Upload
others
View
3
Download
0
Embed Size (px)
Citation preview
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
BombardierTransportationAustralia/New Zealand
March 2018
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.#WeMoveCities
Bombardier in Australia/New Zealand
• 1,000+ employees
• 21 site locations
• Manufacturing & EngineeringCentres of Excellence
• Rail Control & Signalling
• Services & Asset Maintenance
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Bombardier in Australia/New Zealand
33
Sydney (HQ Sales & Bid Office)
1000+ Employees
AdelaidePTS Fleet Maintenance (DMU & EMU)Adelaide LRVs (Supply)
Wulkuraka, QLDQNGR Maintenance
Milton, QLDEngineering, Service,Spares, QNGR ProjectManagement, ProductIntroduction
Gold CoastLRT Project + ExtensionMaintenance & Services
Dandenong (Melbourne, Head Office)Manufacturing Facility / Refurb & RepairsWest Melbourne, Dynon, Geelong,BallaratV/Line Maintenance
PerthB Series EMU, A & B Fleet,Maintenance, BHP Rail Automation Project
Dandenong (RCS)Rail Control Solutions Office
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Reference projectsBombardier in Australia/New Zealand
4
Adelaide LRV
15 LRVs
Project awarded in Oct 2004
Concluded: 2012
FLEXITY Swift Melbourne
50 + 20 + 10 trams
Project awarded in Oct 2010,September 2015 & May 2017
Services commenced Nov 2013
Extension 2015, 2017
GoldCoast Rapid Transit
14 FLEXITY 2 LRVs & Maintenance
Project awarded in Jun 2010
Stage 1 services commenced Jul 2014
Extension 4 x LRVs in 2015
Stage 2 services commenced Dec 2017
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
IntroductionGold Coast Light Rail
5
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Stage 1 TimelineGold Coast Light Rail
6
Operations commenced July 2014
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Stage 2 OverviewGold Coast Light Rail
7
• 7.3 kilometre northern extension
• Connects the light rail with CityTrain commuter service toBrisbane
• Three (3) new light rail stations
• Two (2) new park and ride facilities with 1400 car spaces
• Four (4) new Flexity 2 trams
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Stage 2 TimelineGold Coast Light Rail
8
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Helensvale Multimode TerminalGold Coast Light Rail
9
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Helensvale Multimode TerminalGold Coast Light Rail
10
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Flexity 2 LRVGold Coast Light Rail
11
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Flexity 2 LRVGold Coast Light Rail
12
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Obstacle Detection Assistance SystemGold Coast Light Rail
13
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Obstacle Detection Assistance SystemGold Coast Light Rail
14
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Future Stage 3AGold Coast Light Rail
15
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.
Future Stage 3AGold Coast Light Rail
16
PR
IVA
TE
AN
DC
ON
FID
EN
TIA
L©
Bom
bard
ier
Inc.or
its
subsid
iaries.A
llrights
reserv
ed.