s GMSPower packs Pvt Limited at a cost of Rs.6.5 Lakhs. The embankmentdesign will be got approved by Water Resources Department Govt ofOdisha and approval so accorded will be submitted in due course to MOEF.Work order letter enclosed as Enclosure IV.

Q.6. The Committee desired that a project specific R&R Plan should befurnished.

Ans. R&R plan prepared by DAWN was enclosed as annexure XXI of finalEIA/EMP report. The same was presented vide slide no. 68-75 of ECpresentation dated 20.03.2012 and queries raised ware answered by the

Page 3: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[3]

representative of DAWN during the course of discussion. A copy of the R&R plan is again enclosed as Enclosure V for your kind perusal

Q.7. The Committee sought the status of EC of the linked Plants usingclean and the FBC based TPPs for use of coal rejects along with theirlocation and present status of the project

Ans. Status of EC of the linked Plants using clean and the FBC based TPPs foruse of coal rejects along with location and present status of the project isgiven below:

Name of JVpartner

Name of theEUP

Location & Distancefrom the Block

Status of the project

Rungta MinesLtd.

1. DRI Plantand FBBTPP

A. Location : Jharbandh,Dhenkanal, OrissaDistance : 50 Km

B. Location :Komando,Sundergarh, OrissaDistance: 300 Km

A) DRI capacity :1.5 MTPA FBC capacity : 200 MW

EC received vide letter no.J-11011/241/2009-IA II (I) dt 2nd

August, 2010. Letter enclosed asAnnexure I.The plant is under constructionand schedule to commission inphase from April 2015 to March2016.

B) 1100 TPD DRI Kiln underproduction.300 TPD DRI kiln, 0.20 MTPASMS and 25 MW CPP would becommissioned by October 2012.TOR for another 51 MW AFBCplant has been received. TORletter enclosed as Annexure II

Ocean Ispat PvtLtd.

1. DRI Plant2. FBB TPP

Location: Basantpur,Dist. Keonjhar, OrissaDistance : 300 km

DRI capacity : 0.4 MTPACFBC capacity : 50 MWTOR received vide letter no. J-11011/579/2011-IA-II(I) dated 14th

February , 2012. TOR letter enclosedas Annexure III

OCL India Ltd. 1. DRI Plant2. FBB TPP3. Clinker

Plant

Location: LalmoiLamloi & RajgangpurRajgangpur, OrissaDistance 260 km

DRI capacity: 400 TPD under operation.1000 TPD would be commission byOctober 201272 MW AFBC based power plant underoperation40 MW AFBC power plantcommissioned by December 2012. forwhich EC received vide letter no.J-11011/241/2010-IA II (I) dt 29th March2012. Letter enclosed as Annexure IV1.1 MTPA clinker plant under operation.EC letter enclosed as Annexure V.

Q.8. The Committee also desired that a CSR Plan incorporating the issuesraised in Public Hearing along with budgetary allocation should beprovided. A separate 3-column table on the issues raised in P.H. alongwith commitments made with budgetary provisions should also befurnished.

Page 4: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 5: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 6: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 7: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 8: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 9: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 10: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 11: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 12: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

DRAFT REPORT ENCLOSURE-V

2011

Socio-Economic Survey & Rehabilitation Action Plan

Radhikapur (W) Coal Project

Tehsil: Chhendippada, Dist. Angul. (Odisha)

CLIENT: RADHIKAPUR (WEST) COAL MINING PVT. LTD

Prepared By DAWN (Development Alternatives for Wider Network

Page 13: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Contents Page

Socio-Economic Survey Findings at a glance 3

CHAPTER I

Introduction 5

CHAPTER II

Methodology of the Study 10

CHAPTER III

Socio-Economic Profile

1. Profile of the project area

2. Profile of the Affected Families 17

CHAPTER IV

Legal Requirement and R&R Policy/Entitlements 31

CHAPTER V

Rehabilitation Action Plan 42

Annexure

I. Profile of PAFs

Page 14: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

SOCI0-ECONOMIC SURVEY FINDINGS AT A GLANCE

Total number of Project Affected families (Original)

identified:

1664

Total number of Project Affected families (Extended)

identified:

3714

Sl. No. Impacts of Land acquisition Number/Amount/Percent

1 Total area of Private land acquisition (acres) 1824.894

2 Total number of Families losing all agricultural land &

Homestead land

1348

3 Total number of Families losing >2/3 agricultural land &

Homestead land

362

4 Total number of families losing all agricultural land but not

homestead land

214

5 Total number of families losing >1/3rd

agricultural land

homestead land

90

6 Total number of families losing Homestead land but not

Agricultural land

54

7 Total number of families losing Agricultural land part but not

homestead land

1646

8 Total number of Original Families 1664

9 Total number of New Families 2050

10 Total Number of Project Affected Extended Families 3714

11 Total Marginal Farmers (%) 60

12. Total Small Farmers (%) 19

13. Total Medium Farmers (%) 6

14. Total Big Farmers (%) 5

Page 15: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

15. Total Landless families (%) 10

16. Total ST Families (%) 6.4

17. Total SC Families 17.0

18. Total SEBC/OBC Families (%) 76.5

19. Total Gen Families (%) 0.1

20 Marital Status of Project Affected Family members

Married (%) 49.6

Unmarried (%) 50.1

Widow/Widower (%) 0.3

21. Primary Occupation of family members

Cultivation (%) 41.3

Agriculture & Non Agriculture

Wage Labour (%)

6.9

Service (%) 1.4

22. Literacy of Project Affected Family Members (%) 83.3%

23. Type of House

Thatched (%) 70

Semi-Pucca (%) 25

Pucca (%) 5

29. Perception about the Project

Awareness about the project (%) 35

30. Expectation from the project Job and high (triple the

market rate)land

compensation

Page 16: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Chapter-I

Socio-Economic Survey & Rehabilitation Action Plan

Project Title: “Socio-Economic Survey, Socio-Cultural Property Survey, Resource

Mapping, General Infrastructure Survey of the Project Displaced/Affected Families at

Radhikapur (W) Coal Block in Chhendipada Tehsil of Angul District, Odisha”.

1.1 Introduction

The State of Orissa is endowed with rich mineral resource in terms of deposit and production.

The mineral deposit of the state is not only vast but also equally diverse. Orissa's rich mineral

reserves constitute 28% Iron ore, 24% coal, 59% Bauxite and 98% Chromite of India's total

deposits. Thus, mining is an integral part of the economic activities of Orissa.

It is an established fact that the acquisition of private land for a development project cause social ,

economic, cultural and environmental problems which affect the productive assets and sources of

income, the habitat, families and kinship, community structure, social relations, etc. As a result, it may

lead towards impoverishment risks of families such as, landlessness, joblessness, homelessness,

marginalization, food insecurity, loss of common lands and resources, increased health risks and social

disarticulation (Impoverishment Risks and Reconstruction (IRR) Model by Prof. Michael Cernea, 1996). In

order to mitigate the risks, measures for rehabilitation and resettlement of displaced and affected

families is warranted to maintain the status quo and improve the socio-economic conditions.

As a response to the issue of displacement, the Orissa Resettlement and Rehabilitation (R&R) Policy,

2006 came into operative as a comprehensive policy to provide “people, who are displaced or otherwise

affected by the projects, mean to improve or at least restore their former living standards. Displacement

and project-related hazards are now minimized, both as an ethical responsibility and a cost-effective

strategy for all development programmes. Models for minimising risks, both people-centric and

community-centric, are built-in necessities for policy formulations for such projects. Developing R&R

packages and formulating new methodological tools to restore people’s pre-displaced livelihood have

been much more systematised in recent times. Orissa is one of the first states to have formulated a

Page 17: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

progressive R&R policy in 2006 to address the hazards of displacement. The R&R Policy, 2006 and SES

guidelines of Revenue and Disaster Management Department of Govt. of Orissa are the major

instruments to conduct the proposed socio-economic study.

1.2 Rationale of the Study

It has been seen that displacement and resettlement due to infrastructural projects

increase the risks of impoverishing local populations, threatening their livelihoods and

truncating their chances for sustainable development or even survival (Cernea 1999, 2000,

2001; Pandey 1998; Fernandez 1994; Downing 1996 and 2002; Government of India 1993).

Societies that have endured for hundreds, if not thousands, of years can quickly disintegrate

under the pressures of displacement. Avoidance of this outcome demands detailed planning

and allocation of adequate financial and human resources. Integral to any successful

resettlement is the use of skilled development-induced resettlement specialists. Extensive

development knowledge and scientific research show that rehabilitation and restoration

(R&R) of livelihoods is more likely when all potential impoverishment risks are identified early

and arrangements are made to mitigate or avoid them. Informed, timely, widespread and

active participation of the project-affected people is an essential prerequisite of an effective

R&R policy. Involuntary resettlement is a socio-economic, not an engineering issue. The

chances of risk mitigation and restoration are greater when stand-alone financing is provided

for displacement, since this removes the conflict of interest that makes the authorities view

resettlement and rehabilitation as an unnecessary social service rather than a necessary cost.

To ensure an improved living condition for the impacted people, the authorities should take

appropriate steps in consultation with the impacted community, identify the possible

impoverishment risks from a very early stage of the project and take risk mitigation

measures for sustainable R&R.

Radhikapur (W) Coal Project and its initiatives

Page 18: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Radhikapur (W) Coal Mining Private Limited , joint venture enterprise of Rungta Mines Ltd., OCL India

Ltd. and ocean Ispat (Pvt.) Ltd., intends to establish a coal project at Chhendipada of Angul District,

Orissa which requires 1824.894 acres of Private land and 764.712 acres of Govt. Land for acquisition

totaling to 2589.606 acres of land.

Radhikapur (West)Coal Mining Pvt. Ltd. (RWCMPL) initiated the process for carrying out the Socio-

Economic Survey and preparation of Rehabilitation Action plan by identifying DAWN, an independent

agency who has experience in similar studies and empanelled by the Government Orissa

DAWN accepted the letter of award of (RWCMPL) to conduct the Socio-Economic Survey in accordance

with Orissa R&R Policy, 2006 and SES guidelines, Govt. of Orissa, 2008.

Location of the Project:

The project is located in Chhendipada Tehsil, Angul district, at a distance of 32 km from Angul and 10

km North of NH 42.

1.3 Land Requirement:

The village wise land acquisition from Land Schedule is summarized below

Table 1.3.1

Land requirement for the proposed project

Government Lands (In Acres) Sl.

No.

Name of

the Village

Private

Lands

(In Acres) Communal Leasable Gochar Village

Forest

Total

Govt.

Grand

Total

(In

Acres)

1 Barapada 584.263 75.249 32.342 43.832 55.919 207.342 791.605

2 Kusakila 609.170 37.570 39.240 47.510 34.420 158.740 767.910

3 Naupada 330.100 17.000 45.100 39.120 21.370 122.590 452.690

4 Kusakila

Jungle Bar

225.582 3.550 98.150 36.180 69.960 207.840 433.422

5 Jhintipal 25.267 2.940 21.169 15.537 4.362 44.008 69.275

6 Putagadia 38.680 0.480 0.000 0.000 22.210 22.690 61.370

Page 19: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

7 Balipata 9.211 0.173 0.000 0.040 1.289 1.502 10.713

8 Kosala 2.621 0.000 0.000 0.000 0.000 0.000 2.621

TOTAL 1824.894 136.962 236.001 182.219 209.530 764.712 2589.606

Table 1.3.2

Village wise % of share of Private Land acquisition

Sl.No. Name of the Village Land to be

acquired (In acre)

% of share

1 Barapada 584.263 32.0

2 Kusakila 609.170 33.4

3 Naupada 330.100 18.1

4 Kusakila Jungle Bar 225.582 12.4

5 Jhintipal 25.267 1.4

6 Putagadia 38.680 2.1

7 Balipata 9.211 0.5

8 Kosala 2.621 0.1

TOTAL 1824.894 100.0

Page 20: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

The above table shows that Barapada and Kusakila village followed by Naupada village are the most

affected villages in terms of land acquisition. Putagadia, Balipata and Kosala are the least affected

villages to be affected through land acquisition for Radhikapur Coal mine project.

1.4 Objectives of the Study

1. To collect all the details of the people who are likely to be affected in terms of their

demographic features like names of family members, their age, sex, educational

status, occupation (main and subsidiary) and employment status and their sources

of income.

2. To estimate the income, consumption and indebtedness of the households and

Project Affected Families (PAF).

3. To determine the ownership over land holdings, land use particulars.

4. To estimate households’ loss of production from the land due to the land that is

likely to be acquired by the project.

5. To assess the extent of possession of immovable properties like houses, wells,

ponds, trees etc. from the every household / PAF.

6. To assess the employment potentials of the area with the help of educational status,

unemployed personnel available for work.

7. To identify the households/families who do not reside in the area but derive their

income from land that is likely to be acquired for the project.

8. To identify the absentee landlords who are owning land i.e., likely to be acquired by

the projects.

9. To assess and analyze the choice of rehabilitation option of all the PAPs who are

likely to be affected by the land acquisition.

10. To study the economic and social situations of the families whose land is going to be

acquired due to the project establishment.

11. To identify tribal or any other special groups who are likely to be affected.

12. Any other items considered pertinent for comprehensive study.

Chapter-II

Page 21: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Methodology of the Study

2. Survey Methodology

The broad objective of the present socio-economic survey is to generate the necessary data to form a

baseline and information, so as to prepare an appropriate Rehabilitation Action Plan (RAP) of affected

people. The study involved collection of the socio-economic conditions of the PAFs and their attitude

towards the proposed project. On the basis of such information, a rehabilitation action plan is prepared

for the people whose livelihood systems have been affected. Therefore, a socio-economic survey and

the preparation of an effective Rehabilitation Action Plan (RAP) is the two direct outcomes of this

report. The socio-economic study will act as a benchmark to monitor the progress of the standard of

living of the affected persons after the implementation of the rehabilitation measures.

2.1 Study Approach

The approach we have undertaken for the Socio Economic Survey is to ensure active participation of the

affected families rather than externally imposed requirement. To perform this task, we have made an

effective communication with the affected families and their leaders regarding the R&R benefits

enshrined in Orissa R&R Policy, 2006. We also spelt out that the study provides an opportunity for the

affected families to ventilate their grievances and choices for a viable Rehabilitation and Resettlement

plan. When they were convinced about the about the objective of the study, it became easier to collect

data and cross verify it.

2.3 Coverage and Scope of the Study:

The SES is limited to the study of affected families of 8 villages of Chhendipada Tahasil of Anugul District.

The work was undertaken as per Orissa R &R Policy, 2006 and guidelines issued by Revenue and Disaster

Management Department, Govt. of Orissa vide Notification. No.18680 dt. 24.04.08.

2.4 Survey Planning:

Before undertaking the survey, the survey team of DAWN and concerned Radhikapur (W) Coal Mining

Pvt. Ltd. personnel jointly planned the time schedule for undertaking the survey in the project area in

Chhendipada Tehsil of Angul district. It was decided to have informed communication between the field

personnel of DAWN and Radhikapur (W) Coal Mining Pvt. Ltd. Personnel based at Angul.

2.5 Survey Design, Tools and Technique

Page 22: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

The survey team of DAWN gets acquainted with the Survey methodology, tools and techniques

of data collection.

• Family interview through Household Interview Schedule following the questionnaire of

SES guidelines, 2008, Govt. of Orissa

• Village Infrastructure, Socio-Cultural and Village Resource through village meeting,

Transect Walk, and Participatory Rural Appraisal (PRA)

2.6 Skill and Qualification of the Study Team:

In order to perform the following tasks, Mr.R. K. Parida, Sociologist acted as Team Leader and

provided overall supervision of the Socio-Economic Survey and Mr.Subrat Ku. Indrasingh has co-

ordinated the whole survey. Mr. R.K. Parida had conducted several R&R studies in the State of

Orissa and outside.

1.6.1 Selection of Research Investigators: The Research Investigators are being recruited with

social science background who are proficient in the local language. The team members are

well versed with the local traditions, customs, culture and economic conditions of the PAPs

as some members belong to the local area of undivided Dhenkanal District, presently Angul

and Dhenkanal district and others are selected from the neighbouring district

1.6.2 Training to Research Investigators and Supervisors: The Research Investigators and

Supervisors are trained in the National R&R Policy, LA Act, 1984, Orissa R & R Policy, 2006,

data collection procedure, contents of the questionnaires, Intensive Training were provided

regarding the collection of data, scruninizing, coding, data processing, interpreting and

report writing..

1.6.3 Technical Knowledge: The team had computer professionals and used computerized

format of Ms Excel for data entry and process it for the report. The team possesses the

knowledge how to transfer the coded data from Ms Excel to SPSS for statistical testing.

1.6.4 Procedure of the Socio-Economic Study:

Page 23: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

The National R&R Policy, 2007, R&R policy, 2006 of Govt. of Orissa was studied and the

legal requirements under Land Acquisition Act 1894 amended in 1984 for the acquisition of

Private land, Govt. land, Forest land and Gochhar land etc. were analysed. The Land

Encroachment Act (1972) was also studied to understand the terms and conditions to

provide Record of Rights to the landless families.

2.7 Data Collection:

The study primarily involved the collection of both primary and secondary data and other information,

which are both qualitative and quantitative in nature.

The relevant secondary data was also collected and reported include:

• Land Schedule ( data on the area of land acquired) from the office of JR Power Gen Limited

• Records of Rights & Bhulekh

• Voters list

• Census data

• BPL list of the Affected Villages

2.7.1 Field Investigation for Primary data Collection:

To start with, a pilot visit with a tentative broad frame of reference was made to the affected

villages, sitting at common places, grocery shops and tea stalls with an objective of primarily getting

a FEEL of the problem on hand. This involved a few short duration meetings with the leaders and

people of different age group that made opinions there (influencing people)

The study was extensively depended on primary data that are affected by the project. The land

schedule and ROR was the base to find out the affected families. It was found that the land records

were not updated and jointly owned by family members. The primary task before collecting data at

family level, the family genealogy of each Khatiyan and ROR was delineated with each household so

that it became clear to identify the titleholders.

2.7.2 A typical Example of Family Geneology of Gobinda Ch Roul , Village Barapada: Khata No.61 is

presented below.

Page 24: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Thereafter, the households survey was undertaken to collect information at family level

following the SES guidelines of Revenue and Disaster Management Department, Govt. of Orissa,

published on Dated the 24th April, 2008.

2.7.3 Tools of Data Collection:

Quantitative and Qualitative tools were carried out while conducting the socio-economic

survey. For quantitative data, the method of Interview Schedule (Interview scheduled attached

in SES guidelines of Revenue and Disaster Management Department, Govt. of Orissa) having

opened and closed ended questions were followed.

2.7.4 Household Interview Schedule: The data for the socio-economic survey were collected at

the family level on the following aspects.

a) General information about the Affected Household

b) Identification of the Household ,

c) Household composition

d) House particulars

e) Land particulars

f) The cost of cultivation

g) Wage particulars of wage labourers

h) Particulars about business/enterprise

Late Govinda Ch. Roul

Wife: Surabala Roul

(Original Family)

Nityananda Roul

(Married Son)

Separate Family

Binaya Roul

(Married Son)

Separate Family

Arakshit Roul

(Married Son)

Separate Family

Page 25: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

i) Cattle and Livestock

j) Movable family assets & earning

k) Common property resources

l) Jajmani/Usufructary/Customary rights

m) Perception of Household

n) Declaration for options relating to R&R benefits

2.7.5 Contacts with key informants in the community and PRI representatives

The survey team apart from the household survey also interacted with the key informants of the

community and PRI representatives to collect data about the community.

In addition, discussion with the community leaders, Anganwadi worker, government officials

concern with R & R, was also part of the study. The important aspect of the study was

participatory appraisal with the involvement of the community to enable them to understand

the process of R & R. Some form of photography were taken to record the existing area for

identification.

2.7.6 The following tools of Participatory Rural Appraisal (PRA) methodology were applied for

obtaining qualitative data for the study.

2.7.6.1 Walk over Survey/Transact walk

The transact walk was conducted with the help of some affected persons to get insight on the

field situation related to topography, agricultural crops, and irrigation facilities of the acquired

land.

2.7.6.2 Resource Mapping

A resource mapping of every village was done in order to understand the natural and physical

resources existing in the area. The natural resources such as land, water, forest and physical

resources such as road, electricity, and transport facilities are identified in the walk over

surveys. It helped to identify the infrastructure need of the village for a village resource planning

and development.

2.7.6.3 Focused group discussions

Page 26: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

The focused group discussions were conducted in the affected villages. The discussions were

held with groups of about 15-20 respondents by using an unstructured direct approach to

ensure flexibility, open handedness and freedom in expressing ideas and feelings. The objective

was to stimulate and generate new ideas relating to land acquisition, the rehabilitation package

and other development aspects.

2.8 Data Processing Data Scrutiny, Validation, Coding and Entry:

After the completion of data collection, the survey team of DAWN scrutinized and validated each and

every filled-up schedule. All the qualitative and open ended questions in the schedules were coded prior

to the data entry.

2.9 Creation of Computerized Data base

The data related to survey and profiling were computerized for retrieval and management

information to take actions according to the need of the people. It also served as a bench mark for

monitoring the impact of different activities on people’s standard of living and quality of life.

2.10 IT Enabling of Data

The analysis of field data collected through different tools was analyzed using computer software. The

steps used particularly for undertaking the quantitative analysis are presented in the box.

Particularly package like MS Excel was used for data computerization and cleaning; and the SPSS

package was

applied for analysis

and generation of

data tables. Data

outputs for each

variable was

presented in the

report in charts

and tabular forms with frequencies, percentages and averages. Besides, multi-vitiate tables was

generated and presented in the report based on the study requirements. Unlike quantitative analysis,

Page 27: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

the qualitative analysis of information was carried out and presented in the form of qualitative data

tables / matrixes.

2.11 Community Development works:

2.11.1 General, Socio-Cultural Infrastructure Survey:

The general, Socio-cultural infrastructure survey of the affected villages was conducted to make

an inventory of public utilities, village common property and natural resources.

2.12 The Initial Hurdle

The survey at Kuskila village was commenced as per the Action Plan but the resistance of the

people delayed the process of data collection. They have the understanding that the socio

economic Survey may pave the way to force them to lose their lands and their native place itself.

It took time to motivate them regarding the objective of the Socio-Economic survey which

provides an opportunity to participate and ventilate their grievances. The communication was

made to different party leaders separately which became effective and the data collection

continued.

CHAPTER III

SOCIO-ECONOMIC PROFILE

In order to assess the extent of social impacts, it is necessary to assess the socio-economic

profile of the project area and socio-economic conditions of the affected people. The Socio-

economic is essentially involves the social and cultural impacts of development, and economic

of the term is generally seen as including not only economics, but also demography and

planning, again with input from other fields, as needed.

Page 28: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

The demographic profile gives an idea about the social fabric of the affected families on the

basis of their ethnic group, family type, caste, age group, sex and education and other variables,

whereas the economic profile helps in ascertaining their living standard through various

indicators like occupation, income, expenditure pattern, land holdings etc. The survey provides

an understanding of the nature and magnitude of the problems of the Project Affected Families

(PAFs) after the acquisition of land.

3.1 BRIEF SOCIO-ECONOMIC PROFILE OF THE PROJECT AREA

3.1.1 Demography of the Project area

A total of 08 villages are affected due to proposed Radhikapur (W) Coal mine project. Total human

population of affected villages is 15389 , comes from 3162 households. Of the total population, males

constitute to about 50.7% and females to 49.3% of the total population. Age group 0-6 year accounts for

14.5% of the total population. Scheduled Caste (SC) population is 19.9 % of the total population, while

Scheduled Tribe population is 7.8 % of the total population. It is worthy to mention that in the Village

Putagadia, ST population constitute 65.5% of the total population of the village. Average literacy rate in

the affected villages is 60.3 % with high percentage in male population. Around 46.5 % of the total

population is engaged in the various types of works like cultivation, agricultural, household industries,

small scale business, etc

Table 3.1.1

Demography of the Project area

Sl.

No.

Demography Barapada Kuskila Naupada Kuskila

Jungle(

san)

Jintipal Putagadia Balipata Kosala

1 Number of

Household

222 386 310 4 325 130 728 1057

2 Total

Polulation

1053 2028 1637 23 1581 686 3544 4837

3 Male

Population

533 1005 835 9 801 346 1782 2501

4 Female

Population

520 1023 802 14 780 340 1762 2336

Page 29: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

5 0-6 years 155 345 250 6 278 112 490 601

6 Household Size 4.7 5.3 5.3 5.8 4.9 53 4.9 4.6

7 Sex Ratio

(females per

1000 males)

976 960 960 1556 974 983 1068 896

8 SC Population 153 530 340 0 273 53 963 756

9 Proportion of

SC

Population(%)

14.5 26.1 20.8 0 17.3 7.7 27.2 15.6

10 ST Population 147 32 77 0 231 450 72 189

11 Proportion of

ST

Population(%)

14.0 1.6 4.7 0 146 65.6 2.0 3.9

12 Literacy Rate

(%)

54.5 52.9 68.2 29.4 73.8 60.3 67.3 76.5

13 Work

Participation

Rate (%)

50.2 43.4 50.8 43.5 45.4 49.1 52.7 37.6

14 Main Workers

partipation

rate (%)

27.5 35.9 42.3 30.4 38.0 45.2 26.9 24.1

15 Marginal

workers

participation

rate (%)

22.7 7.6 8.4 13.0 7.4 3.9 25.8 13.5

3.1.2 Economic Condition:

The BPL list is an indicator of the Socio-Economic condition of people which portrays the poverty

situation of the area. It is taken as baseline information before initiation of any development project.

The BPL Survey by the Department of Panchayatraj of Govt. of Orissa indicates that there are 3598 BPL

families in the villages coming under the project area. The village wise list of BPL families alongwith the

concerned Panchayat BPL families are narrated below.

Table 3.1.2

Poverty level

Sl.No. Village Name No. of BPL families Name of the G.P. under

Page 30: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Chhendipada Block of

Angul District &

BPL family

1. Barapada 231 Barapada (495)

2. Kusakila 383 Kusakila (672)

3. Naupada 353 Balipata (353)

4. Kusakila Jungle Bar 01 Kusakila (672)

5. Jhintipal 392 Korada (1025)

6. Putagadia 163 Korada (1025)

7. Balipata 826 Balipata (353)

8. Kosala 1249 Kosala (2206)

Total 3598

3.2 Socio-Economic Condition of Project Affected Persons

The socio-economic condition of the Project Displaced Families (PDFs)/Project Affected Families

(PAFs) has become imperative to understand the baseline information of the life style and life

chances of the family members as the land acquisition process would suddenly alternate their

land holdings status. It would form help in planning for Rehabilitation and Resettlement process

of the affected families. So, the family profile was studies which narrate the socio-economic

condition and their opinion and choice for rehabilitation measures.

The identification of Project Displaced Families (PDF) and Project Affected Families(PAF) was done as

per the Family Definition as per Orissa R&R Policy, 2006.

• Family” means the person and his or her spouse, minor sons, unmarried daughters, minor

brothers or unmarried sisters, father, mother and other members residing with him or her and

dependent on him or her for his / her livelihoods.

Page 31: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

• Note:- Each of the following categories will be treated as a separate family for the purpose of

extending rehabilitation benefits under this policy.

(i) A major son irrespective of his marital status.

(ii) Unmarried daughter / sister more than 30 years of age.

(iii) Physically and mentally challenged person irrespective of age and sex;(duly certified by the

authorized Medical Board). For this purpose, the blind / the deaf/ the orthopedically

handicapped / mentally challenged person suffering from more than 40% permanent disability

will only be considered as separate family.

(iv) Minor orphan, who has lost both his/her parents.

(v) A widow or a woman divorcee.

3.2. Identification of affected families:

Identification of affected families is one of the key outputs expected from the socio-economic survey.

According to the R&R Policy, 2006 of Government of Orissa, the survey is also required to classify

families as ‘Original’ and ‘Separate’ among the affected families identified in the survey.

Table-3.2.1

Number of affected (Original and Separate) Families

Total number of Affected families (Original) identified: 1664

Total number of Affected families (Separated) identified: 3714

Based on the survey results, 1664 families have been identified as ‘Original Affected Family’ and 3714

families as ‘Separate Family’.

Table-3.2.3

No. of original Project Displaced Families (PDFs)/Project Affected Families (PAFs )

surveyed in the Project Villages

Name of the Village Original Family New Total (Separated

Families)

Page 32: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Barapada 264 128 392

Kuskila &

Kuskila Jungle

394 291 685

Naupada 672 1140 1812

Balipata

Putagadia 132 198 330

Jhintipal 99 148 247

Kosala 09 14 23

Total 1664 2050 3714

Table-3.2.2

Number of PDFs & PAFs in the Project Area

Number of Original, New and Separate affected families PDF PAF Total

Total number Separate Families identified: 1854 1860 3714

It is found from the above table that there are 1854 Project Displaced Families and 1860 Project

Affected families are in the project area. The category wise Affected families are presented below.

Table-3.2.3

Categorization of Affected Families as per Orissa R &R Policy,2006 for Mining Project

Categorization of

Families

Barapada Kuskila

&

Kuskila

Naupada Balipata Putagadia Jhintipal Kosala Total

Page 33: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Jungle

C-(i) (DF Losing all

land and

homestead land)

392 685 271 - - - - 1348

C-(ii) (DF losing

>2/3 AL and HL)

- - 362 - - - - 362

C-(iii) (Families

losing all AL &

not HL)

- - 181 - 33 - - 214

C-(iv)(DF losing

>1/3 AL and HL)

- - 90 - - - - 90

C-(v) (DF losing

HL but not AL)

- - 54 - - - - 54

C-(vi) (Loosing

part of Agri. Land

not HL)

- - 854 225 297 247 23 1646

Total 392 685 1812 225 330 247 23 3714

As per the definition of “Displaced Families “ means a family ordinary residing in the project area prior

to the date of publication of notification under the provisions of the relevant Act and on account of

acquisition of his/her homestead land is displaced from such area or required to be displaced. In the

proposed project, there are 3714 separate families (1854 Project Displaced Families and 1860 Project

Affected Families) and the categorization is as under;

Category-I (1348 families), ii (362 families), iv (90 families), v (54 families) fall under Project Displaced

Families which comes to 1854 Project Displaced Families and Category-iii (214 families)and vi (1646

families)fall under Project Affected families which comes to 1860 Project Affected Families in the

project area.

3.3 Social Profile of Affected Families

3.3.1 Caste Composition of Affected Families

Page 34: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

It is found that 17% affected

families belong to Scheduled

Castes (SCs), 6.4% belong to

Scheduled Tribes (STs) and the

highest 76.5% are from Other

Backward Caste (OBC)

Communities. Very marginal

percentage i.e. 0.1% is from

General caste community. Among the Other Backward Caste (OBC) Communities, Chasa (Cultivating

caste) is the dominant caste in the project area.

3.3.2 Village Wise Caste Composition of Affected Families (In %)

Village/

Caste

Barapada

Kuskila Kuskila

Jungle

Bar

Naupada Balipata Putagadia Jhintipal Kosala

SC 15.6 21.7 46.8 6.1 3.3 3.9 7.1

ST 7.4 1.9 7.5 3.3 51.0 25.0

SEBC/OBC 77.1 78.3 50.7 86.1 93.3 45.1 67.9 100.0

General 0.6 0.2

Total 100.0 100.0 100.0 100.0 100.0 100.0 100.0 100.0

It is observed from the above table that the highest 46.8% Scheduled Caste affected families are from

the total affected families of Kusikila Jungle bar followed by 21.7% of Kuskila village. As far as the

Scheduled Tribe communities are concerned, 51% of the affected families are found from the total

affected families of Putagadia village and 25% of the affected families are seen in Jhintipal village. The

highest 03.3% of OBC are in Balipata Village followed by 86.1%, 78.3%, 77.1%, in Naupada, Kuskila and

Barapada village.

3.4 Demographic Profile of the Affected Families

0 20 40 60 80 100

17 6.4 76.5 0.1

Chart 3.3.1 Caste Composition of Affected Families (in

%)

SC

ST

SEBC/OBC

General

Page 35: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.4.1Gender-wise Distribution of Affected Family Members

Table-3.4.1

Gender of Population

Sex Affected Family members (In %)

Male 51.8%

Female 48.2%

Total 100.0

Gender wise distribution of affected family members shows that 51.8% male members and 48.2%

females covered in the survey.

Figure 3.4.1

Sex Composition

48.2%

51.8%

Female

Male

3.4.2 Age-wise Distribution of Affected Family Members

Table 3.4.2

Age wise Composition of Population

AGE Affected Family members

(%)

0-5 6.0

Page 36: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

6-14 25.6

15-17 5.9

18-40 41.1

41-50 9.5

51-60 6.9

Above 60 5.1

Total 100.0

The age wise break-up of Affected family members( PDF) shows highest family members i.e. 41.1% are

within the most productive age group of 18 to 40yrs followed by 25.6% are in 6 to 14 yrs age.

Hence, there is need to provide training, capacity development programme and promote self

employment programmes for the age group of 18 to 40 yrs and educational promotion activities for the

Pre-School children.

Figure 3.4.2

Age Group

AGE

Above 6051-6041-5018-4015-176-140-5

Perc

ent

50

40

30

20

10

0

Page 37: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.4.3 Religion of Affected Families

All the 3714 affected families belong to Hinduism. None of them is from other religious community like

Christianity, Muslim, etc.

3.4.4 Marital Status of Affected Family members

Table-3.4.4

Marital Population (%)

Marital Status Affected Family

members (%)

Married 49.6

Unmarried 50.1

Widow/ Widower 0.3

Divorce/Separated 0

Deserted 0

More than one wife 0

Total; 100.0

It is revealed from the above table that 49.6 % Affected family members are married, 50.1% are

unmarried and 0.3% are widow/Widowers. None of the affected family members is a divorcee /

separated/destitute/more than one wife.

Among different categories of affected family members, widows/widowers are considered to be

extremely vulnerable. Widows are more vulnerable due to their dispossession from agriculture land.

The widows and widowers require utmost care and sensitivity on part of R&R team to extend all

possible support starting from the provision of vocational training, livelihood support, etc.

Page 38: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.4.5 Educational Status of Affected Family members

Table-3.4.5

Educational Status of affected family members

Education Affected Family

members (%)

Illiterate 16.7

R & W 17.9

UP 34.9

ME 11.1

Higher Secondary 14.7

Under Graduate 2.3

Graduate & Above 1.5

Technical 0.4

Child 0.4

Education is one of the major social development indicators apart from the caste, religion and marital

status of family members. Excluding the 0.4% children who do not go to school (mainly 5yrs or below

children), the survey result shows that 16.7% Affected Family members are completely illiterates who

can neither read nor write anything. Near about 17.9% families members can only able read and write

but they cannot be considered as functionally literates. Adding together the percentage of illiterates and

read &write, near about 34.6% affected family members are educationally backward.

The survey findings also show that 34.9% affected family members have completed education upto UP,

11.1% have completed M.E., 14.7% are upto the level of higher secondary, 2.3% are upto undergraduate

and 1.5% are graduate and above only. 0.4% family members have Technical which is very negligible.

Thus, adequate effort must be made by the project proponent to technically equip the affected family

members so that they get employed and earn better income for restoration of their livelihood.

Page 39: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.4.6 Occupational Status of Affected Families

Table-3.4.6

Occupational Profile

Occupation Affected Family

members (%)

Cultivation 41.3

Labour 6.9

Service 1.4

Pvt. Job 0.4

Business 0.5

Housewife 49.2

Others 0.3

Total 100.0

It is seen that 50.5% family members pursue any occupation for earning an income or livelihood for the

entire family. The rest 49.5% family members do not earn any income and are dependent on the earning

members of their family. These dependents are basically Women/children / adolescents below 18 years,

house wives and aged people.

Among the earning members who pursue different occupations, highest i.e. 41.3% earn their major

income from the Agriculture and followed by 6.9% earn major income from labour work in agriculture

and non-agriculture sector, 1.8% each earn from Service and Private job.

Subsistence agriculture, non-farm based wage and agriculture have been pursued by almost all

affected family members to eke out a living for their families.

Page 40: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.5 Asset Holding Status of Affected Families

3.5.1 Ownership Land holding status

Land is an important productive resource in rural areas. It also confers to an individual’s overall status

in the village.

Table-3.5.1

Land Particular

Land owned (In

acres)

Affected Family

members (%)

Landless 10

Up to 2.5 60

2.5-5.0 19

5.0-10.0 6

10.0 & above 5

Data presented in Table3.5.1 reveal that majority 60% affected families belong to the Marginal

landholding category (2.5%).Only 19% families fall under Small farmers category who have

land between 2.5 acres and 5 acres. Again 14% families own land in the range of 5 acres to 10

acres. On the other hand, only 6% among them posses land between 5-10 acres and 5%

families possess more than 10 acres of land less. 10% families found to be landless.

Page 41: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

3.5.2 Type of House Owned

Table-3.5.2

Structure of House

House Type Affected Family

members (%)

Thatched 70.0

Semi-Pucca (Tiled

/Asbestos roof)

25.0

Pucca 05.0

Total 100.0

The survey findings reveal that 70% houses of the affected families are made up thatched and

mud houses. 25% houses are semi-pucca made of tile and asbestos roof and only 5% houses of

the affected are pucca only.

Page 42: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Chapter IV

LEGAL REQUIREMENT AND REHABILITATION AND RESETTLEMENT

POLICY/ENTITLEMENTS

4.1 Policy of Entitlement

Radhikapur (W) Coal Mining Private Limited has followed the ORISSA RESETTLEMENT AND

REHABILITATION POLICY 2006, published in 14th May, 2006 to improve the quality of life of the project

affected persons. For the purpose of R & R benefits under the R&R policy, 2006, Development Projects

are classified into the following types:

Project Types

A. Industrial Projects;

B. Mining Projects;

C. Irrigation Projects, National parks and Sanctuaries;

D. Urban Projects and Linear Projects like roads and railways, power lines; and

E. Any other Projects

Radhikapur (W) Coal Mining Pvt. Ltd. comes under the category of B. Mining Projects;

and essentially addresses the rehabilitation of PAFs and provide a broad canvas for an effective

consultation between PAFs and the project authorities. It has also listed R&R measures and

entitlements for different category of PAFs.

4.2 Resettlement and Rehabilitation Plan

Based on the list approved by Government and option of displaced families, Resettlement and

Rehabilitation Plan shall be prepared by the Collector for resettlement and rehabilitation after due

consultation with displaced communities in the manner determined by the Government. Such plan

should address the specific needs of the women, vulnerable groups and indigenous communities. The

same will be placed before the RPDAC for approval. While preparing the plan, the following aspects

should be taken into consideration:

Page 43: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

(i) Site for resettlement habitat shall be selected by the RPDAC in consultation with the displaced

families.

(ii) No physical displacement shall be made before the completion of resettlement work as approved by

the RPDAC. The certificate of completion of resettlement work will be issued by the Collector.

(iii) Gram Sabha shall be consulted.

(iv) Where there is multiple displacement additional compensation amounting to 50 % of the normal

compensation payable, shall be paid to each displaced family over and above the normal compensation

in form of ex-gratia.

(v) Provisions relating to rehabilitation will be given effect from the date of actual vacation of the land.

(vi) Project Authority shall abide by the provisions laid down in this Policy and the decisions taken by

RPDAC from time to time provided they are within the ambits of the approved Policy of the

Government.

(vii) District Administration and Project Authorities shall be jointly responsible for ensuring that the

benefits of R & R reach the target beneficiaries in a time bound manner.

(viii) Record of Rights of the land and house allotted to the displaced persons should be handed over to

them by District Administration while resettling them in the Resettlement habitat. The District

Administration shall take steps for immediate declaration of the new Resettlement habitat as a Revenue

Village if it is not a part of an already existing Revenue Village.

(ix) Steps will be taken by the Project Authorities for acclimatization of the resettled people in new

habitat including development of cordial social relationship between the host and resettled

communities and to ensure as far as practicable overall improvement of standard of living of the

displaced families.

(x) Subject to the details regarding provision of employment as enunciated elsewhere in the Policy the

project authorities shall give preference in the matter of employment, both direct and indirect as well as

through contractors employed by them, for execution, operation and maintenance of the project, to

local persons as per the detailed guidelines issued by the State Government from time to time.

4.3 Social Entitlement Framework

Radhikapur (W) Coal Mining Pvt. Ltd. prime concern is to rehabilitate and resettle people affected by its

operations. Following are the entitlements prescribed by the R&R Policy, 2006 which becomes the

guiding principle for Radhikapur (W) Coal Mining Pvt. Ltd.

Page 44: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

a. Land Acquisition and Payment of Compensation / Award

Procedure prescribed by Government shall be followed in acquiring land and other properly and for

payment of compensation / award. All compensation money due to the “displaced families” / project

affected persons shall be paid through account payee cheques. As regards “public properly” like School

Building, Club House, Hospital, Panchayat Ghar, Electrical installation, place(s) of worship, value of such

properly affected shall be deposited with the concerned District Collector. Either Project for District

Administration shall take up construction at the place as would be determined in consultation with

representatives of displaced persons. The Project proponent may opt for direct purchase of land on the

basis of negotiated price after issue of notification requiring acquisition of land under relevant Act(s). If

acquisition of land through direct purchase fails, other provisions of the relevant Act may be invoked.

Land not utilized by the Project within the prescribed time limit and for the required purposes shall be

resumed.

b. Rehabilitation assistance

Rehabilitation Assistance will be specific to the ‘type’ of project as mentioned at para 5 above, because

of difference in nature of projects, their source(s) of funding and magnitude of displacement / impact.

II Type B: Mining Projects:

(a) Employment: Displaced and other affected families shall be eligible for employment, by the project

causing displacement. For the purpose of employment, each family will nominate one member of the

family. The project proponent will give preference to the nominated members of the displaced and

Other affected families in the matter of employment. The order of preference will be as follows:

(i) Displaced families losing all land including homestead land,

(ii) Displaced families losing more than 2/3rd of agricultural land and

homestead land,

(iii) Families losing all agricultural land but not homestead land,

(iv) Displaced families losing more than 1/3rd of agricultural land and

homestead land,

(v) Displaced families losing only homestead land but not agricultural land,

Page 45: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

( vi) Families losing agricultural land in part but not homestead land.

The Project authority will make special efforts to facilitate skill up-gradation of the nominated member

of each displaced / other family make him/her ‘employment’ in their project.

1. In case of nominees of displaced families eligible for employment otherwise, the upper age limit shall

be relaxed by five years.

2. Project authorities should notify their employment capacity sufficiently in advance.

3. As far as practicable, the objective shall be to provide one member from each displaced / other family

as mentioned above with employment in the project. However, where the same cannot be provided

because of reason to be explained in writing, cash compensation as mentioned below shall be provide to

the displaced / other families. Displaced / other families, who do not opt for employment / self-

employment as mentioned in sub para (a) and (b) below, shall be provided by the Project authority with

one time cash assistance in lieu of employment at the scale indicated below.

Sl.No. Families under category as Amount of onetime cash per sub-para (a) above assistance (Rs. In

Lakhs.)

(i) Displaced Families coming under category (i) 5.00

(ii) Displaced Families coming under category (ii) 3.00

(iii) Displaced Families coming under category (iii) 2.00

(iv) Displaced Families coming under category (iv),(v) &(vi) 1.00

(b) Training for Self-employment: Project authority under the guidance of the Collector concerned will

make adequate arrangement to provide vocational training to at least one member of each displaced /

other family so as to equip him her to start his/her own small enterprise and refine his/her skills to take

advantage of new job opportunities. For those engaged in traditional occupations / handicrafts /

handlooms, suitable training shall be organized at the cost of project authority to upgrade their existing

skills.

(c) Convertible Preference Share : At the option of the displaced family and, subject to the provisions of

relevant law(s) in force for the time being, the project authority may issue Convertible Preference

Share(s) or Secured Bond(s) up to a maximum of 50 % out of one time cash assistance as mentioned in

sub-para (a) above.

(d) Provision for homestead land: Subject to availability, each displaced family will be given at least

1/10th of an acre of land free of cost in a resettlement habitat for homestead purpose.

(e) Assistance for Self-relocation: Each of the displaced family who opts for self-relocation elsewhere

Page 46: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

other than the Resettlement habitat shall be given a onetime cash grant of Rs. 50,000/- in lieu of

homestead land.

(f) House Building Assistance: Besides, Project authority shall construct house for each of the displaced

families in the resettlement habitat or provide house building assistance of Rs. 150,000/- to each of the

displaced families selling in the Resettlement habitat or opting for self relocation elsewhere.

(g) Shops and Service Units: Project authorities will also construct shops and service units as feasible

locations at their own cost, which will be allotted in consultation with Collector to project displaced

families opting for self-employment. While allotting such units, preference will be given to physically

challenged persons and members of displaced SC & ST families.

Benefit to landless & homestead-less encroachers common to all categories

(a) An encroacher family, who is landless as defined in the Orissa Prevention of Land Encroachment

Act, 1972, and is in possession of the encroached land at least for a period of ten years

continuously prior to the date of notification under relevant law(s) declaring intention of land

acquisition will get ex-gratia equal to compensation admissible under the Land Acquisition Act,

1894 for a similar category of land to the extent of land under his/her physical possession up to a

maximum of one standard acre it the encroachment is unobjectionable. While determining the

extent of land for such compensation the royalty land held by him/her is to be taken into taken

account.

(b) An encroacher family, who is homestead less as defined in the Orissa Prevention of Land

Encroachment Act, 1972 and is in possession of the encroached land at least for a period of ten

years continuously prior to the date of notification under relevant law(s) declaring intention of land

acquisition will get ex-gratia equal to compensation, for the similar category of homestead land,

against the encroached homestead land up to a maximum of 1/10th of an acres in rural areas or

1/25th of an acre in urban areas, if the encroachment is unobjectionable. While determining the

extent of land for such compensation the homestead land held by him/her is to be taken into

account. The ex-gratia will be in addition to the actual cost of structures thereon. If the

encroachment is found to be objectionable, (s) he will be entitled to the cost of structure only.

Page 47: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Other Assistance Common to all categories of projects:

(a) Maintenance Allowance: In order to ensure timely vocation, an allowance of Rs. 2,000/- per

month per displaced family shall be provided an vocation of land / house for a period of one year

from the date of vocation as determined by the Collector concerned.

(b) Assistance for Temporary Shed: An assistance of Rs.10,000/- shall be provided to each displaced

family.

(c) Transportation Allowance: Transportation allowance of Rs.2,000/- or free transportation to the

resettlement habitat or their new place of inhabitance, shall be provided to each displaced family by

the Project Authority. Provided that State Government in Revenue Department shall review and

may revise rate if necessary, once every two years basing on the index point.

Additional provisions for assistance

Notwithstanding anything contained elsewhere in the policy, the Government or the Project

Authority may extend any additional benefits and provisions to the displaced families keeping in

view the specific nature of displaced.

Indexation of Rehabilitation Grant

Rehabilitation grant will be indexed to the Wholesale Price Index (WPI) with 01.04.2006 as the reference

date and will be revised by the Government once in every two years thereafter the basis of WPI.

The R&R policy of Orissa states “as far as practicable, the objective would be to provide one member

from each displaced/other family with employment in the project. However where the same cannot be

provided because of the reason to be explained in writing, cash compensation shall be provided”

In pursuance of the aforesaid provision, the State Government do hereby make the following revision of

rehabilitation grant in monetary terms relating to the specific component as per Govt. of Orissa,

Revenue and Disaster Management Department, Ref. No. R&REH-70/10-51633/R&DM dt. 15.12.10.

Sl.No. Description of the

components

Relevant provision of

the Policy

Existing rate Revised rate

(2008)

Revised

rate(2010)

1. Assistance for self- Paragraph 8.1 (e), 8.II Rs.50,000/- Rs.56,000/- 63,000/-

Page 48: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

relocation

(elsewhere other

than the

resettlement

habitat)

(e), 8.III (a), 8.IV (a)

2. House building

Assistance

Paragraph 8.1 (f)m 8.II

(f), 8.III (b)m 8.IV (b).

Rs.1,50,000/- Rs.1,66,000/- 1,87,000/-

3. One time financial

assistance in lieu of

employment for

Mining projects

Paragraph 8.1 (a)

(i)Displaced families

coming under

category (i)

(ii)Displaced families

coming under

category (II)

(iii)Displaced families

coming under

category (iii)

(iv) Displaced families

coming under

category (iv) ,(v) & (vi)

Rs. 5,00,000/-

Rs. 3,00,000/-

Rs. 2,00,000/-

Rs.1,00,000/-

Rs. 5,52,000/-

Rs. 3,31,000/-

Rs. 2,21,000/-

Rs. 1,11,000/-

6,21,000/-

3,73,000/-

2,49,000/-

1,25,000/-

4. Maintenance

allowance

Paragraph 10 (a )

Rs. 2,000/- per

month

Rs. 2300/- per

month

2,500/-

p.m. for

one year

6. Assistance for

temporary shed

Paragraph 10 ( b ) Rs. 10,000/- Rs. 11,100/- 12,500/-

7. Transportation

Allowance

Paragraph 10 (c) Rs. 2,000/- Rs. 2300/- 2,500/-

Periphery Development

The Project authority shall be responsible for periphery development as decided by the RPDAC

within the guidelines issued from time to time by the State Government.

Page 49: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Training: The Project authority will make special efforts to facilitate skill up-gradation of the nominated

member of each displaced / other family make him/her ‘employment’ in their project.

Definitions

(a) “Agricultural Land” means land used or capable of being used or raising of crops, grass or garden

produce, horticulture, dairy farming, fish farming, breeding and keeping of live stock and used as

pasture or for any other purpose where such use is ancillary to agriculture.

(b) “Compensation” has the same meaning as assigned to it under the Land Acquisition Act, 1894.

(c) “Cut-off Date” for the purpose of compensation shall be the date on which the notification declaring

the intention to acquire land under the relevant Act or under the provisions of this Policy is published.

Note:- For the purpose of declaring eligibility for R & R benefits, the list of displaced families, will be

updated on the 1st of January of the year in which physical displacement id scheduled to take place

provided that those families who move into the project area after determination of the “cut-off- date”,

will not be eligible for any benefit.

(d) “Displaced Family,” means a family ordinary residing in the project area prior to the date of

publication of notification under the provisions of the relevant Act and on account of acquisition of

his/her homestead land is displaced from such area or required to be displaced.

(e) “District Compensation Advisory Committee (DCAC)” means the Committee constituted by

Government under relevant provisions of this Policy.

(f) ”Family” means the person and his or her spouse, minor sons, unmarried daughters, minor brothers

or unmarried sisters, father, mother and other members residing with him or her and dependent on him

or her for his / her livehoods. Note:- Each of the following categories will be treated as a separate family

for the purpose of extending rehabilitation benefits under this policy.

(i) A major son irrespective of his marital status.

(ii) Unmarried daughter / sister more than 30 years of age.

(iii) Physically and mentally challenged person irrespective of age and sex;(duly certified by the

authorized Medical Board). For this purpose, the blind / the deaf/ the orthopedically handicapped /

mentally challenged person suffering from more than 40% permanent disability will only be considered

as separate family.

(iv) Minor orphan, who has lost both his/her parents.

(v) A widow or a woman divorcee.

(g) “Government” means the Government of Orissa in Revenue Department.

Page 50: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

(h) “Land Acquisition Officer (LAO)” means an Officer appointed by the Government by an order to

perform duties as such under Land Acquisition Act 1894, for the project and shall include a Special Land

Acquisition Officer.

(i) “Non-Government Organization (NGO)” means any organization duly registered under the Society

Registration Act 1860 and functioning for public cause outside the Government.

(j) “Original Family” means the family, which at the time of Notification under provisions of relevant

Act(s) is living together in a single household with a common kitchen.

(k) “Periphery” means the district(s) in which the project is geographically situated

(l) “Project” means the construction, extension or improvement of any work such as reservoir, dam,

canal, highway, industrial plant, factory, mining, national park, sanctuary, etc. as notified by the

Government from time to time and includes its offices and establishment within the State.

(m)“Project area” for the purpose of extending R & R benefits means the land, which is acquired /

alienated / purchased for establishment of any project.

(n) “Project Director Resettlement & Rehabilitation (PD-RR)” means an officer appointed by the

Government by an order to perform such duties under R & R Policy of the State, for the project.

(o) “Rehabilitation & Periphery Development Advisory Committee (RPDAC)” means the committee

constituted by the Government under relevant provisions of this Policy by Government to look after

rehabilitation and periphery development matters.

(p) “State Level Compensation Advisory Committee” means a committee constituted by Government

under the relevant provisions of this Policy.

(q) “State Level Council on Resettlement & Rehabilitation (SLCRR)” means the council headed by the

Chief Minister constituted by a notification of Government to that effect.

4.4 Legal Process of Land Acquisition

RADHIKAPUR (W) COAL MINING PVT. LTD. strictly follows the procedures laid down under the National

Law for acquisition of private properties i.e. the Land Acquisition Act (LA Act, 1894, amended in 1984

when land is acquired for the steel industry. Acquisition under this law is a comprehensive process and

involves issuance of various notification informing affected persons as well as general public regarding

impending acquisition of private land/assets etc. for public purpose. The LA Act specifies that in all cases

of land acquisition, no award of land can be made by the government authorities unless all

compensation has been paid. RADHIKAPUR (W) COAL MINING PVT. LTD. follows an activity schedule for

Page 51: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

land acquisition. The whole process can be divided in three different phases for better understanding.

The process is presented below.

4.5 Land Acquisition Process

STAGE-I

SECTION-4(1)

• Publication of a preliminary notification by the Government that land in a particular locality is

needed or may be needed for a public purpose or for a company.

SECTION-5

• Filing of objections to the Acquisition by persons interested and enquiry by collector

STAGE-II:

SECTION-6 (1) : Declaration of intended acquisition by Government

SECTION-7&8

• Collector to take order from the government for land acquisition and land to be marked out,

measured and planned.

STAGE-III:

SECTION-9

• Public Notice and individual notices to persons interested to file their claims for compensation.

SECTION-11

• Enquiry into claims & Award by the Collector

SECTION-16

• Taking possession of the land by the Collector

SECTION-17: POSSESSION BEFORE AWARD IN CASE OF EMERGENCY

Under S.17 the Government has been given special powers to acquire land without making the

award. This power can be used only in cases of urgency. If the Government thinks that it is a

case of urgency, it may direct the collector to take possession of the and even though he has not

Page 52: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

given his award. The collector can acquire the land fifteen days after the publication of the

notice under Sec-9(1), but not before.

Page 53: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

CHAPTER V

Rehabilitation Action Plan

Introduction

In order to develop the standard of living of the project affected families through the provision of

adequate Compensation & Rehabilitation measures in the project area, Orissa Government has

formulated a comprehensive Rehabilitation and Resettlement policy in 2006. The policy is the up soot of

the past lessons learnt from project specific Resettlement and Rehabilitation policies.

The main objectives of Orissa R & R policy, 2006 are to avoid displacement wherever possible and

minimize it exercising available options, to recognize voices of displaced communities emphasizing the

needs of the indigenous communities and vulnerable sections, to ensure environmental sustainability

through participatory and transparent process, and to help guiding the process of developing

institutional mechanism for implementation, monitoring, conflict resolution and grievance redressal.

The policy also emphasizes to conduct a socio-economic survey for identification of displaced families

and for preparing their socio- economic baseline.

The Orissa R & R policy, 2006 is proposed for the project affected families of the Coal Mine project of

RADHIKAPUR (W) COAL MINING PVT. LTD. at Chhendipada in ANGUL DISTRICT. The plan has been

prepared in accordance with the Orissa R&R Policy, 2006 and SES guidelines for conduct of Socio-

Economic Survey and Socio-Cultural, Resource Mapping and Infrastructural Survey in the Project Area

formulated by Revenue and Disaster Management Department, Government of Orissa (2008).

Consulting both policy and SES guidelines, the best options have been suggested in favour of the villages

and communities

Objectives of R& R Plan:

The primary objective of the R&R Plan is to identify impacts and to plan measures to mitigate various

losses of the Project while the specific objectives are as follows:

· To prepare an action plan for the project affected people for improving or at least retaining the living

standards in the post resettlement period.

Page 54: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

· To outline the entitlements for the affected persons for payment of compensation and assistance for

establishing the livelihoods

METHODOLOGY Rehabilitation and Resettlement Plan has been emphasized that the project shall play a positive

role in their socio-economic upliftment and also for betterment of quality of life of the Project

Displaced Families and Project Affected Families.

In addition to the rightful compensation, the provisions of Rehabilitation Assistance and activities for

periphery development have been proposed for the project affected families affected through

RADHIKAPUR (W) COAL MINING PVT. LTD. at Chhendipada in Angul District.

The survey was carried out for the Project displaced households and Project Affected Families

of both land Titleholders and Non Titleholders. A detailed Household Interview Schedule,

General Infrastructure Survey, Social and Cultural Infrastructure Survey questionnaire was

prepared for this purpose. The surveys and preparation of the plan included the following

procedure:

– The private land for the acquisition was collected from the project authority to identify the

titleholders,

- Due to the non availability of revenue records of the Non-titleholders (Encroachers), the land

for the acquisition was identified with panchayat members and elderly persons of the

concerned village along with physical verification of non-titleholders’ possession of land on site

– Door to door socio-economic survey of the project-affected families/owner was conducted to

collect the base line data. Data was collected on various parameters of Quality of life, Income

patterns, Land holdings, Amount of land loss due to this project, etc.

– The existing socio-economic profile of the project-affected area has been collected for the

purpose.

– Discussions and Consultations were held with all project affected families/persons of the

Project Area

Page 55: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ASSESSMENT OF COMPENSATION AND OTHER BENEFITS

The Land Acquisition Act, 1894 amended in 1984 is the core legal instrument for the private land

acquisition by the Government for public purpose. The immovable properties including land, house,

tree, irrigation channel, pipelines etc. falling within affected area will be acquired in accordance with the

provision of section 23 of Land Acquisition Act.

The LAA provides a framework for facilitating land acquisition in India. LAA enables the State

Government to acquire private land for public purposes. LAA ensures that no person is deprived of land

except under LAA and entitles APs to a hearing before acquisition. The main elements of LAA are:

(i) Land identified for the purpose of a project is placed under Section 4 of the LAA. This

constitutes notification. Objections must be made within 50 days to the District

Collector (DC, the highest administrative officer of the concerned District).

(ii) The land is then placed under Section 6 of the LAA. This is a declaration that the

Government intends to acquire the land. The DC is directed to take steps for the

acquisition, and the land is placed under Section 9. Interested parties are then invited to

state their interest in the land and the price. Under Section 11, the DC will make an

award within one year of the date of publication of the declarations. Otherwise, the

acquisition proceedings shall lapse.

(iii) In case of disagreement on the price awarded, within 6 weeks of the award, the parties

(under Section 18) can request the DC to refer the matter to the Courts to make a final

ruling on the amount of compensation.

(iv) Once the land has been placed under Section 4, no further sale or transfer is allowed.

(v) Compensation for land and improvements (such as houses, wells, trees, etc.) is paid in

cash by the project authorities to the State Government, which in turn compensates

landowners.

(vi) The price to be paid for the acquisition of agricultural land is based on sale prices

recorded in the District Registrar's office averaged over the three years preceding

notification under Section 4. The compensation is paid after the area is acquired, with

actual payment by the State taking about two or three years. An additional 30 percent is

added to the award as well as an escalation of 12 percent per year from the date of

Page 56: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

notification to the final placement under Section 9. For delayed payments, after

placement under Section 9, an additional 9 percent per annum is paid for the first year

and 15 percent for subsequent years.

Resettlement Policy and Entitlement Matrix

i. R&R POLICY AND ENTITLEMENT FRAMEWORK

The Resettlement and Rehabilitation policy is based on the basic principle that the project

affected persons should improve their living standards in the post resettlement period and

share the benefits of the project. The RAP has been prepared as per the provisions laid down in

The Orissa Rehabilitation and Resettlement Policy, 2006.

The core involuntary resettlement principles for the Program to be followed for the power project (i)

land acquisition, and other involuntary resettlement impacts will be avoided or minimized exploring all

viable alternative designs; (ii) where unavoidable, time-bound resettlement plans (RPs) will be prepared

and PDF/PAFs will be assisted in improving or at least regaining their pre-program standard of living; (iii)

consultation with APs on compensation, disclosure of resettlement information to APs, and participation

of APs in planning and implementing the project will be ensured; (iv) vulnerable groups will be provided

special assistance; (v) payment of compensation to APs including non-titled persons (e.g., informal

dwellers/squatters, and encroachers) for acquired assets at replacement rates; (vi) payment of

compensation and resettlement assistance prior to the contractor taking physical acquisition of the land

and prior to the commencement of any construction activities; (vii) provision of income restoration and

rehabilitation; and (viii) establishment of appropriate grievance redress mechanisms.

ii. Rehabilitation Assistance for Project Displaced Family:

The R&R policy of Orissa states “as far as practicable, the objective would be to provide one member

from each displaced/other family with employment in the project. However where the same cannot be

provided because of the reason to be explained in writing, cash compensation shall be provided”

Page 57: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

In pursuance of the aforesaid provision, the State Government do hereby make the following revision of

rehabilitation grant in monetary terms relating to the specific component as per Govt. of Orissa,

Revenue and Disaster Management Department, Ref. No. R&REH-70/10-51633/R&DM dt. 15.12.10.

iii. Orissa R&R Policy 2006

For the purpose of providing rehabilitation benefits, the Orissa R&R Policy 2006 categorizes

development projects into five types viz. A) Industrial Projects; B) Mining Projects; C) Irrigation Projects,

National Parks and Sanctuaries; D) Urban Projects and Linear Projects like roads and railways, power

lines; and E) Any Other Projects.

Radhikapur (W) Coal Mining Pvt. Ltd. comes under the category of B. Mining Projects;

and essentially addresses the rehabilitation of PAFs and provide a broad canvas for an effective

consultation between PAFs and the project authorities. It has also listed R&R measures and

entitlements for different category of PAFs.

iv. Entitlement for Rehabilitation Assistance:

Employment: Displaced and other affected families shall be eligible for employment, by the project

causing displacement. For the purpose of employment, each family will nominate one member of the

family. The project proponent will give preference to the nominated members of the displaced and

Other affected families in the matter of employment. The order of preference will be as follows:

(i) Displaced families losing all land including homestead land,

(ii) Displaced families losing more than 2/3rd of agricultural land and

homestead land,

(iii) Families losing all agricultural land but not homestead land,

(iv) Displaced families losing more than 1/3rd of agricultural land and

homestead land,

(v) Displaced families losing only homestead land but not agricultural land,

( vi) Families losing agricultural land in part but not homestead land.

Page 58: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Table-5.1

Category wise Number of PDFs and PAFs in the project area:

SL. No. Category Number of Families

1. Category-I (PDF) 1348

2. Category-ii (PDF) 362

3. Category-iii (PAF) 214

4. Category-iv(PDF) 90

5. Category-v(PDF) 54

6. Category-vi (PAF) 1646

Total 3714

Displaced/other families who are eligible to be considered for employment and families defined under

claues (i) to (v) shall be provided with one time cash assistance Revised Rate( 2010) in lieu of

employment/ self-employment in the scale indicated below:

Table-5.2

Amount of RA

Sl.No. Families under category as per sub-Para.

(a) above

Amount of one time cash

assistance (Rs. in lakhs)

(1) (2) (3)

(i) Displaced Families coming under category (i) 6.21

(ii) Displaced Families coming under category (ii) 3.73

(iii) Families coming under category (iii) 2.49

(iv) Displaced & Families coming under category (iv)

,(v) & (vi)

1.25

Provision for homestead land: Subject to availability, each displaced family will be given at least 1/10th

of an acre of land free of cost in a resettlement habitat for homestead purpose.

Page 59: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Assistance for Self-relocation: Each of the displaced family who opts for selfrelocation elsewhere other

than the Resettlement habitat shall be given a one time cash grant of Rs.63, 000/- in lieu of homestead

land.

House Building Assistance: Besides, Project Authority shall construct house for each of the displaced

families in the resettlement habitat or provide house building assistance of Rs. 1, 87,000/- to each of the

displaced families settling in the Resettlement habitat or opting for self relocation elsewhere.

Maintenance Allowance: In order to ensure timely vacation, an allowance of Rs.2, 500/- per month per

displaced family shall be provided on vacation of land/house for a period of one year from the date of

vacation as determined by the Collector concerned.

Assistance for Temporary Shed: An assistance of Rs.12, 500/- shall be provided to each displaced

family.

Transportation Allowance: Transportation allowance of Rs.2, 500/- or free transportation to the

resettlement habitat or their new place of inhabitance, shall be provided to each displaced family by the

Project Authority.

Rehabilitation Assistance

Entitlement Assistance (One Time)

Employment One member of the ORIGINAL Project Displaced Family and Project

Affected Family losing all land in order of preference

Skill Up gradation One member of the ORIGINAL Project Displaced Family and Project

Affected Family losing all land in order of preference

One time Cash Assistance in

lieu of Employment

Category (i) 6.21 lakh, (ii) 3.73 lakh ,(III) 2.49 lakh ,

(iv), (v) &( vi )1.25 lakh ( to all separate families who opt)

Assistance for self

relocation (other than

resettlement habitat)

Rs.0.63 Lakh (For each Separate family)

Page 60: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

House building Assistance 1.87 lakh (For each Separate family)

Temporary Shed Rs. 12,500/- (For each Separate family)

Transportation Allowance Rs.2500/- (For each Separate family)

Maintenance Allowance Rs.2500/- per month for a year (For each Separate family)

Table-5.3

Amount of Rehabilitation Assistance for each PDF/PAFs based on Category of the

proposed project (Rs. In lacs)

Entitlement Category

(i)

Category

(ii)

Category

(iii)

Category

(iv)

Category

(v)

Category

(vi)

RA in lieu of

Employment

6.21 3.73 2.49 1.25 1.25 1.25

Assistance for self

relocation

0.63 0.63 NA 0.63 0.63 NA

House Building

Assistance

1.87 1.87 NA 1.87 1.87 NA

Maintenance

Allowance

0.30 0.30 NA 0.30 0.30 NA

Assistance for

Temporary Shed

0. 125 0.125 NA 0.125 0.125 NA

Transportation

Allowance

0. 025 0.025 NA 0.025 0.025 NA

Total 9.16 6.68 2.49 4.2 4.2 1.25

Page 61: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Table-5.4

Proposed Budget for Rehabilitation Assistance and self relocation to PDF/PAFS

SL. No. Category Unit Cost(Rs. In

lacs)

Number Total Cost (Rs. in

lacs)

1. Category-I (PDF) 9.16 1348 12347.68

2. Category-ii (PDF) 6.68 362 2418.16

3. Category-iii (PAF) 2.49 214 532.86

4. Category-iv (PDF) 4.2 90 378.00

5. Category-v (PDF) 4.2 54 226.80

6. Category-vi (PAF) 1.25 1646 2057.50

Total 3714 17961.00

i. Training: The Project authority will make special efforts to facilitate skill up-gradation of the

nominated member of each displaced / other family make him/her ‘employment’ in their

project.

Radhikapur (W) Coal Mining Pvt. Ltd.has undertaken a special initiative to conduct a study on

Employment potential, Skill development and aptitude of the Project Affected Families for an economic

opportunity as an income restoration strategy.

The affected persons shall be offered the necessary training facilities for development of

entrepreneurship, technical and professional skills for self employment.

RWCMPL would invite trainees among the affected families for the training on various courses. It would

select 25 trainees every year for the period of 7 years (training period for a batch is one year). The

project authority would bear all expenditure including accommodation, travel etc. of the trainees and

charges of the concerned department. Total financial out lay for the training programme would be Rs.

84.00 lakhs (@ Rs. 4000/- per month for a trainee).

Page 62: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

vi. Shops and Service Units: RWCMPL will also construct shops and service units at feasible locations at

its own cost, which will be allotted in consultation with Collector to project displaced families opting for

selfemployment. Total amount for shops and Service Units would be Rs. 100.00 lakhs.

vii. Addressing Vulnerability: While allotting shops and Service units, preference will be given to

Vulnerable groups, physically challenged persons, members of displaced SC & ST families. The income

restoration of the vulnerable groups such as, women, Widow, Orphan and BPL PAFs would be taken up

on a priority basis through direct employment, self employment, establishing linage with Govt. income

generation schemes and skill development programmes. Providing revolving fund for the income

generation programmes for the Women Self Help Groups in the project affected villages. Total amount

for Income generation programme, revolving funds for the SHGs would be Rs. 100.00 lakhs.

viii. Periphery Development

The Project Authorities shall be responsible for periphery development as decided by the RPDAC within

the guidelines issued from time to time by the State Government. The guidelines for utilization of funds

for Periphery Development have been issued by the Department of Revenue and Disaster Management

Department, Govt. of Orissa Vide Letter No. R &REH-01/09 (Pt.I)28168/CSR &DM,Bhubaneswar, the 1st

July, 2011 to carry out works in the following sectors;

i. Education ii. Drinking Water iii. Health iv. Irrigation v. Agriculture Extension Wotk

vi. Pre-School Education and Care vii. Electrification ix. Vocational Education x. Sanitation and

Sewerage xi. Communication-Provision of Roads xii. Livelihood Support xiii. Individual Oriented

activities.

According to the above guidelines, the following community development works are proposed under

R&R for the Project Affected Families of the affected villages under Radhikapur (W) Coal mine project.

Page 63: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Table-5.5

Budget Estimate for Community Development Work under R&R in the Project Affected Villages

Sl.

No.

Community Development

Work

Unit Cost

(In Rs.)

Number Cost for Community

Development (In Rs.)

1. Education

1.1 Educational Promotion

for 0-5 years children(Play

materials for Anganwadi

Centre)

50,000/- 10 5,00,000.00

1.2 Study materials &

stationery in Schools for 6-

14 years students

1,00,000/- 10 10,00,000.00

1.3 Scholarship for

meritorious students (50%

marks above)

5,000/- 100 5,00,000.00

1.4 Infrastructural Support

to Village Schools (Four

Rooms and other facilities)

4,00,000 5 20,00,000.00

2. Health

2.1 Mobile Health Services Lumpsum 10,00,000.00

3. Drinking Water

3.1 Drinking Water Facility

(Installation of Hand Pumps)

100,000/- 15 15,00,000.00

4. Infrastructure Development

4.1 Community Centre

(separate centre for men

and women)

4,00,000/- 7 28,00,000.00

4.2 Road Development 50,000/- 20,00,000.00

Page 64: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

4.4 Renovation of Ponds

(Two Ponds)

2,50,000/- 4 10,00,000.00

4.5 Club House Construction 2,00,000/- 4 8,00,000.00

4.6 Provision of High

Voltage Transformer

4,50,000/- 2 9,00,000.00

5. Environment

5.1 Plantation 24000 20,00,000.00

6. Livelihood (Women)

6.1 Training & Capacity

Development programme

for Women Self Help Groups

1,00,000 20 20,00,000.00

Total 180,00,000.00

Table-5.6

Total Budget for Rehabilitation and Resettlement Package

SL. No. Category Total Cost (Rs. In

lacs)

1. Cost of Rehabilitation Assistance 17961.00

2. Training Cost 84.00

3. Shops & Service Units 100.00

4. Income Generation, SHG Revolving fund 100.00

5. Periphery Development 180.00

Sub-Total 18425.00

6. Support Cost for RP Implementation

(Implementation Charges i/c, Administration,

Management, Monitoring, NGOs etc. @ 10% of

the total budget

1842.50

7. Contingency @ 8% 474.00

Page 65: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Grand Total 21741.50

Resettlement Colony:

It is proposed to provide a resettlement colony for Project Displaced Families, if they opt. The same will

be approved by the RPDAC, Angul.

The Master Plan for the proposed Rehabilitation and Resettlement Colony with 70% land for built up

area for Housing and 20% for infrastructure and 10% for green belt the following infrastructure

facilities are being recommended.

Proposed cost for Rehabilitation Colony:

Total Cost Sl. No. Item Area Unit Cost (In

Rs.) Quantity

(Rs. In lac)

1 Land 185.4 acres(0.10

acre for each Displaced

Family X 1854 DFs)

185.4 acre 300000 - 556.2

2 Housing (built up area

450 sq.ft)

450 Sq.ft 900 1854 7508.7

3 Cattleshed 100000 1854 1854

3 Education

High School 6830 Sq.ft 1100 1 75.13

ME School 4230 Sq.ft 1100 2 93.06

Primary School 3400 Sq.ft 1100 3 112.2

4 Health

Health Centre 2450 Sq.ft 1100 1 26.95

Medical Equipment

with Ambulance

Lump sum 20

5 Drinking Water

Common Water Supply 20000000 200

Bore well (Hand Pump)

1 for 120 family

40000 10 4

6 Pond 1000000 4 40

7 Community Centre

Community Centre Big 3000 1100 1 33

Page 66: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Community Centre

Small

150000 9 13.5

8 Temple Big 2500 sqft. 3500000 2 70

9 Temple Small 1500 Sq.ft 2000000 3 60

10 Electricity 30000000 300

11 Hata & Market 15

12 Playground & large &

small

500000 3 15

13 Road (internal

Approach)

16 Km 2500000 16 400

14 Drain 20000000 200

15 Panchayat Office &

Godown

4400 1100 1 48.4

16 Community Green 8000000 80

17 Green Belt 10000000 100

Total 11825.14

I. Institutional Arrangement and Budget

RWCMPL will be implementing the Rehabilitation Action Plan (RAP) with the assistance of local

administration, communities and Project Displaced and Affected Families. A Social Management Team would

be constituted at project site with DGM/Chief Manager (Chhendipada) as its in charge. Other members of the

Cell are Manager, and one Engineer and a Social Scientist conversant with R&R and CSR activities. The Head,

Corporate Affairs will take up the implementation of RAP along with the project implementation. The team

will maintain all databases, will closely work with PAPs, target community and community based

organizations (CBOs).

The Project Director will also be responsible for internal monitoring of the progress on implementation of the

RAP. The implementation period of RAP shall be a time bound activity and will be implemented and

completed within 12-18 months, effective from the commencement of project execution.

J. Consultation, Disclosure and Grievance

i. Consultation: Stakeholders’ consultations have been in progress from the inception stage of

the project and the same will be continued during the entire project cycle, i.e., preparation,

implementation and post implementation. During the preparatory stages, consultations have

Page 67: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

been carried out with various concerned government officials and local communities as part of

the social and resettlement study in order to gather their views on the proposed program.

Formal and informal consultative process will be carried out during the project cycle

including, but not limited to: focus group discussions (FGDs), public meetings, community

discussions, and in-depth and key informant interviews; in addition to the censuses and socio-

economic surveys. Consultations will be held with special emphasis on vulnerable groups.

Encouraging public participation in consultations informs the public of the Program and serves

as a venue for the public to express their opinion on priorities which the Program should

address. The PMU will ensure that affected families and other stakeholders are informed and

consulted about the project, its impact, their entitlements and options, and allowed to

participate actively in the development of the project.

The key stakeholders to be consulted during RAP implementation, and program

implementation includes:

(i) all project affected families, including vulnerable households;

(ii) program beneficiaries;

(iii) host populations in resettlement sites

(iv) elected representatives, community leaders, and representatives of community-based

organizations;

(v) local NGOs;

(vi) local government and relevant government agency representatives; and

(vii) Program staff, PMU and consultants.

ii. Disclosure: The project RP will be made available at relevant government offices and

project areas. The information will be disseminated to affected families at various stages of the

R&R Plan. Rehabilitation Action Plan will be translated into the local language and made

available at offices of the: (i) Project Site office; (ii) relevant local government line agencies; and

(iii) PMU

. Each RP will be made available in local language(s) during focus group discussions and

stakeholder meetings at the village/community level to ensure inputs from stakeholders

particularly at the village/community level. Female-headed households will be consulted. A

Page 68: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

resettlement information leaflet containing information on compensation and resettlement

options will be made available in local language(s) and distributed to affected families. The PMU

will conduct consultations in affected villages to explain the resettlement plan in coordination

with village/community leaders. Each Affected Family will be provided information regarding

specific entitlements. Disputes on entitlements can be forwarded to the PMU for appropriate

action.

i. Grievance/Redressal Mechanism:

A committee will be set up comprising of Radhikapur (W) Coal Mining Pvt. Ltd., representatives

of local authorities, PAPs, Gram Panchayat or any well reputed person as mutually agreed with

the local authorities and PAPs. This committee will address the grievances of the PAPs. A senior

official will represent RWCMPL from Region/Corporate Centre.

K. Implementation Schedule, Monitoring and Evaluation

i. Implementation Schedule

All land acquisition, resettlement, and compensation will be completed before the start of civil

works All land required will be provided free of encumbrances to the contractor prior to handing

over of project sites and the start of civil works. The implementation of the Rehabilitation Action

Plan (RAP) will include: (i) identification of cut-off date and notification, (ii) verification of losses and

extent of impacts, (iii) finalization of entitlements and distribution of identity cards, (iv)

consultations with affected families on their needs and priorities, and (v) resettlement, provision of

compensation and assistance, and income restoration for affected families.

L. Monitoring and Evaluation

i. Internal Monitoring

Internal monitoring will be the responsibility of the Project Management Unit (PMU). The PMU

internal monitoring will include: (i) administrative monitoring: daily planning, implementation,

feedback and problem identification, individual AP file maintenance, and progress reports; (ii)

Page 69: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

socio-economic monitoring: baseline information for comparing AP’s socio-economic

conditions, evacuation, demolition, salvaging materials, , community relationships, dates for

consultations, and number of appeals placed; and (iii) impact evaluation monitoring: Income

standards restored/improved, and socioeconomic conditions of the affected persons.

Monitoring and evaluation reports documenting progress on resettlement implementation and

RP completion reports will be provided by the PMU for review by the management.

ii. External Monitoring

RWCMPL will engage the services of an independent agency or civil society not associated with

project implementation to undertake external monitoring and evaluation. The external agency, with

previous experience in resettlement activities and familiarity with Government R& R policy, will be

engaged. The external monitor will monitor and verify RP implementation to determine whether

resettlement goals have been achieved, livelihood and living standards have been restored, and

provide recommendations for improvement. The external monitoring will undertake monthly

monitoring and impact evaluation on a sample basis during mid-term and project completion.

Monitoring will also ensure recording AP views on resettlement issues; AP understanding of

entitlement policies, options, and alternatives; site conditions; compensation valuation and

disbursement; grievance redress procedures; and staff competencies. The external monitor will also

evaluate the performance of the PMU related to resettlement issues. The external agency will

report its findings simultaneously to the RWCMPL twice a year. Provisions would be made in the

resettlement budget component for engaging an external monitor. The internal monitoring report

will be submitted quarterly for review where as the external monitoring report will be submitted

half yearly for review.

Recommendations

RWCMPL may develop a communication plan regarding the employment (both direct and

indirect) of the people in the RWCMPL project, plan of technical education for self employment,

Rehabilitation and Resettlement benefits for the Project Displaced Families/Project Affected

Page 70: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

Families, awareness about the infrastructure facilities to be provided in the Resettlement

Colony, and guide the villagers to have alternative income generating activities.

The expectation of the affected families on rehabilitation assistance is heavily tilted towards job and

contract work in the Company. This requires lot of discussion, consultation and counseling by the project

authorities to convince the families regarding the benefits of other remunerative economic

rehabilitation options.

Along with the technical training, training on entrepreneurship along with behavioural inputs such as

achievement-motivation should be imparted to enhance self-employment opportunities.

Awareness regarding the utilization of Compensation to all the land losers may be given at the

earliest so that the affected families can use their compensation in productive way and find

their alternate livelihood options with the compensation amount.

The following genuine gender concerns are addressed in the R & R Plan which needs to be implemented

with gender sensitized personnel:

• Health and ICDS facilities for women and children

• Vocational and Income generating activities for women through women self-help groups

• Education and skill based training of girl children

Implementation, Concurrent Monitoring of R&R may be done by RWCMPL with the team of

experts in R&R and Community Development works.

Page 71: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

CORPORATE SOCIAL RESPONSIBILITY PLAN

FOR

RADHIKAPUR(W) COAL BLOCK

OF

TALCHER - COALFIELD

IN

DISTRICT ANGUL, ORISSA

(AREA: 1048 Ha within ML)

MAY, 2012

Prepared by:

RADHIKAPUR (W) COAL MINING PRIVATE LIMITED RUNGTA HOUSE, CHAIBASA

JHARKHNAD - 833201

ENCLOSURE: VI

Page 72: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[1]

CORPORATE SOCIAL RESPONSIBILTY Corporate Social Responsibility is our continuing commitment to behave

legally and ethically & contribute to the socio-economic development of the people while improving the quality of life of the workforce & their families as well as of the local community and society at large.

Vision Pro-active initiatives for socio-economic development of the communities in

which we operate to build a better, sustainable way of life, especially for the marginalized sections of society, and contribute to raise the human development index of the country in line with the Millennium Development Goals.

Objectives

• Continued endeavors to enable our neighbors and stakeholders for a sustainable development process resulting in better business opportunity and win-win situation for all.

• Creating conducive working environment with minimal social risk.

• Cultivate good will of all the stakeholders especially the communities situated in the immediate vicinity of our plant and mines sites

• Ensure harmony and synergy among the stakeholders to fulfill the ethical responsibility of the group.

Overall Strategy

• To involve the community/beneficiaries/ primary stakeholders at all level of programme planning, execution, monitoring, evaluation and not making them mere silent recipients of their own development programmes.

• Micro level planning (MLP) of all the villages/communities with Peoples Oriented Planning Process carried out in a phased manner keeping abreast of the recent development.

• Collaborative partnership with the Government, District authorities, the village development committees/ Panchayats, NGOs and other likeminded agencies & stakeholders to widen our reach and leverage upon our collective expertise and experience.

1.0 PROPOSED CSR ACTIVITIES 1.1 Need of CSR Activities RWCMPL would single mindedly inspire and push the region towards higher

quality of life and uplifting of the socio-economic development of the adjacent locality.

Page 73: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[2]

The scope of proposed intervention under the CSR would include following

sectors:

• Health

• Education.

• Physically challenged

• Drinking water

• Tribal handicraft development

• Capacity building

• Vulnerable persons

• Infrastructure

• Sports and culture

• Miscellaneous. All developmental activities under the CSR interventions would be

environment friendly and socially acceptable to the local people and society 1.2 Identification of CSR Zone For undertaking the CSR activities in the vicinity of the project area, Core

Zone (CSR-CZ) has been considered consisting of eight villages from which the land will be acquired.

The Buffer Zone (CSR-BZ) have been considered consisting of villages

falling in the periphery of 0-2 Km from the proposed site and specific villages may be adopted even beyond 2 km zone – if situation so demands and considered expedient for overall growth of the area. The detail of villages falling in the CSR zone is presented in Table 1.

TABLE 1

DISTRIBUTION OF VILLAGES IN VARIOUS CSR ZONES

CSR Zone Villages Core Zone (Project Affected Villages)

Barapada, Kusakila, Naupada, Kusakila jungle bar, Jhintipal, Putagaria, Balipata and Kosala.

Buffer Zone (Villages within 0-2 km radius from RWCMPL Site)

Dubanali, Paraobani, Palsabani,Sona kusakila , Chandrapur,Hadisah, Gopinathpur, Korara and Hatinah

Total 16

1.3 Assessment of availability of basic amenities & infrastructure Amenities available in the (within 10 Km) villages is as follows:

• Education facilities in the study area consist of 77 primary schools, and 4 Graduate colleges.

• Medical facilities in the study area consist of 2 family Allopathic hospitals, and 2 health centre.

• Water facilities in the study area well water is used in villages,

Page 74: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[3]

• In the study area, 37 villages have power supply for all purposes

• There are 18 post offices in the study area.

• Communication within the study area comparatively good. There are 25 bus stops, 25 villages are connected with pucca roads,

• 4 villages have commercial bank and 3 villages have Agricultural credit society in the study area.

1.4 Allocation of funds RWCMPL allocated Rs 5/- per tone of coal which comes to around Rs 3.0

crores. The Sector wise budgetary estimate for CSR activities is presented in Table 3.

TABLE 2 BUDGETARY ESTIMATE FOR CSR ACTIVITIES

Estimated Cost (in Lakh Rs) Sl No.

Scope

Capital Cost Recurring (Annual)

1 Health 76.2 90.6

2 Education 57.0 72.0

3 Physically Challenged 2.40 12.0

4 Water 17.1 12.0

5 Tribal Handicraft 6.0 9.0

6 Capacity building 51.6 48.0

7 Vulnerable persons 13.2 13.2

8 Infrastructure 54.0 30.0

9 Sports and Culture 16.5 16.5

10 Miscellaneous 6.0 6.0

Total 300.00 309.3

The phase wise allocation of fund for undertaking CSR activities is

presented in Table 3. Out of total fund will be invested within 3 year, thereafter every year would be spent under the CSR activities is given in Table 4.

TABLE 3

PHASE-WISE ALLOCATION OF FUND FOR CSR ACTIVITIES

Phase-Wise Investment (Rs. In Lakhs) Sl. No.

Activities 1st Year 2nd Year 3rd Year Total

1 Health 45.0 15.0 16.2 76.2

2 Education 40.0 10.0 7.0 57.0

3 Physically Challenged 0.8 0.8 0.8 2.40

4 Water 10.0 5.0 2.1 17.1

5 Trial Handicraft Development

2.0 2.0 2.0 6.0

6 Capacity building 20 20 11.6 51.6

Page 75: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[4]

7 Vulnerable persons 5.0 5.0 3.2 13.2

8 Infrastructure 40 10.0 4.0 54.0

9 Sports and Culture 10.0 5.0 1.5 16.5

10 Miscellaneous 2.0 2.0 2.0 6.0 Total 174.80 78 50.4 300.00

Sector wise detail of budgetary estimates in presented in Table 4

TABLE 4 SECTOR-WISE DETAIL BUDGETARY ESTIMATE FOR CSR ACTIVITIES

Sl. No. Activity and implementation target Capital cost

Recurring cost

A Health

1 Mobile Clinic with testing and diagnostic facilities 60 36.0

2 Upgradation of local PHC with equipments and infrastructure and medicines

12 6

3 Partnership with Govt. for National Health Programmes like Polio, TB, Malaria etc

0 6

4 Health Camps for Family Planning, HIV/AIDS and other communicable diseases.

3.0 9

5 Addressing local health related issues through audio visuals and group meetings

1.2 0.6

6 Subsidized treatment in hospital with which tie-up will be there

0 30

7 Specific Programmes for hygiene and sanitation 0 3.0

Sub Total A 76.2 90.6

B Education

1 Targeted programme development and organization for primary education for specially girl child

3.0 3.0

2 Augmentation of infrastructure and equipments, furniture, blackboard, toilets etc in villages schools

12 12

3 Scholarships to meritorious students 3.0 3.0

4 Adult education 3.0 15

5 Partnerships in state sponsored education programmes

3.0 3.0

6 School wall boundary maintenance 0 6

7 Existing govt. School Strengthening by boundary wall construction, construction of toilets, roof repair, drinking water taps, etc

12 6.0

8 Monetary contribution for expansion of govt. school from 6th to 8th class (construction of classrooms, field, toilets, taps, etc)

9 12

9 Monetary contribution for expansion of govt. school from class 9th to 12th class

12 12

Sub Total B 57 72.0

C Physically Challenged

1 Helping aids to each category of physically 2.4 3.0

Page 76: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[5]

Sl. No. Activity and implementation target Capital cost

Recurring cost

challenged as per requirement

2 Eye camps to address the issue of cataracts specially 0 9

Sub Total C 2.4 12

D Water

1 Provision of potable drinking water supply in near by villages through wells, hand pumps, tankers etc

15 9

2 Awareness campaigns for water borne diseases, sanitation and hygiene

2.1 3.0

Sub Total D 17.1 12

E Tribal Handicraft Development

1 Engagement of NGOs for product improvement 3.0 3.0

2 Facilitation for backward and forward linkages as per need and requirement

3.0 6

Sub Total E 6.0 9.0

F Capacity Building

1 Scholarship for ITI training outside for 60 persons 24 24

2 Sponsorship of land losers / wards for full term courses

6 6

3 Short term courses for skill up gradation 3.6 6

4 Vocational training (dairy, poultry, bee keeping, etc.) 12 6

5 Specific Programmes for Ladies (stitching, knitting, embroidery, tailoring etc)

6 6

Sub Total E 51.6 48

G Vulnerable Persons

1 Pensions to vulnerable (Elderly/ Widows etc) 7.2 7.2

2 Gainful engagement on priority 6 6

Sub Total G 13.2 13.2

H Infrastructure

1 Construction of roads, drainage, community halls, school buildings, health centres, street lighting, equipments to educational institutions, public utilities, sanitation facilities, etc in nearby area.

54 30

Sub Total H 54 30

I Sports and Culture

1 Regular Rural Sports 3.0 3.0

2 Facilitation / Sponsorship to local talent 1.5 1.5

3 Promotion of local festivals 3.0 3.0

4 Participation of local community in national festivals 3.0 3.0

5 Preservation of culture and heritage 6 6

Sub Total I 16.5 16.5

J Miscellaneous

1 Construction of temple in village 6 0

2 Anganwadi 0 6.0

Sub Total J 6.0 6.0

Grand Total 300 309.3

Page 77: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

[6]

1.5 Institutional Arrangement A Corporate Social Responsibility Committee (CSR) will be constituted at

the RWCMPL for identification and implementation of activities which involve the followings:-

� The Committee will interact with the concerned State Officials/Govt.

officials to confirm the areas for undertaking activities under CSR and ensure to avoid duplicacy of the job.

� The Committee will decide the priority of the activities to be

undertaken under CSR.

� Based on the total activities to be undertaken the Committee will recommend the quantum of Budget for the year.

� The Committee will monitor and review the progress of activities

undertaken/completed. The Committee will be constituted with the representation of all the local

community, headed by Asst. Vice President and in every 6(Six) months CMD/Director of RWCMPL will review the CSR activities.

Page 78: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

STATEMENT OF ISSUES RAISED BY THE PUBLIC DURING PUBLIC HEARING & RESPONSE OF THE

PROJECT PROPONENT

FOR

RADHIKAPUR(W) COAL BLOCK

OF

TALCHER – COALFIELD

IN

DISTRICT ANGUL, ORISSA

(AREA: 1048 Ha within ML)

MAY, 2012

EN

CL

OS

UR

E: V

II

Page 79: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

1

STATEMENT OF ISSUES RAISED BY THE PUBLIC VERBALLY DURING PH & RESPONSE OF THE PROJECT PROPONENT

SlNo.

Name andAddress ofperson raisingquestion

Questions asked by the people Response of the company & status of actionstaken, till 01.05.2012

Budgetary provision

1. Pramod Sahu,Barapada

He intimated the Public that anumber of meetings have been heldwith Representatives of the projectand some decisions were made. Heread all the points those weredecided in their meeting and handedover the copy of the decision at thedais which has been given below

1) Company is bound to take allland of Barapada and takeland beyond Singhada Jhore ifany body is not willing, it is ok.

1) Total private land in Barapada is 236.4483 hawithin lease area. Land within lease area will beonly acquired. Land beyond Singhada Jhor willnot be acquired since it is outside lease

2) Price of land to be decided invillage meeting, then RPDACmeeting to be held otherwiseRPDAC meeting will not beallowed.

2) Management will discuss with villagers andRPDAC. Legal process of land acquisition will befollowed and approved prices paid.

3) List as per 2006/08 notacceptable it should on thebasis of 2011 otherwise wewill not give land.

3) The list “for the purpose of compensation” shallbe shall be the date on which the section 4(I)notification is published under Land AcquisitionAct.( Cut – off date).

Persons or families who are normally residing inor near the project areas for a period of at3(three) year prior to the date of section 4(I)notification (under Land Acquisition Act) may be

Page 80: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

2

considered for the purpose of R&R benefits –clarification on displaced / affected families withreference to Orissa R&R policy, 2006 vide letterno. R&R EH -56/ 1042388/ R&DM date20.10.2010

4) Every person of the areahaving land if not appointedwill not leave the place.

4) Project affected families shall have first right foremployment, but the job availability is limited(80% of 1702 vs. 3714 displacees & land loserPAF’s). Management will endeavor to provideemployment to one member of the each family asper qualification and capability. Families who donot opt for or could not be provided employment/self employment will be eligible for cashcompensation. Cash compensation will be paidas per category mentioned in R&R plan.

5) 60 lakhs / acres in all kisam ofland with package otherwisewe will not give land.

5) The rate to be paid for the acquisition ofagricultural land should be higher than saleprices recorded in the District Registrar office.

6) In R&R colony we neededucation, Health centre, club,playground travel facilitiesdrinking water, electricity,temple etc to be provided bycompany.

6) Management will provide education, healthcentre, club, drinking water facility, etc inResettlement Rehabilitee and nearby areas.

The total expenditure of Healthaspects will be Rs. 90.60 lakhs/annum .On education it will beRs.72 lakhs/ annum.Drinkingwater facilities it will be Rs.12lakhs/ annum . These are all apart of the CSR plan

7) Rs 10,000/- as medical aid willbe provided within 30 daysafter sec-4(I) and we need 5additional teachers in ourschool.

7) Company will establish dispensary andfree medical check up and medicine (fixedamount approved by RPDAC) will be provided.School will be shifted to a new site. Additionalteachers shall be provided as approved byRPDAC.

Agreed. The total capitalexpenditure of Health aspects willbe Rs. 76.2 lakhs and recurringcost will be 90.6 lakhas// annum

The total capital expenditure ineducation will be Rs. 57.0 lakhsand recurring cost will be 72.0lakhas// annum

Page 81: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

3

8) All children of a person shouldbe included in family pensionplan.

8) Not agreed to. However if RPDAC include thesame at the time of approval of R&R Plan – thesame will be followed.

9) All members in a family to beappointed as per theireligibility.

9) For the purpose of employment, each family willnominate one member of the family-As perOdisha R&R Policy,2006, Clause II.Type B:Mining Project

10) All the families to be provided0.20 acres of area specified inR&R and company to make ahouse of 700 sq ft. If anybodywants to make his house of hisown choice then as perschedule company should paythe money.

10) Provision for homestead land: Subject toavailability, each displaced family will be given atleast 1/10th of an acre of land free of cost in aresettlement habitat for homestead purpose. Thearea of the house shall be as decided by RPDAC.In case someone wants to build his own house –company will provide cash assistance.

11) 5226 sq ft land should beprovided for cows.

11) Not agreed to. However, an assistance of Rs12500/- shall be provided to each displacedfamily for construction of shed as provided inR&R policy 2006.

12) As per demand the place to begiven for R&R colony shouldbe with villagers choices.

12) Management will chose the R&R site inconsultation with the Village DevelopmentCommittee and IDCO’s Land Acquisition Officer.

13) Old person, unmarried girl,widow, hadicapped to be paid30,000/- per month.

13) The Un-married girls above 30 years, Widow andPhysically handicapped persons will be treatedas a ‘Separate Family” and receive all R&Rbenefits. Old persons as vulnerable group will becovered under R&R Plan.

14) Village committee will decideabout Gochar, Patta, Forestland etc

14) The land use will be followed as per revenuerecords

15) Before getting compensationall persons must get job cardfor employment.

15) An identity card shall be issued to each displacedfamily in a manner prescribed by the Governmenton receipt of compensation. The employmentshall be commensurate with development ofmine.

Page 82: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

4

16) All villagers should know aboutsurvey report going to besubmitted

16) The survey was carried out for the projectdisplaced families and land losers.

17) Before employment persons tobe trained in training centrewith full expenses of company.

17) Candidates selected for employment in mineswould undergo training in various spheres, priorto their full fledged employment in mines. Duringthe training they would be paid Rs 3500/- permonth as stipend.

18) All disputes about land to besolved by village committee. Ifany disputes goes to court,villagers have got power tostop mining.

18) The committee will be formed to address thegrievances of the PAPs.

19) Rate of kisam wise land will beequal from the date of sec 4(I)company is bound to pay theinterest.

19) The compensation of land will be determined bythe District Collector based on 3 years salesdeed of the area. An interest @12% per annumwill be paid from the date of 4(1) notification.

20) Company is bound to pay fullamount within 1 year of sec4(I)

20) The amount of compensation will be paid by theGovt. after Section 11 of Land acquisition Act.The Company makes deposits in the Govt. after9(1) notification which is normally within 1 year of4(1) notification. Usually, the land looser receivesthe compensation within 2 years time.

21) Above 18 years all to getemployment as per theirqualification.

21) A major son (Above 18) irrespective of his maritalstatus is treated as a separate family. Hence,eligible for employment.

22) If any family has got daughtermore than 25 years(unmarried) must getappointment as perqualification.

22) Odisha R&R Policy treated Unmarrieddaughters/sister more than 30 years of age as aseparate family for the purpose of extendingrehabilitation benefits.

23) 10-15 year’s children shouldbe in waiting list forappointment.

23) 10-15 years children are provided witheducational facilities under R&R Plan

24) After section 4(I) upto 33 years 24) District Compensation Advisory Committee

Page 83: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

5

Rs 50,000/- to be paid peracres (annually)

(DCAC) under the chairmanship of the collectoris constituted to determine the negotiated price.

25) Issueless, widow, handicapped,etc as per their own wishnominee for payment to belisted.

25) Payment to nominees will be made followinglegal process of land acquisition

26) For peripheral developmentwork, company is bound.

27) Management will spend Rs 3.0 crores initiallyfollowed by Rs 3.09 crores / annum as recurringcost in CSR activities

27) Those who do not have anyhouse should be included inthe list of recipient of house asper R&R.

28) Benefits will be provided to homestead lessencroachers who is in possession of theencroached land at least for a period of ten yearsas per Land Encroachment Act, 1972 provided toencroachment is unobjectionable. Otherwise onlythe cost of structure will be provided.

28) Those who are not willing to dojob, they must get 30 lakhs forshifting charges.

29) Families who do not opt for employment /selfemployment will be eligible for cashcompensation as per R&R plan . One timecompensation varies from Rs. 1.25 lakhs to Rs.6.21 lakhs

29) Package for displacement tobe 30 lakhs for shiftingcharges.

30) Transportation allowance of Rs 2,500/- fortransportation to the resettlement habitat or theirnew place of habitat shall be provided to eachdisplaced family

30) Sec 4(I) to be published in theknowledge of villagers.

31) Yes, it will be published and all villagers will beinformed publically

31) Company is bound to giveemployment in our area.

32) The Management will give preference localpersons in the matter of employment, both directand indirect as well as through contractorsemployed by them,

Management will also make necessaryarrangement to provide vocational training to one

Page 84: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

6

member of project affected family so as to equiphim/her to start his/her own small enterprise andrefine one’s skill to take advantage of new jobopportunities. For those engaged in traditionaloccupations / handicrafts/ handlooms, suitabletraining will be organized to upgrade their skills

32) Company is bound to provideemployment at a time to everyfamily.

33) The company will provide employment in differentphases of execution, operation andmaintenance of the project

33) Both sides should be declaredsec 4(I) at time.

34) it will be published and all villagers will beinformed publically

2. Jugal KishoreSahu,Barapada

He suggested that the public hearingshould have been conducted wellbefore the land acquisition and evenbefore the proposal is finalized

Public hearing has been conducted as per MOEF EIAnotification S.O.1533 dated 14th September 2006.

Management has applied land aquisition through IDCOand deposited Rs 21,30,77,880.00 to Land Officer,Orissa Industrial Infrastructure DevelopmentCorporation as processing fee of IDCO. Landacquisition is yet to start. The public meetings for thepurpose of land acquisition are held in the form ofGram Sabha which have since been conducted

3. AbhinashPradhan,Chakundapala

He instigated the people that theyshould not sell their mother land tothe company for the proposed coalmine project. He informed that oncethe villagers sell their mother land,they will loose their identity forever.He complained about the reportednoise level of 36 dB(A) during nighthours in the study area as mentionedin the Executive Summary. Hencethe noise level should be monitored

Noise level is well within the limit specified forresidential and rural area category.

EIA /EMP have been prepared by recognizedconsultants. On 02.02.2003, consultant received ISO9001:2000 certification under ANZ-JAS.

R&R policy 2006 of Government of Orissa will befollowed in letter and spirit.

The company will establish its own well equipped

Page 85: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

7

once more. He also intimated thatthe area was proposed for anirrigation project earlier and hequestioned that how the same areawill become a coal mine. Hesuggested that the EIA study shouldbe carried out by an independentbody. The health of the people will beaffected due to coal mine project.The coal bearing water will bedischarged to Singhara Jhor. Thenew 2011 R&R Policy of the StateGovt. will not be followed by theproject proponent. He again made apoint that the grade of the coal asmentioned in the EIA report as Ggrade is not correct.

occupational health centre. Management will providemobile clinic with testing and diagnostic facilitiesaround the villagesThe mine drainage water will be pumped to desiltingpond which in turn would discharge into main settlingpond from where water would be utilized for inhouseneed and surplus water after settlement in settlingpond would be pumped to adjoining Singhara Jhore,

The coal of Radhikapur (West) Coal Block is mostly ofgrade "G" with 83.41 MT coal in this category as perGeological Report prepared by CMPDI.

4. KurtarthaChandraSingh,President, ZillaJungle “O”ParibeshSurakshyaSamiti, Angul,Odisha

He suggested that a coordinationcommittee should be formed to carryout all the developmental works ofthe area. A thick green belt has to becreated in the locality. Theunderground water should not beused for any industrial purpose. Thewaste water from the coal washeryshould be treated before dischargingto Singhara Jhor. The mined out areashould be re-habilitated. The newR&R Policy, 2011 should be followedby the industry. The mine authorityshould take all precautionarymeasures to control pollution. Thedrinking water should be supplied tothe affected villagers. The solidwaste of the coal washery should beproperly managed.

RPDAC to be constituted for the project which wouldbe actively involved in implementation and monitoringof R & R package.

A plantation program over life of the mine has beenplanned in a phase wise manner. 16.75 Ha green beltdevelopment around the ML area will be carried outand more wide green belt will be taken up whereverspace is available. A thick plantation is proposed to beprovided and maintained around the mining area andalong the roads. Under ground water will be used onlyfor domestic purpose.

Waste water after being used for Coal washeryoperation will be screened through a five stageclarification process and all the suspended particulatematter would be squeezed and clear water is recycledback to the washery. Zero discharge will be adopted.

Page 86: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

8

Mined out area will be backfilled & planted.

Management will take measures to control air pollutionwater pollution and noise pollution.

The compensation to the land losers and displacesshall be as per R&R policy of Government of Orissa.Management will provide employment facility to thedisplacees as per their qualification and capability.

Coal washery middling shall be utilised in AFBC boilerof proposed AFBC based TPP

5. PradeepKumar Sahu,Kosala

He pointed out that the Talcher,Kaniha and Chhendipada areas havealready been affected by the Talchercoal belt. The Singhada Jhor, AunliJhor and Brahmani River have beenaffected by the coal mine activities inthe areas. This will subsequentlyaffect the civilization along the waterbodies. Hence he suggested that amaster plan for all the proposed coalmines should be prepared and theaffected people should be re-habilitated accordingly. He furthersuggested that instead of conductingindividual public hearing for eachproject, one public hearing should beconducted for the entire area as perthe master plan. The mine authorityshould take up massive plantationprogramme in the area.

The suggestion of Master Plan for Talcher Coal Fieldis already attacting Orissa Govt’s attention and in factstudy has been commissioned by IDCO – with CMPDI.Cost of Master Plan will be shared by coal allocatees.

7.5 m width of green belt will be developed around theML area and more width of green belt will be taken upwherever space is available. 1913150 trees isproposed around the mining area and along theroadside.

6. PrasanaKumar Behra,NEWS, Angul

He informed that the affected peopleare only interested for landcompensation whereas peoplesurrounding the project area are

EIA/EMP has been prepared as per MOEF EIANotification S.O.1533 dated 14th September 2006.The area with 10 Km radius has been considered inEIA study.

The cost estimate for measures tobe taken up within the core zoneas well as buffer zone (10 kmarea) is Rs. 412 Lakhs. Out of this

Page 87: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

9

affected by the pollution created byindustry. The EIA study should becarried out for one complete yearcovering all the seasons instead ofrapid EIA. Even if the Angul-Talcherarea has been declared as criticallypolluted area, the CEPI has not beenreflected in the EIA report. Theproposed project will affect the flora,fauna, water and air of the area.Hence, all the mitigative measures tobe adopted should have beenmentioned in the EIA report. TheSinghada Nallah should be protectedand a mitigative plan should beprepared. The Forest Right Act hasbeen violated by the all industries.Hence the project proponent shouldprepare a proper forest diversionproposal. He complained that most ofthe mines and industrial houses inthis area ara not developing 33% oftheir area for green belt.

There is no ecologically sensitive area such asBiosphere Reserves/ National Parks/ WL Sanctuaries/Elephant Reserves in the study area. The Wild lifeConservation Plan has already been prepared by Mr.Laxmidhar Bhoi,IFS DFO (Rtd)..

As per MOEF circular no. J-20012/11/98-IA.II(M) dated12.02.2002 for environmental appraisal, it is sufficientto prepare a Rapid Environmental Impact Assessment(EIA) report based on pre project base line data of onecomplete season only. Four season’s data is notneeded.

MoEF have lifted the ban on Angul – Talcher criticallypolluted area for consideration of project forenvironmental clearance vide OM dated 31.03.2011

Environmental Action plan for CPA Angul has beenprepared and enclosed in EIA/EMP report.

Management will provide garland drains around mineboundary, excavation and toe drains around dumpsand storm water drains.

Check dams will be provided to prevent solids fromwash off and screen if any from the mine relatedactivities.

Zero effluent discharge systems will be adopted.

Domestic wastewater from work site will be treated inseptic tank-soak pit system

The Forest Diversion Proposal in prescribed Form – Aunder section – 2 of FC. Act 1980 has been prepared

Rs 114 lakhs shall be utlized bythe project proponent and rest 298Lakhs shall be place with the DFOAngul to be utilized forconservation of Wild Fauna.

Page 88: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

10

and submitted to The Chief Conservator of Forests(Nodal) grant of Forest Diversion on 06.05.2011

7. Rusab Majhi,Korada

He informed the public that theaffected people only understand thecompensation of the land and re-habilitation package. The projectproponent should cooperate with thepeople to avoid any untowardsituation in future. He suggested thata coordination committee should beformed with citizens of affected &periphery villages and projectproponent to protect the environmentof the area and carry out peripheraldevelopment works. The SingharaJhor should be protected.

RPDAC to be constituted for the project would includerepresentative of displacees and leading NGOsamongst others; would be responsible forimplementation and maintaining of R & R programme.

Management will discussed with villagers regardingperipheral activities

Zero effluent discharge will be adopted.

CSR budget will be Rs 3.0 croresinvested initially followed by Rs3.09 crores / annum as recurringcost.

8. Dilip KumarSahu, Kosala

He informed that the villagerssupport is required for the miningproject. The project proponent shouldtake up afforestation programme andthe health of the affected villagersshould be taken care up. The forestland in the mine lease area shouldbe protected.

Management will take up afforestation programme.

Management will provide health check up in campnearby villages

The Company has already prepared Forest DiversionProposal in prescribed Form – A under section – 2 ofFC 1980 and has submitted to Chief Conservator ofForests (Nodal) Bhubaneswar on 6th May 2011 forgrant of Forest Diversion. There are no reserved orprotected forests, only revenue forest is there.

9. PrasantaKumar Das,ParibeshSurakhya,Talcher

He suggested that a coordinationcommittee should be formed with thevillagers and project proponent tocarry out all the developmental worksin consultation with affected villagersof 8 villages. He supported theproject with condition.

Management agrees to make coordination withvillagers. RWCMPL will initiate the amenities either byproviding or by improving the facilities in the area,which will help in uplifting the living standards of localcommunities in Education, Health, drinking water,sewerage and sanitation, electricity, and road etc.

The total expenditure of Healthaspects will be Rs. 90.60 lakhs/annum .On education it will beRs.72 lakhs/ annum. Infrastructuredevelopment it will be 30 lakhs/annum .Drinking water facilities itwill be Rs.12 lakhs/ annum .These are all a part of the CSRplan

Page 89: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ENCLOSURE : VII Contd..

11

10. Ram ChandraSahu Nuapada

He reiterated that the points raisedby Sri Pramod Kumar Sahu (speakersl no. 1) should be implemented. Theproject proponent should take upelectrification and better roadcommunication in the area.

Electrification in surrounding areas is under Govtjurisdiction. Management will help as much aspossible. Other answers same as S.L.1

11. Ram ChandraRoutray,President,JungleParibesh,Angul

He suggested that the environmentalarea should be protected and themine authority should take upmassive plantation of the area tocreate forest. The mine authorityshould take all preventive measuresto control pollution. He welcomed theproject and said that it will help ineconomic prosperity of their area andthe District.

The pollution control norms will be adhered. Projectproponent will carry out controlled blasting and adoptnecessary water sprinkling arrangements to reducedust. The mined out area will be backfilled. A massiveplantation programme involving nearly 20 lakhsspecies is planned over the life of the mine.

The total investment onenvironmental improvement worksis envisaged as Rs. 473.35 lakhswhile the recurring expenditureduring the stage of production isenvisaged as Rs. 131.08 lakhs peryear

Page 90: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 91: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 92: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 93: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 94: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 95: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 96: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 97: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 98: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 99: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 100: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 101: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 102: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 103: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 104: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 105: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 106: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 107: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 108: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 109: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV

Page 110: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV Contd..

Page 111: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV Contd..

Page 112: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV Contd..

Page 113: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV Contd..

Page 114: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections

ANNEXURE : IV Contd..

Page 115: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 116: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 117: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 118: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections
Page 119: both of the Crown dumps top will reduce from 85 m (A SL) to ......[2] both of the Crown dumps top will reduce from 85 m (A SL) to 52 m (A SL). The revised conceptual plan and sections