11.30.18 NIEMITZ DESIGN GROUP ELIOT HOTEL BOSTON | MA PROPOSED NEW AWNINGS & EXTERIOR WALLSCONCES MASSACHUSETTS AVE. & COMMONWEALTH AVE. - BOSTON, MA EXTERIOR ELEVATION AT COMM AVE. W/ EXISTING AWNINGS & WALLSCONCES EXTERIOR ELEVATION AT MASS AVE. W/ EXISTING AWNINGS & WALLSCONES

Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

E X T E R I O R E L E VAT I O N AT C O M M AV E .W / E X I S T I N G AW N I N G S & WA L L S C O N C E S

E X T E R I O R E L E VAT I O N AT M A S S AV E .W / E X I S T I N G AW N I N G S & WA L L S C O N E S

Page 2: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

I M A G E AT E X I S T I N G AW N I N G S& F R A M E - M A S S AV E .

I M A G E AT E X I S T I N G AW N I N G S& F R A M E - M A S S AV E .

I M A G E AT E X I S T I N G AW N I N G S& F R A M E - C O M M AV E .

Page 3: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

U N IU N IU N I U N I U N I U N IU N I

N E W AW N I N G S AT F I R S T F L O O R , G R O U N D L E V E L

* N E W AW N I N G S AT G R O U N D L E V E L AT M A S S . AV E . S I D E WA L k A p p p R OX I M AT E Ly 8 ’ - 0 ” - 9 ’ -0 ” A b O V E S I D E WA L k TO b OT TO M O F AW N I N G W I T h VA Ry I N G S L O p E O F S I D E WA L k

N E W WA L L S C O N C E S I N E X I S T I N G L O C AT I O N S

E X T E R I O R E L E VAT I O N AT M A S S A C h U S E T T S AV E . - C O L O R O p T I O N A

N E W AW N I N G S AT 3 R D F L O O R

N E W AW N I N G S AT 2 N D F L O O R

N E W AW N I N G S AT 4 T h F L O O R

C O L O R O p T I O N : A

Page 4: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

E X T E R I O R E L E VAT I O N AT C O M M O N W E A LT h AV E . - C O L O R O p T I O N A

N E W AW N I N G S AT 3 R D F L O O R

C O L O R O p T I O N : A

N E W AW N I N G S AT 2 N D F L O O R

N E W AW N I N G S AT F I R S T F L O O R , G R O U N D L E V E L

Page 5: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

C O L O R O p T I O N : A C O L O R O p T I O N : b

N E W AW N I N G S AT 3 R D F L O O R

N E W AW N I N G S AT 2 N D F L O O R

N E W AW N I N G S AT F I R S T F L O O R , G R O U N D L E V E L

* N E W AW N I N G S AT G R O U N D L E V E L AT M A S S . AV E . S I D E WA L k A p p p R OX I M AT E Ly 8 ’ - 0 ” - 9 ’ -0 ” A b O V E S I D E WA L k TO b OT TO M O F AW N I N G W I T h VA Ry I N G S L O p E O F S I D E WA L k

N E W WA L L S C O N C E S I N E X I S T I N G L O C AT I O N S

N E W AW N I N G S AT 4 T h F L O O R

E X T E R I O R E L E VAT I O N AT M A S S A C h U S E T T S AV E . - C O L O R O p T I O N b

Page 6: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

E X T E R I O R E L E VAT I O N AT C O M M O N W E A LT h AV E . - C O L O R O p T I O N b

N E W AW N I N G S AT F I R S T F L O O R , G R O U N D L E V E L

N E W AW N I N G S AT 3 R D F L O O R

N E W AW N I N G S AT 2 N D F L O O R

C O L O R O p T I O N : b

Page 7: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

T y p I C A L D E TA I L AT p R O p O S E D N E W AW N I N G( b U I L D I N G AT TA C h M E N T TO M AT C h E X I S T I N G )

C O L O R O p T I O N : b

Page 8: Boston - ELIOT hOTEL pROpOSED NEW AWNINGS & EXTERIOR … · - boston, ma color option: a color option: b new awnings at 3rd floor new awnings at 2nd floor new awnings at first floor,

1 1 . 3 0 . 1 8N I E M I T Z D E S I G N G R O U P

E L I OT H OT E LB O S TO N | M A

P R O P O S E D N E W AW N I N G S & E X T E R I O R WA L L S C O N C E SM A S S A C H U S E T T S AV E . & C O M M O N W E A LT H AV E . - B O S TO N , M A

p R O p O S E D N E W WA L L S C O N C E M A N U F A C T U R E R : S T E R N b E R G L I G h T I N GM O D E L : M S 6 0 5 A O W / S p I k E S & L E N S E D R O O FL E N S E : C L E A R S E E D E D A C Ry L I C L E N S E - C S AA R M : WA L L b R A C k E T - TAF I N I S h : b L A C k T E X T U R E D

F I N I S h

L E N S

A R M

E X I S T I N G WA L L S C O N C E

BKT - BLACK TEXTURED WHT - WHITE TEXTURED PGT - PARK GREEN ABZT - ARCHITECTURAL DBT - DARK BRONZETEXTURED MEDIUM BRONZE TEXTURED

TEXTURED

VG- VERDE GREEN SI - SWEDISH IRON OWGT - OLD WORLD GRAY TEXTURED

CM - CUSTOM MATCH OI - OLD IRON RT - RUST WBR - WEATHERED CD - CEDAR WBK - WEATHERED TT - TWO TONE BROWN BLACK

Smooth finishes areavailableuponrequest

TRADITIONAL PAINT COLORS

555 Lawrence Ave., Roselle, IL 60172 | P 800-621-3376 | F 847-588-3440 | E [email protected] | www.sternberglighting.com

TPC/11-2016

Standard Finishes

Sternberg Select Finishes

Notes

Custom Finishes

COLORMATCH

- Standard and Select finishes are no extra charge.

- Custom finishes will have an additional charge.

- Metallic colors are subject to additional charges pending receipt and approval of color chips.

- All colors shown are approximate and may have aslight variation.

Written Coatings SpecificationStage I: All products to be coated shall receive a 96 second

Alkaline cleaner application followed by a 48 secondfresh water rinse at ambient temperature.

Stage II: Shall be a 60 second Phosphoric Acid 4% solution treatment with a Fluoride accelerant followed by a 48second reverse osmosis water rinse at ambient temper-ature. The rinse will be followed by a high pressure airspray to remove all moisture from the product.

Stage III: Shall be a 48 second Non-Chrome Polymer sealer application.

Stage IV: Shall start with 16 minutes in a drying oven at 400 degrees.

Stage V: Shall be an electrostatic application of polyester powder in a downdraft spray booth and applied by articulated robotic arm sprayer and over sprayed by an application technician. Polyester powder over sprayshall be recoverable and reusable.

Stage VI: Shall be 25 minutes oven curing at 450 degrees toharden the powder finish and create final appearanceand adhesion to the substrate. Curing shall be followedby 9.5 minutes in a cooling tunnel to prepare for un-racking.

Pre -Treatment and curing processes shall be followed by qualitychecks for adhesion using a cross-hatch test and for proper curingby means of a solvent rub test. Coatings process shall meet orexceed AAMA-2604-05 standard.