S/No Item Name Unit Qty Rate Amount
1 Excavation as in foundation. M3 234.28
2 P.c.c (1:4:8) as in foundation. M3 38.94
3 Feb of mild steel reinforcement. Ton 17.44
4 R.c.c (1:2:4) as in raft foundation. M3 47.95
5 R.R stone masonry (1:6) csm. M3 340.00
6 R.c.c (1:2:4) as in column beam. M3 100.01
7 B.B masonry (1:6) csm. M3 66.92
8 S/F of D/wood joinery. M2 104.07
9 S/F of D/wood trusses. M3 13.11
10 S/F of steel grail to windows M2 70.24
11 BB masonry (1:6) csm on 1st floor M3 35.47
12 S/F of CGI sheet. M2 294.79
13 S/F of PGI sheet. M 33.83
14 S/F of D/wood ceiling 1/2" thick. M2 246.46
15 S/F of D/wood Eve board. M2 17.37
16 P.c plaster 1/2" thick (1:4). M2 1072.57
17 P.c pointing (1:3) csm. M2 211.23
18 S/F of D/wood Almerah. M2 10.40
19 S/F of D/wood picture railing. M 195.50
20 Earth filling as under floor. M3 341.86
21 Sand filling as under floor. M3 23.91
22 P.c.c (1:4:8) as under floor. M3 24.41
23 P.c.c (1:2:4) as floor topping. M3 379.39
24 P/F of glass strip1.5" vide M 798.55
25 Making of black board1/2" thick (1:3) csm. M2 10.03
26 P.c.c (1:3:6) as plain. M3 43.61
27P/lay marble fine dressing and polished stone
flooring surfaceM2 35.22
28P/lay marble fine dressing and polished stone
Dado skirtingM2 10.50
29 B.B masonry in B/wall (1:6) csm. M3 84.93
30 S/F of steel gate. M2 5.85
31 White washing 3 coats. M2 173.88
32 Distempering 3 coats on new surface M2 940.14
33 Weather shield 3 coats M2 316.91
34 Oil painting 3 coats. M2 293.39
35Excavation /cutting on shingle /gravel etc i/l
disposal of siteM3 840.88
36 P/F of earthen ware WC as spd No 5.00
37 P/F of low level flushing tank. No 5.00
BILL OF QUANTITY
NAME OF WORK: CONVERSION OF 100 MOSQUE SCHOOLS INTO REGULAR PRIMARY SCHOOLS IN KHYBER
PAKHTUNKHWA ADP NO: 141/140408 SUB HEAD:- CONVERSION OF 03 MOSQUE SCHOOLS INTO REGULAR PRIMARY
SCHOOLS IN DISTRICT DIR UPPER .
G.M.P.S BANDISH PK-91.SUB WORK:-
38 CI pipe 4" dia i/c cement joint spd. M 20.00
39 S/F of 4" dia RCC pipe M 50.00
40 P/F of shower rose 1/2" dia as spd. No 2.00
41 P/F of CP floor trape as spd No 5.00
42 P/F of CI pipe 2" dia. M 22.00
43 P/F of GI pipe 1/2" dia. M 200.00
44 Constt: of septic tank as spd. No 3.00
45 Constt: of soakage pit spd 5' dia. No 1.00
46 P/F of bib cock 1/2" dia. No 5.00
47 P/F of WHB No 4.00
48Constt: of gully grating chamber complete
concrete gully trap with main hole Rcc cover.No 5.00
49 S/F of paper holder. No 5.00
50 S/F of soap dish. No 5.00
51 S/F of stop cock 1/2" dia. No 8.00
52 S/F Super tuff water tank. No 2.00
53 Piller cock 1/2" dia No 6.00
54 P/F of glass shelf No 1.00
55 P/F of Looking glass mirror M 4.00
Contractor sign: