Truck [TK_797] Settings:
Example 2
Defaults
Capacity: 360.000 (Tons)
Loading : 00:03:47 (HH:MM:SS)
Dumping : 00:01:06
Idle at Shovel : 00:00:36
-------------- : ----------
: 00:05:30
Ore
Capacity: 361.000 (Tons)
Loading : 00:04:00 (HH:MM:SS)
Dumping : 00:01:11
Idle at Shovel : 00:00:48
Idle at Crusher: 00:00:30
Avg. delay : 00:01:11
-------------- : ----------
: 00:07:42
Waste
Capacity: 365.000 (Tons)
Loading : 00:03:12 (HH:MM:SS)
Dumping : 00:00:24
Idle at Shovel : 00:00:42
Dump : 00:00:30
Avg. delay : 00:01:11
-------------- : ----------
: 00:06:00
Other
Capacity: 365.000 (Tons)
Loading : 00:03:47 (HH:MM:SS)
Dumping : 00:00:18
Idle at Shovel : 00:00:36
Other : 00:00:30
Avg. delay : 00:01:11
-------------- : ----------
: 00:06:23
Speeds Flat (Kilometres/Hour)
Loaded: 48.00
Empty : 52.00
Speeds inclined Loaded
Grade Uphill Downhill
3.00 32.00 32.00
6.00 26.00 26.00
9.00 24.00 24.00
Speeds inclined Empty
Grade Uphill Downhill
3.00 32.00 32.00
6.00 26.00 26.00
9.00 24.00 24.00
Startup Delays
Distance Speed
5.00 5.00
10.00 7.00
15.00 9.00
20.00 11.00
25.00 12.00
30.00 15.00
Curvature Delays
Distance Speed
3.00 2.00
6.00 4.00
8.00 6.00
=================================================================
Pit exit/entrance to destination
One way 621.54 (Metres)
Round trip 1243.09 (Metres)
Loaded Grade Uphill Downhill
3.00 23.05 78.55
6.00 0.00 0.00
9.00 225.32 142.78
Flat 151.85
Empty Grade Uphill Downhill
3.00 78.55 23.05
6.00 0.00 0.00
9.00 142.78 225.32
Flat 151.85
Run times for:
Loaded Empty (time)
00:01:57 00:01:57 => 00:03:55 (HH:MM:SS)
Pit route specified
Bench [1260] Round trip dist. 4341.81 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 623.67 644.81
Flat 280.88
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 623.67
Flat 280.88
Pit lift : 00:08:41 (00:08:41 startup)
Route - delays: 00:12:36
-------------- --------
Ore + delays: 00:20:18
Waste + delays: 00:18:36
Other + delays: 00:19:00
Bench [1270] Round trip dist. 3915.94 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 523.17 644.81
Flat 168.44
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 523.17
Flat 168.44
Pit lift : 00:04:30 (00:04:30 startup)
Route - delays: 00:08:25
-------------- --------
Ore + delays: 00:16:07
Waste + delays: 00:14:25
Other + delays: 00:14:49
Bench [1280] Round trip dist. 3731.90 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 422.67 644.81
Flat 176.92
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 422.67
Flat 176.92
Pit lift : 00:04:02 (00:04:02 startup)
Route - delays: 00:07:57
-------------- --------
Ore + delays: 00:15:39
Waste + delays: 00:13:57
Other + delays: 00:14:21
Bench [1290] Round trip dist. 3546.21 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 322.17 644.81
Flat 184.57
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 322.17
Flat 184.57
Pit lift : 00:03:33 (00:03:33 startup)
Route - delays: 00:07:28
-------------- --------
Ore + delays: 00:15:10
Waste + delays: 00:13:28
Other + delays: 00:13:52
Bench [1300] Round trip dist. 3356.90 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 221.67 644.81
Flat 190.42
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 221.67
Flat 190.42
Pit lift : 00:02:52 (00:02:52 startup)
Route - delays: 00:06:47
-------------- --------
Ore + delays: 00:14:29
Waste + delays: 00:12:47
Other + delays: 00:13:11
Bench [1310] Round trip dist. 3169.83 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 121.17 644.81
Flat 197.38
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 121.17
Flat 197.38
Pit lift : 00:02:23 (00:02:23 startup)
Route - delays: 00:06:18
-------------- --------
Ore + delays: 00:14:00
Waste + delays: 00:12:18
Other + delays: 00:12:42
Bench [1320] Round trip dist. 2997.18 (Metres)
Loaded Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 20.67 644.81
Flat 211.56
Empty Grade Uphill Downhill
3.00 0.00 0.00
6.00 0.00 0.00
9.00 644.81 20.67
Flat 211.56
Pit lift : 00:01:55 (00:01:55 startup)
Route - delays: 00:05:50
-------------- --------
Ore + delays: 00:13:32
Waste + delays: 00:11:50
Other + delays: 00:12:14