BOIS D’ARC LAKE 2-mile-long, 90-foot-tall dam Approximately 26 square miles of surface area Able to store 120 billion gallons of water Firm yield of 108 million gallons per day Water delivery expected in 2022 Other Projects Untreated (raw) water pipeline and pump station Water treatment plant Treated water pipeline Road and bridge construction and improvements Mitigation work at two sites BOIS D’ARC LAKE PROJECTS OVERVIEW www.BoisdArcLake.org BOIS D’ARC LAKE Leonard Water Treatment Plant Dam New FM 897 Road and Bridge Treated Water Pump Station Raw Water Pump Station Terminal Storage Reservior Upstream Mitigation Site Riverby Mitigation Site 90” Raw Water Pipline 84” Leonard to McKinney Treated Water Pipeline Connects to the NTMWD regional water system Boat ramps Lake Operations Center March 2019

Bois d’Arc LAke · Bois d’Arc LAke ProJecTs oVerVieW BOIS D’ARC LAKE Leonard Water Treatment Plant Dam New FM 897 Road and Bridge Treated Water Pump Station Raw Water Pump Station

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bois d’Arc LAke · Bois d’Arc LAke ProJecTs oVerVieW BOIS D’ARC LAKE Leonard Water Treatment Plant Dam New FM 897 Road and Bridge Treated Water Pump Station Raw Water Pump Station

Bois d’Arc LAke• 2-mile-long, 90-foot-tall

dam • Approximately 26 square

miles of surface area• Able to store 120

billion gallons of water• Firm yield of 108 million

gallons per day• Water delivery expected

in 2022

other Projects• Untreated (raw) water

pipeline and pump station • Water treatment plant• Treated water pipeline• Road and bridge construction

and improvements• Mitigation work at two sites

Bois d’Arc LAke ProJecTs oVerVieW

www.BoisdArcLake.org

BOISD’ARC LAKE

Leonard Water Treatment Plant

Dam

New FM 897 Road and Bridge

Treated Water Pump Station

Raw Water Pump Station

Terminal Storage Reservior

Upstream Mitigation Site

Riverby Mitigation Site

90” Raw Water Pipline

84” Leonard to McKinneyTreated Water Pipeline

Connects to the NTMWD regional water system

Boat ramps

Lake Operations Center

March 2019