PREPARED BY:
VICINITY MAP
SCALE: N.T.S.
LOCATION MAP
SCALE: N.T.S.
LOCATION
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT
UPGRADES
Haddam-Killingworth
High School
95 Little City Road
Higganum, CT 06441
DRAWING LIST
COVER SHEET
MECHANICAL
M-001 MECHANICAL NOTES, LEGENDS & ABBREVIATIONS
MD-101 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 1
MD-102 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 2
M-101 MECHANICAL BOILER ROOM PLAN
M-102 MECHANICAL BOILER ROOM PLAN
M-103 MECHANICAL FLOOR PLAN AREA A
M-104 MECHANICAL FLOOR PLAN AREA B
M-201 MECHANICAL DETAILS
M-202 MECHANICAL DETAILS
M-203 MECHANICAL DETAILS
M-301 MECHANICAL SCHEDULES
PLUMBING
P-001 PLUMBING NOTES, LEGENDS SCHEDULES & ABBREVIATIONS
PD-101 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 1
PD-102 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 2
P-101 PLUMBING BOILER ROOM PLAN
P-102 PLUMBING PARTIAL SITE PLAN
P-201 PLUMBING DETAILS
ELECTRICAL
E-001 ELECTRICAL NOTES, LEGENDS, ABBREVIATIONS, AND DETAILS
ED-101 ELECTRICAL BOILER ROOM DEMOLITION PLAN
E-101 ELECTRICAL BOILER ROOM POWER PLAN
E-102 ELECTRICAL BOILER ROOM LIGHTING PLAN
ARCHITECTURAL
A1 PART ROOF PLAN, RCP & MISC. DETAILS
TS TEMPERATURE SENSOR
SMOKE DETECTORSD
H
T
HUMIDISTAT/SENSOR
TEMPERATURE/CO2 COMBINATION SENSOR
MAY NOT APPEAR ON THE DRAWINGS.
NOTE: SOME SYMBOLS AND ABBREVIATIONS MAY OR
BD
BA
SF
MDORM
SD
FD
BAROMETRIC DAMPER
RECTANGULAR TO RECTANGULAR
OR ROUND TO ROUND
FIRE & SMOKE DAMPER / ACCESS DOOR
BACKDRAFT DAMPER
FLEXIBLE CONNECTION (PIPING)
SMOKE DAMPER / ACCESS DOOR
COMBINATION
DIRT TRAP
OF FLOW
PIPE ELBOW, TURNED UP
PIPE UNION, SWEAT
PIPE TEE
PIPE UNION, FLANGE
PIPE ELBOW, TURNED DOWN
WATER FLOW METER
BALANCING VALVE
BALL VALVE
PUMP
OR
P PRESSURE SENSOR
THERMOSTAT/SENSOR
RETURN / EXHAUST GRILLE
STRAINER
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
POSITIVE PRESSURE DUCT
DUCT WORK, DIRECTION OF FLOW
PRESSURE GAUGE WITH COCK VALVE
BD
FD & AD
OR
MOTORIZED DAMPER
RECTANGULAR TO
FIRE DAMPER WITH ACCESS DOOR
FLEXIBLE CONNECTION (DUCTWORK)
BALANCING DAMPER
DROP
CHANGE OF ELEVATION,
NEGATIVE PRESSURE DUCT
NUMBER INDICATES NOTE
DIRECTION OF FLOW
MECHANICAL NOTE REFERENCE,
VOLUME DAMPER
TO EXISTING PIPING/DUCT
CONNECT PROVIDED PIPING/DUCT
THERMOMETER
FIRE DAMPER / ACCESS DOOR
ROUND TRANSITION
GATE VALVE
ANGLE GLOBE VALVE
GLOBE VALVE
ANGLE GATE VALVE
BUTTERFLY VALVE
TWO WAY MOTORIZED
CONTROL VALVE
MOTORIZED VALVE
OS & Y
THREE WAY MOTORIZED
CONTROL VALVE
BACKFLOW PREVENTER
HOSE BIB
CHECK VALVE
HOSE END DRAIN
GAS COCK
CAP
PIPE COUPLING (JOINT)
PIPE CONNECTION, TOP
ELBOW, 90°
ELBOW, 45°
PIPE CONNECTION, BOTTOM
PIPE TEE, OUTLET DOWN
TRANSITION
PRV - PRESSURE REDUCING VALVE
QUICK CLOSING LEVER VALVE
(PRESSURE & TEMPERATURE)
SAFETY RELIEF VALVE (PRESS.)
UP
DN
PITCH UP IN DIRECTION
OF FLOW
PITCH DOWN IN DIRECTION
PIPE UNION, SCREWED
PIPE TEE, OUTLET UP
CHWS
CHWR
CHTWS
CHTWR
CWR
CWS
CHILLED WATER HIGH TEMPERATURE SUPPLY
CHILLED WATER HIGH TEMPERATURE RETURN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
CHILLED WATER SUPPLY
CHILLED WATER RETURN
PIPING FLEX CONNECTION (DUCTWORK)
FLEXIBLE JOINT
LINED DUCTWORK
ROOF MOUNTED EXHAUST FANOR
M
O OCCUPANCY SENSOR
ISOLATION VALVE (REFER TO SPECS FOR TYPE)
HWS
HWR
RLL
RSL
RV
RHG
DRAIN
D
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
REFRIGERANT VENT
HOT WATER SUPPLY
HOT WATER RETURN
XX
XX
EQUIPMENT TYPE DESIGNATION
TOTAL LENGTH (FT), PROVIDE ENCLOSURE
FROM WALL TO WALL OR WALL TO
COLUMN ENCLOSURE, ENCLOSURE
SURFACE SHALL MATCH ACTIVE LENGTH
ENCLOSURE SURFACE.
GBD
GRAVITY BACKDRAFT DAMPER
XX
XX/XX
EQUIPMENT TYPE DESIGNATION
MAXIMUM AIR FLOW
MINIMUM AIR FLOW
VAV EQUIPMENT TAG
DUCT WORK, 90° ELBOW FITTING
WITH TURNING VANES. PROVIDE TURNING
ON ALL 90° ELBOW FITTING UNLESS
OTHERWISE NOTED
XX
ACTIVE LENGTH (FT) / WATER FLOW RATE
(GPM)
FTR OR RP EQUIPMENT TAG
#
S
T S
D
SYMBOL LIST
PIPING SYMBOLS
1. NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO
GENERAL NOTES.
2. CONTRACTOR SHALL VISIT THE SITE AND BECOME INFORMED AS TO THE NATURE AND SCOPE OF WORK REQUIRED BY
CONTRACT DOCUMENTS PRIOR TO BIDDING PROJECT.
3. PROVIDE ALL REQUIRED MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF THE WORK
AS SHOWN ON THESE DRAWINGS OR SPECIFIED BY THE BASE BUILDING DRAWING AND SPECIFICATIONS.
4. REFER TO AND CAREFULLY CHECK ARCHITECTURAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS AND DETAILS,
NOTES, LOCATIONS WHERE WALLS, PARTITIONS, CEILINGS, AND OTHER SURFACES ARE FURRED, LOCATIONS OF SHAFTS,
SOFFITS, AND CONFLICTS WITH WORK OF OTHER TRADES, AND ARRANGE WORK ACCORDINGLY. FURNISH ALL OFFSETS,
DAMPERS, CONNECTORS, ETC., REQUIRED TO MEET SUCH CONDITIONS.
5. DUE TO SCALE OF DRAWINGS, ALL REQUIRED OFFSETS, DAMPERS, ETC., MAY NOT BE INDICATED.
6. COORDINATE DUCT LOCATIONS WITH LIGHTING FIXTURES AND SPRINKLER HEADS.
7. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN
ACCORDANCE WITH STATE AND LOCAL GOVERNING CODES.
8. THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL, AND CONNECT COMPLETELY".
9. TURN OVER TO THE OWNER ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED.
10. WHERE THE CONTRACTOR PROPOSES TO USE AN ITEM OF EQUIPMENT OTHER THAN THAT SPECIFIED OR DETAILED ON THE
DRAWINGS WHICH REQUIRES ANY REDESIGN OF THE STRUCTURE, PARTITIONS, FOUNDATIONS, PIPING, WIRING OR ANY OTHER
PART OF THE MECHANICAL, ELECTRICAL OR ARCHITECTURAL LAYOUT, ALL SUCH REDESIGN AND ALL NEW DRAWINGS AND
DETAILING REQUIRED THEREFORE, SHALL BE PREPARED AT THE CONTRACTOR'S EXPENSE AND ARE SUBJECT TO THE REVIEW
AND APPROVAL OF THE OWNER OR HIS AUTHORIZED REPRESENTATIVE. OWNER RESERVES THE RIGHT TO HAVE THE
ARCHITECT OR ENGINEER OF HIS CHOICE PREPARE ANY REDESIGN WORK.
11. CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF MECHANICAL EQUIPMENT WITH ELECTRICAL CONTRACTOR.
12. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AUTHORITIES.
13. BEFORE SELECTING MATERIAL AND EQUIPMENT, AND PROCESSING THE WORK, INSPECT AREAS WHERE MATERIAL AND
EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY AND CHECK NEEDED SPACE FOR PLACEMENT AND CLEARANCES.
14. BEFORE CUTTING AND DRILLING INTO BUILDING ELEMENTS, INSPECT AND LAYOUT WORK TO AVOID DAMAGING STRUCTURAL
ELEMENTS AND BUILDING UTILITIES.
15. CONTRACTOR RESPONSIBLE FOR REPAIR AND PAYMENT FOR ALL UTILITIES DAMAGE DURING CONSTRUCTION.
16. CONTRACTOR TO CONFIRM DUCTWORK LOCATIONS, ELEVATIONS AND SIZES BEFORE ANY WORK IS STARTED. IF ANY
DISCREPANCIES ARE FOUNDED, NOTIFY ENGINEER BEFORE PROCEEDING WITH WORK. (SEE PAR. 48 "COORDINATION
DRAWINGS").
17. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF PROVIDED EQUIPMENT.
18. CONTRACTOR TO REPLACE ALL SUSPENDED CEILING TILES DAMAGED AS A RESULT OF HVAC SYSTEM INSTALLATION.
19. ALL SHOP DRAWINGS OF INDIVIDUAL COMPONENTS ARE TO BE SUBMITTED AS A COMPLETE PACKAGE.
20. HVAC DRAWINGS DO NOT NECESSARY SHOW ALL CONDITIONS OF BUILDING. CONTRACTOR TO USE ALL DRAWINGS AND
SPECIFICATIONS OF CONTRACT DOCUMENTS AND INSPECTION OF FIELD CONDITIONS FOR DIVISION 23.
21. HVAC PLANS, DETAILS AND ONE LINE DIAGRAMS SHOW THE GENERAL LOCATION AND ARRANGEMENT OF THE SYSTEM. THESE
ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, HANGERS, ACCESS DOORS, ETC. WHICH THE CONTRACTOR MUST
PROVIDE TO COMPLETE THE SYSTEM.
22. ALL WORK IN INTERIOR FINISHED SPACES EXCEPT INDICATED IS TO BE CONCEALED ABOVE CEILING. PROVIDE ALL NECESSARY
CUTTING, PATCHING, REPAINTING AND/OR REPLACEMENT OF FINISHES AS REQUIRED TO PERFORM COORDINATE WITH OTHER
DIVISIONS.
23. IF MANUFACTURER OF EQUIPMENT REQUIRES LARGER CAPACITY CIRCUITRY AND/OR EQUIPMENT THE CONTRACTOR SHALL
PROVIDE SUCH CAPACITY AND/OR EQUIPMENT UNDER THIS CONTRACT AT NO COST TO THE OWNER.
24. SUPPORT DUCTWORK ABOVE SUSPENDED CEILING FROM CONSTRUCTION ABOVE AS CLOSE AS POSSIBLE TO BOTTOM OF
SLABS, BEAMS, MAINTAINING HEADROOM AT ALL TIMES.
25. DO NOT SCALE DRAWINGS. CHECK EXISTING SPACE CONDITIONS AT THE JOB SITE.
26. ALL DUCTWORK SHALL BE HUNG FROM STRUCTURE ABOVE.
27. PROVIDE FLEXIBLE JOINTS ON ALL PIPING AND DUCTWORK WHERE PENETRATING ALL BUILDING EXPANSION JOINTS.
28. PROVIDE FLEXIBLE CONNECTIONS BETWEEN MECHANICAL EQUIPMENT AND DUCTWORK AND PIPING.
29. ALL PENETRATIONS THRU WALLS, ROOF, AND FLOORS TO BE COORDINATED BEFORE SITE WORK EXECUTION WITH
STRUCTURAL ENGINEERS.
30. THERMOSTAT AND TEMPERATURE SENSOR LOCATIONS TO BE COORDINATED WITH INTERIOR LAYOUT.
31. NO THREADED FITTINGS 2-1/2" AND LARGER ALLOWED FOR HYDRONIC HVAC PIPING.
32. CONTRACTOR SHALL SELECT AND PROVIDE EXPANSION JOINTS OR EXPANSION LOOPS AND ANCHORS AS REQUIRED TO
PREVENT TEMPERATURE EXPANSION STRESSES OF HYDRONIC PIPES BASED ON ACTUAL INSTALLATION/CONDITIONS.
33. ELECTRICAL CHARACTERISTICS FOR MECHANICAL EQUIPMENT: EQUIPMENT OF HIGHER ELECTRICAL CHARACTERISTICS MAY BE
FURNISHED PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL SERVICES,
CIRCUIT BREAKERS, AND CONDUIT SIZES ARE APPROPRIATELY MODIFIED. IF MINIMUM ENERGY RATINGS OR EFFICIENCIES ARE
SPECIFIED, EQUIPMENT SHALL COMPLY WITH REQUIREMENTS.
34. ALL BASE-MOUNTED PUMPS SHALL BE INSTALLED WITH CONCRETE FILLED INERTIA BASE.
35. COORDINATION DRAWINGS: DETAIL MAJOR ELEMENTS, COMPONENTS, MECHANICAL SYSTEM EQUIPMENT AND MATERIALS IN
RELATIONSHIPS WITH OTHER SYSTEMS, INSTALLATIONS, AND BUILDING COMPONENTS. SHOW SPACE REQUIREMENTS FOR
INSTALLATION AND ACCESS. INDICATE IF SEQUENCE AND COORDINATION ARE IMPORTANT TO EFFICIENT FLOW OF THE WORK.
INCLUDE THE FOLLOWING.
A. PLANNED PIPING LAYOUT, INCLUDING VALVE AND SPECIALTY LOCATIONS AND VALVE-STEM MOVEMENT.
B. CLEARANCES FOR INSTALLING AND MAINTAINING INSULATION.
C. CLEARANCES FOR SERVING AND MAINTAINING EQUIPMENT, ACCESSORIES, AND SPECIALTIES, INCLUDING SPACE FOR
DISASSEMBLY REQUIRED BY PERIODIC MAINTENANCE.
D. EQUIPMENT AND ACCESSORY SERVICE CONNECTIONS AND SUPPORT DETAILS.
E. EXTERIOR WALL AND FOUNDATION PENETRATIONS.
F. FIRE-RATED WALL AND FLOOR PENETRATION.
G. SIZES AND LOCATION OF REQUIRED CONCRETE PADS AND BASES.
H. SCHEDULING, SEQUENCING, MOVEMENT, AND POSITIONING OF EQUIPMENT INTO BUILDING DURING
CONSTRUCTION.
I. FLOOR PLANS, ELEVATIONS, AND DETAILS TO INDICATE PENETRATIONS, FLOORS, WALLS, AND CEILINGS AND THEIR
RELATIONSHIP TO OTHER PENETRATIONS AND INSTALLATIONS.
J. REFLECTED CEILING PLANS TO COORDINATE AND INTEGRATE INSTALLATION OF AIR OUTLETS, LIGHT FIXTURES,
COMMUNICATION SYSTEMS, COMPONENTS, SPRINKLERS, AND OTHER CEILING-MOUNTED ITEMS.
K. ACCESS DOOR AND ACCESS PANEL LOCATIONS, WITH FIRE-RATINGS REQUIRED TO MAINTAIN FIRE RATING OF
CONSTRUCTION, IN LOCATIONS AS REQUIRED FOR PROPER ACCESS FOR MAINTENANCE ADJUSTMENT, REPAIR AND
REMOVAL OF ALL EQUIPMENT AND DEVICES.
L. SCALE: MINIMUM 1/4"=1'-0" FOR FLOOR PLAN, 3/8"=1'-0" FOR MECHANICAL ROOMS.
36. ALL PENETRATIONS FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS SHALL BE CAULKED AND SEALED FOR SMOKE AND
FIRE AS REQUIRED.
37. CONTROL CONTRACTOR TO PROVIDE ALL CONTROL DEVICES, EQUIPMENT, ACCESSORIES, VFD DRIVES, OTHER APPARATUSES,
CONTROL VALVES AND DAMPERS, ACTUATORS, SENSORS, ETC. AND ALL CONTROL WIRING AND LOW VOLTAGE POWER WIRING
RELATED TO CENTRAL DDC CONTROL SYSTEM. SEE SPECIFICATION SECTION 230900.
HVAC GENERAL NOTES
ACB ACTIVE CHILLED BEAM
AFS AIR FLOW MEASURING STATION
AC AIR CONDITIONING
ACC AIR COOLED CONDENSER UNIT (NO COMPRESSOR)
ACCU AIR COOLED CONDENSING UNIT
AD ACCESS DOOR
AHU AIR HANDLING UNIT
AL ALUMINUM DUCTWORK
ALD ALUMINUM DOUBLE WALL DUCTWORK
ALS ALUMINUM SINGLE WALL DUCTWORK
AS AIR SEPARATOR
AFF ABOVE FINISH FLOOR
AMPS AMPERE
B BOILER
BAL BALANCE
BD BAROMETRIC DAMPER
BDD DAMPER BACK DRAFT
BHP BREAK HORSEPOWER
BMS BUILDING MANAGEMENT SYSTEM
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT/HR
DWD DOUBLE WALL DUCTWORK
C-C COLUMN ENCLOSURE TO COLUMN ENCLOSRE
C-W COLUMN ENCLOSURE TO WALL
CA COMBUSTION AIR
CAV SINGLE DUCT VAV BOX
CB CHILLED BEAM
CENTRIF CENTRIFUGAL
CFM CUBIC FEET PER MINUTE
CF CHEMICAL FILL SYSTEM
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHTWR CHILLED WATER HIGH TEMPERATURE RETURN
CHTWS CHILLED WATER HIGH TEMPERATURE SUPPLY
CO CLEAN OUT
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
CW DOMESTIC COLD WATER
CV CONTROL VALVE
CMEU CEILING MOUNTED EVAPORATOR
CUH CABINET UNIT HEATER
DB DRY BULB
DC DIRECT CURRENT
DCS DUST COLLECTION SYSTEM
DEA DRYER EXHAUST AIR
DEF DRYER EXHAUST FAN
DIA OR Ø DIAMETER
DHW DOMESTIC HOT WATER HEATER
DN DOWN
DP DEW POINT
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EF EXHAUST FAN
ERDW ENERGY RECOVERY DEHUMIDIFICATION
ERHW ENERGY RECOVERY HEAT WHEEL
ESP EXTERNAL STATIC PRESSURE
ETC EXPANSION TANK (COOLING)
ETH EXPANSION TANK (HEATING)
EWT ENTERING WATER TEMPERATURE
EUH ELECTRIC UNIT HEATER
EXH EXHAUST
EXP EXPANSION
FC FLEXIBLE CONNECTOR
FD/AD FIRE DAMPER/ACCESS DOOR
FLG FLANGE
FCU FAN COIL UNIT
FMS FLOW MEASURING STATION
FPM FEET PER MINUTE
°F DEGREES FAHRENHEIT
FPS FEET PER SECOND
REF RADON EXHAUST FAN
FS FLOW SWITCH
FT FEET
FTR FIN-TUBE RADIATION
FT3 CUBIC FEET
GA GAUGE
GP GLYCOL PUMP/TANK SYSTEM
GPM GALLONS PER MINUTE
H HEAT CONTENT (BTU/lb)
H HUMIDISTAT
HC HEATING COIL
HD HEAD
HP HORSEPOWER
HT HEIGHT
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY & RETURN
HWUR HOT WATER UNIT HEATER
HZ CYCLES
ID INSIDE DIAMETER
IN INCHES
KEA TYPE 1 KITCHEN HOOD EXHAUST
KEF KITCHEN EXHAUST FAN
KVA KILLOVOLT AMPERE
KW KILOWATTS
L LENGTH
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LEA LAB EXHAUST AIR
LEF LAB EXHAUST FAN
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LWT LEAVING WATER TEMPERATURE
MD MOTORIZED DAMPER
MAU MAKE-UP AIR UNIT
MAX MAXIMUM
MBH THOUSAND BTU/HOUR
MIN MINIMUM
MTS MINUTES
MUW MAKE-UP WATER
MV MOTORIZED VALVE
NEG NEGATIVE
NG NATURAL GAS
NO NUMBER
NRS NON-RISING STEM
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OCPD OVER CURRENT PROTECTION DEVICE
OED OPEN END DUCT, TERMINATE WITH
STAINLESS STEEL BIRD SCREEN
OS&Y OUTSIDE STEM & YOKE
OP OIL PUMP
OT OIL TANK
P PUMP
PBD PARALLEL BLADE DAMPER
PEF PROCESS EXHAUST FAN
PH PHASE
PHWR POOL HOT WATER RETURN
PHWS POOL HAT WATER SUPPLY
PHWS&R POOL HAT WATER SUPPLY & RETURN
PNL PANEL
POS POSITIVE
PRESS PRESSURE
PRV PRESSURE RELIEF VALVE
PS PRESSURE SWITCH
PSIA POUNDS PER SQUARE INCH
ATMOSPHERE
PSIG POUNDS PER SQUARE INCH GAUGE
RA RETURN AIR
RDF RADON EXHAUST FAN
RECIRC RECIRCULATING
RH RELATIVE HUMIDITY
RP RADIANT PANEL
RPA RADIANT PANEL ALTERNATE
RPM REVOLUTIONS PER MINUTE
SA SUPPLY AIR
SATT SOUND ATTENUATOR
SCFM STANDARD CUBIC FEET/MINUTE
SENS SENSOR
SF SUPPLY FAN
SH SENSIBLE HEAT
SCP SHORT CIRCUIT CIRCULATION PUMP
SP STATIC PRESSURE
STP STANDARD TEMP & PRESSURE
SUP SUPPLY
SV SOLENOID VALVE
T&PV TEMP & PRESSURE RELIEF VALVE
SFD/AD COMBINATION SMOKE/FIRE DAMPER
TC TEST CONNECTION WITH ACCESS
DOOR
TEMP TEMPERATURE
T THERMOSTAT
TH TOTAL HEAT
TRA TRANSFER AIR
TRV RELIEF VALVE TEMP
TSP TOTAL STATIC PRESSURE
TS TEMPERATURE SENSOR
TYP TYPICAL
UH UNIT HEATER
UN UNIT
VAV VAV UNIT
VD VOLUME DAMPER
VT VENT
VLV VALVE
VI VIBRATION ISOLATOR
V VOLTS
W-W WALL TO WALL
W-C WALL TO COUMN ENCLOSURE
W WATTS
WB WET BULB
WG WATER GAUGE
WH WATER HEATER
WI WIDTH
WT WEIGHT
ABBREVIATIONS
X
EXISTING TO REMAIN
EXISTING TO BE REMOVED
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-0
01
.D
WG
je
sse
.vo
se
N.T.S.
M-001
JEV
RC
MECHANICAL NOTES, LEGENDS &ABBREVIATIONS
4"
4"
5"
5"
3"
6"
4" 6" 6" 6"
5"
5"
6"
8"
5"
3"
4"
4"
4"
6" 6" 8"
1-1
/4
"
1-1
/4
"1
-1
/2
8"
8"
8"
8"
8"
8"8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
6"
5"
5"
4"
COMPRESSOR
TEMP. CONTROL
PANEL
5
5
6
2
2
2
3
3
4
1
2
2
EXISTING
ELECTRICAL
GEAR
3"
3"
4"
EXISTING
WATER
HEATER
3"
3"
3"
3"
3"
EXISTING
COMPRESSOR
EXISTING AIR
SEPARATOR
EXISTING
EXPANSION
TANK
EXISTING
BOILER #2
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
EXISTING
BOILER #1
DEMOLITION KEY NOTES:
REMOVE EXISTING FIRETUBE BOILER INCLUDING ALL SUPPLY & RETURN
HEATING PIPING, OIL PIPING, GAS PIPING, AND CONTROLS. CAP PIPING
BACK AT MAINS.
REMOVE EXISTING BOILER PUMP & PIPING.
REMOVE BOILER BREECHING AS INDICATED.
REMOVE EXISTING HEATING BOILER INCLUDING ALL PIPING, CONTROLS, &
BOILER STACK. CAP HEATING PIPING BACK AT MAINS.
REMOVE EXISTING HEATING SUPPLY PIPING TO DOMESTIC WATER
HEATER INCLUDING VALVES. CAP PIPING AT MAIN AS SHOWN AND/OR AS
REQUIRED.
REMOVE EXISTING DOMESTIC HOT WATER HEATER / STORAGE TANK, AND
CONCRETE SUPPORTS. SEE PLUMBING DRAWINGS FOR FURTHER
INFORMATION AND REQUIREMENTS.
REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND
RETURN PIPING, CONTROLS AND CONCRETE PAD. CAP PIPING AT MAINS
AS SHOWN AND/OR AS REQUIRED. NEW PUMP P-8 AND ASSOCIATED
PIPING MUST BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING
EXISTING P-8. DOWNTIME OF PUMPS SERVING POOL HEAT EXCHANGER
AND POOL AHU MUST BE MINIMIZED TO MAINTAIN POOL WATER AND AIR
TEMPERATURES.
REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND
RETURN PIPING INCLUDING CONTROLS. CONCRETE PAD TO REMAIN. CAP
PIPING AT MAINS AS SHOWN AND/OR AS REQUIRED. NEW PUMP P-8 AND
ASSOCIATED PIPING MUST BE INSTALLED AND OPERATIONAL PRIOR TO
REMOVING EXISTING P-8. DOWNTIME OF PUMPS SERVING POOL HEAT
EXCHANGER AND POOL AHU MUST BE MINIMIZED TO MAINTAIN POOL
WATER AND AIR TEMPERATURES.
EXISTING HYDRONIC UNIT HEATER AND ASSOCIATED PIPING TO REMAIN.
REMOVE EXISTING AIR COMPRESSOR AND ALL ASSOCIATED PIPING,
CONTROLS, ETC.
1
2
3
4
5
EXISTING
WATER
HEATER
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
EXISTING CAST
IRON BOILER
1
6
UH
UH
UH
7
8
9
EXISTING
P-1
EXISTING
P-2
EXISTING
P-3
EXISTING
P-4
EXISTING
P-5
EXISTING
P-6
EXISTING
P-7
EXISTING
P-8
8
8
7
9
9
EXISTING
EXHAUST FAN
GENERAL DEMOLITION NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO
NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR
AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE
NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL
TEMPORARY CONNECTIONS IN BID PRICE.
4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.
CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER
IN ADVANCE.
10
10
EXISTING FUEL-OIL
PUMP TRANSFER
STATION
3/8" = 1'-0"
MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 11
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
D-1
01
.D
WG
je
sse
.vo
se
3/8"=1'-0"
MD-101
JEV
RC
MECHANICAL BOILER ROOMDEMOLITION PLAN - PHASE 1
MD-101
NORTH
BOILER
ROOM
BOILER B-1
BOILER B-2
BOILER B-3
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
6"
EXISTING
BOILER #2
EXISTING
ELECTRICAL
GEAR
DEMOLITION KEY NOTES:
REMOVE EXISTING FIRETUBE BOILER INCLUDING ALL SUPPLY & RETURN
HEATING PIPING, OIL PIPING, GAS PIPING, AND CONTROLS. CAP PIPING
BACK AT MAINS.
REMOVE EXISTING BOILER PUMP & PIPING.
REMOVE BOILER BREECHING AS INDICATED.
REMOVE EXISTING HEATING SYSTEM MAKE-UP WATER BACKFLOW
PREVENTOR ASSEMBLY.
REMOVE EXISTING HEATING SUPPLY PIPING TO DOMESTIC WATER
HEATER INCLUDING VALVES.
REMOVE EXISTING DOMESTIC HOT WATER HEATER / STORAGE TANK, AND
CONCRETE SUPPORTS. SEE PLUMBING DRAWINGS FOR FURTHER
INFORMATION AND REQUIREMENTS.
REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND
RETURN PIPING AND CONTROLS. CONCRETE PAD TO REMAIN.
REMOVE EXISTING EXPANSION TANKS. SEE GENERAL DEMOLITION NOTE
#3, AND GENERAL NOTES ON DRAWINGS M-101 AND M-102 DESCRIBING
PHASING OF CONSTRUCTION. EXISTING EXPANSION TANKS MAY NEED TO
BE REMOVED AT END OF PROJECT, AS CONTRACTOR MAY NEED TO
TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO NEW HW
SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR AND
REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED
WHERE NEW EXPANSION TANKS WILL BE INSTALLED..
REMOVE SECTION OF TEMPORARY PIPING INSTALLED UNDER PHASE 1.
1
2
3
4
5
6
7
8
4"
5"
5"
3"
6"
4" 6" 6" 6"
4"
4"
6" 6" 8"
1-1
/4
"
1-1
/4
"1
-1
/2
8"
8"
6"
5"
5"
4"
EXISTING
ELECTRICAL
GEAR
4"
EXISTING
WATER
HEATER
3"
3"
3"
EXISTING
COMPRESSOR
EXISTING AIR
SEPARATOR
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
UH
UH
EXISTING
P-1
EXISTING
P-3
EXISTING
P-4
EXISTING
P-5
EXISTING
P-6
EXISTING
P-7
5"
5"
6"
8"
5"
3"
UH
P-8
1
2
2
2
2
2
2
2
2
2
2
3
3
5
5
5
5
6
77 7
7
7
7
7
7
7
7
8
8"
3"HWS
3"HWR
8
4
BP-1
4"HWR
4"HWR
4"HWR
4"HWS
4"HWS
4"HWS
4"HWS
4"HWR
FOS
9
9
9
9
9
EXISTING
EXPANSION
TANK
4"HWS
EXISTING
EXPANSION
TANK
EXISTING
EXPANSION
TANK
8
8
8
EXISTING
EXPANSION
TANK
8
EXISTING
EXPANSION
TANK
8
EXISTING
EXPANSION
TANK
8
EXISTING FUEL-OIL
PUMP TRANSFER
STATION
GENERAL DEMOLITION NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO
NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR
AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE
NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL
TEMPORARY CONNECTIONS IN BID PRICE.
4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.
CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER
IN ADVANCE.
3/8" = 1'-0"
MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 21
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
D-1
02
.d
wg
je
sse
.vo
se
3/8"=1'-0"
MD-102
JEV
RC
MECHANICAL BOILER ROOMDEMOLITION PLAN - PHASE 2
MD-101
NORTH
BOILER
ROOM
4"
5"
5"
5"
6"
4" 6" 6" 6"
4"
4"
6" 8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
8"
5"
5"
4"
TEMP. CONTROL
PANEL
AIR
SEPARATOR
EXISTING
WATER
HEATER
3"
3"
3"
EXISTING AIR
SEPARATOR
EXISTING
COMPRESSOR
EXISTING
BOILER #2
EXISTING CAST
IRON BOILER
EXISTING FUEL-OIL
PUMP TRANSFER
STATION
P-5P-7
P-3P-4
P-6
8"H
WS
3"HWS
3"HWR
8
"
H
W
S
EXISTING
P-1
4"
CONNECTS TO (8)
EXISTING EXPANSION
TANKS
16
16
17
16
EXISTING
ELECTRICAL
GEAR
DOMESTIC HOT WATER HEATERS BY PLUMBING CONTRACTOR. VENTS AND
COMBUSTION AIR INTAKES BY MECHANICAL CONTRACTOR. PLUMBING
CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC CONTROL MODULE TO
CONNECT DOMESTIC WATER HEATERS TO THE ALERTON BUILDING DDC SYSTEM.
DDC SYSTEM TO MONITOR AND CONTROL ALL AVAILABLE POINTS. PLUMBING
CONTRACTOR TO COORDINATE ALL REQUIREMENTS WITH MECHANICAL
CONTRACTOR AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).
1
NEW WORK KEY NOTES:
PROVIDE NEW 6" HIGH CONCRETE HOUSEKEEPING PAD FOR NEW
OIL-FIRED BOILERS B-1, B-2 & B-3.
PROVIDE NEW FLEX TUBE HOT WATER BOILER - MAINTAIN
MANUFACTURER'S REQUIRED SERVICE CLEARANCES AROUND BOILER.
PROVIDE NEW BOILER PUMP INSTALLED 3-4 FEET ABOVE FLOOR - REFER
TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
PROVIDE NEW PRIMARY HEATING PIPING TO/FROM BOILER.
SPACE DESIGNATED FOR FUTURE GAS TRAIN. CAP PORT AT NEW BURNER
AS REQUIRED.
PROVIDE NEW PUMP VARIABLE FREQUENCY DRIVE ON WALL BETWEEN
PUMP PADS FOR ACCESS.
PROVIDE NEW HEATING SYSTEM PUMP - REFER TO DETAILS AND
SPECIFICATIONS - TYP.
PROVIDE NEW HEATING SYSTEM AIR SEPARATOR - SUPPORT FROM
STRUCTURE WITH ISOLATION HANGERS.
PROVIDE NEW FUEL OIL TRANSFER PUMP STATION - CONNECT RETURN
PIPING TO EXISTING.
PROVIDE NEW FUEL OIL PIPING - RUN HIGH THROUGH BOILER ROOM AND
DROP PIPING DOWN AT BURNER LOCATIONS. REFER TO PIPING DIAGRAM
ON DWG. M-201 - TYP.
PROVIDE NEW BOILER BREECHING AND STACK UP THROUGH EXISTING
LOW ROOF. REFER TO DETAILS AND SPECIFICATIONS - TYP.
EXISTING 122"Wx122"H (60 SQ. FT. FREE AREA) COMBUSTION AIR LOUVER
TO REMAIN.
PROVIDE NEW BACKFLOW PREVENTER ASSEMBLY ON MAKE-UP WATER TO
HEATING SYSTEM. RECONNECT TO EXISTING 1-1/2" PIPING AS REQUIRED.
REFER TO DETAIL ON DWG. M-202.
PROVIDE NEW HW HEATING PIPING - RUN AS HIGH AS POSSIBLE AND
RECONNECT TO EXISTING AS SHOWN.
RECONNECT PUMP INLET PIPING TO NEW 8" HEADER.
INSTALL EMERGENCY SHUTOFF FOR ALL NEW BOILERS AND DOMESTIC
HOT WATER HEATERS. SEE DETAIL ON ELECTRICAL DRAWINGS.
INCREASE SIZE OF EXISTING CONCRETE EQUIPMENT PADS FOR
BASE-MOUNTED PUMPS AS REQUIRED TO INSTALL NEW CONCRETE
INERTIA BASES TO SUPPORT PUMPS, SUCTION DIFFUSERS, ETC.
COORDINATE WITH EXISTING FLOOR DRAINS TO REMAIN.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18 PROVIDE AL29-4C FLUE VENT AND COMBUSTION AIR PIPING TO GAS FIRED
DOMESTIC WATER HEATERS. REFER TO PIPING DETAIL ON DWG. M-203, AND
INSTALL PER MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS.
RUN HEATER FLUE VENT AND COMBUSTION AIR PIPING AS HIGH AS POSSIBLE
THROUGH BOILER ROOM. DO NOT RUN ABOVE ELECTRICAL GEAR.
PROVIDE NEW FLUE VENT AND COMBUSTION AIR PIPING UP THROUGH
EXISTING LOW ROOF WITH 6" APPROVED TERMINATION (AL29-4C TO PVC
ADAPTER, & SHORT PIECE OF PVC PIPING). MAINTAIN MINIMUM 10 FT
HORIZONTAL CLEARANCE FROM HIGH WALL ABOVE ROOF TO FLUE
TERMINATION. COMBUSTION AIR CAN BE LESS THAN 10 FT HORIZONTAL
DISTANCE. CONTRACTOR NOTE: IF MANUFACTURER'S REQUIRED
TERMINATION CLEARANCES CANNOT BE MAINTAINED, NOTIFY ENGINEER .
PROVIDE MOTOR OPERATED VALVES (NORM. CLOSED) ON BACK-UP SUPPLY
PIPING.
19
20
21
P-8
5"
5"
6"
8"
5"
3"
3" HWS TO POOL HX & AC-14.
5" HWR FROM OLD JUNIOR
HIGH SCHOOL, POOL HX, AND
AC-14.
8" HWR FROM BUILDING
WINGS A THRU H.
5" HWS TO OLD JUNIOR HIGH
SCHOOL.
5" HWS TO BUILDING WINGS G & H.
6" HWS TO BUILDING WINGS A THRU F.
BP-1
BP-2
BP-3
4"HWR
4"HWR
4"HWR
4"HWS
4"HWS
4"HWS
4"HWS
3
3
3
4"HWS
4"HWS
BOILER B-1
BOILER B-2
BOILER B-3
FO
R
FO
S
FO
R
FO
S
1110
10
1-1/2" TO EACH
BOILER (TYP.)
2"
FO
R
FO
S
2"
2"
BOILER
STACK
11
6
4"HWR
FOR
FOS
EXISTING
ELECTRICAL
GEAR
18
18
18
19
20
20
6"
10
'-0
" M
IN
IM
UM
PWH-1 PWH-2 PWH-3 PWH-4
GENERAL NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO
NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR
AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE
NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL
TEMPORARY CONNECTIONS IN BID PRICE.
4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.
CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER
IN ADVANCE.
5. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC
HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER MIXING VALVES, ETC.)
SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED
BUILDING SYSTEMS, INC. (ALERTON). PROVIDE A NEW COMPUTER WORKSTATION OR
LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF
ALL EQUIPMENT, ADJUST SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT
PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC
CONTROL PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE
120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND
LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS
RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.
6. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF
PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
6"
DOMESTIC WATER MIXING VALVE
BY PLUMBING CONTRACTOR.
MIXING VALVE AND HOT WATER
RECIRCULATION PUMPS MUST BE
CONNECTED TO THE ALERTON
BUILDING DDC SYSTEM. DDC
SYSTEM TO MONITOR AND
CONTROL ALL AVAILABLE POINTS.
PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS
WITH MECHANICAL CONTRACTOR
AND CONTROLS CONTRACTOR
(BACNET VS MODBUS, ETC.).
6" FLUES UP (TYP)
6"CAI UP (TYP)
3/8" = 1'-0"
MECHANICAL BOILER ROOM PLAN - PHASE 11
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-1
01
.D
WG
je
sse
.vo
se
3/8"=1'-0"
M-101
JEV
RC
MECHANICAL BOILER ROOM PLAN -PHASE 1
M-101
NORTH
BOILER
ROOM
5"
5"
6"
8"
5"
3"
EXISTING
COMPRESSOR
P-7
BOILER B-1
BOILER B-2
BOILER B-3
BOILER B-4
BOILER B-5
BOILER B-6
BOILER
STACK
BOILER
STACK
BP-1
BP-2
BP-3
3"HWS
3"HWS
BP-6
BP-5
BP-4
8"HWR
FO
R
FO
S
FO
R
FO
S
FOR
FOS
FO
R
FO
S
FO
R
FO
S
FO
R
FO
S
8"HWS
4"HWR
4"HWR
4"HWR
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
8"H
WR
8"H
WS
8"H
WR
8"H
WS
8"H
WR
4"HWR
4"HWR
4"HWR
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
4"HWS
HW
R
HW
S
2"
2"
14
14
3
3
3
3
3
3
11
11
11
11
10
10
10
10
8"H
WR
8"H
WR
8"H
WS
8"HWS
6"H
WS
5"H
WS
5"H
WS
5"HWS
6"HWS
7
7
5"HWS 5"HWS3"HWS
6 66 6
66
15
16
16
8"HWR
8"HWS
17 17 17 17 17 17
16
ET-1 ET-2 ET-3 ET-4
EXISTING
ELECTRICAL
GEAR
8
AS-1
18
18
18
19
6"
2"
2"
HW
R
HW
S
12
1-1/2" TO EACH
BOILER (TYP.)
1-1/2" TO EACH
BOILER (TYP.)
6"
21
3" HWS TO POOL HX & AC-14.
5" HWR FROM OLD JUNIOR
HIGH SCHOOL, POOL HX, AND
AC-14.
8" HWR FROM BUILDING
WINGS A THRU H.
5" HWS TO OLD JUNIOR HIGH
SCHOOL.
5" HWS TO BUILDING WINGS G & H.
6" HWS TO BUILDING WINGS A THRU F.
8"H
WS
3' MAXIMUM
2"2"
PWH-1
P-8
PWH-2 PWH-3 PWH-4
P-3 P-4 P-5 P-6
1-1/2"
1-1/2"
13
TO AIR SEPARATOR
CONNECT EXISTING BRANCH PIPE
THAT SERVES BOILER ROOM UNIT
HEATERS TO HWS FROM PUMP P-6
DOMESTIC HOT WATER HEATERS BY PLUMBING CONTRACTOR. VENTS AND
COMBUSTION AIR INTAKES BY MECHANICAL CONTRACTOR. PLUMBING
CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC CONTROL MODULE TO
CONNECT DOMESTIC WATER HEATERS TO THE ALERTON BUILDING DDC SYSTEM.
DDC SYSTEM TO MONITOR AND CONTROL ALL AVAILABLE POINTS. PLUMBING
CONTRACTOR TO COORDINATE ALL REQUIREMENTS WITH MECHANICAL
CONTRACTOR AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).
DOMESTIC WATER MIXING VALVE
BY PLUMBING CONTRACTOR.
MIXING VALVE AND HOT WATER
RECIRCULATION PUMPS MUST BE
CONNECTED TO THE ALERTON
BUILDING DDC SYSTEM. DDC
SYSTEM TO MONITOR AND
CONTROL ALL AVAILABLE POINTS.
PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS
WITH MECHANICAL CONTRACTOR
AND CONTROLS CONTRACTOR
(BACNET VS MODBUS, ETC.).
GENERAL NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO
NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR
AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE
NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL
TEMPORARY CONNECTIONS IN BID PRICE.
4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.
CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER
IN ADVANCE.
5. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC
HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER MIXING VALVES, ETC.)
SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED
BUILDING SYSTEMS, INC. (ALERTON). PROVIDE A NEW COMPUTER WORKSTATION OR
LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF
ALL EQUIPMENT, ADJUST SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT
PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC
CONTROL PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE
120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND
LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS
RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.
6. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF
PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
EXISTING FUEL-OIL
PUMP TRANSFER
STATION
4"
20
20
10
'-0
" M
IN
IM
UM
6" FLUES UP (TYP)
6"CAI UP (TYP)
1
NEW WORK KEY NOTES:
PROVIDE NEW 6" HIGH CONCRETE HOUSEKEEPING PAD FOR NEW
OIL-FIRED BOILERS B-1, B-2 & B-3.
PROVIDE NEW FLEX TUBE HOT WATER BOILER - MAINTAIN
MANUFACTURER'S REQUIRED SERVICE CLEARANCES AROUND BOILER.
PROVIDE NEW BOILER PUMP INSTALLED 3-4 FEET ABOVE FLOOR - REFER
TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
PROVIDE NEW PRIMARY HEATING PIPING TO/FROM BOILER.
SPACE DESIGNATED FOR FUTURE GAS TRAIN. CAP PORT AT NEW BURNER
AS REQUIRED.
PROVIDE NEW PUMP VARIABLE FREQUENCY DRIVE ON WALL BETWEEN
PUMP PADS FOR ACCESS.
PROVIDE NEW HEATING SYSTEM PUMP - REFER TO DETAILS AND
SPECIFICATIONS - TYP.
PROVIDE NEW HEATING SYSTEM AIR SEPARATOR - SUPPORT FROM
STRUCTURE WITH ISOLATION HANGERS.
PROVIDE NEW FUEL OIL TRANSFER PUMP STATION - CONNECT RETURN
PIPING TO EXISTING.
PROVIDE NEW FUEL OIL PIPING - RUN HIGH THROUGH BOILER ROOM AND
DROP PIPING DOWN AT BURNER LOCATIONS. REFER TO PIPING DIAGRAM
ON DWG. M-201 - TYP.
PROVIDE NEW BOILER BREECHING AND STACK UP THROUGH EXISTING
LOW ROOF. REFER TO DETAILS AND SPECIFICATIONS - TYP.
EXISTING 122"Wx122"H (60 SQ. FT. FREE AREA) COMBUSTION AIR LOUVER
TO REMAIN.
PROVIDE NEW BACKFLOW PREVENTER ASSEMBLY ON MAKE-UP WATER TO
HEATING SYSTEM. RECONNECT TO EXISTING 1-1/2" PIPING AS REQUIRED.
REFER TO DETAIL ON DWG. M-202.
PROVIDE NEW HW HEATING PIPING - RUN AS HIGH AS POSSIBLE AND
RECONNECT TO EXISTING AS SHOWN.
RECONNECT PUMP INLET PIPING TO NEW 8" HEADER.
INSTALL EMERGENCY SHUTOFF FOR ALL NEW BOILERS AND DOMESTIC
HOT WATER HEATERS. SEE DETAIL ON ELECTRICAL DRAWINGS.
INCREASE SIZE OF EXISTING CONCRETE EQUIPMENT PADS FOR
BASE-MOUNTED PUMPS AS REQUIRED TO INSTALL NEW CONCRETE
INERTIA BASES TO SUPPORT PUMPS, SUCTION DIFFUSERS, ETC.
COORDINATE WITH EXISTING FLOOR DRAINS TO REMAIN.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18 PROVIDE AL29-4C FLUE VENT AND COMBUSTION AIR PIPING TO GAS FIRED
DOMESTIC WATER HEATERS. REFER TO PIPING DETAIL ON DWG. M-203, AND
INSTALL PER MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS.
RUN HEATER FLUE VENT AND COMBUSTION AIR PIPING AS HIGH AS POSSIBLE
THROUGH BOILER ROOM. DO NOT RUN ABOVE ELECTRICAL GEAR.
PROVIDE NEW FLUE VENT AND COMBUSTION AIR PIPING UP THROUGH
EXISTING LOW ROOF WITH 6" APPROVED TERMINATION (AL29-4C TO PVC
ADAPTER, & SHORT PIECE OF PVC PIPING). MAINTAIN MINIMUM 10 FT
HORIZONTAL CLEARANCE FROM HIGH WALL ABOVE ROOF TO FLUE
TERMINATION. COMBUSTION AIR CAN BE LESS THAN 10 FT HORIZONTAL
DISTANCE. CONTRACTOR NOTE: IF MANUFACTURER'S REQUIRED
TERMINATION CLEARANCES CANNOT BE MAINTAINED, NOTIFY ENGINEER .
PROVIDE MOTOR OPERATED VALVES (NORM. CLOSED) ON BACK-UP SUPPLY
PIPING.
19
20
21
3/8" = 1'-0"
MECHANICAL BOILER ROOM PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-1
02
.d
wg
je
sse
.vo
se
3/8"=1'-0"
M-102
JEV
RC
MECHANICAL BOILER ROOM PLAN -PHASE 2
M-101
NORTH
BOILER
ROOM
AC-1
AC-2
AC-3
AC-4
AC-6
AC-7
AC-8
AC-19 AC-20 AC-21 AC-22 AC-23 AC-24 AC-25 AC-26 AC-27 AC-28
AC-16 AC-17 AC-18
AC-5
UNIT
WATER FLOW (GPM) PIPE SIZE (IN.)
AC-1 12 1-1/4
AC-2 15 1-1/4
AC-3 15 1-1/4
AC-4 11 1-1/4
AC-5 18 1-1/2
AC-6 9 1-1/4
AC-7 18 1-1/2
AC-8 28 2
AC-9 13 1-1/4
AC-10 14 1-1/4
AC-11 8 1-1/4
AC-12 30 2
AC-13 30 2
AC-14 27 2
AC-15 15 1-1/4
AC-16 14 TBD BY CONTRACTOR
AC-17 14 TBD BY CONTRACTOR
AC-18 8 TBD BY CONTRACTOR
AC-19 20 1-1/2
AC-20 5 1
AC-21 10 1-1/4
AC-22 25 2
AC-23 27 2
AC-24 5 1
AC-25 12 1-1/4
AC-26 15 1-1/4
AC-27 14 1-1/4
AC-28 19 1-1/2
AC-29 26 2
AC-30 27 2
AC-31 21 1-1/2
NOTES:
CONTROL VALVES: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAY HOTWATER CONTROL VALVES AT EACH AIR-HANDLING UNIT (EXCEPT AC-14; SEE BELOW) WITHNEW PNEUMATIC MODULATING 2-WAY CONTROL VALVES. THE NEW 2-WAY CONTROLVALVES SHALL BE CONNECTED TO THE RESPECTIVE AIR-HANDLING UNIT'S PNEUMATICCONTROL PANEL. CONTRACTOR TO PROVIDE ALL CONTROLS COMPONENTS (PNEUMATIC,ELECTRONIC, AND ELECTRIC), WORK, AND PROGRAMMING AS REQUIRED FOR A FULLYFUNCTIONING CONTROL SYSTEM. CUT AND CAP BYPASS LINE FROM EXISTING 3-WAYCONTROL VALVES. EXISTING CONTROL SEQUENCES TO BE EITHER REUSED OR MODIFIED ASREQUIRED FOR NEW MODULATING CONTROL VALVES. CONTROL VALVE SIZES ARE SHOWNFOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZES IN FIELD.CONTRACTOR TO RE-BALANCE HOT WATER FLOWS TO EACH AIR-HANDLING UNIT AFTERINSTALLATION OF NEW CONTROL VALVES.
AC-14 CONTROL VALVE: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAYHOT WATER CONTROL VALVES AT AIR-HANDLING UNIT AC-14 WITH NEW MODULATING2-WAY CONTROL VALVE. THE NEW 2-WAY CONTROL VALVES SHALL BE CONNECTED TO THEALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY OF AC-14'S NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL,AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, ANDLOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CUT AND CAP BYPASSLINE FROM EXISTING 3-WAY CONTROL VALVE. EXISTING CONTROL SEQUENCES TO BEEITHER REUSED OR MODIFIED AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLYOPERATIONAL. CONTROL VALVE SIZE IS SHOWN FOR REFERENCE ONLY. CONTRACTOR TOVERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TO RE-BALANCE HOT WATERFLOW TO AIR-HANDLING UNIT AFTER INSTALLATION OF NEW CONTROL VALVE.
HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: ADD ALTERNATE #1 ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSORS / TRANSMITTERS IN EACH HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMPS LOCATED IN BOILER ROOM. PRESSURE SENSORS /TRANSMITTERS TO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMPVFD'S TO MAINTAIN CONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVESAT AHU'S OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).
1/16" = 1'-0"
MECHANICAL FLOOR PLAN - EAST1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-1
03
.d
wg
je
sse
.vo
se
1/16"=1'-0"
M-103
JEV
RC
MECHANICAL FLOOR PLANAREA A
M-103 M-104
NORTH
M-103
A B C D
E F
G H
OLD JHS
AC-11 AC-10 AC-9
AC-12
AC-13
AC-14
AC-15
AC-29 AC-30
AC-31
FILTER ROOM
POOL HEATER EXCHANGER
BALANCING VALVE
BALL VALVE
GATE VALVE
ANGLE GLOBE VALVE
GLOBE VALVE
ANGLE GATE VALVE
BUTTERFLY VALVE
TWO WAY MOTORIZED
CONTROL VALVE
MOTORIZED VALVE
OS & Y
THREE WAY MOTORIZED
CONTROL VALVE
QUICK CLOSING LEVER VALVE
(PRESSURE & TEMPERATURE)
SAFETY RELIEF VALVE (PRESS.)
ISOLATION VALVE
M
CONTINUATION
EXISTING PIPE TO REMAIN
EXISTING DUCT TO REMAIN
EXISTING EQUIPMENT
00
00
00
00
EXISTING LAYERS
M-ANNO-DIMS
M-ANNO-KEYN
M-ANNO- NOTE
M-ANNO-NPLT
M-ANNO-PATT
M-ANNO-REDL
M-ANNO-REFR
M-ANNO-REVS
M-ANNO-SYMB
M-ANNO-TEXT
M-DEMO-PHS1
M-DEMO-PHS2
M-DEMO-PHS3
M-DISC-INFO
M-FLOR-IDEN
M-FLOR-NUMB
ST
HVAC LAYERS
M-CHEM-PIPE
M-CNDW-PIPE
M-COND-PIPE
M-CONT-THER
M-CONT-WIRE
M-CWTR-PIPE
M-DUAL-PIPE
M-DUST-DUCT
M-EXHS-DUCT
M-GTHP-PIPE
M-HVAC-ACCS
M-HVAC-CDFF
M-HVAC-DAMP
M-HVAC-EQPM
M-HVAC-FDFF
M-HVAC-IDEN
M-HVAC-RETN
M-HVAC-ROOF
M-HWTR-PIPE
M-PENE-FLOR
M-PENE-ROOF
M-RCOV-PIPE
M-REFG-PIPE
M-HVAC-TAGS
M-HVAC-WDFF
M-HVAC-SUPP
M-GTHP-EQPM
BKGD
BORDER
EXISTING PIPE TO REMOVE
EXISTING DUCT TO REMOVE
M-HVAC-GAS
TEXT
TE
XT
3"
4"
(E)3"
(E)2" TO AC-13
(E)2" TO AC-14
(E)2" (E)1-1/4" TO RADS
(E)1-1/2" TO AC-15
(E)2-1/2"
(E)3" HWS&R
DOWN TO POOL
HEAT EXCHANGER
AC-15
AC-12
AC-13
AC-14
(E)2" TO AC-12
(N)2"TO AC-14
(N)2"
(N)2"TO AC-14
(N)2"TO AC-14
(N)2"
INSTALL NEW 2" HWS&R
TO SERVE AC-14 FROM
EXISTING 3" HWS&R TO
POOL HEAT EXCHANGER.
REMOVE
EXISTING 2"
HWS&R
SERVING
AC-14.
UNIT
WATER FLOW (GPM) PIPE SIZE (IN.)
AC-1 12 1-1/4
AC-2 15 1-1/4
AC-3 15 1-1/4
AC-4 11 1-1/4
AC-5 18 1-1/2
AC-6 9 1-1/4
AC-7 18 1-1/2
AC-8 28 2
AC-9 13 1-1/4
AC-10 14 1-1/4
AC-11 8 1-1/4
AC-12 30 2
AC-13 30 2
AC-14 27 2
AC-15 15 1-1/4
AC-16 14 TBD BY CONTRACTOR
AC-17 14 TBD BY CONTRACTOR
AC-18 8 TBD BY CONTRACTOR
AC-19 20 1-1/2
AC-20 5 1
AC-21 10 1-1/4
AC-22 25 2
AC-23 27 2
AC-24 5 1
AC-25 12 1-1/4
AC-26 15 1-1/4
AC-27 14 1-1/4
AC-28 19 1-1/2
AC-29 26 2
AC-30 27 2
AC-31 21 1-1/2
NOTES:
CONTROL VALVES: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAY HOTWATER CONTROL VALVES AT EACH AIR-HANDLING UNIT (EXCEPT AC-14; SEE BELOW) WITHNEW PNEUMATIC MODULATING 2-WAY CONTROL VALVES. THE NEW 2-WAY CONTROLVALVES SHALL BE CONNECTED TO THE RESPECTIVE AIR-HANDLING UNIT'S PNEUMATICCONTROL PANEL. CONTRACTOR TO PROVIDE ALL CONTROLS COMPONENTS (PNEUMATIC,ELECTRONIC, AND ELECTRIC), WORK, AND PROGRAMMING AS REQUIRED FOR A FULLYFUNCTIONING CONTROL SYSTEM. CUT AND CAP BYPASS LINE FROM EXISTING 3-WAYCONTROL VALVES. EXISTING CONTROL SEQUENCES TO BE EITHER REUSED OR MODIFIED ASREQUIRED FOR NEW MODULATING CONTROL VALVES. CONTROL VALVE SIZES ARE SHOWNFOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZES IN FIELD.CONTRACTOR TO RE-BALANCE HOT WATER FLOWS TO EACH AIR-HANDLING UNIT AFTERINSTALLATION OF NEW CONTROL VALVES.
AC-14 CONTROL VALVE: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAYHOT WATER CONTROL VALVES AT AIR-HANDLING UNIT AC-14 WITH NEW MODULATING2-WAY CONTROL VALVE. THE NEW 2-WAY CONTROL VALVES SHALL BE CONNECTED TO THEALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY OF AC-14'S NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL,AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, ANDLOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CUT AND CAP BYPASSLINE FROM EXISTING 3-WAY CONTROL VALVE. EXISTING CONTROL SEQUENCES TO BEEITHER REUSED OR MODIFIED AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLYOPERATIONAL. CONTROL VALVE SIZE IS SHOWN FOR REFERENCE ONLY. CONTRACTOR TOVERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TO RE-BALANCE HOT WATERFLOW TO AIR-HANDLING UNIT AFTER INSTALLATION OF NEW CONTROL VALVE.
HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: ADD ALTERNATE #1 ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSORS / TRANSMITTERS IN EACH HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMPS LOCATED IN BOILER ROOM. PRESSURE SENSORS /TRANSMITTERS TO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMPVFD'S TO MAINTAIN CONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVESAT AHU'S OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).
3"
4"
(E)3"
(E)2" TO AC-13
(E)2" TO AC-14
(E)2" (E)1-1/4" TO RADS
(E)1-1/2" TO AC-15
(E)2-1/2"
(E)3" HWS&R
DOWN TO POOL
HEAT EXCHANGER
AC-15
AC-12
AC-13
AC-14
(E)2" TO AC-12
(N)2"TO AC-14
(N)2"
(N)2"TO AC-14
(N)2"TO AC-14
(N)2"
INSTALL NEW 2" HWS&R
TO SERVE AC-14 FROM
EXISTING 3" HWS&R TO
POOL HEAT EXCHANGER.
REMOVE
EXISTING 2"
HWS&R
SERVING
AC-14.
UNIT
WATER FLOW (GPM) PIPE SIZE (IN.)
POOL HX 75 3
NOTES:
POOL WATER HEAT EXCHANGER CONTROL VALVE: BASE BID INCLUDES REPLACING THEEXISTING SPOOL PIECE (PREVIOUS LOCATION OF 3-WAY HOT WATER CONTROL VALVE) ATTHE HEAT EXCHANGER WITH A NEW MODULATING 2-WAY CONTROL VALVE. THE NEW2-WAY CONTROL VALVE SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BYAUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOTPERMITTED FOR ANY OF THE POOL HEAT EXCHANGER'S NEW CONTROLS. CONTRACTOR TOEITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL, AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, AND LOW-VOLTAGETRANSFORMERS FOR NEW CONTROL COMPONENTS. PROVIDE AND IMPLEMENT CONTROLSEQUENCES AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLY OPERATIONAL TOMAINTAIN POOL WATER TEMPERATURE. CONTROL VALVE SIZE IS SHOWN FOR REFERENCEONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TORE-BALANCE HOT WATER FLOW TO POOL HEAT EXCHANGER AFTER INSTALLATION OF NEWCONTROL VALVE.
HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: BASE BID ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSOR / TRANSMITTER IN PUMP P-8'S HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMP LOCATED IN BOILER ROOM. PRESSURE SENSOR / TRANSMITTERTO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMP VFD TO MAINTAINCONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVES AT AC-14 AND THEPOOL HEAT EXCHANGER OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).
1/16" = 1'-0"
MECHANICAL FLOOR PLAN - WEST1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-1
03
.d
wg
je
sse
.vo
se
1/16"=1'-0"
M-104
JEV
RC
MECHANICAL FLOOR PLANAREA B
NORTH
M-104
A B C D
E F
G H
OLD JHS
M-103 M-104
1/4" = 1'-0"
D-WING MECHANICAL PLAN - WORK PART OF BASE BID2
M-104
M-201
1
8 FT. MIN.
HIGH ROOF
CABLES, ANCHORS
AND TENSIONERS
28"Ø CBILA
316/304
28"Ø CBILA
316/304
16"Ø CBILA
316/304
4
5
°
ROOF
FLOOR
ROOF CURB
4"
(4 in)
PAD
M-201
2
RETURN TO TANK
CHECK
VALVE
GATE
VALVE
CHECK
VALVE
SUPPLY TO BURNERS
CHECK
VALVE
PRESSURE
GAUGES
W/ISOLATORS
BURNER
NOZZLE
GATE
VALVE
EXISTING
FUEL-OIL
TANK
FILTER
GATE
VALVE
CHECK
VALVE
VACCUUM OR COMPOUND
GAUGE W/ISOLATOR
OIL INLET
OIL RETURN
OIL
METERING
VALVE
FILTER
EXISTING FUEL-OIL PUMP
TRANSFER STATION
OIL INLET
OIL RETURN
OIL
METERING
VALVE
CHECK
VALVE
BACK PRESSURE VALVE
SET BELOW 3 PSI
BURNER
NOZZLE
STRAINER
PRESSURE
GAUGES
W/ISOLATORS
GATE
VALVE
GATE
VALVE
RELIEF
VALVE
FUEL
UNIT
FUEL
UNIT
VOLUME
CONTROL
BY-PASS
HWS
AV
2"
HW
S
HW
R
ET-3
ET-2
SHUT OFF
VALVE (TYPICAL)
PUMP P-3
BASE MTD
TTT
36"
MAX
T
TRIPLE
BASE MTD
PUMP P-8
FINISHED FLOOR
DUTY VALVE
(TYPICAL)
FINISHED FLOOR
SECONDARY
VFD DRIVE PUMP
SECONDARY
VFD DRIVE PUMP
HWR
8"
3"
3"
5"
5"
8"
8"
8"8"
6"
6"
ET-1
M-201
3
NOT TO SCALE
ET-4
PUMP P-4
BASE MTD
SECONDARY
VFD DRIVE PUMP
5"
5"
PUMP P-5 (STANDBY)
BASE MTD
SECONDARY
VFD DRIVE PUMP
6"
6"
PUMP P-6
BASE MTD
SECONDARY
VFD DRIVE PUMP
5"
5"
SHUT OFF
VALVE (TYPICAL)
PUMP P-7
BASE MTD
SECONDARY
VFD DRIVE PUMP
6"
6"
TRIPLE
DUTY VALVE
(TYPICAL)
BOILER #1
INLINE
PUMP BP-1
BOILER #2
INLINE
PUMP BP-2
BOILER #3
INLINE
PUMP BP-3
BOILER #4
INLINE
PUMP BP-4
BOILER #5
INLINE
PUMP BP-5
BOILER #6
INLINE
PUMP BP-6
8"8"
8"8"8"
DRAIN VALVE
(TYPICAL)
TEMPERATURE SENSOR
(TYPICAL)
HWS HWS
HWS HWS
HWS
HWS
4"
4" 4" 4" 4" 4" 4"
4" 4" 4" 4" 4"
SEE BASE MOUNTED PUMP
INSTALLATION DETAIL FOR ALL
SECONDARY PUMPS (TYP.)
SEE BASE MOUNTED PUMP
INSTALLATION DETAIL FOR ALL
SECONDARY PUMPS (TYP.)
SEE INLINE PUMP
INSTALLATION DETAIL
FOR ALL BOILER
PUMPS (TYP.)
SEE INLINE PUMP
INSTALLATION DETAIL
FOR ALL BOILER
PUMPS (TYP.)
AIR SEPARATOR. SEE AIR
ELIMINATION AND EXPANSION
TANK INSTALLATION DETAIL.
EXPANSION TANKS. SEE AIR
ELIMINATION AND EXPANSION
TANK INSTALLATION DETAIL.
1-1/2"
DCW 1-1/2"
1-1/2"
PRESSURE REDUCING VALVE ASSEMBLY.
SEE AIR ELIMINATION AND EXPANSION
TANK INSTALLATION DETAIL.
3"
5"
3" TO POOL HX & AC-14
HWS
HWS
3"
STRAINER (TYPICAL)STRAINER (TYPICAL)
HWS
6"
5"
5"
6"
5" TO OLD JUNIOR HIGH SCHOOL
5" TO BUILDING WINGS G & H
5" FROM POOL HX, AC-14, & OLD JUNIOR HIGH SCHOOL
8" COMBINED RETURN
6" TO BUILDING WINGS A THRU F
8"
1"
ONE-SHOT CHEMICAL FEEDER &
FILTER FEEDER. SEE CHEMICAL
FEEDER INSTALLATION DETAIL.
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-2
01
.D
WG
je
sse
.vo
se
N.T.S.
M-201
XXX
XXX
MECHANICAL DETAILS
NOT TO SCALE
CENTRIFUGAL AIR SEPARATOR (LINE SIZE)
W/ STRAINER. SEE NOTE #2.
SEE NOTE #3.
HOSE END DRAIN VALVE W/ CAP. TYPICAL.
T. & P. RELIEF VALVE. (WHEN NOT
PROVIDED ON HEAT TRANSFER DEVICE).
SEE NOTE #4.
SYSTEM CONNECTION (CONNECT TO SIDE
OR BOTTOM OF MAIN HEADER)
CITY WATER MAKE-UP. REFER TO
WORK BY DIV. 22 FOR CONTINUATION.
REDUCER. (WHERE REQ'D.) TYPICAL.
FULL SIZE BYPASS W/ GLOBE
VALVE
PRESSURE REDUCING VALVE. (SET AT 4 PSIG
HIGHER THAN THE SYSTEM PRESSURE AT
THE HIGH POINT IN THE SYSTEM)
PRESSURE GAUGE
W/ NEEDLE VALVE. TYPICAL.
HIGH CAPACITY AUTOMATIC AIR VENT
W/ PETCOCK. TYPICAL.
AIR CHARGING VALVE. (PRESSURIZE DRY
TANK EQUAL TO FILL VALVE PRESSURE)
TO SUCTION HEADER
OF PUMPS
FROM SYSTEM
UNION OR FLANGE. TYPICAL.
FLOOR MOUNTED PRESSURIZED VERTICAL
EXPANSION TANK. (FIXED OR REPLACABLE
BLADDER TYPE). SEE NOTE #2.
4" HOUSEKEEPING
CONCRETE PAD.
FINISHED FLOOR
SHUT-OFF VALVE W/ TAG : "THIS VALVE TO
BE OPEN AT ALL TIMES, EXCEPT WHEN
DRAINING TANK OR FOR TANK
MAINTENANCE."
SEE NOTE #1
INSERT THIS TEE WHEN PARALLEL
TANKS ARE TO BE USED. REFER TO PLANS.
NOTES:
1. PIPING SHALL BE THE SAME SIZE AS THE TANK INLET CONNECTION, MINIMUM 1".
2. AIR SEPARATOR SHALL BE SUSPENDED FROM THE STRUCTURE ABOVE ON THREADED STEEL RODS AND SUPPORTS
AS REQUIRED. PROVIDE SEISMIC RESTRAINTS FOR THE AIR SEPARATOR AND EXPANSION TANK AS REQUIRED BY
LOCAL BUILDING CODE AND AS INDICATED IN THE SPECIFICATIONS AND ON THE CONTRACT DRAWINGS. INSTALL
THE AIR SEPARATOR AND THE TANK(S) AND THEIR RESPECTIVE COMPONENTS IN STRICT ACCORDANCE WITH THE
MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.
3. INSTALL UNIT LEAVING ADEQUATE DISTANCE TO REMOVE STRAINER ON UNITS WITH A STRAINER.
4. IF THE SYSTEM FLUID IS A WATER AND GLYCOL MIXTURE, THEN PIPE THE THE RELIEF VALVE DISCHARGE TO THE
GLYCOL CHEMICAL FEED SYSTEM, OTHERWISE PIPE TO THE NEAREST FLOOR DRAIN AND TERMINATE WITH AN AIR
GAP FITTING. MINIMUM PIPE SIZE TO BE EQUAL TO THE RELIEF VALVE DISCHARGE.
DIV. 23. DIV. 22.
M-202
8
M-202
3
RESTRAINED SPHERICAL TYPE
ELASTOMER CONNECTOR. TYPICAL
CALIBRATED TRIPLE DUTY VALVE.
(SIZED FOR 1-3 PSI P.D. AT THE
DESIGN FLOW RATE)
A
NOT TO SCALE
Trerice
ISOLATION VALVE. BALL OR
BUTTERFLY TYPE. TYPICAL.
OSHA/ANSI COUPLER GUARD
PUMP & MOTOR WITH BASE PLATE GROUTED
& BOLTED TO CONCRETE INERTIA BASE.
CONCRETE HOUSEKEEPING
PAD - 4" MINIMUM
STRAINER BLOWDOWN.
TERMINATE NEAR FD.
FINISHED FLOOR
ADJUSTABLE SUPPORT FOOT
COMBINATION SUCTION
DIFFUSER & STRAINER
Trerice
9" INDUSTRIAL THERMOMETER
W/ 3/4" NPT WELL. TYPICAL.
MULTIPORT PRESSURE
INDICATOR (4-PORT)
SEE NOTE #2.
1/4" O.D. COPPER TUBING W/ COMP. FITTINGS
GALV. THREADED STEEL ROD SUPPORTED
FROM BUILDING STRUCTURE. REFER TO
PIPE HANGER INSTALLATION DETAILS FOR
ROD SIZES. SEE NOTES #1 & 3.
A
CONCRETE FILLED INERTIA BASE
1" MINIMUM
SPRING ISOLATORS. SEE NOTE #3.
NOTES:
1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING PUMP TO BUILDING STRUCTURE.
2. PROVIDE SPRING & NEOPRENE TYPE PIPE HANGERS PER SPECIFICATIONS AT ALL HANGER LOCATIONS WITHIN 50'-0", UP AND DOWN
STREAM, OF ALL PUMPS.
3. PROVIDE SEISMIC BRACING/RESTRAINTS AS REQUIRED BY CODE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. FOR CONDENSER WATER PUMPS ONLY: PROVIDE A LOW PRESSURE DROP, LARGE MESH (MINIMUM 1/4" MESH) 'Y' STRAINER ON THE
SUCTION SIDE. PROVIDE A FINE MESH 'Y' STRAINER ON THE PUMP DISCHARGE SIDE, BETWEEN THE DISCHARGE AND THE TRIPLE DUTY
TYPE BALANCING VALVE.
5. ALL VALVES & HYDRONIC SPECIALTIES (I.E. TRIPLE DUTY VALVES, STRAINERS, ISOLATION VALVES, ETC...) SHALL BE FULL SIZE OF THE
SYSTEM PIPING. PROVIDE A CONCENTRIC REDUCER AT THE PUMP DISCHARGE CONNECTION, AS REQUIRED.
FROM SYSTEM
A
SEE NOTE #1 & #7.
TO SYSTEM
SPRING AND NEOPRENE TYPE
VIBRATION ISOLATORS. TYPICAL FOR 2.
GALV THREADED STEEL ROD SUPPORTED FROM
BUILDING STRUCTURE. TYPICAL. SEE NOTES #2
& #3. FOR BOILER PUMPS BP-1 THRU BP-6,
PROVIDE SUPPORTS FROM FLOOR WITH
NEOPRENE ISOLATORS.
TRIPLE DUTY VALVE W/ POSITIVE SHUTOFF.
(SIZE FOR 1-3 PSI P.D. AT THE DESIGN FLOW
RATE)
MULTIPORT PRESSURE
INDICATOR (3-PORT)
NOTES:
1. PROVIDE FLANGES/UNIONS FOR REMOVAL OF PUMP. THE MECHANICAL CONTRACTOR SHALL COORDINATE.
2. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING PUMP TO BUILDING STRUCTURE.
3. PROVIDE SEISMIC BRACING AS REQUIRED BY CODE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. THE MECH. CONTRACTOR IS RESPONSIBLE FOR INSTALLING MOTOR SUPPORTS ON INLINE PUMPS WHEN MOTORS ARE GREATER THAN 1/2
HP. MOTOR SUPPORTS SHALL BE PER MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS. MOTOR SUPPORT BRACKET
MUST BE MOUNTED IN SUCH A WAY AS TO NOT CREATE ANY STRESSES ON PUMP COMPONENTS. MOTOR SUPPORTS SHALL NOT BE SO
RIDIGDLY MOUNTED THAT IT LIMITS THE PUMPS ABILITY TO MOVE WITH PIPE EXPANSION MOVEMENT.
5. FOR CONDENSER WATER PUMPS ONLY: PROVIDE A FINE MESH 'Y' STRAINER ON THE PUMP DISCHARGE SIDE, BETWEEN THE DISCHARGE
AND THE TRIPLE DUTY TYPE BALANCING VALVE.
6. PROVIDE BALL VALVE FOR PIPING UP TO 2-1/2" AND BUTTERFLY TYPE VALVE FOR PIPING 3" AND GREATER.
7. ALL VALVES & HYDRONIC SPECIALTIES (I.E. TRIPLE DUTY VALVES, STRAINERS, ISOLATION VALVES, ETC...) SHALL BE FULL SIZE OF THE
SYSTEM PIPING. PROVIDE A CONCENTRIC REDUCERS AT THE PUMP CONNECTIONS, AS REQUIRED.
1/4" O.D. COPPER TUBING
W/ COMP. FITTINGS. TYPICAL.
9" INDUSTRIAL THERMOMETER
W/ 3/4" NPT WELL.
ISOLATION VALVE.
TYPICAL. SEE NOTE #6.
STRAINER WITH HOSE END
BLOW DOWN VALVE.
SEE NOTE #5.
A
SEE NOTE #5.
NOT TO SCALE
M-202
4
M-202
7
FLOW
BALL VALVE (TYP.)
1" PIPE (TYP.)
TO NEAREST FLOOR
DRAIN.
FROM HWS HEADER ON
DISCHARGE SIDE OF
PRIMARY LOOP PUMPS
SPRING-LOADED
SWING CHECK VALVE
(TYP.)
CHEMICAL
FEEDER
TANK
MANUAL AIR
VENT
GLOBE VALVE
FILL FUNNEL
NOT TO SCALE
M-202
11
NOT TO SCALE
STAINLESS STEEL COUNTER FLASHING.
ALUMINUM INSULATED
ROOF CURB. SEE NOTE #4.
VENTILATED ALUM. CURB EXTENSION.
FINISHED ROOF. SEE NOTE #3.
SEE NOTE #1
NOTES:
1. TOP OF STACK 8' MIN. ABOVE ROOF, EXCEPT WHERE THE STACK IS WITHIN 10' OF ANY PORTION OF THE BUILDING OR IS CONCEALED
WITHIN ARCHITECTURAL SCREENING, THE STACK MUST TERMINATE A MINIMUM OF 8' HIGHER.
2. PROVIDE WALL SUPPORT ASSEMBLY OR PLATE SUPPORT AT EACH FLOOR IN RISE. PROVIDE INTERMEDIATE SUPPORTS IN RISE EVERY
10'-0" MINIMUM. PROVIDE MEANS FOR EXPANSION BETWEEN FIXED SUPPORTS. PROVIDE A WALL GUIDE UPSTREAM OF ALL EXPANSION
JOINTS. DO NOT SECURE SUPPORTS, GUIDES, ETC... TO COMBUSTIBLE CONSTRUCTION. COORDINATE WITH MANUFACTURER.
3. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR EXACT ROOF CONSTRUCTION.
4. PROVIDE A MINIMUM OF 4" CLEARANCE BETWEEN THE OUTER STACK WALL AND THE INSIDE FACE OF THE ROOF CURB AND TO
COMBUSTIBLE MATERIALS. FOR ADDITIONAL ROOF CURB INSTALLATION INFORMATION, REFER TO ROOF MOUNTED EXHAUST FAN DETAIL.
5. RUN 1" CPVC DRAIN AND PITCH DOWN 2% IN THE DIRECTION OF FLOW. RUN DRAIN TO THE INLET SIDE OF THE ACID NEUTRALIZER
SYSTEM AT THE CONDENSING BOILER. TRAP HEIGHT EQUAL TO MAX. APPLIANCE OUTLET PRESSURE. SECURE DRAIN LINE TO
STRUCTURE ACCORDINGLY. MAINTAIN MAXIMUM HEADROOM BELOW PIPING - MIN. 7'-6".
6. PROVIDE GUY RING CABLE ATTACHMENTS WITH GUY WIRES AT 6'-0" INTERVALS. ALL MATERIALS, INCLUDING THE GUY RINGS, CABLE
CLAMPS, TURNBUCKLES, FASTENERS AND GUY WIRES SHALL BE STAINLESS STEEL AND LOAD RATED, SO THE STACK CAN BE CAPABLE OF
WITHSTANDING WIND LOADS INDICATED IN THE SPECIFICATIONS. ANY COMPONENTS NOT SUPPLIED BY THE STACK MANUFACTURER
SHALL BE PROVIDE BY THE MECHANICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL EMPLOY A STRUCTURAL ENGINEER TO
SIZE AND RATE ALL THE SUPPORTING COMPONENTS AND SUBMIT STAMPED DOCUMENTS, TO THE PROJECT ENGINEER OF RECORD, FOR
APPROVAL PRIOR TO INSTALLATION.
1" AIR SPACE
TO BOILER(S) OR
DRAFT FAN.
TRAPPED DRAIN.
SEE NOTE #5.
TEE W/ DRAIN
TEE CAP.
STAINLESS STEEL
STORM COLLAR.
PROVIDE 3 GUY WIRES (MIN.), EQUALLY
SPACED AROUND THE CIRCUMFERENCE OF
THE STACK. SEE NOTE #6.
TURNBUCKLE. SEE NOTE #6
SECURE GUY WIRE MOUNTING PLATE TO THE TOP OF
THE BUILDING STRUCTURAL STEEL OR CONCRETE
DECK. TYPICAL AT ALL CONNECTIONS. SEAL ALL
PENETRATIONS IN ROOF MEMBRANE. SEE NOTE #6.
4" CLEAR
APPLY SEALANT BETWEEN COUNTER FLASHING/STORM
COLLARS AND CASING. TYPICAL.
GUY RINGS.
SEE NOTE #6.
PROVIDE PLATE SUPPORT AT UNDERSIDE OF
ROOF OPENING. MECHANICAL CONTRACTOR TO
PROVIDE SUPPORT STEEL AS REQUIRED.
CLOSURE RING.
FOUR PIPE
DIAMETERS,
10" MAX.
HIGHEST POINT IN SYSTEM
NOT TO SCALE
M-202
10
1/4" TYPE "L" COPPER TUBE TO
NEAREST SUITABLE DRAIN
(AUTOMATIC VENTS ONLY)
MANUAL OR AUTOMATIC
AIR VENT
1/4" GAGE COCK
1/4" BRASS NIPPLE
REDUCER
INSULATION
PITCH UP
FLOW
NOTES:
1. REFER TO PIPE HANGER DETAIL FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT, PROVIDE MIN.
3/8" DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).
2. FOR PIPES UNDER 2" USE 1-1/2"x1-1/2"x1/4". FOR PIPES 2" AND LARGER USE 3"x3"x1/4".
3. EXPANSION SHIELDS SHALL BE ONLY USED IN CONC. SLABS OR BEAMS OF 4" MIN. DEPTH.
4. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ACTUAL CONSTRUCTION TYPE.
5. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST CONCRETE STRUCTURE
WITH APPROPRIATE LOAD RATED FASTENERS. COORDINATE WITH THE PRECAST MANUFACTURER TO PROVIDE
THE CORRECT METHOD TO ADEQUATELY SECURE TO THE PRECAST CONCRETE STRUCTURE.
EXPANSION BOLTS.
TYPICAL. SEE NOTE #5.
CONCRETE FLOOR OR ROOF
SLAB SEE NOTE #4.
CLIP ANGLE
GALV. STEEL,
THREADED HANGER
ROD. TYPICAL. SEE
NOTE #1
ANGLE IRON SEE
NOTE #2
TURNBUCKLE
NUT AND WASHER
EACH SIDE. TYPICAL.
STEEL EXPANSION SHIELD FOR
EXISTING CONSTRUCTION.
SEE NOTE #3
PRECAST HOLLOW CORE
CONCRETE PLANK.
USE TOGGLE STYLE FASTENERS IN THE
PLANK CORES ONLY. SEE NOTE #5.
NOT TO SCALE
M-202
2
BACK TO BACK ANGLE IRON W/
SPACE BLOCKS 2 FT. ON CTR.
SEE NOTE #2
CONCRETE FLOOR
OR ROOF SLAB
STRUCTURAL STEEL OR OPEN
WEB STEEL JOISTS (TYP.)
C-CLAMP W/ RETAINING
CLIP & LOCKING NUT
SEE NOTE #5
SIDE BEAM CLAMP SEE
NOTE #5
HANGER ROD (TYP)
SEE NOTE #1
DOUBLE SIDED BEAM
CLAMP
TACK WELD IN PLACE
BOTH SIDES
NUT AND
WASHER
NUT AND
WASHER
NOTES:
1. REFER TO PIPE HANGER DETAIL FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT PROVIDE MIN. 3/8"
DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).
2. FOR PIPES UNDER 2" USE A SINGLE 1-1/2"x1-1/2"x1/4" ANGLE IRON WITH C-CLAMP. FOR PIPES 2-1/2" AND LARGER
USE 3"x3"x1/4" ANGLE IRON BACK TO BACK AS SHOWN.
3. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS TO CONCRETE DECK DETAIL" FOR ATTACHING
HANGER RODS TO CONCRETE DECK.
4. REPAIR OF FIREPROOFING IN ORDER TO FACILLITATE THE INSTALLATION OF HANGER RODS IN EXISTING
CONSTRUCTION SHALL BE BY THE G.C.
5. USE OF C-CLAMPS AND SIDE BEAM CLAMPS IS LIMITED TO PIPING 2-1/2" AND UNDER.
NOT TO SCALE
M-202
1
INSULATION SHIELD, 12"
LONG (SEE NOTE #2)
NOTES:
1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR
ATTACHING HANGERS TO THE STRUCTURE.
2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM
AND PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.
3. ADJUSTABLE YOKE PIPE ROLL SHALL BE USED ON 4" AND 5" PIPING. ON ALL
PIPING 6" AND LARGER USE DUAL ROD PIPE ROLL.
HANGER ROD SCHEDULE
PIPE SIZE ROD SIZE MAX. ALLOWABLE SPACING
4"
5"
6"
8"
10"
12"
1/2" DIA.
1/2" DIA.
5/8" DIA.
5/8" DIA.
5/8" DIA.
5/8" DIA.
10'
10'
10'
10'
10'
10'
HANGER ROD
(SEE NOTE #1)
LOCKING NUT
AND WASHER
ADJUSTABLE YOKE PIPE
ROLL (SEE NOTE #3)
SUPPORT NUT
AND WASHER
INSULATION
PIPE
HIGH DENSITY
INSULATION 12" LONG
PIPE SADDLE
(SEE NOTE #2)
DUAL ROD PIPE ROLL
(SEE NOTE #3)
M-202
6
NOT TO SCALE
M-202
5
NOT TO SCALE
INSULATION SHIELD, 12"
LONG (SEE NOTE #2)
PIPE SADDLE
(SEE NOTE #2)
HANGER ROD
(SEE NOTE #1)
LOCKING NUT
AND WASHER
SUPPORT NUT
AND WASHER
CLEVIS HANGER
INSULATION
PIPE
HIGH DENSITY
INSULATION
12" LONG
HANGER ROD SCHEDULE
NOTES:
1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR
ATTACHING HANGERS TO THE STRUCTURE.
2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM
AND PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.
3. CLEVIS TYPE PIPE HANGER SHALL BE USED ON ALL PIPING 3" AND SMALLER.
HANGER ROD SPACING
PIPE SIZE
UP TO 2"
2-1/2" THRU 3"
ROD SIZE
3/8" DIA.
1/2" DIA.
PIPE SIZE MAX. ALLOWABLE SPACING
1"
1-1/4"
1-1/2"
2"
2-1/2"
3"
7'
8'
9'
10'
10'
10'
M-202
9
3/4" HANGER ROD
(SEE NOTE #1)
PIPE
PIPE ROLLER AND
ROLLER CHAIR (TYP.)
PIPE WITHOUT
INSULATION
LOCKING NUT AND
WASHER (TYP.)
SUPPORT NUT AND
WASHER (TYP.)
BOLT PIPE ROLLERS TO
CHANNEL OR ANGLE (TYP.)
MAX. SPAN 36"
3/4" HANGER ROD
(SEE NOTE #1)
INSULATION
PIPE
2" x 1 5/8" x 12 GA.
CHANNEL (SEE NOTE #3)
PIPE SADDLE
(SEE NOTE #2)
HIGH DENSITY
INSULATION 12" LONG
INSULATION SHIELD, 12"
LONG (SEE NOTE #2)
NOTES:
1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING
HANGERS TO THE STRUCTURE.
2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM AND
PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.
3. TRAPEZE TYPE HANGER SHALL BE USED FOR A MAXIMUM 1000 LB. UNIFORM LOAD.
4. ABOVE DETAIL IS DIAGRAMMATIC ONLY AND CONTRACTOR SHALL COORDINATE
NUMBER OF PIPES REQUIRED/ TRAPEZE.
NOT TO SCALE
NOTES:
1. CHEMICAL FEEDER SHALL BE EQUAL TO NEPTUNE FILTER FEEDER MODEL FTF-5DB (5 GALLON CAPACITY) WITH BOTTOM DRAIN.
2. MOLYBDENUM CORROSION INHIBITOR (JAMESTOWN TECHNOLOGIES MOLYGARD 140) SHALL BE ADDED TO HEATING SYSTEM TO MAINTAIN
50-150 PPM MOLYBDENUM RANGE.
TO HWR HEADER ON
SUCTION SIDE OF
PRIMARY LOOP PUMPS
1" PIPE (TYP.)
HIGH PRESSURE
FLOW SIGHT
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-2
02
&
M
-2
03
.d
wg
je
sse
.vo
se
N.T.S.
M-202
JEV
RC
MECHANICAL DETAILS
M-203
2
NOT TO SCALE
SECURE TO THE PRECAST
CONCRETE TEE.
SEE NOTE #2. TYPICAL.
PREINSULATED SPIDER GUIDE W/ LOAD BEARING, HIGH
DENSITY, CALCIUM SILICATE INSULATION AT ALL GUIDE HOT
WATER LOCATIONS. SEE NOTE #3.
PIPE GUIDE SPLIT SLEEVE TYPEPIPE INSULATION
REFER TO SPECS.
SEE NOTE #4
BOLT TO SUPPORTS
AS REQUIRED.
PIPE
NOTES:
1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.
2. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST CONCRETE STRUCTURE
WITH APPROPRIATE LOAD RATED FASTENERS TO ACCOMMODATE TO FORCES OF THE PIPING SYSTEMS.
COORDINATE WITH THE PRECAST MANUFACTURER TO PROVIDE THE CORRECT METHOD TO ADEQUATELY SECURE
TO THE PRECAST CONCRETE STRUCTURE. WHEN THE STRUCTURAL STEEL MEMBER RUNS PERPENDICULAR TO
THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE LENGTH, ONE IN EACH CORE. WHEN THE STRUCTURAL
STEEL MEMBER RUNS PARALLEL TO THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE LENGTH - MIN. 8" O.C.
SEE NOTE #1.
3. REFER TO PIPING GUIDE ARRANGEMENT DETAIL FOR ADDITIONAL INFORMATION.
4. ALL SEAMS AND JOINTS IN INSULATION SHALL BE SEALED TO MAINTAIN A CONTINUOUS VAPOR BARRIER.
2"x2"x1/4"> FOR PIPES 2" & SMALLER
3"x3"x5/16"> FOR 2-1/2" & LARGER
WELD. TYPICAL.
PRECAST HOLLOW CORE
CONCRETE PLANK.
USE TOGGLE STYLE
FASTENERS IN THE
PLANK CORES ONLY.
SEE NOTE #2.
M-203
1
WELD SUPPORT ANGLE TO STRUCTURAL
STEEL. SEE NOTE #2. TYPICAL.
PREINSULATED SPIDER GUIDE W/ LOAD BEARING, HIGH
DENSITY, CALCIUM SILICATE INSULATION AT ALL GUIDE HOT
WATER LOCATIONS. SEE NOTE #3.
NOT TO SCALE
WELD (TYP)
STRUCTURAL
STEEL
2"x2"x1/4"> FOR PIPES 2" & SMALLER
3"x3"x5/16"> FOR 2-1/2" & LARGER
BOLT TO SUPPORTS
AS REQUIRED
PIPE
PIPE INSULATION REFER
TO SPECS. SEE NOTE #4
NOTES:
1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.
2. WELD ENTIRE LENGTH OF SUPPORT ANGLE WHERE SUPPORT ANGLE IS RUN PARALLEL TO STRUCTURAL STEEL.
3. ALL SEAMS AND JOINTS IN INSULATION SHALL BE SEALED TO MAINTAIN A CONTINUOUS VAPOR BARRIER.
4. REFER TO PIPING GUIDE ARRANGEMENT DETAIL FOR ADDITIONAL INFORMATION.
PIPE GUIDE SPLIT SLEEVE TYPE
M-203
4
NOT TO SCALE
INSULATION TO BE INSTALLED WITH
CONTINUOUS JOINTS THAT ARE
VAPOR PROOFED
2"x2"x1/4"> FOR PIPES 2" & SMALLER
3"x3"x5/16"> FOR 2-1/2" & LARGER
3/8" THICK PLATE FOR 2" PIPES & SMALLER
1/2" THICK FOR 2-1/2" PIPES & LARGER
NOTES:
1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS,
WELDS, & BOLTS.
2. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST
CONCRETE STRUCTURE WITH APPROPRIATE LOAD RATED FASTENERS TO ACCOMMODATE TO
FORCES OF THE PIPING SYSTEMS. COORDINATE WITH THE PRECAST MANUFACTURER TO
PROVIDE THE CORRECT METHOD TO ADEQUATELY SECURE TO THE PRECAST CONCRETE
STRUCTURE. WHEN THE STRUCTURAL STEEL MEMBER RUNS PERPENDICULAR TO THE CORES,
PROVIDE FASTENERS DOWN THE ENTIRE LENGTH, ONE IN EACH CORE. WHEN THE STRUCTURAL
STEEL MEMBER RUNS PARALLEL TO THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE
LENGTH - MIN. 8" O.C. SEE NOTE #1.
3. SEAL ALL SEAMS, JOINTS AND PENETRATIONS IN PIPING INSULATION AND MAINTAIN A
CONTINUOUS VAPOR BARRIER.
SECURE TO THE PRECAST
CONCRETE TEE.
SEE NOTE #2. TYPICAL.
PRECAST HOLLOW CORE
CONCRETE PLANK.
USE TOGGLE STYLE
FASTENERS IN THE
PLANK CORES ONLY.
SEE NOTE #2.
WELD. TYPICAL.
WELD. TYPICAL.
M-203
3
NOT TO SCALE
INSULATION TO BE INSTALLED WITH
CONTINUOUS JOISTS THAT ARE
VAPOR PROOFED.
2"x2"x1/4"> FOR PIPES 2" & SMALLER
3"x3"x5/16"> FOR 2-1/2" & LARGER
WELD SUPPORT ANGLE TO STRUCTURAL
STEEL. SEE NOTE #2. TYPICAL.
3/8" THICK PLATE FOR 2" PIPES & SMALLER
1/2" THICK FOR 2-1/2" PIPES & LARGER
NOTES:
1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.
2. WELD ENTIRE LENGTH OF SUPPORT ANGLE WHERE SUPPORT ANGLE IS RUN PARALLEL TO STRUCTURAL STEEL.
3. SEAL ALL SEAMS AND JOINTS IN PIPING INSULATION AND MAINTAIN A CONTINUOUS VAPOR BARRIER.
WELD. TYPICAL.
WELD. TYPICAL.
M-203
5
NOT TO SCALE
ANCHOR THE PIPING GUIDES TO
THE BUILDING STRUCTURE AND
SEISMICALLY BRACE. SEE NOTE #2.
PREINSULATED SPIDER GUIDE
PIPE GUIDE
HIGH DENSITY, CALCIUM SILICATE
INSULATION. SEE NOTE #1.
PIPE
STEEL SUPPORT ANGLES AS
REQUIRED
NOTES:
1. INSULATION THICKNESS SHALL BE AS INDICATED IN THE INSULATION SPECIFICATIONS FOR THE APPRORIATE
SERVICE.
2. SEISMIC BRACING SHALL NOT PASS THROUGH BUILDING SEISMIC AND/OR EXPANSION AND CONTRACTION
JOINTS. SEISMIC BRACING SHALL NOT CONNECT OR TIE TOGETHER DIFFERENT SIDES OR PARTS OF THE
BUILDING STRUCTURE. REFER TO THE SPECIFICATIONS AND THE SEISMIC DETAIL DRAWINGS FOR
ADDITIONAL INFORMATION.
3. MAX 2 IN. THICK HOLLOW CYLINDRICAL HEAVY DENSITY (MIN 3.5 PCF) GLASS FIBER UNITS JACKETED ON THE
OUTSIDE WITH AN ALL-SERVICE JACKET. LONGITUDINAL JOINTS SEALED WITH FACTORY APPLIED
SELF-SEALING LAP TAPE. TRANSVERSE JOINTS SECURED WITH BUTT TAPE SUPPLIED WITH THE PRODUCT.
THE ANNULAR SPACE BETWEEN THE INSULATED PENETRATING ITEM AND THE PERIPHERY OF THE OPENING
SHALL BE MIN 1/2 IN. TO MAX 1-1/2 IN. THE PIPE COVERING SHALL MEET THE ABOVE CRITERIA AND BEAR THE
UL CLASSIFICATION MARKING WITH A FLAME SPREAD AND SMOKE DEVELOPED INDEX AS NOTED IN THE
SPECIFICATIONS.
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-2
02
&
M
-2
03
.d
wg
je
sse
.vo
se
N.T.S.
M-203
JEV
RC
MECHANICAL DETAILS
UNIT LOCATION MANUFACTURER SERVICESERIES, MODEL
TYPE GPM
HEAD
FT.
NPSH
FT.
EFFICIENCY
(%)
IMPELLER
DIA.
(INCH)
BHP MAX HP
PUMP
RPM
MOTOR
TRIPLE
DUTY
VALVE
TDV
PRESS.
DROP FT.
SUCTION
DIFFUSER
SUC. DIFF.
PRESS.
DROP FT.
REMARKS
ELECTRICAL HP
P-3 BOILER ROOM BELL & GOSSETT OLD JUNIOR HIGH SCHOOLE-1510, 4BD
BASE-MOUNTED 455 62 6.8 80.6 8.5 9.06 10.73 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4
P-4 BOILER ROOM BELL & GOSSETT OLD JUNIOR HIGH SCHOOLE-1510, 4BD
BASE-MOUNTED 455 62 6.8 80.6 8.5 9.06 10.73 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4
P-5 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS A-FE-1510, 4EB
BASE-MOUNTED 554 98 7.3 78.8 10.5 17.71 19.82 1750 460V - 3Ø 20 3DS-4S 6.3 GF-3 1.8
P-6 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS G-HE-1510, 4BD
BASE-MOUNTED 455 75 6.8 78.4 9.125 11.24 14.13 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4
P-7 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS A-FE-1510, 4EB
BASE-MOUNTED 554 98 7.3 78.8 10.5 17.71 19.82 1750 460V - 3Ø 20 3DS-4S 6.3 GF-3 1.8
P-8 BOILER ROOM BELL & GOSSETTPOOL HEAT EXCHANGER, AC-14 E-1510, 2BD
BASE-MOUNTED 110 80 4.4 66.1 8.75 3.38 5.37 1750 460V -3Ø 7.5 3DS-2S 4.7 DC-3 1.2
PB-1 BOILER ROOM BELL & GOSSETT
BOILER (B-1) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
PB-2 BOILER ROOM BELL & GOSSETT
BOILER (B-2) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
PB-3 BOILER ROOM BELL & GOSSETT
BOILER (B-3) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
PB-4 BOILER ROOM BELL & GOSSETT
BOILER (B-4) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
PB-5 BOILER ROOM BELL & GOSSETT
BOILER (B-5) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
PB-6 BOILER ROOM BELL & GOSSETT
BOILER (B-6) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -
SYMBOL LOCATION SERVICE MANUFACTURER MODEL
PIPE SIZE (IN.)
OPER. WEIGHT
(LBS)
REMARKS
AS-1 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT RL-10F 102,052
NOTES:
1. INSTALL AND CONNECT HIGH CAPACITY AUTOMATIC AIR VENT AT TOP OF AIR SEPARATOR.
2. INSTALL HOSE END DRAIN VALVE AT BOTTOM OF AIR SEPARATOR.
UNIT LOCATION MANUFACTURER MODEL FUEL
BOILER DATA
FLUID DATA BLOWER POWER CONTROL
GAS
PRESSURE
(IWC)
OPERATING
WEIGHT (LBS)
REMARKS
TYPE BOILER HP
OIL INPUT
(GPH)
GAS INPUT
(MBH)
MAXIMUM
OUTPUT
(MBH)
MAX. THERMAL
EFFICIENCY
%
BOILER TURN
DOWN
MAX. WORKING
PRESSURE (PSI)
GPM
EWT (°F) LWT (°F)
VOLT PH AMPS BLOWER HP VOLT PH MIN. MAX.
B-1 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
B-2 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
B-3 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
B-4 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
B-5 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
B-6 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600
SYMBOL LOCATION SERVICE MANUFACTURER MODEL TYPE
VOLUME (GALS.) ACCEPTANCE (GALS.) HEIGHT (IN.) DIAMETER (IN.)
OPER. WEIGHT
(LBS)
REMARKS
ET-1 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000
VERTICAL
BLADDER - ASME
792.0 792.0 118 48 8164.0
ET-2 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000
VERTICAL
BLADDER - ASME
792.0 792.0 118 48 8164.0
ET-3 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000
VERTICAL
BLADDER - ASME
792.0 792.0 118 48 8164.0
ET-4 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000
VERTICAL
BLADDER - ASME
792.0 792.0 118 48 8164.0
NOTES:
NOTES:
1. PROVIDE INVERTER DUTY RATED MOTORS AND VARIABLE FREQUENCY DRIVES (SYSTEM PUMPS P-3, P-4, P-5, P-6, P-7, & P-8).
2. PUMP IS SELECTED TO PROVIDE A MOTOR THAT IS NON-OVERLOADING OVER ITS ENTIRE IMPELLER CURVE.
3. BOILER PUMPS TO BE CONTROLLED BY PACKAGED BOILER CONTROLS AND MONITORED BY BUILDING DDC SYSTEM. BOILER CONTROLS AND DDC SYSTEM TO
CONTROL BOILERS AND PRIMARY PUMPS TO MAINTAIN HOT WATER RESET SCHEDULE FOR SECONDARY WATER TEMPERATURE TO BUILDING BASED ON
OUTDOOR TEMPERATURE, INDOOR TEMPERATURE, HOT WATER SUPPLY TEMPERATURE TO THE BUILDING, AND HOT WATER RETURN TEMPERATURE FROM THE
BUILDING.
4. EXISTING PUMPS P-1 AND P-2 SHALL BE REMOVED AND NOT REPLACED.
3. HEAT-TIMER CONTROLS TO CONTROL BOILERS AND ASSOCIATED PUMPS. BUILDING DDC SYSTEM TO
CONTROL BOILER PUMPS IF HEAT-TIMER CONTROLS ARE UNABLE TO DO SO. BMS CONTRACTOR TO
COORDINATE ALL REQUIREMENTS WITH HEAT-TIMER CONTROLS TO PROVIDE ALL ADDITONAL
CONTROLS REQUIRED FOR A FULLY-FUNCTINING SYSTEM. BUILDING DDC SYSTEM TO ENABLE HOT
WATER SYSTEM, AND MONITOR EVERY AVAILABLE OUTPUT POINT FROM THE HEAT-TIMER CONTROL
SYSTEM. HEAT-TIMER CONTROLS AND DDC SYSTEM TO CONTROL BOILERS AND PRIMARY PUMPS TO
MAINTAIN HOT WATER RESET SCHEDULE BASED ON OUTDOOR TEMPERATURE. THE HOT WATER RESET
SCHEDULE IS TO BE OVERRIDDEN UPON A CALL FOR HOT WATER FROM THE POOL HEAT EXCHANGER. .
4. BURNER SHALL BE DUAL FUEL, FULLY-MODULATING. THE MECH. CONTRACTOR SHALL INSTALL IN
STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE U.L. GAS
TRAINS WITH ALL APPURTENANCES INCLUDING BUT NOT LIMITED TO: MAIN & PILOT - PRESSURE
REGULATORS, GAUGES & GAS COCKS, PILOT SOLENOID, HIGH & LOW GAS PRESSURE SWITCHES,
LEAKAGE TEST COCKS, ETC.
5. IN ADDITION PROVIDE: ELECTRIC IGNITION, ULTRA-VIOLET FLAME DETECTOR, ETC... ALL
ELECTRONIC PROGRAMMING CONTROL COMPONENTS AND ELECTRICAL DEVICES SHALL BE
FACTORY WIRED IN A UNIT MOUNTED CONTROL PANEL.
NOTES:
1. PROVIDE WITH STAINLESS STEEL DOUBLE-WALLED CHIMNEY SYSTEM TESTED IN ACCORDANCE WITH
UL 103.
2. PROVIDE HEAT TIMER MULTI-MOD CONTROLS WITH EXTENSION MODULES (EXM), BMS INTERFACE,
INTERNET REMOTE COMMUNICATION, AND ALL REQUIRED RELAYS, SENSORS, AND OTHER
COMPONENTS FOR A FULLY-FUNCTIONING SYSTEM.
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\H
VA
C\0
-C
urre
nt\M
-3
01
.D
WG
je
sse
.vo
se
N.T.S.
M-301
XXX
XXX
MECHANICAL SCHEDULES
CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ELBOWS, TEES, DROPS, AND MISCELLANEOUS PIPING DUE TO ELEVATION CHANGES,
OBSTRUCTIONS, COORDINATION WITH OTHER TRADES, ETC. TO INSTALL A COMPLETE, FUNCTIONING, PLUMBING SYSTEM.
LP GAS PIPING (PROPANE) G
HOT WATER RECIRCULATION PIPING140°F
140°F HOT WATER PIPING 140°F TEMPERATURE
CONDENSATE DRAIN PIPING CD
GAS VALVE
BUTTERFLY VALVE
GAS PRESSURE REGULATOR
GAS SOLENOID VALVE
ALL PIPING IS TO BE RUN CONCEALED IN CEILINGS OR WALLS. PIPING IS TO BE EXPOSED ONLY WHERE NOTED ON DRAWINGS. IF
CONTRACTOR CANNOT RUN PIPING CONCEALED, NOTIFY ENGINEER IMMEDIATELY TO RESOLVE CONFLICT.
31.
35.
NO PIPING SHALL BE INSTALLED WITHIN STAIRS, STAIR WALLS, ELEVATOR MACHINE ROOMS, TRANSFORMERS VAULTS, ELECTRICAL
ROOMS OR OVER ELECTRICAL PANELS/EQUIPMENT. ONLY DEDICATED PLUMBING PIPING WILL BE ALLOWED WITHIN EACH OF THE
SPACES INDICATED ABOVE. COORDINATE THE LOCATION OF ALL PIPING WITH ALL OTHER TRADES, AND ADJUST AS NECESSARY
DOMESTIC WATER DROPS OR RISERS INSTALLED IN EXTERIOR WALLS, SHALL BE INSTALLED ON THE WARM SIDE OF THE BUILDING
INSULATION, AND THE LOCATION SHALL BE MADE INFILTRATION FREE.
INSTALL FLOOR MOUNTED EQUIPMENT, SUCH AS WATER HEATERS, STORAGE TANKS, ETC. ON A 4" HIGH CONCRETE HOUSEKEEPING
PAD. COORDINATE SIZE AND FINAL LOCATION OF ALL CONCRETE PADS WITH THE STRUCTURAL ENGINEER. PADS SHALL BE MINIMUM 6"
LARGER THAN THE EQUIPMENT IN BOTH HORIZONTAL DIRECTIONS.
ALL INDIRECT WASTE DRAINS SHALL BE PIPED TO FLOOR DRAINS, FUNNELS OR FIXED AIR GAP FITTINGS, THROUGH AIR GAP OR TO A
SINK DRAIN TAILPIECE.
COORDINATE ALL PLUMBING EQUIPMENT REQUIRING POWER, FOR EXACT LOCATION AND POWER REQUIREMENTS WITH THE ELECTRICAL
CONTRACTOR.
INSTALL TRAP PRIMERS FOR EACH INDIVIDUAL FLOOR DRAIN OR, AS A OPTION, CONTRACTOR MAY UTILIZED UTILITY DISTRIBUTION UNIT
FOR MULTIPLE DRAIN. CONNECT TRAP PRIMER TO NEAREST ACTIVE COLD WATER MAIN; PROVIDE ISOLATION VALVES AND EXTEND TO
FLOOR DRAIN.
1.
5.
8.
9.
7.
12.
11.
10.
6.
17.
16.
13.
14.
15.
20.
22.
21.
19.
18.
23.
PIPING DIRECTION OF FLOW
PIPING RISER UP
PIPING RISER DOWN
BRANCH/BOTTOM CONNECTION
DESCRIPTION
SOIL OR WASTE ABOVE FLOOR OR GRADE
SOIL OR WASTE BELOW FLOOR OR GRADE
COLD WATER PIPING
HOT WATER PIPING 110°F TEMPERATURE
TRAP PRIMER PIPING
HOT WATER RECIRCULATION PIPING
CHECK VALVE
BALL VALVE
TRAP
CLEANOUT DECKPLATE
UNION
CAP ON END OF PIPE
TRAP PRIMER VALVE
SAN
SAN
TP
SYMBOL
FLOOR DRAIN
POINT OF CONNECTION
3.
2.
4.
THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES. THE DRAWINGS ARE
DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND PIPING. THE CONTRACTOR SHALL COORDINATE THE EXACT
LOCATION OF EQUIPMENT AND PIPING INSTALLATION WITH ALL TRADES BEFORE COMMENCING WORK.
THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY PIPING, FITTINGS, TRANSITIONS ETC. AS NECESSARY TO INSTALL PLUMBING
SYSTEM, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE.
REFER TO LATEST ARCHITECTURAL PLANS FOR ELEVATIONS, SECTIONS, DETAILS, MOUNTING HEIGHTS, LOCATION OF PLUMBING
FIXTURES. ALL HANDICAPPED DESIGNATED FIXTURES SHALL BE INSTALLED IN ACCORDANCE WITH ANSI AND ADA STANDARDS.
IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW INDIVIDUAL BRANCH PIPING TO EACH PLUMBING FIXTURE; ONLY THE BRANCH PIPING
TO GROUPS OF FIXTURES IS INDICATED. THE ENTIRE PLUMBING SYSTEM SHALL BE FULLY OPERATIONAL AND READY FOR BENEFICIAL
USE BEFORE THE JOB IS CONSIDERED COMPLETE.
INSTALL WATER HAMMER ARRESTORS (WHA) AT ALL QUICK-CLOSING VALVES (FLUSH VALVES, SOLENOID VALVES, ETC:) THROUGHOUT
THE PLUMBING SYSTEM. WATER HAMMER ARRESTORS SHALL BE SIZED BASED ON SUPPLY FIXTURE UNITS PER PLUMBING DRAINAGE
INSTITUTE (PDI) STANDARDS AND INSTALLED PER MANUFACTURER'S RECOMMENDATIONS.
PIPE ALL CONDENSATE DRAINS FROM MECHANICAL EQUIPMENT COOLING COILS, BY GRAVITY (INTERIOR AIR HANDLING UNITS, FAN COIL
UNITS, ETC.) TO FLOOR DRAINS OR JANITOR'S SINKS THROUGH AN AIR GAP. EACH CONDENSATE DRAIN SHALL BE TRAPPED AT THE
EQUIPMENT DRAIN OUTLET, REFER TO TRAP DETAILS ON DRAWINGS. COORDINATE EXACT LOCATION WITH THE HVAC CONTRACTOR AND
ADJUST AS NECESSARY.
WHERE AN INACCESSIBLE CEILING IS INSTALLED (GYP BOARD OR EQUIVALENT), THE CONTRACTOR SHALL COORDINATE THE LOCATIONS
OF ACCESS PANELS FOR ALL VALVES, CLEANOUTS, ETC., REQUIRING ACCESS, WITH THE ARCHITECT, PRIOR TO INSTALLATION OF SUCH
DEVICES AND OTHER APPURTENANCES.
COORDINATE EXACT LOCATION OF ALL UNDERGROUND UTILITIES (WATER, GAS, SANITARY, ETC.) EXITING OR ENTERING THE BUILDING
WITH THE SITE CONTRACTOR AND UTILITY DRAWINGS. COORDINATE ALL FOUNDATION WALL PENETRATIONS AND INVERT ELEVATIONS
WITH THE GENERAL CONTRACTOR AND OR CONSTRUCTION MANAGER.
EVERY FIXTURE SHALL BE PROPERLY PIPED TO WATER, SANITARY, WASTE, AND VENT SYSTEMS. REFER TO THE PLUMBING SCHEDULES
ON MEP DRAWINGS FOR INDIVIDUAL PIPE SIZES TO EACH FIXTURE.
24.
25.
26.
27.
28.
29.
30.
32.
33.
34.
HOT WATER RECIRCULATING PUMP
BACKFLOW PREVENTER
TEMPERING VALVE
BALANCING VALVE
S
DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS & CONDITIONS IN THE FIELD AND SHALL NOTIFY THE
ENGINEER IMMEDIATELY OF ANY & ALL DISCREPANCIES.
IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY PIPE, FITTING, RISE/DROP OR DETAIL. SYSTEM & COMPONENTS SHALL BE
INSTALLED ACCORDING TO THE INTENT AND MEANING OF CONTRACT DOCUMENTS AND IN ACCORDANCE WITH GOOD PRACTICE.
CONTRACTOR IS RESPONSIBLE TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS WITH FACILITIES AND SERVICES TO MEET
REQUIREMENTS INDICATED AND IN ACCORDANCE WITH APPLICABLE CODES AND ORDINANCES.
EQUIPMENT AND COMPONENTS HAVING EQUAL PERFORMANCE CHARACTERISTICS BY OTHER MANUFACTURERS MAY BE CONSIDERED,
PROVIDED DEVIATIONS IN DIMENSIONS, OPERATION AND OTHER CHARACTERISTICS DO NOT CHANGE DESIGN CONCEPT OR INTENDED
PERFORMANCE AS JUDGED BY THE ENGINEER. BURDEN OF PROOF OF EQUALITY OF PRODUCTS IS ON THE CONTRACTOR.
CONTRACTOR IS RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY
FOR THE PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.
CONTRACTOR IS RESPONSIBLE TO PROPERLY PROTECT OWNER'S PROPERTY AND EQUIPMENT FROM INJURY, AND DAMAGE TO SAME
SHALL BE REPLACED BY CONTRACTOR.
CONTRACTOR IS TO CLEAN JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS CAUSED BY THE PERFORMANCE
OF THE WORK INCLUDED IN THIS CONTRACT.
ALL WORK TO BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER, CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE
OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE CONSTRUCTION AREAS BY MEANS
OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN WORK AREA.
CONTRACTOR IS RESPONSIBLE TO PROPERLY SECURE AREAS OF CONSTRUCTION AT THE END OF EACH WORKING DAY.
EQUIPMENT AND PIPING TO BE INSTALLED IN ACCORDANCE WITH SEISMIC REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE.
CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER TRADES.
ALL EQUIPMENT SUPPORTS AND PIPE HANGERS TO BE CONNECTED FROM THE BUILDING STRUCTURE.
ALL NEW PENETRATIONS THRU RATED WALLS, FLOORS AND CEILINGS SHALL BE FIRESTOPPED AND SEALED TO MAINTAIN RATING.
REFER TO SPECIFICATION SECTION 07801.
PROVIDE ACCESS PANELS/DOORS FOR ALL CONCEALED PLUMBING ITEMS REQUIRING ACCESS, COORDINATE WITH DIVISION 8.
PROVIDE SHUTOFF VALVES AT ALL BRANCH PIPING TAKEOFFS.
ALL BRANCH WATER PIPES TO HAVE STOP VALVES AT EACH PLUMBING FIXTURE.
INSULATE EXPOSED WASTE, HOT AND COLD WATER PIPING UNDER HANDICAP LAVATORIES.
INSULATE COLD WATER, HOT WATER AND RECIRCULATION PIPING, CONDENSATE DRAIN, STORM PIPING AND ROOF DRAIN BODIES.
NON-POTABLE COLD WATER PIPING
NP
PUMPED DISCHARGED WASTE PIPINGPD
85°FTEPID WATER PIPING 85°F TEMPERATURE
FD
HT - HEAT TRACED PIPE
TMC - TEMPERATURE MAINTENANCE TRACED PIPE
PLUMBING LEGENDGENERAL NOTES
CIRCULATION PUMP SCHEDULE
TYPE MANUFACTURER MODEL REMARKSQTY.
PROPANE TANK SYSTEM NOTES
1. THE OUTSIDE PROPANE TANK SYSTEM INCLUDING REMOVAL OF EXISTING TANKS, INSTALLATION OF NEW TANKS SHALL BE DESIGNED AND INSTALLED BY AMERIGAS COMPANY,
DOMESTIC WATER HEATER SCHEDULE
TYPE MANUFACTURER MODEL REMARKSQTY.
MIXING VALVE SCHEDULE
TYPE MANUFACTURER MODEL REMARKSQTY.
PWH-1,
PWH-2,
PWH-3,
PWH-4
CYCLONE MXI COMMERCIAL WATER HEATER
MODEL No. BTH-500A
AO SMITH PROPANE
WATER HEATER
DOMESTIC WATER HEATER, 119 GAL STORAGE, 576
GPH RECOVERY AT 100 DEG. F., 33" DIAMETER, 75"
HIGH, APPROXIMATE SHIPPING WEIGHT 855 LBS.
(EACH)
4
MV POWERS INTELLISTATION MODEL LFIS150 LP DIGITAL TEMPERATURE REGULATING SYSTEM 1
WITHIN +/- 2 DEGREES F to ASSE 1017
CP-1,CP-2 TACO 2400-45 115V,3.6 AMPS,3450 RPM, 1/3 HP, 60 HZ 1 PH (EACH)2
LOCATED AT 268 ROUTE 80 IN KILLINGWORTH, CT 06419.
2. THE ENTIRE OUTSIDE PROPANE TANKS ALONG WITH ALL RELATED PIPING INSTALLATION SHALL BE IN ACCORDANCE WITH ALL LOCAL AND STATE REQUIREMENTS.
AMERIGAS SHALL PROVIDE ALL REQUIRED TESTING, APPROVALS, PERMITS AS REQUIRED AND READY FOR OWNER USE.
3. AMERIGAS SHALL PERFORM ALL WORK IN PHASES AND ENSURE THAT THE BUILDING PROPANE SUPPLY IS ALWAYS AVAILABLE AND
SHALL NEVER BE INTURRUPTED UNLESS APPROVED BY THE OWNER IN WRITING 72 HOURS PRIOR..
4. FOR A DESCRIPTION OF PROPANE TANK REMOVAL AND INSTALLATION PHASING SEE DRAWING P-201.
ET 1 WATTS MODEL No. DETA-100 ASME POTABLE WATER EXPANSION TANK
PROVIDED WITH AO SMITHGAS TRANE ASSEMBLY
PROVIDED WITH AO SMITH CONDENSATE
NEUTRALIZATION KIT
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
7p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
-0
01
.D
WG
je
sse
.vo
se
N.T.S.
P-001
AM
MB
PLUMBING NOTES, LEGENDS,SCHEDULES & ABBREVIATIONS
BOILER #1 BOILER #2
3"C
W
3"HW
3"C
W
3"CW 4"CW 4"CW
3/4
"H
WR
(1
40
°)
1-1
/2
"H
W(1
40
°)
2"H
WR
3"H
W
4"C
W
3"G
3/4
"C
W
2-1/2"G2"G
1-1/2"G
1-1/2"G1-1/2"G
3/4
"H
WR
(1
40
°)
1-1
/2
"H
W(1
40
°)
3/4
"C
W
3/4
"C
W
3/4
"H
W
(1
40
°)
3/4"HWR(140°)
3/4"HW(140°)
3/4"CW
3/4"HWR(140°)
1"HW(140°)
3/4"CW
3/4"CW 3/4
"H
W(1
40
°)
3/4
"C
W
3/4
"C
W
3/4
"H
W
1"C
W
1"H
W(1
40
°)
2"C
W
6"CW 6"CW
6"CW
4"C
W
6"CW
6"C
W
EXISTING
P-1
EXISTING
WATER
HEATER
2"HW(140°)
2"HW(140°) 2"HW(140°)1"HW(140°)
2-1/2"CW
1-1/2"HW
2-1/2"CW
1-1/2"HW
2-1/2"CW
3/4"HW(140°)
2-1/2"CW
1-1/2"CW
2"H
WR
3"H
W(1
40
°)
3"C
W
ABANDONED 7,500 GALLON
HYDRO-PNEUMATIC TANK
3"G
2-1/2"CW
1-1/2"CW
EXISTING
WATER
HEATER
EXISTING
P-2
EXISTING
P-3
EXISTING
P-4
EXISTING
P-5
EXISTING
P-6
EXISTING
P-7
EXISTING
P-7
EXISTING
ELECTRICAL
GEAR
3"HW(140°)
3"HW(140°)
3"CW
3"CW
2"H
WR
2"HWR
2"HWR
3/4" BYPASS
(#1)
EXISTING PUMPS (TYP)
SEE DEMOLITION NOTE #3 THIS DRAWING
(#2)
SEE DEMOLITION NOTE #2 THIS DRAWING
EXISTING CW,HW,HWR PIPING TO REMAIN (TYP)
EXISTING CW,HW,HWR PIPING TO REMAIN (TYP)
EXISTING PLUMBING PIPING
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
SYSTEM PIPING TO REMAIN (TYP)
DEMOLITION NOTES (PHASE1)
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
EXISTING CIRCULATION VALVE
ASSEMBLY TO REMAIN IN USE
DURING DEMOLITION OF WATER
HEATER #1 (TYP FOR 2)
(SEE DEMOLITION NOTE #3)
1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS
OTHERWISE NOTED.
2. DISCONNECT AND REMOVE EXISTING WATER HEATER (#1) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, VALVES,
FITTINGS, CHECK VALVES, UNIONS, ETC AND CAP AT NEAREST VALVED MAIN CONNECTION.
3. EXISTING WATER HEATER (#2) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, CIRCULATION PUMPS, MIXING
VALVES, ETC. SHALL REMAIN AS IS AND OPERATIONAL UNTIL NEW WATER HEATERS AND RELATED COLD, HOT, AND HOT WATER RETURN
PIPING ARE INSTALLED AND FULLY OPERATIONAL.
4. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED
(TYP)
5. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)
6. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS
7. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR
8. DISCONNECT AND REMOVE ALL EXISTING WATER HEATER #1 SUPPORTS, CONCRETE PADS, ETC. OWNERS INSTRUCTIONS.
EXISTING 3" PROPANE GAS PIPE FROM
OUTSIDE PROPANE BULK STORAGE
TANKS TO REMAIN (TYP.)
2"G
(SHOWN FOR REFERENCE.
SEE MECHANICAL DWGS FOR
DETAIL). (TYP.)
CUT AND CAP CW PIPE (TYP.)
EXISTING MIXING VALVE
ASSEMBLY TO REMAIN IN USE
DURING DEMOLITION OF WATER
HEATER #1 (SEE DEMOLITION
NOTE #3)
CUT AND CAP HW PIPE (TYP)
EXISTING PIPING TO REMAIN (TYP.)
CUT AND CAP HW PIPE (TYP)
CUT AND CAP GAS PIPE
AFTER BOILER #2
REMOVED
PHASING NOTES FOR THE REPLACEMENT OF DOMESTIC WATER HEATERS
1. DISCONNECT EXISTING WATER HEATER #1 COMPLETELY AND CAP CONNECTING CW, HW, AND HWR PIPING
3. PROVIDE (4) PROPANE WATER HEATERS LOCATED WHERE WATER HEATER #1 WAS REMOVED
4. AFTER THE (4) PROPANE WATER HEATERS ARE INSTALLED, TESTED, AND OPERATIONAL, DISCONNECT AND REMOVE EXISTING WATER HEATER #2.
DISCONNECT AND REMOVE EXISTING WATER HEATER #2 COMPLETELY ALONG WITH ALL RELATED CIRCULATION PUMPS, MIXING VALVE, ETC.
2. MAINTAIN EXISTING WATER HEATER #2 OPERATIONAL ALONG WITH ALL RELATED CW,HW, HWR MIXING VALVE AND CIRCULATION PUMPS
GENERAL DEMOLITION NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL
FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL COORDINATE SHORT TERM
SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.
REMOVE GAS PIPING
AFTER BOILER #2
REMOVED.
REMOVE GAS PIPING
AFTER BOILER #1
REMOVED.
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
3/8" = 1'-0"
PLUMBING BOILER ROOM DEMOLITION PLAN (PHASE 1)1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
D-1
01
A
ND
P
D-1
02
.D
WG
je
sse
.vo
se
3/8"=1'-0"
PD-101
AM
MB
PLUMBING BOILER ROOMDEMOLITION PLAN - PHASE 1
PD-101
NORTH
BOILER
ROOM
3"C
W
3"HW
3"C
W
4"CW 4"CW
3/4
"H
WR
(14
0°)
1-1/2"H
W(1
40
°)
2"H
WR
3"H
W
4"C
W
3"G
3/4
"C
W
2-1/2"G
3/4
"H
WR
(1
40
°)
1-1/2
"H
W(14
0°)
3/4"C
W
3/4
"C
W
3/4"H
W
(14
0°)
3/4"HWR(140°)
3/4"HW(140°)
3/4"CW
3/4"HWR(140°)
1"HW(140°)
3/4"CW
3/4"CW 3/4"H
W(1
40
°)
3/4
"C
W
3/4"C
W
3/4"H
W
1"C
W
1"H
W(14
0°)
2"C
W
6"CW 6"CW
6"CW
4"C
W
6"CW
6"C
W
2"HW(140°)
2"HW(140°) 2"HW(140°)1"HW(140°)
2-1/2"CW
1-1/2"HW
2-1/2"CW
1-1/2"HW
2-1/2"CW
3/4"HW(140°)
2-1/2"CW
1-1/2"CW
3"C
W
3"G
2-1/2"CW
1-1/2"CW
EXISTING
WATER
HEATER
EXISTING
ELECTRICAL
GEAR
3"HW(140°)
3"CW
2"H
WR
2"HWR
3/4" BYPASS
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
DEMOLITION NOTES (PHASE 2)
DISCONNECT AND REMOVE EXISTING
MIXING VALVE ASSEMBLY
(SEE DEMOLITION NOTES #2)
ABANDONED 7,500 GALLON
HYDRO-PNEUMATIC TANK
1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS
OTHERWISE NOTED.
2. AFTER NEW WATER HEATERS AND RELATED COLD, HOT, AND HOT WATER RETURN PIPING ARE INSTALLED AND FULLY OPERATIONAL, DISCONNECT
AND REMOVE EXISTING WATER HEATER (#2) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, VALVES, FITTINGS, CHECK
VALVES, UNIONS, ETC AND CAP AT NEAREST VALVE MAIN CONNECTION ONLY AFTER THE NEW PROPANE WATER HEATERS SYSTEM INCLUDING ALL
MIXING VALVE ASSEMBLY, CIRCULATION PUMPS, PIPING, VALVES, ETC. ARE INSTALLED, TESTED, AND APPROVED TO BE USED BY OWNER.
3. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED (TYP)
4. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)
5. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS
6. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM
PIPING TO REMAIN (TYP)
REMOVE EXISTING HOT
WATER VALVES AND
REPLACE WITH NEW (TYP.)
DISCONNECT AND REMOVE EXISTING
CIRCULATION PUMP ASSEMBLY (TYP FOR 2)
(SEE DEMOLITION NOTES #2)
CUT AND CAP 3" HW (110) PIPE
CUT AND CAP 1" HWR (140) PIPE
CUT AND CAP
2" HWR (140) PIPE
CUT AND CAP
2" HW (140) PIPE
PROPANE WATER HEATERS SHOWN
FOR REFERENCES ONLY (SEE
DRAWING P-101 FOR NEW WORK)
PHASING NOTES FOR THE REPLACEMENT OF DOMESTIC WATER HEATERS
1. DISCONNECT EXISTING WATER HEATER #1 COMPLETELY AND CAP CONNECTING CW, HW, AND HWR PIPING
3. PROVIDE (4) PROPANE WATER HEATERS LOCATED WHERE WATER HEATER #1 WAS REMOVED
4. AFTER THE (4) PROPANE WATER HEATERS ARE INSTALLED, TESTED, AND OPERATIONAL, DISCONNECT AND REMOVE EXISTING WATER HEATER #2.
DISCONNECT AND REMOVE EXISTING WATER HEATER #2 COMPLETELY ALONG WITH ALL RELATED CIRCULATION PUMPS, MIXING VALVE, ETC.
2. MAINTAIN EXISTING WATER HEATER #2 OPERATIONAL ALONG WITH ALL RELATED CW,HW, HWR MIXING VALVE AND CIRCULATION PUMPS
EXISTING 3" PROPANE GAS PIPE FROM
OUTSIDE PROPANE BULK STORAGE
TANKS TO REMAIN (TYP.)
PWH-1 PWH-2 PWH-3 PWH-4
GENERAL DEMOLITION NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE
OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A
TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH
BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION
SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.
DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.
CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON
PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND
MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02
SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL
INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,
AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH
RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST
INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT
WHILE SCHOOL IS OCCUPIED WITH STUDENTS.
3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL
FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL COORDINATE SHORT TERM
SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
3/8" = 1'-0"
PLUMBING BOILER ROOM DEMOLITION PLAN PHASE 21
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
D-1
01
A
ND
P
D-1
02
.D
WG
je
sse
.vo
se
3/8"=1'-0"
PD-102
AM
MB
PLUMBING BOILER ROOMDEMOLITION PLAN - PHASE 2
PD-102
NORTH
BOILER
ROOM
2"C
W
3/4
"H
WR
(1
40
°)
1-1
/2
"H
W(1
40
°)
2"H
WR
3"H
W
4"C
W
3"G
3/4
"C
W
3/4
"H
WR
(1
40
°)
1-1
/2
"H
W(1
40
°)
3/4
"C
W
3/4
"C
W
3/4
"H
W
(1
40
°)
3/4"HWR(140°)
3/4"HW(140°)
3/4"CW
3/4"HWR(140°)
1"HW(140°)
3/4"CW
3/4"CW 3/4
"H
W(1
40
°)
3/4
"C
W
3/4
"C
W
3/4
"H
W
1"C
W
1"H
W(1
40
°)
2"C
W
6"CW 6"CW
6"CW
4"C
W
6"C
W
2"HW(140°) 2"HW(140°)1"HW(140°)
2-1/2"CW
1-1/2"HW
2-1/2"CW
1-1/2"HW
2-1/2"CW
3/4"HW(140°)
2-1/2"CW
1-1/2"CW
ABANDONED 7,500 GALLON
HYDRO-PNEUMATIC TANK
3"G
2-1/2"G
2-1/2"CW
1-1/2"CW
FOR CONTINUATION SEE
DRAWING P-102
6"CW
EXISTING
ELECTRICAL
GEAR
2" PROPANE GAS PIPE TO
WATER HEATERS (TYP.)
COORDINATE IN FIELD
EXACT PIPE LOCATION ,
ELEVATION, METHOD OF
SUPPORT, ETC. PRIOR TO
START OF WORK. (TYP.)
4"C
W4
"C
W
6"CW
2"HW(140°)
2-1/2"CW
1-1/2"HW
2"
G
2"
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)
2"
2"
G
G
GGGGGG
G G
PROVIDE (4) TANK TYPE WATER
HEATERS COMPLETE WITH VALVES,
UNIONS, CHECK VALVE, ETC. AS PER
MANUFACTURERS RECOMMENDATION.
COORDINATE EXACT LOCATION IN
FIELD PRIOR TO START WORK. MAKE
SURE THAT ADEQUATE CLEARANCES
ARE MAINTAINED FROM EXISTING
ELECTRICAL EQUIPMENT, PANELS,
HVAC EQUIPMENT ETC. ALSO
COORDINATE EXACT WATER HEATER
LOCATION WITH HVAC CONTRACTOR
AND ELECTRICAL CONTRACTOR FOR A
COMPLETE PIPING LAYOUT.
PROVIDE 4" HIGH HOUSEKEEPING PAD
FOR WATER HEATERS. COORDINATE
EXACT SIZE WITH EQUIPMENT
PROVIDED PRIOR TO START WORK.
COORDINATE IN FIELD EXACT
LOCATION OF PAD TO MAKE SURE
THAT EXISTING FLOOR DRAINS, PIPE
CLEANOUTS, TRENCH DRAINS ETC.
ARE MAINTAINED CLEAR. (TYP.)
3"
1"
4"
2"
CONNECT 2" PROPANE
PIPE TO EXISTING CAPPED
CONNECTION.
EXISTING ELECTRICAL GEAR TO
REMAIN. LOCATE WATER HEATERS MIN
5' AWAY FROM THIS GEAR.
CONSTRUCTION NOTES
1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS
OTHERWISE NOTED.
2. PROVIDE A COMPLETE DOMESTIC WATER HEATER SYSTEM TANK TYPE AO SMITH CYCLONE COMPLETE WITH ALL RELATED COLD, HOT, AND
HOT WATER RETURN PIPING , VALVES FITTINGS, PROPANE PIPING, FILTERS, STRAINERS, CHECK VALVES, UNIONS, ETC AND CAP AT NEAREST
MAIN CONNECTION ONLY AFTER THE NEW PROPANE WATER HEATERS SYSTEM INCLUDING ALL MIXING VALVE ASSEMBLY, CIRCULATION PUMPS,
PIPING, VALVES, ETC. ARE INSTALLED, TESTED, AND APPROVED TO BE USED BY OWNER.
3. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED (TYP)
4. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)
5. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS
6. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR
7. NEW DOMESTIC HOT WATER SYSTEM MUST BE FULLY OPERATIONAL BY AUGUST 24, 2018.
8. CONTRACTOR TO SNAKE, JET, AND VERIFY OPERATION ALL EXISTING FLOOR DRAIN WITHIN BOILER ROOM.
NOTE:
FOR PIPING LAYOUT IN THIS AREA SEE PROPANE DOMESTIC
WATER HEATERS MIXING VALVE AND CIRCULATION PUMPS
PIPING DETAIL SEE DETAIL ON DWG P-201
MIXING VALVE ASSEMBLY COMPLETE
WITH VALVES, UNIONS, CHECK VALVE,
ETC. AS PER MANUFACTURERS
RECOMMENDATION. MIXING VALVE
MUST BE CONNECTED TO THE
ALERTON BUILDING DDC SYSTEM.
DDC SYSTEM TO MONITOR AND
CONTROL ALL AVAILABLE POINTS.
PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS
WITH MECHANICAL CONTRACTOR AND
CONTROLS CONTRACTOR (BACNET
VS MODBUS, ETC.). INSTALL AT AN
ELEVATION 3-4 FEET ABOVE FLOOR.
MV
CIRCULATING PUMP CP-2(140 DEGREES)
COMPLETE WITH AQUASTAT, GAUGES,
ETC. AS PER MANUFACTURERS
RECOMMENDATION. MOUNT AT MAX.
5FT ABOVE FINISHED FLOOR FOR
ACCESS. PUMP MUST BE CONNECTED
TO THE ALERTON BUILDING DDC
SYSTEM. PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS WITH
MECHANICAL CONTRACTOR AND
CONTROLS CONTRACTOR. INSTALL AT
AN ELEVATION 3-4 FEET ABOVE FLOOR.
CIRCULATING PUMP CP-1(110 DEGREES)
COMPLETE WITH AQUASTAT, GAUGES,
ETC. AS PER MANUFACTURERS
RECOMMENDATION. MOUNT AT MAX.
5FT ABOVE FINISHED FLOOR FOR
ACCESS. PUMP MUST BE CONNECTED
TO THE ALERTON BUILDING DDC
SYSTEM. PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS WITH
MECHANICAL CONTRACTOR AND
CONTROLS CONTRACTOR. INSTALL AT
AN ELEVATION 3-4 FEET ABOVE FLOOR.
CP-2
CP-1
2"
4"
3" HW (110°)
3"
1"
2"
2"
PWH-1 PWH-2 PWH-3 PWH-4
ET
EXPANSION TANK SIZED IN
COMPLIANCE WITH WATER HEATER
MANUFAACTURER GUIDELINES
NOTES:
ADD ALTERNATE #2 INCLUDES THE REPLACEMENT OF ALL HOT AND COLD WATER PIPINGWITHIN THE BOILER ROOM, NOT INDICATED FOR REPLACEMENT AS PART OF THE BASE BID.THIS INCLUDES THE REPLACEMENT OF ALL COLD WATER, HOT WATER (110 DEG. F), HOTWATER (140 DEG. F), HOT WATER RETURN (110 DEG. F), AND HOT WATER RETURN (140DEG. F) PIPING AND ISOLATION VALVES WITHIN THE BOILER ROOM. CONNECT TO EXISTINGPIPING AT LOCATIONS OF WALL AND CEILING PENETRATIONS WHERE PIPING LEAVES THEBOILER ROOM. INCLUDE INSULATION OF ALL NEW PIPING.
1" HWR (140°)
2" HWR (110°)
2" HW (140°)
PLUMBING CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC
CONTROL MODULE TO CONNECT DOMESTIC WATER HEATERS TO THE
ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR AND
CONTROL ALL AVAILABLE POINTS. PLUMBING CONTRACTOR TO
COORDINATE ALL REQUIREMENTS WITH MECHANICAL CONTRACTOR
AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).
GENERAL NOTES:
1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION
IS TO INSTALL A TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH BOILERS AT THE SAME TIME. CONTRACTOR
RESPONSIBLE FOR INSTALLATION SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME. DOWNTIME MAY BE REQUIRED TO BE
LIMITED TO WEEKENDS BY OWNER. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON PHASING.
2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00
AND 02 SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF
OF CEILING, BOILERS, AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT
PHASING. PHASING MUST INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT WHILE SCHOOL IS OCCUPIED WITH
STUDENTS.
3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL
COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.
4. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER
MIXING VALVES, ETC.) SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PROVIDE
A NEW COMPUTER WORKSTATION OR LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF ALL EQUIPMENT, ADJUST
SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL
PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE 120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND
LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.
5. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
RELOCATE EXISTING FLOOR DRAIN SO IT DOESN'T
CONFLICT WITH NEW CONCRETE PAD
EXISTING FLOOR
DRAIN (TYP OF 7)
EXISTING FLOOR
DRAIN (TYP OF 7)
RELOCATE EXISTING FLOOR
DRAIN SO IT DOESN'T CONFLICT
WITH NEW CONCRETE PAD
3/8" = 1'-0"
PLUMBING BOILER ROOM PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
-1
01
.D
WG
je
sse
.vo
se
3/8"=1'-0"
P-101
AM
MB
PLUMBING BOILER ROOM PLAN
P-101
NORTH
BOILER
ROOM
3"G
A
S
E
X
I
S
T
I
N
G
F
U
E
L
O
I
L
T
A
N
K
FOR CONTINUATION
SEE DRAWING P-101
CONNECT PROPANE PIPING FROM
(3) 1,000 GALLON TANKS TO EXISTING
TANK PIPING AND SUPPLY THE 3"
EXISTING 3" PROPANE PIPING UNDERGROUND TO REMAIN. (TYP.)
PROVIDE (3) 1,000 GALLON STORAGE PROPANE
TANKS COMPLETE WITH SUPPORTS, PIPE
CONNECTIONS, REINFORCED CONCRETE SUPPORT
BASE IN COMPLIANCE WITH MANUFACTURERS
RECOMMENDATIONS. CONNECT PROPANE PIPING
FROM THESE TANKS TO EXISTING TANK PIPING AND
RECONNECT TO EXISTING 3" PROPANE SUPPLY
PIPE TO INSIDE MECHANICAL ROOM (COORDINATE
ALL WORK IN FIELD PRIOR TO START OF
CONSTRUCTION WITH LOCAL FIRE MARSHAL
REQUIREMENTS).
EXISTING 500 GAL. CAPACITY
L.P. GAS TANK MOUNTED ON
CONCRETE PAD ON GRADE
TO REMAIN. SEE PHASING
NOTES FOR THE DEMOLITION
OF TANK #2.
BUILDING MAIN WITH REGULATOR
PROPANE TANKS PHASING NOTES
1. INSTALL NEW 1,000 GALLON TANK #2.
2. CONNECT TANK #2 TO EXISTING 3" PROPANE MAIN WITH
REGULATOR TO THE BUILDING.
3. DISCONNECT AND REMOVE EXISTING 500 GALLON
TANK #1.
4. INSTALL NEW 1,000 GALLON TANKS #3 IN THE SAME
#1
#2
#3
#4
LOCATION AS THE REMOVED 500 GALLON TANK #1.
5. INSTALL NEW 1,000 GALLON TANK #4.
6. CONNECT PROPANE PIPING FROM TANK #2, TANK #3, AND #4
AS ONE SYSTEM TO SUPPLY THE EXISTING 3" MAIN AND REGULATOR
TO BUILDING.
BOLLARD (TYP.)
PROPANE TANKS GENERAL NOTES
1. ALL TANK INSTALLATION AND REMOVALS SHALL BE PROVIDED BY
AMERIGAS CO., INCLUDING ALL PIPING, VALVES, SUPPORTS, PERMITS,
INSPECTIONS, TESTING, ETC READY FOR USE BY OWNER.
2. AMERIGAS CO. SHALL PROVIDE REMOVAL AND DISPOSING OF THE
EXISTING 500 GALLON TANK #1.
3. CONTRACTOR TO PROVIDE CONCRETE PAD UNDER PROPANE TANKS.
4. CONTRACTOR TO PROVIDE 6-FOOT HIGH CHAIN-LINK FENCE WITH
GREEN PRIVACY SLATS / SCREENING AND LOCKABLE GATE. FENCE TO
SURROUND ALL TANKS AND PROVIDE 3 FEET CLEARANCE ON ALL
SIDES.
5. CONTRACTOR TO PROVIDE BOLLARDS 4-FEET ON CENTER ON
EXTERIOR SIDE OF FENCE TOWARD PARKING LOT / DRIVEWAY AS
SHOWN.
3'-6"
3'-6"
ABOV
E
FIN. G
RADE
6"
6"
3'-0"
18" DIA
STEEL BOLLARD
1NTS
FINISH GRADE
AT PAVEMENTS
SLOPE CONCRETE
AWAY FROM BOLLARD
1/2" R
FINISH GRADE AT
PLANTED AREAS
IN PAVED AREAS HOLD
TOP OF FOOTING 6"
BELOW FIN. GRADE
CAST-IN-PLACE
CLASS 'A' CONCRETE
FOOTING
GRAVEL BASE
6"Ø GALVANIZED STEEL PIPE ASTM
A53 (STD. WEIGHT) FILLED WITH
CONCRETE, PRIME AND PAINT
BLACK (SEE NOTES)
1/8" = 1'-0"
PLUMBING PARTIAL SITE PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
-1
02
.D
WG
je
sse
.vo
se
1/8"=1'-0"
P-102
AM
MB
PLUMBING PARTIAL SITE PLAN
NORTH
P-102
SITE
AREA
Finished Floor
EXPANSION
TANK (ET)
BUILDING COLD WATER
SUPPLY.
(FOR CONT. SEE DWG P-101)
BUILDING HOT WATER
RETURN (140)
(FOR CONT. SEE DWG P-101)
MV
MECHANICAL ROOM
PIPE T & P TO
OPEN DRAIN
PIPE T & P TO
OPEN DRAIN
PIPE T & P TO
OPEN DRAIN
G G
PIPE T & P TO
OPEN DRAIN
#1 #2
EXISTING 3" PROPANE PIPE UNDERGROUND TO REMAIN (TYP)
(3) NEW 1,000 GALLON PROPANE TANKS PROVIFDED BY AMERIGAS.
BUILT -IN CONDENSATE NEUTRALIZATION UNIT (TYP.)
4" HIGH HOUSEKEEPING PAD
POWERS INTELLISTATION
DIGITAL WATER TEMPERING AND
RECIRCULATION SYSTEM ASSEMBLY
FACTORY ASSEMBLED
LOCATE HOT WATER CIRCULATION.
PUMP ASSEMBLY APPROX 5'-ABOVE
FINISH FLOOR FOR ACCESS. (TYP.)
NOTE: FOR WATER HEATER
VENTING REFER TO
MECHANICAL DRAWINGS
EXISTING 500 GALLON PROPANE TANK
ASSEMBLY DISCONNECTED AND
REMOVED BY AMERIGAS CO.
EXISTING 3" PROPANE GAS MAIN
AND AMERIGAS CO. PRESSURE
REGULATOR ASSEMBLY TO REMAIN
(TYP)
EXISTING 500 GALLON PROPANE TANK TO REMAIN
DURING PHASE 1 CONSTRUCTION.
DISCONNECT AND REMOVE AFTER PHASE 2 TANK IS
INSTALLED, TESTED AND APPROVED.
PROPANE TANK PHASING
1. INSTALL NEW 1,000 GALLON TANK (2).
2. CONNECT TANK #2 TO EXISTING 3" MAIN
3. REMOVE EXISTING 500 GALLON TANK.
4. INSTALL NEW 1,000 GALLON TANK #2, #3, #4
5. CONNECT ALL TANKS TO 3" BUILDING SUPPLY
2"
A
3"
HC R
TO BUILDING (110) FOR CONT. SEE DWG P-101(TYP)
3"
(110°)
2" (140°)
2" 1"
1 1/2" 1 1/2" 1 1/2"
3"
DRIP LEG (TYP.)
1 1/2"
4" 4"
2"
BUILDING HOT WATER
RETURN (110)
(FOR CONT. SEE DWG P-101)
1"
B
1 1/2"1 1/2"1 1/2"1 1/2"
B
PROVIDE 1
1
2
" PROPANE GAS PIPE TO WATER
HEATER INTAKE MANIFOLD. ADJUST AND SET
EXISTING GAS PRESSURE REGULATOR LOCATED
NEXT TO THE OUTSIDE PROPANE TANK SUCH THAT
THE INLET GAS PRESSURE TO EACH WATER
HEATER IS 8-10"WC. COORDINATE THE REGULATOR
ADJUSTMENT WITH PROPANE GAS COMPANY
-AMERIGAS.
NOTES
A
1"
G
GGG
DIAL TYPE
PRESSURE GAUGE
(0-100 PSIG)
PIG TAIL (TYP)
PLUG VALVE (TYP)
STRAINER
BALL VALVE
IN-LINE CIRCULATING PUMP (SEE
PUMP SCHEDULE)
AQUASTAT FOR CONTROL
OF PUMP
UNION
CHECK VALVE
FOR CONTINUATION AND SIZE,
SEE FLOOR PLAN
NOT TO SCALE
P-201
3
HANGER ROD
LOCKING NUT
ADJUSTABLE CLEVIS
HANGER
INSULATION
PIPE
INSULATION PROTECTION
SADDLE
POLYSTYRENE RIGID FOAM
INSULATION N18" LONG.
LAP PIPE INSUL. TO
POLY INSUL.
PIPE HANGER
16" LONG x 20 GA.
GALVANIZED STEEL
NINSULATION SADDLE
NOT TO SCALE
P-201
4
NOTE: FOR SEISMIC SUPPORT SYSTEM
DESIGN CRITERIA REFER TO PLUMBING
SPECIFICATIONS
#4
3"
G
TO BUILDING (140) FOR CONT. SEE DWG P-101(TYP)
HWR(110)
1"
1 1/2"
1 1/2"
1 1/2"
1 1/2"
3"
3"
3"
BUILT-IN GAS TRAIN PROVIDED BY MANUFACTURER (TYP.)
G
G
CW
3"
3"
1"
GG
GAS
VALVE
(TYP.)
GAS COCK (TYPICAL)
UNION (TYPICAL)
PIPE SIZE PER
FLOOR PLAN
LOCATE VENT 10'-0" AWAY
FROM ALL MECHANICAL
INTAKES AND /OR
WINDOWS.
VENT DEVICES SEPARATELY
THRU ROOF. SIZE PER
MANUFACTURER'S
REQUIREMENTS.
GAS PRESSURE REGULATOR. REDUCE
GAS PRESSURE FROM 5 lb GAS TO
0.50 lbs. (14" W.C.) OR PER EQUIPMENT
REQUIREMENTS
PRESSURE GAUGE (TYPICAL)
INDICATE PRESSURE:
0-10 LBS.
WATER COLUMN:
0-48 INCHES
ROOF
NOT TO SCALE
P-201
5
3"3"3"
3"
PROPANE TANK SUPPORT
PROVIDED BY AMERIGAS CO.
SHOWN FOR REFERENCE ONLY
(TYP)
PROVIDE VENT PIPE FROM
EACH WATER HEATER
REGULATOR IN
COMPLIANCE WITH
MANUFACTURERS
RECOMMENDATIONS (TYP
FOR 4)
NOTE: ACCORDING TO AO SMITH THE REQUIRED PROPANE GAS PRESSURE AT EACH HEATER
GAS TRANE CONNECTION IS 8 - 10 " WC.
AMERIGAS CO. WILL MODULATE THEIR EXISTING PROPANE GAS REGULATOR LOCATED
NEXT TO THE OUTSIDE STORAGE TANKS IN ORDER TO PROVIDE THE REQUIRED PRESSURE
TO EACH DOMESTIC WATER HEATER. COORDINATE CONNECTION AND THE REQUIRED GAS PRESSURE
TO EACH WATER HEATER WITH AMERIGAS CO. IN FIELD PRIOR TO FINAL GAS CONNECTION
TO WATER HEATERS AND ACTIVATION OF PROPANE GAS SYSTEM.
#3
NOTE: ALL EXISTING FLOOR DRAINS
SHALL REMAIN.
COORDINATE IN FIELD EXACT LOCATION
AND SIZE THE PAD AS PER
MANUFACTURER RECOMMENDATION
MIXING VALVE ASSEMBLY MUST BE
INSTALLED IN FULL COMPLIANCE WITH
MANUFACTURERS
RECOMMENDATIONS. MANUFACTURER
SHALL ALSO INSPECT AND APPROVE
INSTALLATION PRIOR TO START OF
SYSTEM.
1. FOR ALL WATER HEATERS INTAKE AND EXHAUST VENTING, SEE MECHANICAL
DRAWINGS.
2. WATER HEATERS SHALL BE PROGRAMMED TO OPERATE INDIVIDUALLY OR ALL
TOGETHER DURING TIMES OF PEAK DEMAND.
3. FOR DOMESTIC HOT WATER HEATERS, PLUMBING CONTRACTOR TO PURCHASE
OPTIONAL MODEL ICC CONTROL MODULE TO CONNECT DOMESTIC WATER
HEATERS TO THE ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR
AND CONTROL ALL AVAILABLE POINTS. PLUMBING CONTRACTOR TO COORDINATE
ALL REQUIREMENTS WITH MECHANICAL CONTRACTOR AND CONTROLS
CONTRACTOR (BACNET VS MODBUS, ETC.).
4. MIXING VALVE AND RECIRCULATION PUMPS MUST BE CONNECTED TO THE
ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR AND CONTROL ALL
AVAILABLE POINTS. PLUMBING CONTRACTOR TO COORDINATE ALL
REQUIREMENTS WITH MECHANICAL CONTRACTOR AND CONTROLS CONTRACTOR
(BACNET VS MODBUS, ETC.).
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
07
\P
LU
MB
\0
-C
urre
nt\P
-2
01
.D
WG
je
sse
.vo
se
N.T.S.
P-201
AM
MB
PLUMBING DETAILS
NTS
PROPANE STORAGE TANKS PIPING SCHEMATIC2
P-201
NTS
PROPANE DOMESTIC WATER HEATER PIPING DETAIL1
P-201
11,LP
ELECTRICAL GENERAL NOTES
DESCRIPTIONABBREVIATIONS
ELECTRICAL ABBREVIATIONSELECTRICAL LEGEND
ELECTRICAL DEMOLITION NOTES
1. UNLESS OTHERWISE INDICATED, FURNISH AND INSTALL A COMPLETE AND OPERATIONAL ELECTRICAL
SYSTEM INCLUDING ALL NECESSARY MATERIAL, LABOR, AND EQUIPMENT.
2. ELECTRICAL PLANS AND DETAILS, AND ONE LINE DIAGRAMS SHOW THE GENERAL LOCATION AND
ARRANGEMENT OF THE ELECTRICAL SYSTEM. THEY ARE DIAGRAMMATIC AND DO NOT SHOW ALL
CONDUIT BODIES, CONNECTORS, BENDS, FITTINGS, HANGERS, AND ADDITIONAL PULL AND JUNCTION
BOXES WHICH THE CONTRACTOR MUST PROVIDE TO COMPLETE THE ELECTRICAL SYSTEM.
3. ALL EQUIPMENT AND MATERIAL SHALL BE LABELED AND LISTED, AND INSTALLED IN ACCORDANCE WITH
THEIR LISTING.
4. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED
INSPECTIONS IN ACCORDANCE WITH STATE GOVERNING AUTHORITIES.
5. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH STATE GOVERNING
AUTHORITY.
6. THE TERM "INDICATED" SHALL MEAN "AS SHOWN ON CONTRACT DOCUMENTS (SPECIFICATIONS,
DRAWINGS, AND RELATED ATTACHMENTS)".
7. THE TERM "SIZE" SHALL MEAN ONE OR MORE OF THE FOLLOWING: "LENGTH, CURRENT AND VOLTAGE
RATING, NUMBER OF POLES, NEMA SIZE, AND OTHER SIMILAR ELECTRICAL CHARACTERISTICS".
8. THE TERM "SPACE" ON PANELBOARD AND SWITCHBOARD SCHEDULES SHALL MEAN "PROVIDE SPACE TO
INSTALL THE NUMBER OF POLES AND SIZE OF THE PROTECTIVE DEVICE INDICATED WITH ALL THE
NECESSARY BUS AND FITTINGS TO INSTALL THE DEVICE AT SOME FUTURE DATE".
9. COORDINATE ELECTRICAL WORK WITH OWNER.
10. COORDINATE ELECTRICAL WORK WITH OTHER DIVISIONS OF THIS PROJECT.
11. BEFORE SELECTING MATERIAL AND EQUIPMENT, AND PROCEEDING WITH WORK, INSPECT AREAS WHERE
MATERIAL AND EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY, AND CHECK NEEDED SPACE
FOR REPLACEMENT, CLEARANCES AND INTERCONNECTIONS.
12. BEFORE CUTTING OR DRILLING INTO BUILDING ELEMENTS INSPECT AND LAYOUT WORK TO AVOID
DAMAGING STRUCTURAL ELEMENTS AND BUILDING UTILITIES.
13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE ANSI/NFPA 70 2014
EDITION.
14. THE DEFINITION OF ELECTRICAL TERMS USED SHALL BE AS DEFINED IN THE NATIONAL ELECTRICAL
CODE.
15. TYPICAL MOUNTING HEIGHTS OF DEVICES SHALL COMPLY NECA 1-2010.
16. ELECTRICAL CONTRACTOR SHALL SEAL ALL ELECTRICAL PENETRATIONS THROUGH FIRE AND SMOKE
RATED PARTITIONS WITH FIRE RATED MATERIAL EQUAL TO 3M FIRE BARRIER SEALANT CP 25WB+ AS A
MINIMUM. MATERIAL SELECTION SHALL BE BASED ON RATING OF PARTITION PENETRATED.
17. FURNISH AND INSTALL MEANS OF DISCONNECTION FOR ALL MOTORIZED EQUIPMENT IN ACCORDANCE
WITH NEC, SECTIONS 422-III AND 430-IX.
1. ELECTRICAL DEMOLITION PLANS ARE DIAGRAMMATIC AND DO NOT DEPICT ENTIRE SCOPE OF WORK.
ADDITIONAL WORK RELATED TO DEMOLITION MODIFICATIONS SHOULD BE EXPECTED. THE CONTRACTOR
SHALL PROVIDE LABOR AND EQUIPMENT TO COMPLETELY REMOVE ALL EQUIPMENT REQUIRED AND IN
SEQUENCE WITH PROJECT PHASING PLANS.
2. PRIOR TO BID, CONTRACTOR TO INSPECT SITE AND IDENTIFY ANY EXISTING CONDITIONS THAT WILL
AFFECT THE WORK TO BE PERFORMED. IF ANY LATENT HAZARDOUS MATERIALS ARE NOTICES OR
SUSPECTED, CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY AND WAIT FOR FURTHER INSTRUCTIONS
BEFORE STARTING/ RESTARTING ANY WORK IN PROJECT AREA. THE OWNER IS RESPONSIBLE FOR THE
REMOVAL OR ABATEMENT OF ANY/ALL ASBESTOS-LADEN MATERIALS PRIOR TO THE CONTRACTOR
COMMENCING WITH HIS WORK.
3. WHERE THE REMOVAL OF ANY DEVICE, FIXTURE, AND/OR EQUIPMENT INTERRUPTS THE CONTINUITY OF
AN EXISTING (TO REMAIN) CIRCUIT, PROVIDE ALL CONNECTIONS AND CIRCUITRY NECESSARY TO
MAINTAIN EXISTING CIRCUIT CONTINUITY.
4. WHERE BOXES REMAIN AFTER REMOVAL OF FIXTURES AND ELECTRICAL DEVICES FROM EXISTING (TO
REMAIN) CONSTRUCTION, PROVIDE BLANK COVER FOR EACH BOX.
5. EXACT LOCATION OF ALL EXISTING (TO REMAIN OR TO BE RELOCATED) MATERIAL SHALL BE
ESTABLISHED AND VERIFIED IN FIELD.
6. REMOVAL OF ANY ELECTRICAL MATERIAL SHALL INCLUDE THE REMOVAL OF ALL CONTROL,
CONDUCTORS, AND CONDUIT (WHERE PRACTICAL) ASSOCIATED WITH MATERIAL, UNLESS OTHERWISE
NOTED.
7. REFER TO MECHANICAL AND PLUMBING PLANS FOR EQUIPMENT TO BE DEMOLISHED. REMOVE ALL
STARTERS, DISCONNECTS, AND ASSOCIATED WIRING FOR EQUIPMENT U.O.N.
A AMPERES
AC ALTERNATING CURRENT (60 HZ)
AF AMP-FRAME
AFF ABOVE FINISHED FLOOR
AT AMP-TRIP
AWG AMERICAN WIRE GAUGE
C CONDUIT
DWG DRAWING
EMT ELECTRICAL METALLIC TUBING
EQUIP EQUIPMENT
EX EXISTING TO REMAIN
FL FLOOR
FLA FULL LOAD AMPS
FT FEET
GFI GROUND-FAULT CIRCUIT-INTERRUPTER
HP HORSEPOWER
KA KILO AMPERE
Kcmils THOUSAND CIRCUIT MILLS
KV KILOVOLT
KW KILO VOLT-AMPERE
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MLO MAIN LUG ONLY
MOP MAXIMUM OVERCURRENT PROTECTION
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
N.T.S. NOT TO SCALE
P POLE
PH PHASE
RECPT RECEPTACLE
RGS RIGID GALVANIZED STEEL CONDUIT
RM ROOM
SCR SHORT-CIRCUIT RATING
TYP TYPICAL
UL UNDERWRITER'S LABORATORY
U.O.N. UNLESS OTHERWISE NOTED
UTIL UTILITY
V VOLTS
VA VOLT-AMPERES
W WATTS
WP WEATHERPROOF
XFMR TRANSFORMER
% PERCENT
# NUMBER
' FEET
" INCHES
E-001 ELECTRICAL NOTES, LEGENDS, ABBREVIATIONS, AND DETAILS
ED-101 ELECTRICAL BOILER ROOM DEMOLITION PLAN
E-101 ELECTRICAL BOILER ROOM POWER PLAN
E-102 ELECTRICAL BOILER ROOM LIGHTING PLAN
ELECTRICAL DRAWING LIST
J
GFI
SURFACE MOUNTED PANELBOARD
BRANCH CIRCUIT POWER WIRING
BRANCH CIRCUIT HOME RUN (ARROW INDICATES PANEL AND CIRCUIT NUMBER)
FUSED DISCONNECT SWITCH
VARIABLE FREQUENCY DRIVE WITH INTEGRAL DISCONNECT
JUNCTION BOX
DUPLEX RECEPTACLE OUTLET WITH GROUND-FAULT CIRCUIT-INTERRUPTER
MOTOR
EMERGENCY SHUT-OFF FOR BOILERS
PENDANT LIGHT FIXTURE
CARBON MONOXIDE DETECTOR
DESCRIPTION
SYMBOL
EPO
CO
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
08
\0
-C
urre
nt\B
OIL
ER
P
LA
NT
\E
-0
01
.D
WG
je
sse
.vo
se
N.T.S.
E-001
J.P.
B.P.
ELECTRICAL NOTES, LEGENDS,ABBREVIATIONS, AND DETAILS
BOILER #2
BOILER #1
ELECTRICAL DEMOLITION NOTES:
1. ALL PUMPS SHOWN ON PLANS ARE TO BE REMOVED. REFER TO
MECHANICAL AND PLUMBING PLANS FOR EXACT LOCATION. REMOVE
ALL ASSOCIATED WIRING, DISCONNECTS/ STARTERS, CONDUIT AND
HANGERS BACK TO SOURCE IN THEIR ENTIRETY UNLESS
OTHERWISE NOTED.
2. REFER TO MECHANICAL AND PLUMBING PLANS FOR PHASING OF
DEMOLITION.
CAST IRON
BOILER
P-1 P-2 P-3P-4 P-5 P-6
P-7P-8
15KVA
TX
30KVA
TX
"EBR"
/
"EBR1"
"BR"
/
"BR1"
"BR""BR"
"MD01"
EX
EX
EX
EXEXEX
EX
ELECTRICAL DEMOLITION KEY NOTES:
REMOVE EXISTING DISCONNECT/ STARTER, AND WIRE.
UNDERGROUND CONDUIT TO BE REUSED.
REMOVE ALL ASSOCIATED ELECTRICAL IN THEIR ENTIRETY. THIS
INCLUDES BUT IS NOT LIMITED TO DISCONNECT, CONDUIT, WIRE,
HANGERS, ETC.
REMOVE ALL LIGHTING AND ALL ASSOCIATED CIRCUITRY IN ITS
ENTIRETY (INCLUDING SOURCE BREAKER(S)) UNLESS OTHERWISE
NOTED. LIGHTING SHOWN IS APPROXIMATE ONLY.
1
1111111
1
2
2
2
2
CIRC. PUMP
2
CIRC. PUMP
2
EXISTING WALL
MOUNTED FIXTURE TO
REMAIN.
3
3
NOTES:
ADD ALTERNATE #3 INCLUDES THE REPLACEMENT OF THE EXISTING 500 KVATRANSFORMER SERVING THE OLD JUNIOR HIGH SCHOOL. INCLUDE ALL COSTS ASSOCIATEDWITH REMOVING THE EXISTING TRANSFORMER AND INSTALLING THE NEW TRANSFORMER.ANY BUILDING CONSTRUCTION REMOVED FOR THE REMOVAL OR INSTALLATION (CMUWALLS, DOORS AND/OR DOOR FRAMES, STAIRWAY RAILINGS, PIPING, CONDUIT,CONTROLS, ETC. COORDINATE SCHEDULE OF WORK WITH CONTRACTORS INSTALLING NEWPLUMBING AND HVAC SYSTEMS WITHIN THE BOILER ROOM TO ELIMINATE REMOVING ANYNEW PLUMBING OR HVAC COMPONENTS, AND TO MINIMIZE REMOVAL OF ANY EXISTINGCOMPONENTS.
EXISTING 500 KVA
TRANSFORMER TO BE
REPLACED AS PART OF
ADD / ALTERNATE #3
EXIST.
500
KVA
TX
3/8" = 1'-0"
ELECTRICAL BOILER ROOM DEMOLITION PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
08
\0
-C
urre
nt\B
OIL
ER
P
LA
NT
\E
D-1
01
.d
wg
je
sse
.vo
se
3/8"=1'-0"
ED-101
J.P.
B.P.
ELECTRICAL BOILER ROOMDEMOLITION PLAN
ED-101
NORTH
BOILER
ROOM
NEW WORK NOTES:
1. PROVIDE CIRCUITING AS SHOWN TO NEW MOTORS. REFER TO
MOTOR CIRCUIT SCHEDULE FOR WIRE, DISCONNECT, AND CIRCUIT
BREAKER SIZES.
2. REFER TO MECHANICAL AND PLUMBING PLANS FOR PHASING OF
NEW WORK AND LOCATIONS OF ALL EQUIPMENT.
P-3
B-1
BP-1
BP-2
BP-3BP-6
BP-5
BP-4
EQUIPMENT SOURCE PANEL BRANCH CIRCUIT
DISCONNECT STARTER
MOUNTING
LOAD
TYPE FURNISHED INSTALLED RATING TYPE FURNISHED INSTALLED HP FLA MCA MOP V PH
PUMPS
P-3 EBR3#10, #10G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3
P-4 BR3#10, #10G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3
P-5 BR3#10, #10G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 20 27 34 60 480 3
P-6 EBR3#10, #10G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3
P-7 EBR3#10, #10G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 20 27 34 60 480 3
P-8 BR3#12, #12G, 3/4"C
- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 7.5 11 14 20 480 3
BOILER PUMPS
BP-1 BR3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BP-2 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BP-3 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BP-4 BR3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BP-5 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BP-6 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
BOILERS
B-1 BR3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
B-2 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
B-3 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
B-4 BR3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
B-5 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
B-6 EBR-B3#12, #12G, 3/4"C
- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3
WATER HEATERS
WH-1 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1
WH-2 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1
WH-3 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1
WH-4 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1
CIRC. PUMPS
CP-1 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - .25 5.8 8 15 120 1
CP-2 BR12#12, #12G, 3/4"C
FUSED DIV.26 DIV.26 20AT/30AF - - - - .25 5.8 8 15 120 1
B-2
B-3
B-6
B-5
B-4
BOILER 1
BOILER 2
BOILER 3
BOILER 4
BOILER 5
BOILER 6
P-8
P-4 P-5 P-6 P-7
P-8
VFD
P-3
VFD
P-4
VFD
P-5
VFD
P-6
VFD
P-7
VFD
EXISTING EMERGENCY PANELBOARD "EBR"
I-T-E, 480Y/277V, 3PH, 4W, 150A MCB, 14KAIC
MOUNTED ON TOP
EXISTING EMERGENCY PANELBOARD "EBR1"
I-T-E, 208Y/120V, 3PH, 4W, 50A MCB, 10KAIC
MOUNTED ON BOTTOM
EXISTING NORMAL PANELBOARD "BR"
I-T-E, 480Y/277V, 3PH, 4W, 225A MLO,
14KAIC, MOUNTED ON TOP
EXISTING NORMAL PANELBOARD "BR1"
I-T-E, 208Y/120V, 3PH, 4W, 100A MCB,
10KAIC, MOUNTED ON BOTTOM
EXISTING NORMAL PANELBOARD "BR"
I-T-E, 480Y/277V, 3PH, 4W, 400A MLO, 14KAIC
EXISTING NORMAL PANELBOARD "BR"
I-T-E, 480Y/277V, 3PH, 4W, 600A MCB, 14KAIC
EX.15KVA
TX
EX. 30KVA
TX
EXISTING PANELBOARD "MD01"
208Y/120V, 3PH, 4W, MLO,
FED FROM "BR1" (40A/3P)
J
CONTROLS
J
CONTROLS
J
CONTROLS
J
CONTROLS
J
CONTROLS
J
CONTROLS
EPO
EPO
NEW PANELBOARD "EBR-B"
100A, 480Y/277V, 3PH, 4W,
MLO, 14KAIC.
ELECTRICAL NEW WORK KEY NOTES:
EXTEND CONDUIT FROM FLOOR AND CONNECT TO NEW VFD MOUNTED
TO WALL. CONTRACTOR TO CONNECT VFD TO PUMP.
CONTRACTOR TO RUN NEW WIRE IN EXISTING CONDUIT FROM
EXISTING PANELBOARD TO NEW VFD AND PUMP LOCATION. REFER TO
MOTOR CIRCUIT SCHEDULE FOR WIRE SIZE. CONTRACTOR TO
PROVIDE NEW CIRCUIT BREAKERS AND ALL NECESSARY MOUNTING
HARDWARE IN EXISTING PANELS.
CONTRACTOR TO FURNISH AND INSTALL DISCONNECT, CONDUIT, AND
WIRE TO SOURCE PANEL SHOWN ON MOTOR CIRCUIT SCHEDULE.
CONTRACTOR TO PROVIDE NEW CIRCUIT BREAKERS AND ALL
NECESSARY MOUNTING HARDWARE IN EXISTING PANELS.
CONTRACTOR TO FURNISH AND INSTALL PANELBOARD AND FEEDER
FROM EXISTING EMERGENCY PANELBOARD "EBR" TO LOCATION
SHOWN. 4#1, #8G, 1-1/2"C. CONTRACTOR TO FURNISH AND INSTALL
100A/3P CIRCUIT BREAKER IN EXISTING I-T-E PANELBOARD "EBR". AND
ALL NECESSARY MOUNTING HARDWARE.
CONTRACTOR TO PROVIDE NEW 15A/1P CIRCUIT BREAKERS IN
SOURCE PANEL SHOWN FOR 120V BOILER CONTROLS. PROVIDE
2#12, #12G, 3/4"C TO LOCATION.
CONTRACTOR TO PROVIDE NEW 20A/1P CIRCUIT BREAKER IN
SOURCE PANEL SHOWN FOR 120V FUTURE MECHANICAL CONTROLS.
PROVIDE 2#12, #12G, 3/4"C TO LOCATION.
CEILING MOUNTED CARBON MONOXIDE DETECTOR / SENSOR.
CONNECT CARBON MONOXIDE DETECTOR / SENSOR TO BUILDING FIRE
ALARM SYSTEM AS A SEPARATE ZONE. ALARM SHALL ACTIVATE A
SUPERVISORY SIGNAL AT THE MAIN FIRE ALARM CONTROL PANEL AND
ANY REMOTE ANNUNCIATORS. ALARM SHALL NOT ACTIVATE THE
BUILDING EVACUATION ALARM.
1
2
PANELBOARD "EBR-B"
VOLTAGE : 480 ENCLOSURE TYPE: INDOOR
PHASES, WIRES:3 ɸ 4 W
MOUNTING: SURFACE
MINIMUM BUS CAPACITY (A):
100 A
AIC RATING (A):14 KAIC
MAIN O.C. DEVICE (A):
MLO LOCATION: BOILER ROOM
CKT
NO
A P DESCRIPTION BRACH CIRCUIT LOAD
PHASE LOADS (KW)
LOAD BRANCH CIRCUIT DESCRIPTION A P
CKT
NO
A B C
1 15 3 BP-2 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT BP-5 15 3 2
3 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 4
5 - - - - 1.33 2.66 1.33 - - - - 6
7 15 3 B-2 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT B-5 15 3 8
9 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 10
11 - - - - 1.33 2.66 1.33 - - - - 12
13 15 3 BP-3 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT BP-6 15 3 14
15 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 16
17 - - - - 1.33 2.66 1.33 - - - - 18
19 15 3 B-3 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT B-6 15 3 20
21 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 22
23 - - - - 1.33 2.66 1.33 - - - - 24
25 20 1 LIGHTING2#12, #12G, 3/4"C
1.40 1.40 0.00 - SPACE - - 26
27 - - SPACE - 0.00 0.00 0.00 - SPACE - - 28
29 - - SPACE - 0.00 0.00 0.00 - SPACE - - 30
CONNECTED LOAD PHASE
TOTALS (KW)
12.04 10.64 10.64
TOTAL CONNECTED LOAD (KW):
33.32
NOTES:
1,3,5,
EBR-B
7,9,11,
EBR-B
2,4,6,
EBR-B
8,10,12,
EBR-B
14,16,18,
EBR-B
20,22,24,
EBR-B
13,15,17,
EBR-B
19,21,23,
EBR-B
4, EBR1
2, EBR1
6, EBR1
8, EBR1
222222
3
3
3
3
3
BR1
BR1
4
4
CP-1
CP-2
3
3
WH-1
3
WH-2
3
WH-3
3
WH-4
3
5
5
5
5
5
5
5
TO BOILER CONTROL
PANELS. 2#12, #12G,
3/4"C (TYP.)
J
BR1
6
6
NOTES:
ADD ALTERNATE #3 INCLUDES THE REPLACEMENT OF THE EXISTING 500 KVATRANSFORMER SERVING THE OLD JUNIOR HIGH SCHOOL. INCLUDE ALL COSTS ASSOCIATEDWITH REMOVING THE EXISTING TRANSFORMER AND INSTALLING THE NEW TRANSFORMER.ANY BUILDING CONSTRUCTION REMOVED FOR THE REMOVAL OR INSTALLATION (CMUWALLS, DOORS AND/OR DOOR FRAMES, STAIRWAY RAILINGS, PIPING, CONDUIT,CONTROLS, ETC. COORDINATE SCHEDULE OF WORK WITH CONTRACTORS INSTALLING NEWPLUMBING AND HVAC SYSTEMS WITHIN THE BOILER ROOM TO ELIMINATE REMOVING ANYNEW PLUMBING OR HVAC COMPONENTS, AND TO MINIMIZE REMOVAL OF ANY EXISTINGCOMPONENTS.
EXISTING 500 KVA
TRANSFORMER TO BE
REPLACED WITH NEW
TRANSFORMER AS PART
OF ADD / ALTERNATE #3
CO
CO
7
7
7
3/8" = 1'-0"
ELECTRICAL BOILER ROOM PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
08
\0
-C
urre
nt\B
OIL
ER
P
LA
NT
\E
-1
01
.D
WG
je
sse
.vo
se
3/8"=1'-0"
E-101
J.P.
B.P.
ELECTRICAL BOILER ROOMPOWER PLAN
E-101
NORTH
BOILER
ROOM
A1 A1 A1 A1 A1 A1
A1A1
A1
A1
A1 A1 A1 A1
A1 A1 A1 A1
A1
A1 A1
A1A1
A1A1
A1
A1
A1
A1
A1
A1
A1 A1
A1
A1
A1
A1
A1
A1
A1
A1A1
A1A1
A1
NEW WORK LIGHTING NOTES:
1. CONTRACTOR TO ALIGN LIGHTING ACCORDING TO LOCATIONS OF NEW MECHANICAL EQUIPMENT. DO NOT
PLACE IN WORKING SPACE FOR MECHANICAL SYSTEMS. MOVE LIGHTING AROUND IN FIELD TO AREAS WHICH
WILL LIGHT UP AREAS APPROPRIATELY. LOCATIONS SHOWN ON PLANS ARE ONLY APPROXIMATE. VERIFY EXACT
LOCATIONS TO BE INSTALLED IN THE FIELD.
2. CONTRACTOR TO INSTALL A NEW 20A/1P BREAKER IN EMERGENCY PANEL EBR-B FOR LIGHTING (277V).
3. HEIGHTS OF LIGHT FIXTURES TO BE VERIFIED IN THE FIELD. FIXTURES SHALL BE HIGHER OR LOWER IN AREAS
WHERE EXCESSIVE PIPING AND OTHER MECHANICAL SYSTEM ARE LOCATED. FIXTURES SHALL BE
APPROXIMATELY 12'-0" A.F.F. WHERE POSSIBLE.
4. CIRCUITING SHOWN IS SHOWN FOR DIAGRAMMATIC PURPOSES ONLY. CONTRACTOR TO VERIFY EXACT PATH
FOR CONNECTIONS. CONTRACTOR TO USE RIGID PIPE WITH WIRE BETWEEN FIXTURES.
S
3
25,EBR-B
NEW PANELBOARD "EBR-B"
100A, 480Y/277V, 3PH, 4W,
MLO, 14KAIC.
S
3
3/8" = 1'-0"
ELECTRICAL BOILER ROOM LIGHTING PLAN1
95 LITTLE CITY ROAD
HIGGANUM, CT 06441
HADDAM-KILLINGWORTH
HIGH SCHOOL
CHECKED BY:
DRAWN BY:
SHEET:
DATE:
SCALE:
DTC PROJECT NUMBER:
BID DOCUMENT SET
20 NOV., 2017
17137-107
KEY PLAN
DRAWING NO.
NO. DATE ISSUED FOR
REVISIONS
2321 Whitney Avenue - Hamden Center II - Hamden CT 06518
Ph: 203 239 4200 Fax: 203 234 7376
www.teamdtc.com
BOILER PLANT UPGRADES
No
v 2
0, 2
01
7 a
t 7
:4
8p
m
P:\2
01
7\1
71
37
H
KH
S B
oile
r &
L
ig
htin
g U
pg
ra
de
s\1
08
\0
-C
urre
nt\B
OIL
ER
P
LA
NT
\E
-1
01
.D
WG
je
sse
.vo
se
3/8"=1'-0"
E-102
J.P.
B.P.
ELECTRICAL BOILER ROOMLIGHTING PLAN
E-102
NORTH
BOILER
ROOM
LIGHT FIXTURE SCHEDULE
TYPE
BASIS OF DESIGN DESCRIPTION LUMEN LAMPS REMARKS
ALL NECESSARY MOUNTING HARDWARE, BRACKETS, CHAINS, ETC. SHALL BE PROVIDED. VERIFY IN FIELD MOUNTING HEIGHTS FROM CEILING.
2.
1.
NOTES:
ALL COLORS AND FINISHES SHALL BE VERIFIED BY THE OWNER.
A1
UNV
31W LED
PHILIPS DAY-BRITE
FSI440L840-UNV-DIM
4'-0" UTILITY STRIP FIXTURE.
1, 2
VOLTAGE
2000