  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    1/145

    Reference No. Description

    1 ! "#s

    B1-3.6.2.15 page 49 1.1Geotechnical report (bore logs, trial pits, so

    !"escription and li#its o$ %arious soil la&e

    !'a#ple taen

    !'* results

    !+ater le%els

    !"epth o$ boreholepitsounding

    B1-3.6.2.14 page 4 1.2 *opographic sur%e& (1 #eter grids and .5

    !/btain topographic sur%e& #aps

    !0nsure position and ele%ation o$ all ors

    1.3

    1.4

    1.5

    1.6*e#porar& latrines and sanitar& (alloed 1

    1.*e#porar& $ence around site establish#ent

    1.1*e#porar& gate

    1.11*e#porar& ater connection

    1.12*e#porar& electricit& connectiongenerator

    1.13 +ater usage

    1.14 0lectricit&petrol or diesel

    1.15*e#poar& site sign board

    1.16 'uper%ision 7abour

    1.1 8ealth and 'a$te& - sa$et& signs and 0 ac

    1.1: 'ecurit& guard (allo 1 person $or da& a

    1.19 "e-establish#ent o$ site ca#p and stores

    B1-4.9..14 page 152 2SITE $%R&S ' ()T*%R+

    2.1

    2.2 ;ate $or o%erhaul per #3 o$ spoil $or a dis

    2.3 "ig up and re#o%e concrete $oundation

    2.4;e#o%e &ard stone and to be stored $or lat

    2.5 ;e-instate &ard stone

    B2-4.6. page 3

    nal&

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    2/145

    Reference No. Description

    'and

    Aillers

    @oncrete cubes

    3.1 eeping all $oundations $ree o$ ater

    3.2 ;is o$ collapse to sides o$ all eca%ations

    3.3 132 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)

    3.4 132 Fsolator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)

    3.5 132 @urrent *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1 4 9 1 1

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    3/145

    Reference No. Description

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundationB1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.6 132 oltage *rans$or#er

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    4/145

    Reference No. Description

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3. 132 'urge rrestor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.: 132 7o ost Fnsulator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB tB1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1 4 2 1 66 G i $ 8" B lt (>2 E 4)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    5/145

    Reference No. Description

    3.9 132 @able 'ealing 0nd

    B1-4.9..14 page1520ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1 66 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)

    3.11 33 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    6/145

    Reference No. Description

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1:Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 6)

    3.12 33 @urrent *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.13 11 uto ;ecloser

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    3.14 11 Fsolator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    3.15 uillar&

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    7/145

    Reference No. Description

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts

    3.16ard >arshalling ios

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts

    5C)(E TRENCH ,refer to 0ra7in8 no. 9

    4.1 0ca%ation in insitu #aterial

    4.2 Bacill ith 5## si$ted clean sand and co

    4.3 Bacill ith si$ted clean sand in depth o$ 15

    4.4Bacll ith eca%ated insitu #aterial in d

    4.5 @ast insitu concerte bloc (1# .225

    4.6 @ #arer tape

    4. @ast insitu cable route #arer ith recess $

    ;)RD $%R&S

    B1-4.9..1 page 11 5.1

    B1-4.9..14 page 155 5.2repare and co#pl& ith an appro%ed ee

    B1-4.9..14 page 156 5.3

    *he co#plete, suppl& and installation o$ a sgates etc. 2# 8igh dia#ond #esh plastic c

    ra

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    8/145

    CHINTHECHE 132/66/33kV Substation

    nit

    unding logs) and to include

    1 Fte#

    s

    #eter %ertical inter%als)

    1 Fte#

    are correct

    1 Fte#

    1 Fte#

    1 Fte#

    $or BB oce) 2 #onth

    1 Fte#

    2 Fte#

    1 Fte#

    (2) 1 Fte#

    1 >onth

    1 >onth

    1 Fte#

    1 >onth

    cording to BB specications 1 Fte#

    ch and 1 person $or night atch) 2 >onth

    1 Fte#

    14

    ance greater than 1# - rate per # 1 #

    5 Ho

    r use 14

    14

    $or per$or#ance o$ the or 1 *est

    3 *est

    1 *est

    o$ >aterial= is re?uired 3 *est

    3 *est2 *est

    2 *est

    although not specied, is re?uired to co#plete the

    rip 2## o$ topsoil to be stocpiled on site $ored at a site located b& the e#plo&er ithin 1#

    #2

    #2

    #2

    3of 4

    $or each second la&er o$ =Baclling andor

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    9/145

    CHINTHECHE 132/66/33kV Substation

    nit

    2 *est

    2 *est

    3 *est

    1 Fte#

    1 Fte#

    3.62

    .21

    ber) 4.2

    r) 2.91

    2.6

    b 6. #

    1.13

    pths o$ 15## to 9D >od '8*/ 1.:5

    aa&) 1.

    2. g

    suppl& bolts) 1. Ho

    .6

    : Ho

    2.21

    .13

    ber) 3.36

    r) 2.16

    1.2:

    b 4.: #

    .2

    pths o$ 15## to 9D >od '8*/ .94

    aa&) 1.2

    9. g

    suppl& bolts) 1 Ho

    .4

    : Ho

    1.3

    .6 ber) 1.96

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    10/145

    CHINTHECHE 132/66/33kV Substation

    nit

    .1

    b 2.: #

    .49pths o$ 15## to 9D >od '8*/ .36

    aa&) .6

    4. g

    suppl& bolts) 1 Ho

    .2

    4 Ho

    #3

    #2

    #3

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    11/145

    CHINTHECHE 132/66/33kV Substation

    nit

    1.3

    .6

    ber) 1.96

    r) 1.32

    .1

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .36

    aa&) .6

    4. g

    suppl& bolts) 1 Ho

    .2

    4 Ho

    1.3

    .6

    ber) 1.96

    r) 1.32

    .1

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .36

    aa&) .6

    4. g

    suppl& bolts) 1 Ho

    .2

    4 Ho

    1.3

    .6 ber) 1.96

    r) 1.32

    .1

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .36

    aa&) .6

    4. g

    suppl& bolts) 1 Ho.2

    4 H

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    12/145

    CHINTHECHE 132/66/33kV Substation

    nit

    .6.6

    ber) .2

    r) .36

    .56

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .14

    aa&) .52

    3:. gsuppl& bolts) 4 Ho

    .2

    4 Ho

    2.43

    .14

    ber) 3.92

    r) 3.:

    1.54

    b 5.6 #

    .9:

    pths o$ 15## to 9D >od '8*/ .4

    aa&) 1.69

    :6. g

    suppl& bolts) 1 Ho

    .5

    : Ho

    1.23

    .14

    ber) 2.4

    r) -

    1.64

    b 6.: #

    2.3

    pths o$ 15## to 9D >od '8*/ -

    aa&) 1.23

    #

    3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    13/145

    CHINTHECHE 132/66/33kV Substation

    nit

    13. g

    suppl& bolts) 1. Ho

    .146. Ho

    .:5

    .5

    ber) 1.96

    r) 1.2

    .64

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .26

    aa&) .59

    4. g

    suppl& bolts) 1. Ho

    .2

    4. Ho

    1.2

    1.2

    aa&) 1.2

    1.2

    1.2

    aa&) 1.2

    .49

    .1

    ber) 2.24

    r)

    .:

    b 5.6 #

    1.96

    pths o$ 15## to 9D >od '8*/ .aa&) .49

    #

    3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    14/145

    CHINTHECHE 132/66/33kV Substation

    nit

    suppl& bolts) 1 Ho

    .1

    4 Ho

    .13

    .3

    ber) .96

    r)

    .19

    b 3.2 #

    .63

    pths o$ 15## to 9D >od '8*/ .aa&) .13

    g

    suppl& bolts) Ho

    .3

    Ho

    99 :25'2'CHE4

    66.

    #pact to 9:D >od '8*/ 3.

    ## and co#pact to 9:D >od '8*/ 15.

    pths o$ 15## and co#pact to 9D >od '8*/ 46.::

    .5#) 1 #

    1 #

    or brass pla?ue 3 Ho

    42 #

    control and spread o%er cable sealing end &ard 14.

    14.

    Subtota

    Vat 16?

    *ina Tota

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    ecurit& $ence, including earthing o$ all #etal parts,oated gal%anised steel ire and 3##Cat rap

    sts o$ a %ertical post ith 45 degree inclination at$oundation

    #2

    , 2## deep,including le%elling and rolling to#2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    15/145

    Nuber Rate Tota

    1 I 1,. I 1,.

    1 I 2. I 2.

    1 I 5. I 5.

    1 I 1,. I 1,.

    1 I 3,. I 3,.

    6 I 5. I 9,.

    1 I :,. I :,.

    1 I 2. I 4.

    1 I 5. I 5.

    1 I 5. I 5.

    6 I 5. I 3,.

    6 I 1,. I 6,.

    1 I 5. I 5.

    6 I 1,. I 6,.

    1 I -

    6 I 15. I 1,:.

    1 I 1,. I 1,.

    I .: I :3.2

    I 2. I 2.

    I 45. I 225.

    I .: I :3.2

    I 1.5 I 156.

    I 2. I 2.

    I 2. I 6.

    I 2. I 2.

    I 2. I 6.

    I 2. I 6.I 1. I 2.

    I 1 I 2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    16/145

    Nuber Rate Tota

    I 1. I 2.

    I 1. I 2.

    I 2. I 6.

    I 1. I 1.

    I 1. I 1.

    1 I . I 25.32

    1 I 19. I 4.42

    1 I 3. I 126.

    1 I 25. I 2.5

    1 I 265. I 546.96

    1 I 4. I 24.

    1 I 5. I 5.63

    1 I . I 12.92

    1 I . I 12.39

    1 I 3. I 621.

    1 I 5.5 I 5.5

    1 I . I .39

    1 I 5. I 4.

    9 I . I 139.23

    9 I 19. I 222.3

    9 I 3. I 9.2

    9 I 25. I 4:6.

    9 I 265. I 3,62.34

    9 I 4. I 12.:

    9 I 5. I 32.4

    9 I . I 59.22

    9 I . I :.1

    9 I 3. I 2,133.

    9 I 5.5 I 49.5

    9 I . I 2.2

    9 I 5. I 36.

    3 I . I 21.6

    3 I 19. I 34.493 I 3. I 16.4

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    17/145

    Nuber Rate Tota

    3 I 265. I 561.2

    3 I 4. I 33.6

    3 I 5. I .353 I . I .56

    3 I . I 14.4

    3 I 3. I 423.

    3 I 5.5 I 16.5

    3 I . I .51

    3 I 5. I 6.

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    18/145

    Nuber Rate Tota

    3 I . I 21.6

    3 I 19. I 34.49

    3 I 3. I 16.4

    3 I 25. I 99.

    3 I 265. I 561.2

    3 I 4. I 33.6

    3 I 5. I .35

    3 I . I .56

    3 I . I 14.4

    3 I 3. I 423.

    3 I 5.5 I 16.5

    3 I . I .51

    3 I 5. I 6.

    6 I . I 43.2

    6 I 19. I 6:.9

    6 I 3. I 352.:

    6 I 25. I 19:.

    6 I 265. I 1,122.54

    6 I 4. I 6.2

    6 I 5. I 14.

    6 I . I 15.12

    6 I . I 2:.:

    6 I 3. I :46.

    6 I 5.5 I 33.

    6 I . I 1.3

    6 I 5. I 12.

    5 I . I 36.

    5 I 19. I 5.4:5 I 3. I 294.

    5 I 25. I 165.

    5 I 265. I 935.45

    5 I 4. I 56.

    5 I 5. I 12.25

    5 I . I 12.6

    5 I . I 23.4

    5 I 3. I 5.

    5 I 5.5 I 2.55 I . I .:6

    5 I 5 I 1

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    19/145

    Nuber Rate Tota

    6 I . I 2.956 I 19. I 6:.9

    6 I 3. I 35.2:

    6 I 25. I 54.45

    6 I 265. I :::.:1

    6 I 4. I 6.2

    6 I 5. I 14.

    6 I . I 6.5

    6 I . I 21.9

    6 I 3. I 6:4.6 I 5.5 I 132.

    6 I . I 1.3

    6 I 5. I 12.

    2 I . I 34.3

    2 I 19. I 54.34

    2 I 3. I 235.2

    2 I 25. I 1:9.

    2 I 265. I :1:.32

    2 I 4. I 44.:

    2 I 5. I 9.:

    2 I . I 1.42

    2 I . I 23.62

    2 I 3. I 516.

    2 I 5.5 I 11.

    2 I . I .69

    2 I 5. I :.

    1 I . I :.6

    1 I 19. I 25.94

    1 I 3. I 61.2

    1 I 25. I -

    1 I 265. I 434.

    1 I 4. I 2.2

    1 I 5. I 13.65

    1 I . I -

    1 I . I : 61

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    20/145

    Nuber Rate Tota

    1 I 3. I 39.

    1 I 5.5 I 5.5

    1 I . I .961 I 5. I 3.

    3 I . I 1.:5

    3 I 19. I 2:.5

    3 I 3. I 16.4

    3 I 25. I 9.

    3 I 265. I 511.19

    3 I 4. I 33.6

    3 I 5. I .35

    3 I . I 5.46

    3 I . I 12.39

    3 I 3. I 36.

    3 I 5.5 I 16.5

    3 I . I .51

    3 I 5. I 6.

    5 I . I 42.

    5 I 265. I 1,59.

    5 I . I 42.

    6 I . I 5.4

    6 I 265. I 1,9:.

    6 I . I 5.4

    1 I . I 3.43

    1 I 19. I 1:.62

    1 I 3. I 6.2

    1 I 25. I -

    1 I 265. I 2.6

    1 I 4. I 22.4

    1 I 5. I 9.:

    1 I . I -1 I . I 3.43

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    21/145

    Nuber Rate Tota

    1 I 5.5 I 5.5

    1 I . I .69

    1 I 5. I 2.

    1 I . I .::

    1 I 19. I 5.99

    1 I 3. I 2:.:

    1 I 25. I -

    1 I 265. I 5.9

    1 I 4. I 12.:

    1 I 5. I 3.15

    1 I . I -1 I . I .91

    1 I 3. I -

    1 I 5.5 I -

    1 I . I .22

    1 I 5. I -

    I . I 462.

    I -

    I -

    I . I 32:.13

    I -

    I -

    I -

    2. I :,4.

    1. I 14.

    15.I 1,56.

    I 112,2:.12

    I 1,953.3

    I 13,161.41

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    22/145

    Reference No. Description

    1 ! "#s

    B1-3.6.2.15 page 49 1.1 Geotechnical report (bore logs, trial pits, so

    !"escription and li#its o$ %arious soil la&e

    !'a#ple taen

    !'* results

    !+ater le%els

    !"epth o$ boreholepitsounding

    B1-3.6.2.14 page 4 1.2 *opographic sur%e& (1 #eter grids and .5

    !/btain topographic sur%e& #aps

    !0nsure position and ele%ation o$ all ors

    1.3

    1.41.5

    1.6*e#porar& latrines and sanitar& (alloed 1

    1.*e#porar& $ence around site establish#ent

    1.1*e#porar& gate

    1.11*e#porar& ater connection

    1.12*e#porar& electricit& connectiongenerator

    1.13 +ater usage

    1.14 0lectricit&petrol or diesel

    1.15*e#poar& site sign board

    1.16 'uper%ision 7abour1.1 8ealth and 'a$te& - sa$et& signs and 0 ac

    1.1: 'ecurit& guard (allo 1 person $or da& a

    1.19 "e-establish#ent o$ site ca#p and stores

    B1-4.9..14 page 152 2 SITE $%R&S

    2.1

    2.2 Breaing up and re#o%ing concrete $ounda

    2.3 ;ate $or o%erhaul per #3 o$ spoil $or a dis

    2.4 Bul eca%ations (cut) in insitu #aterial

    2.5 0tra o%er bul ea%ations in cla& and blac

    2.6 0tra bul eca%ations in inter#ediate #at

    2. 0tra o%er bul eca%ations in hard roc

    2.: 7e%el and co#pact nal cut la&er to 95D >

    2.9

    B1-4.9..14 page 155 2.1

    !ctual ground le%el

    @osts $or obligations, e?uip#ent or labour,

    re?uire#ents

    plugs and lights)

    ;e#o%e all bushes, shrubs and trees and s$or later use. ll #aterial not used ill be dithin 1# $ro# site

    Bacll (ll) ith insitu #aterial and co#paco#pacting to 95D >od '8*/ densit&

    Bacll ith i#ported G5 #aterial and co#co#pacting to 95D >od '8*/ densit&

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    23/145

    Reference No. Description

    3

    nal&

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    24/145

    Reference No. Description

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)

    3.5 132 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)

    3.6 132 @urrent *rans$or#er

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    25/145

    Reference No. Description

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3. 132 oltage *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stuB1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.: 132 8igh ost Fnsulator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    26/145

    Reference No. Description

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)

    3.9 132 7o ost Fnsulator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartinB1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1 132 'urge rrestor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.11 33 Gantr&

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    27/145

    Reference No. Description

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>36 E :)

    3.12 33 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in dB1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 6)

    3.13 33 @urrent *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.14 33 oltage *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    28/145

    Reference No. Description

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB tB1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.15 33 'urge rrestor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stuB1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.16 33 "isconnetor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#b

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stu

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB t

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E 4)

    3.1*rans$or#er linth (2)

    B1-4.9..14 page 152 E@caAations in insitu ateriaB

    'trip eca%ations

    'u#p eca%ations

    linth

    'ur$ace bed

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    29/145

    Reference No. Description

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in d

    'toc pile insitu surplus #aterial ($or cartin

    B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B'trip Aooting concrete

    'u#p @oncrete

    linth

    'ur$ace bed

    B1-4.9..1 page 163 Concrete ' 3a 1 StoneB

    'trip Aooting concrete

    'u#p @oncrete

    linth

    'ur$ace bed

    art o$ the road

    B1-4.9..1 page 1 *or7orkB

    '#ooth Aor#or

    'u#p alls

    linth

    ;ough Aor#or

    'trip $ooting

    B1-4.9..1 page 1 25 25## @ha#$er to sides o$ plinth

    B1-4.9..1 page 1 Concrete nis- 7oo0oatB

    'ur$ace bedlinth

    B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B

    'ur$ace bed

    linth

    Sun0riesB

    5 to 1## "ia#eter gra%el to ll oil drai

    B1-4.9..22 page 1:1 Bricor (including stairs)

    B1-4.9..22 page 1:4Bric$orce 12## ide (e%er& second la&e

    B1-4.9..1 page 165 @onstructionepansion Joints beteen con

    5 3 Cat copper bend to suit connection

    /ne set o$ rails on tran$or#er plinth

    Benching the inside o$ the su#p ith 2#

    aint 2 la&ers o$ bitu#en to sur$ace

    3.1: C%NTR%( >I(DIN"

    ReoAa of E@istin8 $ork

    *aing out and re#o%ing doors, indos, e

    'teel single door and $ra#e'teel double door and $ra#e

    Gl d t l i d

    'u#p $ra#e - 3 3 57g cast in and gal

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    30/145

    Reference No. Description

    Fnternal plaster $ro# alls and colu#ns

    0ternal plaster $ro# alls and colu#ns

    +akin8 "oo0 to E@istin8 $ork

    @oncrete roo$ to be repaired ith appro%ed

    @oncrete Coor slab

    Ne7 $ork

    Trenc-

    6## *hic checered plate o%er internal tr

    )uiniu *raesB+indos

    *&pe +1 2 19## Ara#e including

    *&pe +2 9 9## Ara#e including 4

    Stee *raesB

    "oors

    *&pe "3 ::5 25## Ara#e and door in

    *&pe "1 12 25## Ara#e and door i

    *&pe "2 12 25##Ara#e and door i

    Interna 7a nis-esB

    +alls to be plastered and painted to #atchE@terna 7a nis-B

    5## strip to be plastered and painted t

    3.19 ">)RD H%>SE

    ReoAa of E@istin8 $ork

    *aing out and re#o%ing doors, indos, e

    'teel single door and $ra#e

    Fnternal plaster $ro# alls and colu#ns

    0ternal plaster $ro# alls and colu#ns

    Ne7 $ork

    Stee *raesB

    "oors

    *&pe "3 ::5 21## Ara#e and door in

    Interna 7a nis-esB+alls to be plastered and painted to #atch

    E@terna 7a nis-B

    8acing upoK and re#o%ing cer#aic tiles i$ro# concrete or bricor and preparing s

    8acing upoK and re#o%ing cer#aic tiles i$ro# concrete or bricor and preparing s

    *&pe "3 ::5 25## Ara#e and steel dco#plete (eternal)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    31/145

    Reference No. Description

    5## strip to be plastered and painted t

    5 E)RTH +)T

    B1-4.9..14 page 152 4.1 0ca%ate 3## (idth) 1## (dept

    B1-4.9..14 page 154 4.2

    C)(E TRENCH ,refer to 0ra7in8 no. 9

    B1-4.9..1: page 1: 5.1

    B1-4.9..1: page 1: 5.2 @oncrete trench co%er $or 1## ide tr

    B1-4.9..1: page 1: 5.3

    B1-4.9..1: page 1: 5.4 @oncrete trench co%er $or 5## ide tre

    B1-3.6.2.12 page 46 6 DR)IN)"E

    6.1

    6.2

    6.3

    6.4

    6.5

    6. %i trap ,refer to 0ra7in8 no. 999 :25'

    0ca%ation in insitu #aterial

    Blinding - 2#a (5## thic)

    '#ooth Aor#or (to be steel or sound ti#

    Baclling to earthing grid and co#pact thco#pacting to 95D >od '8*/ densit&

    *he eca%ation in insitu #aterial $or constrinsitu rein$orced concrete trenches includindia#eter @ drain pipe at 4# centres at t

    *he eca%ation in insitu #aterial $or constrinsitu rein$orced concrete trenches includindia#eter @ drain pipe at 4# centres at t

    'ubsoil "rain'uppl&, la& and Joint 2 16#

    11## belo HG7 in trench hich is to b6) and bacll ith 5 to 5## dia#etersupport o$ sides, eeping eca%ations dr&,

    @onstruct cast insitu concrete #anhole it#aterial, te#porar& support o$ sides, eepidraing no. LLL :24-2)

    'uppl&, la&, Joint and bed 3## dia#eterseer pipes including necessar& bends andseparator

    'uppl&, la&, Joint and bed 45## dia#eterseer pipes including necessar& bends and

    'uppl&, la&, Joint and bed 11## "ia#etetees

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    32/145

    Reference No. Description

    @oncrete - 35#a, 19## 'tone

    25 25## @ha#$er to sides o$ concrete to

    1## "ia#eter concrete cut out

    +ood Coat top o$ concrete slab

    'toc pile insitu surplus #aterial ($or cartin

    ;ein$orcing - 'uppl& Ai onl&

    16## "ia#eter gal%anised iron steps 165

    8ea%& dut& #anhole co%ers

    2## "ia#eter steel pipe

    1## "ia#eter %entilator @ pipe ith

    1## "ia#eter concrete pipe

    aint 2 la&ers o$ bitu#en to internal sur$a

    F R%)D

    .1 )ccess roa0

    B1-4.9..14 page 152 0ca%ation in insitu #aterial

    B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D

    B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pact

    B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #a

    .2 Interna roa0B1-4.9..14 page 152 0ca%ation in insitu #aterial

    B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D

    B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pact

    B1-4.9..15 page 15: +earing course o$ bitu#en #acada# grad

    B1-4.9..15 page 156 .3

    B1-4.9..15 page 159 .4

    .5 erbing including bends and end pieces

    B1-4.9..1 page 146 .6

    'top sign

    ield sign

    ainting o$ paring lines

    :;)RD $%R&S

    B1-4.9..1 page 11 :.1

    tees

    ;oad crossing o%er 5# ide road $or cable9 6## and the internal alls to be

    'eg#ented pa%ing - 'uppl& and la& : #### sand bed (#a 3 ##)M edge restraint'trength 25 >pa

    Roa0 arkin8sB

    *he co#plete, suppl& and installation o$ a sparts, gates etc. 2# 8igh dia#ond #esh pl3## Cat rap ra

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    33/145

    Reference No. Description

    B1-4.9..1 page 11 :.2 5# +ide #otorised electric $ence, ith a $r

    B1-4.9..1 page 11 :.3 1# +ide pedestrian gate ith a $ra#e heig

    B1-4.9..14 page 155 :.4 repare and co#pl& ith an appro%ed eeB1-4.9..14 page 156 :.5

    B1-4.9..2 page 13 :.6 @onstruct a re e?uip#ent bricor ios

    B1-3.6.2.13 page 46 :.

    'uppl& and application o$ 25## stone, 2including le%elling and rolling to co#pact t

    7andscaping - lanting o$ #ediu#-high gro0#plo&er)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    34/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    unding logs) and to include

    1 Fte# 1

    s

    #eter %ertical inter%als)

    1 Fte# 1

    are correct

    1 Fte# 1

    1 Fte# 11 Fte# 1

    $or BB oce) 2 #onth :

    1 Fte# 1

    2 Fte# 1

    1 Fte# 1

    (2) 1 Fte# 1

    1 >onth :

    1 >onth :

    1 Fte# 1

    1 >onth :cording to BB specications 1 Fte# 1

    ch and 1 person $or night atch) 2 >onth :

    1 Fte# 1

    4,423.6

    tions 1. Ho

    ance greater than 1# - rate per # 1. #

    1,5.

    cotton 15.

    rial 15.

    5.

    od '8*/

    1,5.

    663.54

    although not specied, is re?uired to

    rip 15## o$ topsoil to be stocpiled on siteu#ped at a site located b& the e#plo&er #2

    #3

    #3

    #3

    #3

    ct the ground sur$ace in depths o$ 3###3

    pact the ground sur$ace in depths o$ 3###3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    35/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    $or per$or#ance o$ the or 1. *est

    3. *est1. *est

    o$ >aterial= is re?uired 3. *est

    3. *est

    2. *est

    2. *est

    2. *est

    2. *est

    3. *est

    1. Fte# 1. Fte#

    1.5 9

    .51 9

    ber) 5.4 9

    r) 3.:4 9

    4.:4 9

    b 5.6 # 91.96 9

    pths o$ 15## to 9D >od '8*/ 5.: 9

    aa&) 4.96 9

    26. g 9

    suppl& bolts) 1 Ho 9

    .1 9

    : Ho 9

    2.21 33

    .13 33

    ber) 3.36 33

    r) 2.16 33

    1.2: 33

    b 4.: # 33

    .2 33

    pths o$ 15## to 9D >od '8*/ .94 33

    aa&) 1.2 33

    9. g 33

    suppl& bolts) 1 Ho 33

    3of 4

    $or each second la&er o$ =Baclling andor

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    36/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    .4 33

    : Ho 33

    3.62 4

    .21 4

    ber) 4.2 4

    r) 2.91 4

    2.6 4

    b 6. # 4

    1.13 4

    pths o$ 15## to 9D >od '8*/ 1.:5 4aa&) 1. 4

    2. g 4

    suppl& bolts) 1. Ho 4

    .6 4

    : Ho 4

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    37/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    1.3 12

    .6 12

    ber) 1.96 12r) 1.32 12

    .1 12

    b 2.: # 12

    .49 12

    pths o$ 15## to 9D >od '8*/ .36 12

    aa&) .6 12

    4. g 12

    suppl& bolts) 1 Ho 12

    .2 124 Ho 12

    1.3 12

    .6 12

    ber) 1.96 12

    r) 1.32 12

    .1 12

    b 2.: # 12.49 12

    pths o$ 15## to 9D >od '8*/ .36 12

    aa&) .6 12

    4. g 12

    suppl& bolts) 1 Ho 12

    .2 12

    4 Ho 12

    3.:3 1

    4.1 1

    ber) 3.92 1

    r) 3.12 1

    2.4 1

    b 5.6 # 1

    .9: 1

    pths o$ 15## to 9D >od '8*/ 2.24 1

    aa&) 1.6 1

    12: g 1

    suppl& bolts) 1 Ho 1

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    38/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    : Ho 1

    1.3 1

    .6 1

    ber) 1.96 1

    r) 1.32 1

    .1 1

    b 2.: # 1

    .49 1

    pths o$ 15## to 9D >od '8*/ .36 1

    aa&) .6 14. g 1

    suppl& bolts) 1 Ho 1

    .2 1

    4 Ho 1

    1.3 9

    .6 9

    ber) 1.96 9

    r) 1.32 9

    .1 9

    b 2.: # 9

    .49 9

    pths o$ 15## to 9D >od '8*/ .36 9

    aa&) .6 9

    4. g 9

    suppl& bolts) 1. Ho 9

    .2 9

    4. Ho 9

    5.:

    .24

    ber) 5.4

    r) 2.64

    3.22

    b 5.6 #

    1.96

    pths o$ 15## to 9D >od '8*/ 1.62

    aa&) 3.46

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    39/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    suppl& bolts) 1. Ho

    .1

    :. Ho

    1.23 2

    .14 2

    ber) 2.4 2

    r) - 2

    1.64 2

    b 6.: # 2

    2.3 2

    pths o$ 15## to 9D >od '8*/ - 2aa&) 1.23 2

    13. g 2

    suppl& bolts) 1. Ho 2

    .14 2

    6. Ho 2

    .:5

    .5

    ber) 1.96

    r) 1.2

    .64

    b 2.: #

    .49

    pths o$ 15## to 9D >od '8*/ .26

    aa&) .59

    4. g

    suppl& bolts) 1. Ho

    .2 4. Ho

    .:5 2

    .5 2

    ber) 1.96 2

    r) 1.2 2

    .64 2

    b 2.: # 2

    .49 2

    pths o$ 15## to 9D >od '8*/ .26 2

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    40/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    aa&) .59 2

    4. g 2

    suppl& bolts) 1. Ho 2 .2 2

    4. Ho 2

    .:5 2

    .5 2

    ber) 1.96 2

    r) 1.2 2

    .64 2

    b 2.: # 2 .49 2

    pths o$ 15## to 9D >od '8*/ .26 2

    aa&) .59 2

    4. g 2

    suppl& bolts) 1. Ho 2

    .2 2

    4. Ho 2

    1.: 5

    .1 5

    ber) 3.36 5

    r) 1.: 5

    1.13 5

    b 4.: # 5

    .2 5

    pths o$ 15## to 9D >od '8*/ .69 5

    aa&) 1.9 5

    :3. g 5suppl& bolts) 1. Ho 5

    .4 5

    4. Ho 5

    :.32

    .5:

    .35

    9.

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #3

    #2

    #3

    #3

    #3

    #3

    #3

    #3

    #3

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    41/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    pths o$ 15## to 9D >od '8*/ 4.54

    aa&) 2.:

    .6

    .3

    1.5

    2.2

    3.2

    .33

    12.6

    4.544.41

    2.24

    11.4

    13.46

    19 #

    45.3621

    45.36

    42

    45.36

    n 4.54

    31.2:

    r) 125.12 rete and bric 2.22

    n trans$or#er points :. #

    2.1 #

    benching render 1 Fte#

    5

    c $ro# bric to de#olished

    1. Ho 3. Ho

    11 H

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #2

    #2

    #2

    #2

    #2

    #2

    #2

    anised. 25 5## Cat 17g shtail lugs #2

    #3

    #2

    #2

    #2

    #2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    42/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    29.

    14.3

    sealant and bitu#en 21.

    21.

    nch co#plete 3.4

    3: #

    4## double glass co#plete . Ho

    # double glass co#plete 4. Ho

    cluding all iron#onger& co#plete 1. Ho

    ncluding all iron#onger& co#plete 1. Ho

    cluding all iron#onger& co#plete 2. Ho

    eisting 29.

    #atch eisting 14.3

    c $ro# bric to de#olished

    2. Ho

    .1

    36.

    1. Ho

    cluding all iron#onger& co#plete 1. Ho

    eisting .1

    ncluding re#o%ing #ortar bed or adhesi%eur$aces $or ne screed, plaster tiles nish

    #2

    #2

    #2

    #2

    #2.

    #2

    #2

    ncluding re#o%ing #ortar bed or adhesi%eur$aces $or ne screed, plaster tiles nish

    #2

    #2

    or including stainless steel iron#onger&

    #2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    43/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    #atch eisting 36.

    ) $or earth grids 6.

    6.

    99 :25'24

    1. #

    nch (ith #ai#al eight o$ 5 g each) 59. Ho

    41 #

    ch (ith #ai#al eight o$ 5 g each)13. Ho

    :4 #

    4 Ho

    12 #

    35 #

    45 #

    24

    9.

    3.45

    ber) 235.

    #2

    #3

    ground sur$ace in depths o$ 3###3

    ction o$ 1## ide 5## deep castg bends and Junctions to include 1##e botto# o$ the trench

    ction o$ 5## ide 5## deep castg bends and Junctions to include 1##e botto# o$ the trench

    dia#eter pre$erated u@ pipe to be laidlined ith geo$abric #aterial (bide# gade

    stone, including eca%ation, te#porar&o#plete (re$er to draing no. LLL :24-2)

    lid and including eca%ation in insitung eca%ations dr&, co#plete (re$er to

    class 5" spigot and socet ended concretetees $ro# trans$or#er to oil ater

    class 5" spigot and socet ended concretetees

    @ pipe including necessar& bends and

    #3

    #3

    #2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    44/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    45.

    t co%ers 12.: #

    2. Ho

    46.13

    aa&) 9.

    52. g

    ## long :. Ho

    4. Ho

    1. #

    end 1. Ho

    .5 #

    46 #

    ces o$ separator 259.9:

    :1

    >/" '8*/ 4.5

    ed to 9:D >/" '8*/ 36.

    cada# grade 6 penetration :.4

    226.:

    >/" '8*/ 113.4

    ed to 9:D >/" '8*/ 9.2

    6 penetration 21.6

    1. Ho

    11.

    234. #

    3 Fte#

    1 Fte#

    5 #

    4:1.2 #

    #3

    #2

    #3

    #

    2

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    #3

    rench.recast concrete cul%et (si

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    45/145

    (>$IN") 132/66/33kV Substation

    nit Nuber

    #e height that #atch the $ence. 1. Ho

    ht that #atches the $ence 1. Ho

    control and spread o%er substation 6,21:.36

    6,21:.36

    1. Fte#

    621.:4

    Subtota

    Vat 16?

    *ina Tota

    #2

    ## deep, to one #eter be&ond $ences,e stone la&er. #

    2

    ing plants and grass ('ubJect to appro%al o$#2

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    46/145

    Rate Tota

    I 1,. I 1,.

    I 2. I 2.

    I 5. I 5.

    I 1,. I 1,.I 3,. I 3,.

    I 5. I 12,.

    I :,. I :,.

    I 2. I 4.

    I 5. I 5.

    I 5. I 5.

    I 5. I 4,.

    I 1,. I :,.

    I 5. I 5.

    I 1,. I :,.I -

    I 15. I 2,4.

    I 1,. I 1,.

    I .:

    I 3,53:.::

    I 45. I 45.

    I 2. I 2.

    I . I 1,5.

    I . I 1,5.

    I :. I 1,2.

    I 2. I 1,5.

    I . I 1,5.

    I . I 4,644.:

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    47/145

    Rate Tota

    I 2. I 2.

    I 2. I 6.I 2. I 2.

    I 2. I 6.

    I 2. I 6.

    I 1. I 2.

    I 1. I 2.

    I 1. I 2.

    I 1. I 2.

    I 2. I 6.

    I 1. I 1.I 1. I 1.

    I . I 6.3:

    I 19. I :5.52

    I 3. I 1,36.:

    I 25. I :64.

    I 265. I 11,533.:6

    I 4. I 21.6I 5. I ::.2

    I . I 365.15

    I . I 312.23

    I 3. I ,29.

    I 5.5 I 49.5

    I . I 6.1

    I 5. I 36.

    I . I 51.51

    I 19. I :15.1

    I 3. I 3,326.4

    I 25. I 1,:2.

    I 265. I 11,22:.5:

    I 4. I 633.6

    I 5. I 11:.:

    I . I 21.14

    I . I 293.3

    I 3. I ,:21.

    I 5.5 I 1:1.5

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    48/145

    Rate Tota

    I . I :.32

    I 5. I 1,32.

    I . I 11.2

    I 19. I 161.69

    I 3. I 54.

    I 25. I 291.

    I 265. I 2,1:.:4

    I 4. I 96.

    I 5. I 22.5

    I . I 51.I . I 49.5

    I 3. I 2,4:4.

    I 5.5 I 22.

    I . I 1.5:

    I 5. I 16.

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    49/145

    Rate Tota

    I . I :6.39

    I 19. I 13.94

    I 3. I 5.6I 25. I 396.

    I 265. I 2,245.:

    I 4. I 134.4

    I 5. I 29.4

    I . I 3.24

    I . I 56.15

    I 3. I 1,692.

    I 5.5 I 66.

    I . I 2.6I 5. I 24.

    I . I :6.39

    I 19. I 13.94

    I 3. I 5.6

    I 25. I 396.

    I 265. I 2,245.:

    I 4. I 134.4I 5. I 29.4

    I . I 3.24

    I . I 56.15

    I 3. I 1,692.

    I 5.5 I 66.

    I . I 2.6

    I 5. I 24.

    I . I 26:.35

    I 19. I ,9.

    I 3. I 1,16.

    I 25. I :.

    I 265. I 5,43.35

    I 4. I 224.

    I 5. I 49.

    I . I 156.49

    I . I 111.:6

    I 3. I 3,:4.

    I 5.5 I 55.

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    50/145

    Rate Tota

    I 5. I 4.

    I . I 122.39

    I 19. I 195.42

    I 3. I 999.6

    I 25. I 561.

    I 265. I 3,1:.53

    I 4. I 19.4

    I 5. I 41.65

    I . I 42.:4

    I . I 9.55I 3. I 2,39.

    I 5.5 I 93.5

    I . I 2.92

    I 5. I 34.

    I . I 64.:

    I 19. I 13.46

    I 3. I 529.2

    I 25. I 29.

    I 265. I 1,6:3.:1

    I 4. I 1.:

    I 5. I 22.5

    I . I 22.6:

    I . I 42.12

    I 3. I 1,269.

    I 5.5 I 49.5

    I . I 1.54

    I 5. I 1:.

    I . I 249.2

    I 19. I 321.:6

    I 3. I 1,5:.4

    I 25. I 462.

    I 265. I 5,965.6:

    I 4. I 156.:

    I 5. I 6:.6

    I . I 9.3:

    I . I 169.54

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    51/145

    Rate Tota

    I 5.5 I 3:.5

    I . I 4.:

    I 5. I 2:.

    I . I 1.2

    I 19. I 51.:

    I 3. I 122.4

    I 25. I -

    I 265. I :6:.14

    I 4. I 54.4

    I 5. I 2.3

    I . I -I . I 1.22

    I 3. I 61:.

    I 5.5 I 11.

    I . I 1.91

    I 5. I 6.

    I . I -

    I 19. I -

    I 3. I -

    I 25. I -

    I 265. I -

    I 4. I -

    I 5. I -

    I . I -

    I . I -

    I 3. I -

    I 5.5 I -

    I . I -I 5. I -

    I . I 11.9

    I 19. I 19.

    I 3. I 11.6

    I 25. I 6.

    I 265. I 34.9

    I 4. I 22.4

    I 5. I 4.9

    I . I 3.64

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    52/145

    Rate Tota

    I . I :.26

    I 3. I 24.

    I 5.5 I 11.I . I .34

    I 5. I 4.

    I . I 11.9

    I 19. I 19.

    I 3. I 11.6

    I 25. I 6.

    I 265. I 34.9

    I 4. I 22.4I 5. I 4.9

    I . I 3.64

    I . I :.26

    I 3. I 24.

    I 5.5 I 11.

    I . I .34

    I 5. I 4.

    I . I 62.1:

    I 19. I 99.2:

    I 3. I 54.

    I 25. I 225.

    I 265. I 1,49:.5:

    I 4. I 96.

    I 5. I 1:.

    I . I 23.9:

    I . I 3:.2

    I 3. I 1,245.I 5.5 I 2.5

    I . I 1.26

    I 5. I 1.

    I . I 5:.21

    I . I 4.3

    I . I 51.45

    I . I 63.5

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    53/145

    Rate Tota

    I . I 31.5

    I . I 145.45

    I 19. I 143.64

    I 19. I 6.:

    I 19. I 199.5

    I 19. I 43.92

    I 26. I :6.24

    I 26. I :5.2

    I 26. I 3,26.

    I 26. I 1,19.36

    I 26.

    I 2. I 44.:

    I 2. I 22:.

    I 2. I 269.2:

    I 2. I 3:.

    I :. I 362.::I :. I 16:.

    I :. I 362.::

    I :. I 336.

    I 4. I 1,:14.4

    I 19. I :6.1:

    I 1. I 31.2:

    I 1. I 125.12I 1. I 222.

    I 15. I 1,2.

    I 15. I 3,15.

    I 5. I 5.

    I 1. I 5.

    1 I 1.1 I 3.

    1 I 11

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    54/145

    Rate Tota

    2 I 594.14

    2 I 29.46

    3 I 6,3.

    25 I 5,25.

    I -

    I -

    I :9. I 6,23.

    I 265. I 1,6.

    I 1. I 1.

    I 12. I 12.

    I 12. I 24.

    I 9. I 2,63.63

    I 9. I 132.5

    1 I 2.

    I 2. I 141.41

    I 2. I 2.

    I 1. I 1.

    I 1. I 1.

    I 9. I 636.35

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    55/145

    Rate Tota

    I 9. I 324.

    I . I 4,2.

    I .I 4,2.

    I 1. I 1,.

    I 6. I 35,4.

    I 1. I 41.

    I 6. I :,22.

    I 1. I :,4.

    I 265. I 1,6.

    I 15. I 1:.

    I 1. I 3,5.

    I 1:. I :1.

    I . I 69.

    I 19. I 656.26

    I 33. I ,55.

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    56/145

    Rate Tota

    I 19. I :,55.

    I 1. I 12.:

    I 2. I 4.

    I 5.3 I 244.49

    I 6. I 5:2.

    I 2.5 I 1:,:.

    I 225. I 1,:.

    I 12. I 4:.

    I 45. I 45.

    I 2. I 2.

    I 2. I 1.

    I 6. I 26.

    I 5. I 1,299.9

    I . I 56.

    I 25. I 1,12.5

    I 2. I 2.

    I 19. I 159.6

    I . I 1,5:.6

    I 25. I 2,:35.

    I 2. I 1,944.

    I 19. I 41.4

    I 3. I 3.

    I 5. I 55,.

    I 2. I 46:.

    I 1. I 3.

    I 1. I 1.

    I 2. I 1.

    I 2. I 96,344.

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    57/145

    Rate Tota

    I 5. I 5.

    I 1. I 1.

    I 1. I 6,21:.36

    I 15. I 93,25.4

    1,. I 1,.

    I 1,. I 621,:36.

    G 12F21:.F:

    G 12F21:.F:

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    58/145

    NE$ $EN"> 132/6

    Reference No.Description

    1 ! "#s

    B1-3.6.2.15 page 49 1.1Geotechnical report (bore logs, trial pits, sounding logs) and to include

    !"escription and li#its o$ %arious soil la&ers

    !'a#ple taen

    !'* results

    !+ater le%els

    !"epth o$ boreholepitsounding

    B1-3.6.2.14 page 4 1.2*opographic sur%e& (1 #eter grids and .5 #eter %ertical inter%als)

    !/btain topographic sur%e& #aps

    !0nsure position and ele%ation o$ all ors are correct

    1.3

    1.4

    1.5

    1.6*e#porar& latrines and sanitar& (alloed 1 $or BB oce)

    1.*e#porar& $ence around site establish#ent

    1.1*e#porar& gate

    1.11*e#porar& ater connection

    1.12*e#porar& electricit& connectiongenerator (2)

    1.13+ater usage

    1.140lectricit&petrol or diesel

    1.15*e#poar& site sign board

    1.16'uper%ision 7abour

    1.18ealth and 'a$te& - sa$et& signs and 0 according to BB specications

    1.1:'ecurit& guard (allo 1 person $or da& atch and 1 person $or night atch)1.19"e-establish#ent o$ site ca#p and stores

    B1-4.9..14 page 152 2SITE $%R&S ' ()T*%R+

    2.1;e#o%e and treat anthills

    2.2

    2.37e%el and co#pact nal cut la&er to 95D >od '8*/

    2.4;ate $or o%erhaul per #3 o$ spoil $or a distance greater than 1# - rate per #

    2.5Bul eca%ations (cut) in insitu #aterial

    2.60tra o%er bul eca%ations in cla& and blac cotton

    2.0tra bul eca%ations in inter#ediate #aterial 2.:0tra o%er bul eca%ations in hard roc

    2.97e%el and co#pact nal cut la&er to 95D >od '8*/

    2.1

    B1-4.9..14 page 155 2.11

    B2-4.6. page 3

    nal&od '8*/ densit&

    TESTS ,s-a be perfore0 for eac- 3of 4

    "ensit& o$ soil in place o$ sandcone #ethod $or each second la&er o$ =Baclling and

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    59/145

    NE$ $EN"> 132/6

    Reference No.Description

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24E :)

    3.5132 @ircuit Breaer

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>24 E :)

    3.6132 @urrent *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.132 oltage *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stubB1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    60/145

    NE$ $EN"> 132/6

    Reference No.Description

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1132 'urge rrestor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1266 Gantr&

    B1-4.9..14 page152 0ca%ation in insitu #aterialB1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>36 E :)

    3.1366 Fsolator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1466 @ircuit Breaer

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    61/145

    NE$ $EN"> 132/6

    Reference No. Description

    3.1566 @urrent *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1666 oltage *rans$or#er

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.166 'urge rrestor

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts (>2 E 4)

    3.1:66 8igh ost Fnsulator

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1 4 9 19 page 19 ;ein$orcing 'uppl& Ai onl&

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    62/145

    NE$ $EN"> 132/6

    Reference No. Description

    3.2ard >arshalling ios

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 1 '#ooth Aor#or (to be steel or sound ti#ber)

    B1-4.9..1 page 1 ;ough $or#or (to be steel or sound ti#ber)

    B1-4.9..1 page 163 @oncrete - 35#a, 19## 'tone

    B1-4.9..1 page 169 25 25## @ha#$er to sides o$ colu#n stub

    B1-4.9..1 page 169 +ood Coat top o$ concrete $oundation

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    B1-4.9..14 page 153 'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..19 page 19 ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..19 page 19 8" Bolts - *e#plate and installation (BB to suppl& bolts)

    B1-4.9..2 page 1: Grout - 35#a to top o$ stub

    B1-4.2.1 page 66 Greasing o$ 8" Bolts

    3.21*rans$or#er linth (1)

    B1-4.9..14 page152 E@caAations in insitu ateriaB

    'trip eca%ations

    'u#p eca%ations

    linth

    'ur$ace bed

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B

    'trip Aooting concrete

    'u#p @oncrete

    linth

    'ur$ace bedB1-4.9..1 page 163 Concrete ' 3a 1 StoneB

    'trip Aooting concrete

    'u#p @oncrete

    linth

    'ur$ace bed

    B1-4.9..1 page 1 *or7orkB

    '#ooth Aor#or

    'u#p alls

    linth

    ;ough Aor#or

    'trip $ooting

    B1-4.9..1page 1 25 25## @ha#$er to sides o$ plinth

    B1-4.9..1page 169 Concrete nis- 7oo0 oatB'ur$ace bed

    linth

    B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B

    'ur$ace bed

    linth

    Sun0riesB

    5 to 1## "ia#eter gra%el to ll oil drain

    B1-4.9..22 page 1:1 Bricor (including stairs)

    B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)

    B1-4.9..1 page 165 @onstructionepansion Joints beteen concrete and bric

    5 3 Cat copper bend to suit connection on trans$or#er points

    Benching the inside o$ the su#p ith 2## benching render

    'u#p $ra#e - 3 3 57g cast in and gal%anised. 25 5## Cat 17g shtail luto angle (5## llet) at 5## cc. *o t in the open grid hich is 16## ide it4.5## bearer bars, and 4 4## openings ($ull& banded)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    63/145

    NE$ $EN"> 132/6

    Reference No.Description

    3.22*rans$or#er linth (2)

    B1-4.9..14 page 152 E@caAations in insitu ateriaB'trip eca%ations

    'u#p eca%ations

    linth

    'ur$ace bed

    B1-4.9..14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..1 page 163 in0in8 ' 2a , t-ick4B

    'trip Aooting concrete

    'u#p @oncrete

    linth

    'ur$ace bed

    B1-4.9..1 page 163 Concrete ' 3a 1 StoneB

    'trip Aooting concrete'u#p @oncrete

    linth

    'ur$ace bed

    art o$ the road

    B1-4.9..1 page 1 *or7orkB

    '#ooth Aor#or

    'u#p alls

    linth

    ;ough Aor#or

    'trip $ooting

    B1-4.9..1 page 1 25 25## @ha#$er to sides o$ plinth

    B1-4.9..1 page 1 Concrete nis- 7oo0oatB

    'ur$ace bedlinth

    B1-4.9..19 page 19 Reinforcin8 ,+ESH ref 61F4B

    'ur$ace bed

    linth

    Sun0riesB

    5 to 1## "ia#eter gra%el to ll oil drain

    B1-4.9..22 page 1:1 Bricor (including stairs)

    B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)

    B1-4.9..1 page 165 @onstructionepansion Joints beteen concrete and bric5 3 Cat copper bend to suit connection on trans$or#er points

    /ne set o$ rails on tran$or#er plinth

    Benching the inside o$ the su#p ith 2## benching render

    aint 2 la&ers o$ bitu#en to sur$ace

    3.23Aire +all

    B1-4.9..14 page152 0ca%ation in insitu #aterial

    B1-4.9..1 page 163 Blinding - 2#a (5## thic)

    B1-4.9..1 page 163 Aoundation all (35>a concrete)

    B1-4.9..1 page 1 ;ough $or#or

    B1-4.9..1 page 163 @oncrete $oundation slab - 35#a, 19## 'tone

    B1-4.9..1 page 163 @a%it& concrete all (35>a)

    B1-4.9..22 page 1:1 11## bricall

    B1-4.9..1 page 1 +ood Coat top o$ concrete $oundation

    recast concrete copings

    B1 4 9 14 page 154 Bacll ith eca%ated insitu #aterial in depths o$ 15## to 9D >od '8*/

    'u#p $ra#e - 3 3 57g cast in and gal%anised. 25 5## Cat 17g shtail luto angle (5## llet) at 5## cc. *o t in the open grid hich is 16## ide i4.5## bearer bars, and 4 4## openings ($ull& banded)

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    64/145

    NE$ $EN"> 132/6

    Reference No.Description

    B1-4.9..3 page 13: 3.24 @ontrol Building

    E@caAations in insitu ateriaB

    'trip $oundation

    B1-4.9..14 page 155 repare and spar& ith an appro%ed anti-ter#ite control under building

    'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..1 page 1 *or7orkB

    ;ough $or#or (to be steel or sound ti#ber) to sides o$ $oundations

    '#ooth $or#or (to be steel or sound ti#ber) to sides o$ bea#s

    '#ooth $or#or (to be steel or sound ti#ber) to sides o$ colu#ns

    B1-4.9..1 page 163 ConcreteB

    Blinding - 2#a (5## thic)

    ;ein$orced concrete - 35#a, 19## 'tone to sur$ace bed

    ;ein$orced concrete - 35#a, 19## 'tone to $oundations

    ;ein$orced concrete - 35#a, 19## 'tone to colu#ns

    ;ein$orced concrete - 35#a, 19## 'tone to bea#srestresse0 fabricate0 concrete intesB

    Fn lengths not eceeding 3#

    B1-4.9..19 page 19 Reinforcin8B

    ;ein$orcing #esh re$. 395

    ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..22 page 1:1

    B1-4.9..22 page 1:1 2## *hic blocor

    B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)

    B1-4.9..22 page 1:3 "@ ("a#p proo$ course)

    B1-4.9..22 page 1:3 "> ("a#p proo$ #e#bra#e)

    B1-4.9..1 page 1 +ood Coat top o$ concrete

    *oor *inis-esB

    B1-4.9..21 page 1:

    B1-4.9..21 page 1:Gla

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    65/145

    NE$ $EN"> 132/6

    Reference No. Description

    @upboards (to door cupboard ith di%iding shel%es )

    irconditioner central unit in control building

    llo one double door cupboard ith shel%es underneath sin $or itchenB1-4.9..23page 191 *o plate electric cooer

    B1-4.9..23page 1:: RoofB

    225 15## B' ce#ent barge board

    B1-3.6.2.12 page 46

    B1-3.6.2.12 page 46 re-painted alu#iniu# 1 1## don pipes, including holderbats, bracets etc

    Ceiin8B

    B1-4.9.4.1 page 131 'uppl& and install appro%ed roo$ insulation

    B1-4.9..4 page 139 0ternal steel ladder ith sa$et& cage to access roo$

    B1-9..1 page145 ubin8B

    +@ ith all necessar& connections, ttings and piping co#plete and toilet paper hold

    Orinal ith all necessar& connections, ttings and piping co#plete

    'in ith all necessar& connections, ttings, gulle& and piping co#plete

    'hoer ith all necessar& connections, ttings and piping co#plete

    B1-4.9..2 page 13 E@tras

    'uppl& and install re alar#

    B1-4.9..4 page 139 3.25 Guard 8ouse

    E@caAations in insitu ateriaB

    'trip $oundation

    B1-4.9..14 page 155 repare and spar& ith an appro%ed anti-ter#ite control under building

    'toc pile insitu surplus #aterial ($or carting aa&)

    B1-4.9..1 page 1 *or7orkB

    ;ough $or#or (to be steel or sound ti#ber) to sides o$ $oundations

    '#ooth $or#or (to be steel or sound ti#ber) to sides o$ bea#s

    '#ooth o$ sides o$ colu#ns (to be steel or sound ti#ber)

    B1-4.9..1 page 163 ConcreteB

    Blinding - 2#a (5## thic);ein$orced concrete - 35#a, 19## 'tone to $oundations

    ;ein$orced concrete - 35#a, 19## 'tone to sur$ace bed

    ;ein$orced concrete - 35#a, 19## 'tone to colu#ns

    ;ein$orced concrete - 35#a, 19## 'tone to bea#s

    restresse0 fabricate0 concrete intesB

    Fn lengths not eceeding 3#

    B1-4.9..19 page 19 Reinforcin8B

    ;ein$orcing #esh re$. 395

    ;ein$orcing - 'uppl& Ai onl&

    B1-4.9..22 page 1:1

    B1-4.9..22 page 1:1 2## thic bloc or

    B1-4.9..22 page 1:4 Bric$orce 12## ide (e%er& second la&er)

    B1-4.9..22 page 1:3 "@ ("a#p proo$ course)

    B1 4 9 22 page 1:3 "> ("a#p proo$ #e#bra#e)

    @orrugated appro%ed roo$ sheeting - .6## gauge to be tted inculding all necessattings co#plete

    +elded roo$ trusses o$ 3 degrees angle ra$ters, t ie bea#s, rails, struts, braces, cleapurlins, etc and Cat bearer, gusset and connection plates, bolted to steel ith an o%lenghth o$ 12.69# and height o$ 3.66# (*here are 9 trusses)

    re-painted alu#iniu# 15 15## bo gutters including necessar& collared and sepansion Joints

    'uspended ceiling cha#pered and groo%ed acoustic panels on concealed suspensioincluding hangers etc

    Basin ith all necessar& connections, ttings and piping co#plete ith soap dispens#irror

    'uppl& and install re 9g @/2etinguisher ith sign

    @a%it& all - inner sin to be hollo blocor ith insulation and outer sin to be cbricor

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    66/145

    NE$ $EN"> 132/6

    Reference No.Description

    B1-4.9..23 page 1:: RoofB

    B1-3.6.2.12 page 46

    B1-3.6.2.12 page 46 re-painted alu#iniu# 1 1## don pipes, including holderbats, bracets etc

    225 15## B' ce#ent barge board

    Ceiin8B

    B1-4.9.4.1 page 131 'uppl& and install appro%ed roo$ insulation

    'uppl& and install 12 B*O airconditioner

    B1-9..1 page 145 ubin8B

    +@ ith all necessar& connections, ttings and piping co#plete and toilet paper hold

    B1-4.9..2 page 13 E@tras

    'uppl& and install re alar#

    5E)RTH +)T

    B1-4.9..14 page 152 4.1 0ca%ate 3## (idth) 1## (depth) $or earth grids

    B1-4.9..14 page 154 4.2

    C)(E TRENCH ,refer to 0ra7in8 no. 999 :25'24

    B1-4.9..1: page 1: 5.1

    B1-4.9..1: page 1: 5.2@oncrete trench co%er $or 1## ide trench (ith #ai#al eight o$ 5 g each)

    B1-4.9..1: page 1: 5.3

    B1-4.9..1: page 1: 5.4@oncrete trench co%er $or 5## ide trench (ith #ai#al eight o$ 5 g each)

    B1-3.6.2.12 page 46 6DR)IN)"E

    6.1

    6.2

    6.3

    6.4

    6 5

    @orrugated appro%ed roo$ sheeting - .6## gauge to be tted including all necessa

    ttings co#plete

    +elded roo$ trusses o$ 3 degrees angle ra$ters, tie bea#s, rails, struts, braces, cleapurlins, etc and Cat bearer, gusset and connection plates, bolted to steel ith an o%lenghth o$ 4.2# and height o$ 1.6# (*here are 3 trusses)

    re-painted alu#iniu# 15 15## bo gutters including necessar& collared and sepansion Joints

    'uspended ceiling cha#pered and groo%ed acoustic panels on concealed suspensioincluding hangers etc

    Basin ith all necessar& connections, ttings and piping co#plete ith soap dispens#irror

    'uppl& and install re 9g @/2etinguisher ith sign

    Baclling to earthing grid and co#pact the ground sur$ace in depths o$ 3## co#to 95D >od '8*/ densit&

    *he eca%ation in insitu #aterial $or construction o$ 1## ide 5## deep crein$orced concrete trenches including bends and Junctions to include 1## dia#edrain pipe at 4# centres at the botto# o$ the trench

    *he eca%ation in insitu #aterial $or construction o$ 5## ide 5## deep carein$orced concrete trenches including bends and Junctions to include 1## dia#edrain pipe at 4# centres at the botto# o$ the trench

    'ubsoil "rain'uppl&, la& and Joint 2 16## dia#eter pre$erated u@ pipe to be laid 11

    belo HG7 in trench hich is to be lined ith geo$abric #aterial (bide# gade 6) anbacll ith 5 to 5## dia#eter stone, including eca%ation, te#porar& support oeeping eca%ations dr&, co#plete (re$er to draing no. LLL :24-2)

    @onstruct cast insitu concrete #anhole ith lid and including eca%ation in insitu #te#porar& support o$ sides, eeping eca%ations dr&, co#plete (re$er to draing no.:24-2)

    @onstruct cast insitu septic tan o%erall si

  • 7/23/2019 BOQ Control Building Slab Roof Matambo

    67/145

    NE$ $EN"> 132/66

    Reference No.Description

    1## "ia#eter %entilator @ pipe ith bend

    1## "ia#eter concrete pipe

    'uppl&, la&, Joint and bed 16## "ia#eter u@ pipe including necessar& bends an

    aint 2 la&ers o$ bitu#en to internal sur$aces o$ separator

    F $)TER S>(;

    B1-4.9..23 page 1:9 .1

    B1-4.9..23 page 1:9 .2

    8ot ater dispenser capacit& :7

    B1-4.9..23 page 1:9 .35## "ia#eter @ pipeB1-4.9..23 page 1:9 .425## "ia#eter @ pipe

    B1-4.9..23 page 1:9 .515## "ia#eter @ pipe

    : R%)D ' )CCESS )ND INTERN)(

    :.1 )ccess roa0

    B1-4.9..14 page 152 0ca%ation in insitu #aterial

    B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D >/" '8*/

    B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pacted to 9:D >/" '8*/

    B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #acada# grade 6 penetration

    :.2 Interna roa0

    B1-4.9..14 page 152 0ca%ation in insitu #aterial

    B1-4.9..15 page 156 'ub-Base o$ G5 #aterial co#pacted to 9:D >/" '8*/

    B1-4.9..15 page 156 +et-#i road base o$ G6 #aterial @o#pacted to 9:D >/" '8*/

    B1-4.9..15 page 15: 4## *hic earing course o$ bitu#en #acada# grade 6 penetration

    :.3

    B1-4.9..15 page 156 :.4

    B1-4.9..15 page 159 :.5

    B1-4.9..3 page 139 :.6

    B2-4..9 page :1 :.erbing including bends and end pieces

    B1-4.9..1 page 146 :.:

    'top sign

    ield sign

    ainting o$ paring lines

    ;)RD $%R&S

    9.1

    B1-4.9..1 page 11 9.2

    B1-4.9..1 page 11 9.35# +ide #otorised electric $ence, ith a $ra#e height that #atch t