Sl.No DESCRIPTION OF ITEM NAME UNIT

SUB-HEAD [Number] : [Name]

1 [BOQ Description]

[Sub BOQ Description]

NOTE : [Comments/Notes]

Page 2: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 2/8

QTY RATE AMOUNT

Page 3: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 3/8

Sl.No DESCRIPTION OF ITEM NAME

MAIN-CATEGORY:

1

Earth work in cutting in road section in corrext profile in mixed soil

including removal of spoils not exceeding initial lead of 50 Mtr. &

initial lift of 1.5 Mtr.

earth work

2

Extra for carriage of earth beyond initial lead of 50 Mtr. Up to total

lead of 500 mtr. extra carriage

3

Supplying ,Spreading & compacting sand to 150mm compacted

thickness in layers, to proper gradient & camber inundating each

layer by water & packing & ramming layer by layer to achieve desire

compaction including cot of sand ,lighting,guard,barricading & making

earthen bundh where necessary curing with water as per direction

mending crake & depression by ramming when necessary

sand compacting

4

Single brick flat soling of picked jhama bricks including base

preparation i.e. ramming, dressing, levelling and filling the gaps with

sand.

B.F.S

5

Labour for picking up existing metalled black topped surface to an

avg. depth upto 40mm including screening & stacking the pavementmaterials . Hard crust with stone metal/ Jhama metal.

picking up existing black top

6

Supply, spreading & consolidation 1st class Jhama metal / bat of 

(size 63mm to 45mm ) in hard crust to 75mm compacted thickness

(measured after compaction) in layers including screening of 

bats/metals etc. as necessary , hand packing , sweeping ,watering ,

& rolling in stages with power roller to proper line, grade , camber,

lighting, guarding, barricading & making necessary earthen bundh of 

one meter width on each side where necessary to protect edges &

preparing the bed by necessary cutting or filling & rolling all complete

including the cost of all materials & labours and as per specification &

direction of E-I-C

Metal consolidation

Brick bat (63mm to 45mm) - 75mm thickness

Brick bat (63mm to 45mm) - 75mm thickness

Broken Rubish & rolling

7

Laying 20mm the. Premix carpet open graded using 1.8cum. Of 

13.2mm size & 0.9 cum. Of 11.2mm size stone aggregate per 100

sum. Of surface I/c through cleaning of surface applying tack coat,

screening, cleaning & preheating stone chips & fully precoating the

same with the hot matrix @ 54 kg/cum. of aggregate carrying the

mixture by any suitable approved arrangements & laying the mixture

uniformly over the surface by suitable arrangement i/c manual

operation as an when required for proper lvl. grade & camber through

rolling by power roller i/c the cost & carriage of stone chips & matrix ,heating the matrix , preheating the aggregate to required temp.hire

charges of miller mixer 3-5 M.T / Hr.& other machineries, pay of 

operator , cost of fuel & lubricants, materials etc. hire charges & all

other cost complete. On water boung surface using Matrix @4g/10

Sqm. in Tack coat.

Premix

Page 4: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 4/8

Page 5: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 5/8

UNIT QTY RATE AMOUNT

Page 6: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 6/8

Page 7: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 7/8

Sl.No DESCRIPTION OF ITEM NAME

SUB-CATEGORY: IntFinishes-Internal Plastering

1.00 STUCO PLASTER 12MM TOP LAYER & 6 MM UNDER LAYER STUCO PLASTER

Page 8: Boq Template

7/27/2019 Boq Template

http://slidepdf.com/reader/full/boq-template 8/8

UNIT QTY RATE AMOUNT

SQM 100 10 1000