22
PREPARED BY: VICINITY MAP SCALE: N.T.S. LOCATION MAP SCALE: N.T.S. LOCATION 2321 Whitney Avenue - Hamden Center II - Hamden CT 06518 Ph: 203 239 4200 Fax: 203 234 7376 www.teamdtc.com BOILER PLANT UPGRADES Haddam-Killingworth High School 95 Little City Road Higganum, CT 06441 DRAWING LIST COVER SHEET MECHANICAL M-001 MECHANICAL NOTES, LEGENDS & ABBREVIATIONS MD-101 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 1 MD-102 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 2 M-101 MECHANICAL BOILER ROOM PLAN M-102 MECHANICAL BOILER ROOM PLAN M-103 MECHANICAL FLOOR PLAN AREA A M-104 MECHANICAL FLOOR PLAN AREA B M-201 MECHANICAL DETAILS M-202 MECHANICAL DETAILS M-203 MECHANICAL DETAILS M-301 MECHANICAL SCHEDULES PLUMBING P-001 PLUMBING NOTES, LEGENDS SCHEDULES & ABBREVIATIONS PD-101 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 1 PD-102 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 2 P-101 PLUMBING BOILER ROOM PLAN P-102 PLUMBING PARTIAL SITE PLAN P-201 PLUMBING DETAILS ELECTRICAL E-001 ELECTRICAL NOTES, LEGENDS, ABBREVIATIONS, AND DETAILS ED-101 ELECTRICAL BOILER ROOM DEMOLITION PLAN E-101 ELECTRICAL BOILER ROOM POWER PLAN E-102 ELECTRICAL BOILER ROOM LIGHTING PLAN ARCHITECTURAL A1 PART ROOF PLAN, RCP & MISC. DETAILS

BOILER PLANT UPGRADES - Capitol Region Education … Boiler Plant Upgrades... · 12.all work shall be done with licensed workmen in accordance with state and local governing authorities

Embed Size (px)

Citation preview

PREPARED BY:

VICINITY MAP

SCALE: N.T.S.

LOCATION MAP

SCALE: N.T.S.

LOCATION

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT

UPGRADES

Haddam-Killingworth

High School

95 Little City Road

Higganum, CT 06441

DRAWING LIST

COVER SHEET

MECHANICAL

M-001 MECHANICAL NOTES, LEGENDS & ABBREVIATIONS

MD-101 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 1

MD-102 MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 2

M-101 MECHANICAL BOILER ROOM PLAN

M-102 MECHANICAL BOILER ROOM PLAN

M-103 MECHANICAL FLOOR PLAN AREA A

M-104 MECHANICAL FLOOR PLAN AREA B

M-201 MECHANICAL DETAILS

M-202 MECHANICAL DETAILS

M-203 MECHANICAL DETAILS

M-301 MECHANICAL SCHEDULES

PLUMBING

P-001 PLUMBING NOTES, LEGENDS SCHEDULES & ABBREVIATIONS

PD-101 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 1

PD-102 PLUMBING BOILER ROOM DEMOLITION PLAN - PHASE 2

P-101 PLUMBING BOILER ROOM PLAN

P-102 PLUMBING PARTIAL SITE PLAN

P-201 PLUMBING DETAILS

ELECTRICAL

E-001 ELECTRICAL NOTES, LEGENDS, ABBREVIATIONS, AND DETAILS

ED-101 ELECTRICAL BOILER ROOM DEMOLITION PLAN

E-101 ELECTRICAL BOILER ROOM POWER PLAN

E-102 ELECTRICAL BOILER ROOM LIGHTING PLAN

ARCHITECTURAL

A1 PART ROOF PLAN, RCP & MISC. DETAILS

TS TEMPERATURE SENSOR

SMOKE DETECTORSD

H

T

HUMIDISTAT/SENSOR

TEMPERATURE/CO2 COMBINATION SENSOR

MAY NOT APPEAR ON THE DRAWINGS.

NOTE: SOME SYMBOLS AND ABBREVIATIONS MAY OR

BD

BA

SF

MDORM

SD

FD

BAROMETRIC DAMPER

RECTANGULAR TO RECTANGULAR

OR ROUND TO ROUND

FIRE & SMOKE DAMPER / ACCESS DOOR

BACKDRAFT DAMPER

FLEXIBLE CONNECTION (PIPING)

SMOKE DAMPER / ACCESS DOOR

COMBINATION

DIRT TRAP

OF FLOW

PIPE ELBOW, TURNED UP

PIPE UNION, SWEAT

PIPE TEE

PIPE UNION, FLANGE

PIPE ELBOW, TURNED DOWN

WATER FLOW METER

BALANCING VALVE

BALL VALVE

PUMP

OR

P PRESSURE SENSOR

THERMOSTAT/SENSOR

RETURN / EXHAUST GRILLE

STRAINER

AIR VENT, AUTOMATIC

AIR VENT, MANUAL

POSITIVE PRESSURE DUCT

DUCT WORK, DIRECTION OF FLOW

PRESSURE GAUGE WITH COCK VALVE

BD

FD & AD

OR

MOTORIZED DAMPER

RECTANGULAR TO

FIRE DAMPER WITH ACCESS DOOR

FLEXIBLE CONNECTION (DUCTWORK)

BALANCING DAMPER

DROP

CHANGE OF ELEVATION,

NEGATIVE PRESSURE DUCT

NUMBER INDICATES NOTE

DIRECTION OF FLOW

MECHANICAL NOTE REFERENCE,

VOLUME DAMPER

TO EXISTING PIPING/DUCT

CONNECT PROVIDED PIPING/DUCT

THERMOMETER

FIRE DAMPER / ACCESS DOOR

ROUND TRANSITION

GATE VALVE

ANGLE GLOBE VALVE

GLOBE VALVE

ANGLE GATE VALVE

BUTTERFLY VALVE

TWO WAY MOTORIZED

CONTROL VALVE

MOTORIZED VALVE

OS & Y

THREE WAY MOTORIZED

CONTROL VALVE

BACKFLOW PREVENTER

HOSE BIB

CHECK VALVE

HOSE END DRAIN

GAS COCK

CAP

PIPE COUPLING (JOINT)

PIPE CONNECTION, TOP

ELBOW, 90°

ELBOW, 45°

PIPE CONNECTION, BOTTOM

PIPE TEE, OUTLET DOWN

TRANSITION

PRV - PRESSURE REDUCING VALVE

QUICK CLOSING LEVER VALVE

(PRESSURE & TEMPERATURE)

SAFETY RELIEF VALVE (PRESS.)

UP

DN

PITCH UP IN DIRECTION

OF FLOW

PITCH DOWN IN DIRECTION

PIPE UNION, SCREWED

PIPE TEE, OUTLET UP

CHWS

CHWR

CHTWS

CHTWR

CWR

CWS

CHILLED WATER HIGH TEMPERATURE SUPPLY

CHILLED WATER HIGH TEMPERATURE RETURN

CONDENSER WATER SUPPLY

CONDENSER WATER RETURN

CHILLED WATER SUPPLY

CHILLED WATER RETURN

PIPING FLEX CONNECTION (DUCTWORK)

FLEXIBLE JOINT

LINED DUCTWORK

ROOF MOUNTED EXHAUST FANOR

M

O OCCUPANCY SENSOR

ISOLATION VALVE (REFER TO SPECS FOR TYPE)

HWS

HWR

RLL

RSL

RV

RHG

DRAIN

D

REFRIGERANT LIQUID

REFRIGERANT SUCTION

REFRIGERANT HOT GAS

REFRIGERANT VENT

HOT WATER SUPPLY

HOT WATER RETURN

XX

XX

EQUIPMENT TYPE DESIGNATION

TOTAL LENGTH (FT), PROVIDE ENCLOSURE

FROM WALL TO WALL OR WALL TO

COLUMN ENCLOSURE, ENCLOSURE

SURFACE SHALL MATCH ACTIVE LENGTH

ENCLOSURE SURFACE.

GBD

GRAVITY BACKDRAFT DAMPER

XX

XX/XX

EQUIPMENT TYPE DESIGNATION

MAXIMUM AIR FLOW

MINIMUM AIR FLOW

VAV EQUIPMENT TAG

DUCT WORK, 90° ELBOW FITTING

WITH TURNING VANES. PROVIDE TURNING

ON ALL 90° ELBOW FITTING UNLESS

OTHERWISE NOTED

XX

ACTIVE LENGTH (FT) / WATER FLOW RATE

(GPM)

FTR OR RP EQUIPMENT TAG

#

S

T S

D

SYMBOL LIST

PIPING SYMBOLS

1. NOTES BELOW ARE NOT INTENDED TO REPLACE SPECIFICATIONS. SEE SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO

GENERAL NOTES.

2. CONTRACTOR SHALL VISIT THE SITE AND BECOME INFORMED AS TO THE NATURE AND SCOPE OF WORK REQUIRED BY

CONTRACT DOCUMENTS PRIOR TO BIDDING PROJECT.

3. PROVIDE ALL REQUIRED MATERIALS, LABOR, EQUIPMENT, AND SERVICES NECESSARY FOR THE INSTALLATION OF THE WORK

AS SHOWN ON THESE DRAWINGS OR SPECIFIED BY THE BASE BUILDING DRAWING AND SPECIFICATIONS.

4. REFER TO AND CAREFULLY CHECK ARCHITECTURAL, ELECTRICAL, PLUMBING, AND FIRE PROTECTION DRAWINGS AND DETAILS,

NOTES, LOCATIONS WHERE WALLS, PARTITIONS, CEILINGS, AND OTHER SURFACES ARE FURRED, LOCATIONS OF SHAFTS,

SOFFITS, AND CONFLICTS WITH WORK OF OTHER TRADES, AND ARRANGE WORK ACCORDINGLY. FURNISH ALL OFFSETS,

DAMPERS, CONNECTORS, ETC., REQUIRED TO MEET SUCH CONDITIONS.

5. DUE TO SCALE OF DRAWINGS, ALL REQUIRED OFFSETS, DAMPERS, ETC., MAY NOT BE INDICATED.

6. COORDINATE DUCT LOCATIONS WITH LIGHTING FIXTURES AND SPRINKLER HEADS.

7. CONTRACTOR SHALL OBTAIN AND PAY FOR ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED INSPECTIONS IN

ACCORDANCE WITH STATE AND LOCAL GOVERNING CODES.

8. THE TERM "PROVIDE" SHALL MEAN "TO FURNISH, INSTALL, AND CONNECT COMPLETELY".

9. TURN OVER TO THE OWNER ALL MANUFACTURER'S WARRANTIES FOR EQUIPMENT AND MATERIALS PROVIDED.

10. WHERE THE CONTRACTOR PROPOSES TO USE AN ITEM OF EQUIPMENT OTHER THAN THAT SPECIFIED OR DETAILED ON THE

DRAWINGS WHICH REQUIRES ANY REDESIGN OF THE STRUCTURE, PARTITIONS, FOUNDATIONS, PIPING, WIRING OR ANY OTHER

PART OF THE MECHANICAL, ELECTRICAL OR ARCHITECTURAL LAYOUT, ALL SUCH REDESIGN AND ALL NEW DRAWINGS AND

DETAILING REQUIRED THEREFORE, SHALL BE PREPARED AT THE CONTRACTOR'S EXPENSE AND ARE SUBJECT TO THE REVIEW

AND APPROVAL OF THE OWNER OR HIS AUTHORIZED REPRESENTATIVE. OWNER RESERVES THE RIGHT TO HAVE THE

ARCHITECT OR ENGINEER OF HIS CHOICE PREPARE ANY REDESIGN WORK.

11. CONTRACTOR SHALL COORDINATE ELECTRICAL REQUIREMENTS OF MECHANICAL EQUIPMENT WITH ELECTRICAL CONTRACTOR.

12. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH STATE AND LOCAL GOVERNING AUTHORITIES.

13. BEFORE SELECTING MATERIAL AND EQUIPMENT, AND PROCESSING THE WORK, INSPECT AREAS WHERE MATERIAL AND

EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY AND CHECK NEEDED SPACE FOR PLACEMENT AND CLEARANCES.

14. BEFORE CUTTING AND DRILLING INTO BUILDING ELEMENTS, INSPECT AND LAYOUT WORK TO AVOID DAMAGING STRUCTURAL

ELEMENTS AND BUILDING UTILITIES.

15. CONTRACTOR RESPONSIBLE FOR REPAIR AND PAYMENT FOR ALL UTILITIES DAMAGE DURING CONSTRUCTION.

16. CONTRACTOR TO CONFIRM DUCTWORK LOCATIONS, ELEVATIONS AND SIZES BEFORE ANY WORK IS STARTED. IF ANY

DISCREPANCIES ARE FOUNDED, NOTIFY ENGINEER BEFORE PROCEEDING WITH WORK. (SEE PAR. 48 "COORDINATION

DRAWINGS").

17. FOLLOW MANUFACTURER'S RECOMMENDATIONS FOR INSTALLATION OF PROVIDED EQUIPMENT.

18. CONTRACTOR TO REPLACE ALL SUSPENDED CEILING TILES DAMAGED AS A RESULT OF HVAC SYSTEM INSTALLATION.

19. ALL SHOP DRAWINGS OF INDIVIDUAL COMPONENTS ARE TO BE SUBMITTED AS A COMPLETE PACKAGE.

20. HVAC DRAWINGS DO NOT NECESSARY SHOW ALL CONDITIONS OF BUILDING. CONTRACTOR TO USE ALL DRAWINGS AND

SPECIFICATIONS OF CONTRACT DOCUMENTS AND INSPECTION OF FIELD CONDITIONS FOR DIVISION 23.

21. HVAC PLANS, DETAILS AND ONE LINE DIAGRAMS SHOW THE GENERAL LOCATION AND ARRANGEMENT OF THE SYSTEM. THESE

ARE DIAGRAMMATIC AND DO NOT SHOW ALL OFFSETS, HANGERS, ACCESS DOORS, ETC. WHICH THE CONTRACTOR MUST

PROVIDE TO COMPLETE THE SYSTEM.

22. ALL WORK IN INTERIOR FINISHED SPACES EXCEPT INDICATED IS TO BE CONCEALED ABOVE CEILING. PROVIDE ALL NECESSARY

CUTTING, PATCHING, REPAINTING AND/OR REPLACEMENT OF FINISHES AS REQUIRED TO PERFORM COORDINATE WITH OTHER

DIVISIONS.

23. IF MANUFACTURER OF EQUIPMENT REQUIRES LARGER CAPACITY CIRCUITRY AND/OR EQUIPMENT THE CONTRACTOR SHALL

PROVIDE SUCH CAPACITY AND/OR EQUIPMENT UNDER THIS CONTRACT AT NO COST TO THE OWNER.

24. SUPPORT DUCTWORK ABOVE SUSPENDED CEILING FROM CONSTRUCTION ABOVE AS CLOSE AS POSSIBLE TO BOTTOM OF

SLABS, BEAMS, MAINTAINING HEADROOM AT ALL TIMES.

25. DO NOT SCALE DRAWINGS. CHECK EXISTING SPACE CONDITIONS AT THE JOB SITE.

26. ALL DUCTWORK SHALL BE HUNG FROM STRUCTURE ABOVE.

27. PROVIDE FLEXIBLE JOINTS ON ALL PIPING AND DUCTWORK WHERE PENETRATING ALL BUILDING EXPANSION JOINTS.

28. PROVIDE FLEXIBLE CONNECTIONS BETWEEN MECHANICAL EQUIPMENT AND DUCTWORK AND PIPING.

29. ALL PENETRATIONS THRU WALLS, ROOF, AND FLOORS TO BE COORDINATED BEFORE SITE WORK EXECUTION WITH

STRUCTURAL ENGINEERS.

30. THERMOSTAT AND TEMPERATURE SENSOR LOCATIONS TO BE COORDINATED WITH INTERIOR LAYOUT.

31. NO THREADED FITTINGS 2-1/2" AND LARGER ALLOWED FOR HYDRONIC HVAC PIPING.

32. CONTRACTOR SHALL SELECT AND PROVIDE EXPANSION JOINTS OR EXPANSION LOOPS AND ANCHORS AS REQUIRED TO

PREVENT TEMPERATURE EXPANSION STRESSES OF HYDRONIC PIPES BASED ON ACTUAL INSTALLATION/CONDITIONS.

33. ELECTRICAL CHARACTERISTICS FOR MECHANICAL EQUIPMENT: EQUIPMENT OF HIGHER ELECTRICAL CHARACTERISTICS MAY BE

FURNISHED PROVIDED SUCH PROPOSED EQUIPMENT IS APPROVED IN WRITING AND CONNECTING ELECTRICAL SERVICES,

CIRCUIT BREAKERS, AND CONDUIT SIZES ARE APPROPRIATELY MODIFIED. IF MINIMUM ENERGY RATINGS OR EFFICIENCIES ARE

SPECIFIED, EQUIPMENT SHALL COMPLY WITH REQUIREMENTS.

34. ALL BASE-MOUNTED PUMPS SHALL BE INSTALLED WITH CONCRETE FILLED INERTIA BASE.

35. COORDINATION DRAWINGS: DETAIL MAJOR ELEMENTS, COMPONENTS, MECHANICAL SYSTEM EQUIPMENT AND MATERIALS IN

RELATIONSHIPS WITH OTHER SYSTEMS, INSTALLATIONS, AND BUILDING COMPONENTS. SHOW SPACE REQUIREMENTS FOR

INSTALLATION AND ACCESS. INDICATE IF SEQUENCE AND COORDINATION ARE IMPORTANT TO EFFICIENT FLOW OF THE WORK.

INCLUDE THE FOLLOWING.

A. PLANNED PIPING LAYOUT, INCLUDING VALVE AND SPECIALTY LOCATIONS AND VALVE-STEM MOVEMENT.

B. CLEARANCES FOR INSTALLING AND MAINTAINING INSULATION.

C. CLEARANCES FOR SERVING AND MAINTAINING EQUIPMENT, ACCESSORIES, AND SPECIALTIES, INCLUDING SPACE FOR

DISASSEMBLY REQUIRED BY PERIODIC MAINTENANCE.

D. EQUIPMENT AND ACCESSORY SERVICE CONNECTIONS AND SUPPORT DETAILS.

E. EXTERIOR WALL AND FOUNDATION PENETRATIONS.

F. FIRE-RATED WALL AND FLOOR PENETRATION.

G. SIZES AND LOCATION OF REQUIRED CONCRETE PADS AND BASES.

H. SCHEDULING, SEQUENCING, MOVEMENT, AND POSITIONING OF EQUIPMENT INTO BUILDING DURING

CONSTRUCTION.

I. FLOOR PLANS, ELEVATIONS, AND DETAILS TO INDICATE PENETRATIONS, FLOORS, WALLS, AND CEILINGS AND THEIR

RELATIONSHIP TO OTHER PENETRATIONS AND INSTALLATIONS.

J. REFLECTED CEILING PLANS TO COORDINATE AND INTEGRATE INSTALLATION OF AIR OUTLETS, LIGHT FIXTURES,

COMMUNICATION SYSTEMS, COMPONENTS, SPRINKLERS, AND OTHER CEILING-MOUNTED ITEMS.

K. ACCESS DOOR AND ACCESS PANEL LOCATIONS, WITH FIRE-RATINGS REQUIRED TO MAINTAIN FIRE RATING OF

CONSTRUCTION, IN LOCATIONS AS REQUIRED FOR PROPER ACCESS FOR MAINTENANCE ADJUSTMENT, REPAIR AND

REMOVAL OF ALL EQUIPMENT AND DEVICES.

L. SCALE: MINIMUM 1/4"=1'-0" FOR FLOOR PLAN, 3/8"=1'-0" FOR MECHANICAL ROOMS.

36. ALL PENETRATIONS FOR THE INSTALLATION OF THE MECHANICAL SYSTEMS SHALL BE CAULKED AND SEALED FOR SMOKE AND

FIRE AS REQUIRED.

37. CONTROL CONTRACTOR TO PROVIDE ALL CONTROL DEVICES, EQUIPMENT, ACCESSORIES, VFD DRIVES, OTHER APPARATUSES,

CONTROL VALVES AND DAMPERS, ACTUATORS, SENSORS, ETC. AND ALL CONTROL WIRING AND LOW VOLTAGE POWER WIRING

RELATED TO CENTRAL DDC CONTROL SYSTEM. SEE SPECIFICATION SECTION 230900.

HVAC GENERAL NOTES

ACB ACTIVE CHILLED BEAM

AFS AIR FLOW MEASURING STATION

AC AIR CONDITIONING

ACC AIR COOLED CONDENSER UNIT (NO COMPRESSOR)

ACCU AIR COOLED CONDENSING UNIT

AD ACCESS DOOR

AHU AIR HANDLING UNIT

AL ALUMINUM DUCTWORK

ALD ALUMINUM DOUBLE WALL DUCTWORK

ALS ALUMINUM SINGLE WALL DUCTWORK

AS AIR SEPARATOR

AFF ABOVE FINISH FLOOR

AMPS AMPERE

B BOILER

BAL BALANCE

BD BAROMETRIC DAMPER

BDD DAMPER BACK DRAFT

BHP BREAK HORSEPOWER

BMS BUILDING MANAGEMENT SYSTEM

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT/HR

DWD DOUBLE WALL DUCTWORK

C-C COLUMN ENCLOSURE TO COLUMN ENCLOSRE

C-W COLUMN ENCLOSURE TO WALL

CA COMBUSTION AIR

CAV SINGLE DUCT VAV BOX

CB CHILLED BEAM

CENTRIF CENTRIFUGAL

CFM CUBIC FEET PER MINUTE

CF CHEMICAL FILL SYSTEM

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

CHTWR CHILLED WATER HIGH TEMPERATURE RETURN

CHTWS CHILLED WATER HIGH TEMPERATURE SUPPLY

CO CLEAN OUT

CWR CONDENSER WATER RETURN

CWS CONDENSER WATER SUPPLY

CW DOMESTIC COLD WATER

CV CONTROL VALVE

CMEU CEILING MOUNTED EVAPORATOR

CUH CABINET UNIT HEATER

DB DRY BULB

DC DIRECT CURRENT

DCS DUST COLLECTION SYSTEM

DEA DRYER EXHAUST AIR

DEF DRYER EXHAUST FAN

DIA OR Ø DIAMETER

DHW DOMESTIC HOT WATER HEATER

DN DOWN

DP DEW POINT

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

EF EXHAUST FAN

ERDW ENERGY RECOVERY DEHUMIDIFICATION

ERHW ENERGY RECOVERY HEAT WHEEL

ESP EXTERNAL STATIC PRESSURE

ETC EXPANSION TANK (COOLING)

ETH EXPANSION TANK (HEATING)

EWT ENTERING WATER TEMPERATURE

EUH ELECTRIC UNIT HEATER

EXH EXHAUST

EXP EXPANSION

FC FLEXIBLE CONNECTOR

FD/AD FIRE DAMPER/ACCESS DOOR

FLG FLANGE

FCU FAN COIL UNIT

FMS FLOW MEASURING STATION

FPM FEET PER MINUTE

°F DEGREES FAHRENHEIT

FPS FEET PER SECOND

REF RADON EXHAUST FAN

FS FLOW SWITCH

FT FEET

FTR FIN-TUBE RADIATION

FT3 CUBIC FEET

GA GAUGE

GP GLYCOL PUMP/TANK SYSTEM

GPM GALLONS PER MINUTE

H HEAT CONTENT (BTU/lb)

H HUMIDISTAT

HC HEATING COIL

HD HEAD

HP HORSEPOWER

HT HEIGHT

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWS&R HOT WATER SUPPLY & RETURN

HWUR HOT WATER UNIT HEATER

HZ CYCLES

ID INSIDE DIAMETER

IN INCHES

KEA TYPE 1 KITCHEN HOOD EXHAUST

KEF KITCHEN EXHAUST FAN

KVA KILLOVOLT AMPERE

KW KILOWATTS

L LENGTH

LAT LEAVING AIR TEMPERATURE

LB POUNDS

LEA LAB EXHAUST AIR

LEF LAB EXHAUST FAN

LH LATENT HEAT

LPG LIQUID PROPANE GAS

LWT LEAVING WATER TEMPERATURE

MD MOTORIZED DAMPER

MAU MAKE-UP AIR UNIT

MAX MAXIMUM

MBH THOUSAND BTU/HOUR

MIN MINIMUM

MTS MINUTES

MUW MAKE-UP WATER

MV MOTORIZED VALVE

NEG NEGATIVE

NG NATURAL GAS

NO NUMBER

NRS NON-RISING STEM

NTS NOT TO SCALE

OA OUTSIDE AIR

OBD OPPOSED BLADE DAMPER

OCPD OVER CURRENT PROTECTION DEVICE

OED OPEN END DUCT, TERMINATE WITH

STAINLESS STEEL BIRD SCREEN

OS&Y OUTSIDE STEM & YOKE

OP OIL PUMP

OT OIL TANK

P PUMP

PBD PARALLEL BLADE DAMPER

PEF PROCESS EXHAUST FAN

PH PHASE

PHWR POOL HOT WATER RETURN

PHWS POOL HAT WATER SUPPLY

PHWS&R POOL HAT WATER SUPPLY & RETURN

PNL PANEL

POS POSITIVE

PRESS PRESSURE

PRV PRESSURE RELIEF VALVE

PS PRESSURE SWITCH

PSIA POUNDS PER SQUARE INCH

ATMOSPHERE

PSIG POUNDS PER SQUARE INCH GAUGE

RA RETURN AIR

RDF RADON EXHAUST FAN

RECIRC RECIRCULATING

RH RELATIVE HUMIDITY

RP RADIANT PANEL

RPA RADIANT PANEL ALTERNATE

RPM REVOLUTIONS PER MINUTE

SA SUPPLY AIR

SATT SOUND ATTENUATOR

SCFM STANDARD CUBIC FEET/MINUTE

SENS SENSOR

SF SUPPLY FAN

SH SENSIBLE HEAT

SCP SHORT CIRCUIT CIRCULATION PUMP

SP STATIC PRESSURE

STP STANDARD TEMP & PRESSURE

SUP SUPPLY

SV SOLENOID VALVE

T&PV TEMP & PRESSURE RELIEF VALVE

SFD/AD COMBINATION SMOKE/FIRE DAMPER

TC TEST CONNECTION WITH ACCESS

DOOR

TEMP TEMPERATURE

T THERMOSTAT

TH TOTAL HEAT

TRA TRANSFER AIR

TRV RELIEF VALVE TEMP

TSP TOTAL STATIC PRESSURE

TS TEMPERATURE SENSOR

TYP TYPICAL

UH UNIT HEATER

UN UNIT

VAV VAV UNIT

VD VOLUME DAMPER

VT VENT

VLV VALVE

VI VIBRATION ISOLATOR

V VOLTS

W-W WALL TO WALL

W-C WALL TO COUMN ENCLOSURE

W WATTS

WB WET BULB

WG WATER GAUGE

WH WATER HEATER

WI WIDTH

WT WEIGHT

ABBREVIATIONS

X

EXISTING TO REMAIN

EXISTING TO BE REMOVED

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-0

01

.D

WG

je

sse

.vo

se

N.T.S.

M-001

JEV

RC

MECHANICAL NOTES, LEGENDS &ABBREVIATIONS

AutoCAD SHX Text
TC
AutoCAD SHX Text
M
AutoCAD SHX Text
MV
AutoCAD SHX Text
AV

4"

4"

5"

5"

3"

6"

4" 6" 6" 6"

5"

5"

6"

8"

5"

3"

4"

4"

4"

6" 6" 8"

1-1

/4

"

1-1

/4

"1

-1

/2

8"

8"

8"

8"

8"

8"8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

6"

5"

5"

4"

COMPRESSOR

TEMP. CONTROL

PANEL

5

5

6

2

2

2

3

3

4

1

2

2

EXISTING

ELECTRICAL

GEAR

3"

3"

4"

EXISTING

WATER

HEATER

3"

3"

3"

3"

3"

EXISTING

COMPRESSOR

EXISTING AIR

SEPARATOR

EXISTING

EXPANSION

TANK

EXISTING

BOILER #2

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

EXISTING

BOILER #1

DEMOLITION KEY NOTES:

REMOVE EXISTING FIRETUBE BOILER INCLUDING ALL SUPPLY & RETURN

HEATING PIPING, OIL PIPING, GAS PIPING, AND CONTROLS. CAP PIPING

BACK AT MAINS.

REMOVE EXISTING BOILER PUMP & PIPING.

REMOVE BOILER BREECHING AS INDICATED.

REMOVE EXISTING HEATING BOILER INCLUDING ALL PIPING, CONTROLS, &

BOILER STACK. CAP HEATING PIPING BACK AT MAINS.

REMOVE EXISTING HEATING SUPPLY PIPING TO DOMESTIC WATER

HEATER INCLUDING VALVES. CAP PIPING AT MAIN AS SHOWN AND/OR AS

REQUIRED.

REMOVE EXISTING DOMESTIC HOT WATER HEATER / STORAGE TANK, AND

CONCRETE SUPPORTS. SEE PLUMBING DRAWINGS FOR FURTHER

INFORMATION AND REQUIREMENTS.

REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND

RETURN PIPING, CONTROLS AND CONCRETE PAD. CAP PIPING AT MAINS

AS SHOWN AND/OR AS REQUIRED. NEW PUMP P-8 AND ASSOCIATED

PIPING MUST BE INSTALLED AND OPERATIONAL PRIOR TO REMOVING

EXISTING P-8. DOWNTIME OF PUMPS SERVING POOL HEAT EXCHANGER

AND POOL AHU MUST BE MINIMIZED TO MAINTAIN POOL WATER AND AIR

TEMPERATURES.

REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND

RETURN PIPING INCLUDING CONTROLS. CONCRETE PAD TO REMAIN. CAP

PIPING AT MAINS AS SHOWN AND/OR AS REQUIRED. NEW PUMP P-8 AND

ASSOCIATED PIPING MUST BE INSTALLED AND OPERATIONAL PRIOR TO

REMOVING EXISTING P-8. DOWNTIME OF PUMPS SERVING POOL HEAT

EXCHANGER AND POOL AHU MUST BE MINIMIZED TO MAINTAIN POOL

WATER AND AIR TEMPERATURES.

EXISTING HYDRONIC UNIT HEATER AND ASSOCIATED PIPING TO REMAIN.

REMOVE EXISTING AIR COMPRESSOR AND ALL ASSOCIATED PIPING,

CONTROLS, ETC.

1

2

3

4

5

EXISTING

WATER

HEATER

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

EXISTING CAST

IRON BOILER

1

6

UH

UH

UH

7

8

9

EXISTING

P-1

EXISTING

P-2

EXISTING

P-3

EXISTING

P-4

EXISTING

P-5

EXISTING

P-6

EXISTING

P-7

EXISTING

P-8

8

8

7

9

9

EXISTING

EXHAUST FAN

GENERAL DEMOLITION NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO

NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR

AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE

NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL

TEMPORARY CONNECTIONS IN BID PRICE.

4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.

CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER

IN ADVANCE.

10

10

EXISTING FUEL-OIL

PUMP TRANSFER

STATION

3/8" = 1'-0"

MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 11

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

D-1

01

.D

WG

je

sse

.vo

se

3/8"=1'-0"

MD-101

JEV

RC

MECHANICAL BOILER ROOMDEMOLITION PLAN - PHASE 1

MD-101

NORTH

BOILER

ROOM

BOILER B-1

BOILER B-2

BOILER B-3

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

6"

EXISTING

BOILER #2

EXISTING

ELECTRICAL

GEAR

DEMOLITION KEY NOTES:

REMOVE EXISTING FIRETUBE BOILER INCLUDING ALL SUPPLY & RETURN

HEATING PIPING, OIL PIPING, GAS PIPING, AND CONTROLS. CAP PIPING

BACK AT MAINS.

REMOVE EXISTING BOILER PUMP & PIPING.

REMOVE BOILER BREECHING AS INDICATED.

REMOVE EXISTING HEATING SYSTEM MAKE-UP WATER BACKFLOW

PREVENTOR ASSEMBLY.

REMOVE EXISTING HEATING SUPPLY PIPING TO DOMESTIC WATER

HEATER INCLUDING VALVES.

REMOVE EXISTING DOMESTIC HOT WATER HEATER / STORAGE TANK, AND

CONCRETE SUPPORTS. SEE PLUMBING DRAWINGS FOR FURTHER

INFORMATION AND REQUIREMENTS.

REMOVE EXISTING HEATING SYSTEM PUMP INCLUDING ALL SUPPLY AND

RETURN PIPING AND CONTROLS. CONCRETE PAD TO REMAIN.

REMOVE EXISTING EXPANSION TANKS. SEE GENERAL DEMOLITION NOTE

#3, AND GENERAL NOTES ON DRAWINGS M-101 AND M-102 DESCRIBING

PHASING OF CONSTRUCTION. EXISTING EXPANSION TANKS MAY NEED TO

BE REMOVED AT END OF PROJECT, AS CONTRACTOR MAY NEED TO

TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO NEW HW

SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR AND

REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED

WHERE NEW EXPANSION TANKS WILL BE INSTALLED..

REMOVE SECTION OF TEMPORARY PIPING INSTALLED UNDER PHASE 1.

1

2

3

4

5

6

7

8

4"

5"

5"

3"

6"

4" 6" 6" 6"

4"

4"

6" 6" 8"

1-1

/4

"

1-1

/4

"1

-1

/2

8"

8"

6"

5"

5"

4"

EXISTING

ELECTRICAL

GEAR

4"

EXISTING

WATER

HEATER

3"

3"

3"

EXISTING

COMPRESSOR

EXISTING AIR

SEPARATOR

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

UH

UH

EXISTING

P-1

EXISTING

P-3

EXISTING

P-4

EXISTING

P-5

EXISTING

P-6

EXISTING

P-7

5"

5"

6"

8"

5"

3"

UH

P-8

1

2

2

2

2

2

2

2

2

2

2

3

3

5

5

5

5

6

77 7

7

7

7

7

7

7

7

8

8"

3"HWS

3"HWR

8

4

BP-1

4"HWR

4"HWR

4"HWR

4"HWS

4"HWS

4"HWS

4"HWS

4"HWR

FOS

9

9

9

9

9

EXISTING

EXPANSION

TANK

4"HWS

EXISTING

EXPANSION

TANK

EXISTING

EXPANSION

TANK

8

8

8

EXISTING

EXPANSION

TANK

8

EXISTING

EXPANSION

TANK

8

EXISTING

EXPANSION

TANK

8

EXISTING FUEL-OIL

PUMP TRANSFER

STATION

GENERAL DEMOLITION NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO

NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR

AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE

NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL

TEMPORARY CONNECTIONS IN BID PRICE.

4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.

CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER

IN ADVANCE.

3/8" = 1'-0"

MECHANICAL BOILER ROOM DEMOLITION PLAN - PHASE 21

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

D-1

02

.d

wg

je

sse

.vo

se

3/8"=1'-0"

MD-102

JEV

RC

MECHANICAL BOILER ROOMDEMOLITION PLAN - PHASE 2

MD-101

NORTH

BOILER

ROOM

4"

5"

5"

5"

6"

4" 6" 6" 6"

4"

4"

6" 8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

8"

5"

5"

4"

TEMP. CONTROL

PANEL

AIR

SEPARATOR

EXISTING

WATER

HEATER

3"

3"

3"

EXISTING AIR

SEPARATOR

EXISTING

COMPRESSOR

EXISTING

BOILER #2

EXISTING CAST

IRON BOILER

EXISTING FUEL-OIL

PUMP TRANSFER

STATION

P-5P-7

P-3P-4

P-6

8"H

WS

3"HWS

3"HWR

8

"

H

W

S

EXISTING

P-1

4"

CONNECTS TO (8)

EXISTING EXPANSION

TANKS

16

16

17

16

EXISTING

ELECTRICAL

GEAR

DOMESTIC HOT WATER HEATERS BY PLUMBING CONTRACTOR. VENTS AND

COMBUSTION AIR INTAKES BY MECHANICAL CONTRACTOR. PLUMBING

CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC CONTROL MODULE TO

CONNECT DOMESTIC WATER HEATERS TO THE ALERTON BUILDING DDC SYSTEM.

DDC SYSTEM TO MONITOR AND CONTROL ALL AVAILABLE POINTS. PLUMBING

CONTRACTOR TO COORDINATE ALL REQUIREMENTS WITH MECHANICAL

CONTRACTOR AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).

1

NEW WORK KEY NOTES:

PROVIDE NEW 6" HIGH CONCRETE HOUSEKEEPING PAD FOR NEW

OIL-FIRED BOILERS B-1, B-2 & B-3.

PROVIDE NEW FLEX TUBE HOT WATER BOILER - MAINTAIN

MANUFACTURER'S REQUIRED SERVICE CLEARANCES AROUND BOILER.

PROVIDE NEW BOILER PUMP INSTALLED 3-4 FEET ABOVE FLOOR - REFER

TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

PROVIDE NEW PRIMARY HEATING PIPING TO/FROM BOILER.

SPACE DESIGNATED FOR FUTURE GAS TRAIN. CAP PORT AT NEW BURNER

AS REQUIRED.

PROVIDE NEW PUMP VARIABLE FREQUENCY DRIVE ON WALL BETWEEN

PUMP PADS FOR ACCESS.

PROVIDE NEW HEATING SYSTEM PUMP - REFER TO DETAILS AND

SPECIFICATIONS - TYP.

PROVIDE NEW HEATING SYSTEM AIR SEPARATOR - SUPPORT FROM

STRUCTURE WITH ISOLATION HANGERS.

PROVIDE NEW FUEL OIL TRANSFER PUMP STATION - CONNECT RETURN

PIPING TO EXISTING.

PROVIDE NEW FUEL OIL PIPING - RUN HIGH THROUGH BOILER ROOM AND

DROP PIPING DOWN AT BURNER LOCATIONS. REFER TO PIPING DIAGRAM

ON DWG. M-201 - TYP.

PROVIDE NEW BOILER BREECHING AND STACK UP THROUGH EXISTING

LOW ROOF. REFER TO DETAILS AND SPECIFICATIONS - TYP.

EXISTING 122"Wx122"H (60 SQ. FT. FREE AREA) COMBUSTION AIR LOUVER

TO REMAIN.

PROVIDE NEW BACKFLOW PREVENTER ASSEMBLY ON MAKE-UP WATER TO

HEATING SYSTEM. RECONNECT TO EXISTING 1-1/2" PIPING AS REQUIRED.

REFER TO DETAIL ON DWG. M-202.

PROVIDE NEW HW HEATING PIPING - RUN AS HIGH AS POSSIBLE AND

RECONNECT TO EXISTING AS SHOWN.

RECONNECT PUMP INLET PIPING TO NEW 8" HEADER.

INSTALL EMERGENCY SHUTOFF FOR ALL NEW BOILERS AND DOMESTIC

HOT WATER HEATERS. SEE DETAIL ON ELECTRICAL DRAWINGS.

INCREASE SIZE OF EXISTING CONCRETE EQUIPMENT PADS FOR

BASE-MOUNTED PUMPS AS REQUIRED TO INSTALL NEW CONCRETE

INERTIA BASES TO SUPPORT PUMPS, SUCTION DIFFUSERS, ETC.

COORDINATE WITH EXISTING FLOOR DRAINS TO REMAIN.

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18 PROVIDE AL29-4C FLUE VENT AND COMBUSTION AIR PIPING TO GAS FIRED

DOMESTIC WATER HEATERS. REFER TO PIPING DETAIL ON DWG. M-203, AND

INSTALL PER MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS.

RUN HEATER FLUE VENT AND COMBUSTION AIR PIPING AS HIGH AS POSSIBLE

THROUGH BOILER ROOM. DO NOT RUN ABOVE ELECTRICAL GEAR.

PROVIDE NEW FLUE VENT AND COMBUSTION AIR PIPING UP THROUGH

EXISTING LOW ROOF WITH 6" APPROVED TERMINATION (AL29-4C TO PVC

ADAPTER, & SHORT PIECE OF PVC PIPING). MAINTAIN MINIMUM 10 FT

HORIZONTAL CLEARANCE FROM HIGH WALL ABOVE ROOF TO FLUE

TERMINATION. COMBUSTION AIR CAN BE LESS THAN 10 FT HORIZONTAL

DISTANCE. CONTRACTOR NOTE: IF MANUFACTURER'S REQUIRED

TERMINATION CLEARANCES CANNOT BE MAINTAINED, NOTIFY ENGINEER .

PROVIDE MOTOR OPERATED VALVES (NORM. CLOSED) ON BACK-UP SUPPLY

PIPING.

19

20

21

P-8

5"

5"

6"

8"

5"

3"

3" HWS TO POOL HX & AC-14.

5" HWR FROM OLD JUNIOR

HIGH SCHOOL, POOL HX, AND

AC-14.

8" HWR FROM BUILDING

WINGS A THRU H.

5" HWS TO OLD JUNIOR HIGH

SCHOOL.

5" HWS TO BUILDING WINGS G & H.

6" HWS TO BUILDING WINGS A THRU F.

BP-1

BP-2

BP-3

4"HWR

4"HWR

4"HWR

4"HWS

4"HWS

4"HWS

4"HWS

3

3

3

4"HWS

4"HWS

BOILER B-1

BOILER B-2

BOILER B-3

FO

R

FO

S

FO

R

FO

S

1110

10

1-1/2" TO EACH

BOILER (TYP.)

2"

FO

R

FO

S

2"

2"

BOILER

STACK

11

6

4"HWR

FOR

FOS

EXISTING

ELECTRICAL

GEAR

18

18

18

19

20

20

6"

10

'-0

" M

IN

IM

UM

PWH-1 PWH-2 PWH-3 PWH-4

GENERAL NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO

NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR

AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE

NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL

TEMPORARY CONNECTIONS IN BID PRICE.

4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.

CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER

IN ADVANCE.

5. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC

HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER MIXING VALVES, ETC.)

SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED

BUILDING SYSTEMS, INC. (ALERTON). PROVIDE A NEW COMPUTER WORKSTATION OR

LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF

ALL EQUIPMENT, ADJUST SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT

PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC

CONTROL PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE

120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND

LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS

RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.

6. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF

PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

6"

DOMESTIC WATER MIXING VALVE

BY PLUMBING CONTRACTOR.

MIXING VALVE AND HOT WATER

RECIRCULATION PUMPS MUST BE

CONNECTED TO THE ALERTON

BUILDING DDC SYSTEM. DDC

SYSTEM TO MONITOR AND

CONTROL ALL AVAILABLE POINTS.

PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS

WITH MECHANICAL CONTRACTOR

AND CONTROLS CONTRACTOR

(BACNET VS MODBUS, ETC.).

6" FLUES UP (TYP)

6"CAI UP (TYP)

3/8" = 1'-0"

MECHANICAL BOILER ROOM PLAN - PHASE 11

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-1

01

.D

WG

je

sse

.vo

se

3/8"=1'-0"

M-101

JEV

RC

MECHANICAL BOILER ROOM PLAN -PHASE 1

M-101

NORTH

BOILER

ROOM

5"

5"

6"

8"

5"

3"

EXISTING

COMPRESSOR

P-7

BOILER B-1

BOILER B-2

BOILER B-3

BOILER B-4

BOILER B-5

BOILER B-6

BOILER

STACK

BOILER

STACK

BP-1

BP-2

BP-3

3"HWS

3"HWS

BP-6

BP-5

BP-4

8"HWR

FO

R

FO

S

FO

R

FO

S

FOR

FOS

FO

R

FO

S

FO

R

FO

S

FO

R

FO

S

8"HWS

4"HWR

4"HWR

4"HWR

4"HWS

4"HWS

4"HWS

4"HWS

4"HWS

4"HWS

8"H

WR

8"H

WS

8"H

WR

8"H

WS

8"H

WR

4"HWR

4"HWR

4"HWR

4"HWS

4"HWS

4"HWS

4"HWS

4"HWS

4"HWS

HW

R

HW

S

2"

2"

14

14

3

3

3

3

3

3

11

11

11

11

10

10

10

10

8"H

WR

8"H

WR

8"H

WS

8"HWS

6"H

WS

5"H

WS

5"H

WS

5"HWS

6"HWS

7

7

5"HWS 5"HWS3"HWS

6 66 6

66

15

16

16

8"HWR

8"HWS

17 17 17 17 17 17

16

ET-1 ET-2 ET-3 ET-4

EXISTING

ELECTRICAL

GEAR

8

AS-1

18

18

18

19

6"

2"

2"

HW

R

HW

S

12

1-1/2" TO EACH

BOILER (TYP.)

1-1/2" TO EACH

BOILER (TYP.)

6"

21

3" HWS TO POOL HX & AC-14.

5" HWR FROM OLD JUNIOR

HIGH SCHOOL, POOL HX, AND

AC-14.

8" HWR FROM BUILDING

WINGS A THRU H.

5" HWS TO OLD JUNIOR HIGH

SCHOOL.

5" HWS TO BUILDING WINGS G & H.

6" HWS TO BUILDING WINGS A THRU F.

8"H

WS

3' MAXIMUM

2"2"

PWH-1

P-8

PWH-2 PWH-3 PWH-4

P-3 P-4 P-5 P-6

1-1/2"

1-1/2"

13

TO AIR SEPARATOR

CONNECT EXISTING BRANCH PIPE

THAT SERVES BOILER ROOM UNIT

HEATERS TO HWS FROM PUMP P-6

DOMESTIC HOT WATER HEATERS BY PLUMBING CONTRACTOR. VENTS AND

COMBUSTION AIR INTAKES BY MECHANICAL CONTRACTOR. PLUMBING

CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC CONTROL MODULE TO

CONNECT DOMESTIC WATER HEATERS TO THE ALERTON BUILDING DDC SYSTEM.

DDC SYSTEM TO MONITOR AND CONTROL ALL AVAILABLE POINTS. PLUMBING

CONTRACTOR TO COORDINATE ALL REQUIREMENTS WITH MECHANICAL

CONTRACTOR AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).

DOMESTIC WATER MIXING VALVE

BY PLUMBING CONTRACTOR.

MIXING VALVE AND HOT WATER

RECIRCULATION PUMPS MUST BE

CONNECTED TO THE ALERTON

BUILDING DDC SYSTEM. DDC

SYSTEM TO MONITOR AND

CONTROL ALL AVAILABLE POINTS.

PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS

WITH MECHANICAL CONTRACTOR

AND CONTROLS CONTRACTOR

(BACNET VS MODBUS, ETC.).

GENERAL NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. CONTRACTOR MAY NEED TO TEMPORARILY CONNECT EXISTING EXPANSION TANKS TO

NEW HOT WATER SYSTEM, DEPENDING ON SCHEDULE OF PLUMBING CONTRACTOR

AND REMOVAL OF SECOND DOMESTIC HOT WATER STORAGE TANK LOCATED WHERE

NEW EXPANSION TANKS WILL BE INSTALLED. CONTRACTOR TO INCLUDE ALL

TEMPORARY CONNECTIONS IN BID PRICE.

4. BOILER PLANT SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT.

CONTRACTOR SHALL COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER

IN ADVANCE.

5. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC

HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER MIXING VALVES, ETC.)

SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED

BUILDING SYSTEMS, INC. (ALERTON). PROVIDE A NEW COMPUTER WORKSTATION OR

LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF

ALL EQUIPMENT, ADJUST SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT

PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC

CONTROL PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE

120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND

LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS

RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.

6. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF

PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

EXISTING FUEL-OIL

PUMP TRANSFER

STATION

4"

20

20

10

'-0

" M

IN

IM

UM

6" FLUES UP (TYP)

6"CAI UP (TYP)

1

NEW WORK KEY NOTES:

PROVIDE NEW 6" HIGH CONCRETE HOUSEKEEPING PAD FOR NEW

OIL-FIRED BOILERS B-1, B-2 & B-3.

PROVIDE NEW FLEX TUBE HOT WATER BOILER - MAINTAIN

MANUFACTURER'S REQUIRED SERVICE CLEARANCES AROUND BOILER.

PROVIDE NEW BOILER PUMP INSTALLED 3-4 FEET ABOVE FLOOR - REFER

TO DETAILS AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.

PROVIDE NEW PRIMARY HEATING PIPING TO/FROM BOILER.

SPACE DESIGNATED FOR FUTURE GAS TRAIN. CAP PORT AT NEW BURNER

AS REQUIRED.

PROVIDE NEW PUMP VARIABLE FREQUENCY DRIVE ON WALL BETWEEN

PUMP PADS FOR ACCESS.

PROVIDE NEW HEATING SYSTEM PUMP - REFER TO DETAILS AND

SPECIFICATIONS - TYP.

PROVIDE NEW HEATING SYSTEM AIR SEPARATOR - SUPPORT FROM

STRUCTURE WITH ISOLATION HANGERS.

PROVIDE NEW FUEL OIL TRANSFER PUMP STATION - CONNECT RETURN

PIPING TO EXISTING.

PROVIDE NEW FUEL OIL PIPING - RUN HIGH THROUGH BOILER ROOM AND

DROP PIPING DOWN AT BURNER LOCATIONS. REFER TO PIPING DIAGRAM

ON DWG. M-201 - TYP.

PROVIDE NEW BOILER BREECHING AND STACK UP THROUGH EXISTING

LOW ROOF. REFER TO DETAILS AND SPECIFICATIONS - TYP.

EXISTING 122"Wx122"H (60 SQ. FT. FREE AREA) COMBUSTION AIR LOUVER

TO REMAIN.

PROVIDE NEW BACKFLOW PREVENTER ASSEMBLY ON MAKE-UP WATER TO

HEATING SYSTEM. RECONNECT TO EXISTING 1-1/2" PIPING AS REQUIRED.

REFER TO DETAIL ON DWG. M-202.

PROVIDE NEW HW HEATING PIPING - RUN AS HIGH AS POSSIBLE AND

RECONNECT TO EXISTING AS SHOWN.

RECONNECT PUMP INLET PIPING TO NEW 8" HEADER.

INSTALL EMERGENCY SHUTOFF FOR ALL NEW BOILERS AND DOMESTIC

HOT WATER HEATERS. SEE DETAIL ON ELECTRICAL DRAWINGS.

INCREASE SIZE OF EXISTING CONCRETE EQUIPMENT PADS FOR

BASE-MOUNTED PUMPS AS REQUIRED TO INSTALL NEW CONCRETE

INERTIA BASES TO SUPPORT PUMPS, SUCTION DIFFUSERS, ETC.

COORDINATE WITH EXISTING FLOOR DRAINS TO REMAIN.

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18 PROVIDE AL29-4C FLUE VENT AND COMBUSTION AIR PIPING TO GAS FIRED

DOMESTIC WATER HEATERS. REFER TO PIPING DETAIL ON DWG. M-203, AND

INSTALL PER MANUFACTURER'S REQUIREMENTS AND RECOMMENDATIONS.

RUN HEATER FLUE VENT AND COMBUSTION AIR PIPING AS HIGH AS POSSIBLE

THROUGH BOILER ROOM. DO NOT RUN ABOVE ELECTRICAL GEAR.

PROVIDE NEW FLUE VENT AND COMBUSTION AIR PIPING UP THROUGH

EXISTING LOW ROOF WITH 6" APPROVED TERMINATION (AL29-4C TO PVC

ADAPTER, & SHORT PIECE OF PVC PIPING). MAINTAIN MINIMUM 10 FT

HORIZONTAL CLEARANCE FROM HIGH WALL ABOVE ROOF TO FLUE

TERMINATION. COMBUSTION AIR CAN BE LESS THAN 10 FT HORIZONTAL

DISTANCE. CONTRACTOR NOTE: IF MANUFACTURER'S REQUIRED

TERMINATION CLEARANCES CANNOT BE MAINTAINED, NOTIFY ENGINEER .

PROVIDE MOTOR OPERATED VALVES (NORM. CLOSED) ON BACK-UP SUPPLY

PIPING.

19

20

21

3/8" = 1'-0"

MECHANICAL BOILER ROOM PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-1

02

.d

wg

je

sse

.vo

se

3/8"=1'-0"

M-102

JEV

RC

MECHANICAL BOILER ROOM PLAN -PHASE 2

M-101

NORTH

BOILER

ROOM

AC-1

AC-2

AC-3

AC-4

AC-6

AC-7

AC-8

AC-19 AC-20 AC-21 AC-22 AC-23 AC-24 AC-25 AC-26 AC-27 AC-28

AC-16 AC-17 AC-18

AC-5

UNIT

WATER FLOW (GPM) PIPE SIZE (IN.)

AC-1 12 1-1/4

AC-2 15 1-1/4

AC-3 15 1-1/4

AC-4 11 1-1/4

AC-5 18 1-1/2

AC-6 9 1-1/4

AC-7 18 1-1/2

AC-8 28 2

AC-9 13 1-1/4

AC-10 14 1-1/4

AC-11 8 1-1/4

AC-12 30 2

AC-13 30 2

AC-14 27 2

AC-15 15 1-1/4

AC-16 14 TBD BY CONTRACTOR

AC-17 14 TBD BY CONTRACTOR

AC-18 8 TBD BY CONTRACTOR

AC-19 20 1-1/2

AC-20 5 1

AC-21 10 1-1/4

AC-22 25 2

AC-23 27 2

AC-24 5 1

AC-25 12 1-1/4

AC-26 15 1-1/4

AC-27 14 1-1/4

AC-28 19 1-1/2

AC-29 26 2

AC-30 27 2

AC-31 21 1-1/2

NOTES:

CONTROL VALVES: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAY HOTWATER CONTROL VALVES AT EACH AIR-HANDLING UNIT (EXCEPT AC-14; SEE BELOW) WITHNEW PNEUMATIC MODULATING 2-WAY CONTROL VALVES. THE NEW 2-WAY CONTROLVALVES SHALL BE CONNECTED TO THE RESPECTIVE AIR-HANDLING UNIT'S PNEUMATICCONTROL PANEL. CONTRACTOR TO PROVIDE ALL CONTROLS COMPONENTS (PNEUMATIC,ELECTRONIC, AND ELECTRIC), WORK, AND PROGRAMMING AS REQUIRED FOR A FULLYFUNCTIONING CONTROL SYSTEM. CUT AND CAP BYPASS LINE FROM EXISTING 3-WAYCONTROL VALVES. EXISTING CONTROL SEQUENCES TO BE EITHER REUSED OR MODIFIED ASREQUIRED FOR NEW MODULATING CONTROL VALVES. CONTROL VALVE SIZES ARE SHOWNFOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZES IN FIELD.CONTRACTOR TO RE-BALANCE HOT WATER FLOWS TO EACH AIR-HANDLING UNIT AFTERINSTALLATION OF NEW CONTROL VALVES.

AC-14 CONTROL VALVE: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAYHOT WATER CONTROL VALVES AT AIR-HANDLING UNIT AC-14 WITH NEW MODULATING2-WAY CONTROL VALVE. THE NEW 2-WAY CONTROL VALVES SHALL BE CONNECTED TO THEALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY OF AC-14'S NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL,AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, ANDLOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CUT AND CAP BYPASSLINE FROM EXISTING 3-WAY CONTROL VALVE. EXISTING CONTROL SEQUENCES TO BEEITHER REUSED OR MODIFIED AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLYOPERATIONAL. CONTROL VALVE SIZE IS SHOWN FOR REFERENCE ONLY. CONTRACTOR TOVERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TO RE-BALANCE HOT WATERFLOW TO AIR-HANDLING UNIT AFTER INSTALLATION OF NEW CONTROL VALVE.

HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: ADD ALTERNATE #1 ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSORS / TRANSMITTERS IN EACH HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMPS LOCATED IN BOILER ROOM. PRESSURE SENSORS /TRANSMITTERS TO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMPVFD'S TO MAINTAIN CONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVESAT AHU'S OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).

1/16" = 1'-0"

MECHANICAL FLOOR PLAN - EAST1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-1

03

.d

wg

je

sse

.vo

se

1/16"=1'-0"

M-103

JEV

RC

MECHANICAL FLOOR PLANAREA A

M-103 M-104

NORTH

M-103

A B C D

E F

G H

OLD JHS

AutoCAD SHX Text
AIR-HANDLING UNIT HOT WATER CONTROL VALVE REPLACEMENT - ADD ALTERNATE #1

AC-11 AC-10 AC-9

AC-12

AC-13

AC-14

AC-15

AC-29 AC-30

AC-31

FILTER ROOM

POOL HEATER EXCHANGER

BALANCING VALVE

BALL VALVE

GATE VALVE

ANGLE GLOBE VALVE

GLOBE VALVE

ANGLE GATE VALVE

BUTTERFLY VALVE

TWO WAY MOTORIZED

CONTROL VALVE

MOTORIZED VALVE

OS & Y

THREE WAY MOTORIZED

CONTROL VALVE

QUICK CLOSING LEVER VALVE

(PRESSURE & TEMPERATURE)

SAFETY RELIEF VALVE (PRESS.)

ISOLATION VALVE

M

CONTINUATION

EXISTING PIPE TO REMAIN

EXISTING DUCT TO REMAIN

EXISTING EQUIPMENT

00

00

00

00

EXISTING LAYERS

M-ANNO-DIMS

M-ANNO-KEYN

M-ANNO- NOTE

M-ANNO-NPLT

M-ANNO-PATT

M-ANNO-REDL

M-ANNO-REFR

M-ANNO-REVS

M-ANNO-SYMB

M-ANNO-TEXT

M-DEMO-PHS1

M-DEMO-PHS2

M-DEMO-PHS3

M-DISC-INFO

M-FLOR-IDEN

M-FLOR-NUMB

ST

HVAC LAYERS

M-CHEM-PIPE

M-CNDW-PIPE

M-COND-PIPE

M-CONT-THER

M-CONT-WIRE

M-CWTR-PIPE

M-DUAL-PIPE

M-DUST-DUCT

M-EXHS-DUCT

M-GTHP-PIPE

M-HVAC-ACCS

M-HVAC-CDFF

M-HVAC-DAMP

M-HVAC-EQPM

M-HVAC-FDFF

M-HVAC-IDEN

M-HVAC-RETN

M-HVAC-ROOF

M-HWTR-PIPE

M-PENE-FLOR

M-PENE-ROOF

M-RCOV-PIPE

M-REFG-PIPE

M-HVAC-TAGS

M-HVAC-WDFF

M-HVAC-SUPP

M-GTHP-EQPM

BKGD

BORDER

EXISTING PIPE TO REMOVE

EXISTING DUCT TO REMOVE

M-HVAC-GAS

TEXT

TE

XT

3"

4"

(E)3"

(E)2" TO AC-13

(E)2" TO AC-14

(E)2" (E)1-1/4" TO RADS

(E)1-1/2" TO AC-15

(E)2-1/2"

(E)3" HWS&R

DOWN TO POOL

HEAT EXCHANGER

AC-15

AC-12

AC-13

AC-14

(E)2" TO AC-12

(N)2"TO AC-14

(N)2"

(N)2"TO AC-14

(N)2"TO AC-14

(N)2"

INSTALL NEW 2" HWS&R

TO SERVE AC-14 FROM

EXISTING 3" HWS&R TO

POOL HEAT EXCHANGER.

REMOVE

EXISTING 2"

HWS&R

SERVING

AC-14.

UNIT

WATER FLOW (GPM) PIPE SIZE (IN.)

AC-1 12 1-1/4

AC-2 15 1-1/4

AC-3 15 1-1/4

AC-4 11 1-1/4

AC-5 18 1-1/2

AC-6 9 1-1/4

AC-7 18 1-1/2

AC-8 28 2

AC-9 13 1-1/4

AC-10 14 1-1/4

AC-11 8 1-1/4

AC-12 30 2

AC-13 30 2

AC-14 27 2

AC-15 15 1-1/4

AC-16 14 TBD BY CONTRACTOR

AC-17 14 TBD BY CONTRACTOR

AC-18 8 TBD BY CONTRACTOR

AC-19 20 1-1/2

AC-20 5 1

AC-21 10 1-1/4

AC-22 25 2

AC-23 27 2

AC-24 5 1

AC-25 12 1-1/4

AC-26 15 1-1/4

AC-27 14 1-1/4

AC-28 19 1-1/2

AC-29 26 2

AC-30 27 2

AC-31 21 1-1/2

NOTES:

CONTROL VALVES: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAY HOTWATER CONTROL VALVES AT EACH AIR-HANDLING UNIT (EXCEPT AC-14; SEE BELOW) WITHNEW PNEUMATIC MODULATING 2-WAY CONTROL VALVES. THE NEW 2-WAY CONTROLVALVES SHALL BE CONNECTED TO THE RESPECTIVE AIR-HANDLING UNIT'S PNEUMATICCONTROL PANEL. CONTRACTOR TO PROVIDE ALL CONTROLS COMPONENTS (PNEUMATIC,ELECTRONIC, AND ELECTRIC), WORK, AND PROGRAMMING AS REQUIRED FOR A FULLYFUNCTIONING CONTROL SYSTEM. CUT AND CAP BYPASS LINE FROM EXISTING 3-WAYCONTROL VALVES. EXISTING CONTROL SEQUENCES TO BE EITHER REUSED OR MODIFIED ASREQUIRED FOR NEW MODULATING CONTROL VALVES. CONTROL VALVE SIZES ARE SHOWNFOR REFERENCE ONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZES IN FIELD.CONTRACTOR TO RE-BALANCE HOT WATER FLOWS TO EACH AIR-HANDLING UNIT AFTERINSTALLATION OF NEW CONTROL VALVES.

AC-14 CONTROL VALVE: ADD ALTERNATE #1 INCLUDES REPLACING THE EXISTING 3-WAYHOT WATER CONTROL VALVES AT AIR-HANDLING UNIT AC-14 WITH NEW MODULATING2-WAY CONTROL VALVE. THE NEW 2-WAY CONTROL VALVES SHALL BE CONNECTED TO THEALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY OF AC-14'S NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL,AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, ANDLOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CUT AND CAP BYPASSLINE FROM EXISTING 3-WAY CONTROL VALVE. EXISTING CONTROL SEQUENCES TO BEEITHER REUSED OR MODIFIED AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLYOPERATIONAL. CONTROL VALVE SIZE IS SHOWN FOR REFERENCE ONLY. CONTRACTOR TOVERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TO RE-BALANCE HOT WATERFLOW TO AIR-HANDLING UNIT AFTER INSTALLATION OF NEW CONTROL VALVE.

HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: ADD ALTERNATE #1 ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSORS / TRANSMITTERS IN EACH HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMPS LOCATED IN BOILER ROOM. PRESSURE SENSORS /TRANSMITTERS TO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMPVFD'S TO MAINTAIN CONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVESAT AHU'S OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).

3"

4"

(E)3"

(E)2" TO AC-13

(E)2" TO AC-14

(E)2" (E)1-1/4" TO RADS

(E)1-1/2" TO AC-15

(E)2-1/2"

(E)3" HWS&R

DOWN TO POOL

HEAT EXCHANGER

AC-15

AC-12

AC-13

AC-14

(E)2" TO AC-12

(N)2"TO AC-14

(N)2"

(N)2"TO AC-14

(N)2"TO AC-14

(N)2"

INSTALL NEW 2" HWS&R

TO SERVE AC-14 FROM

EXISTING 3" HWS&R TO

POOL HEAT EXCHANGER.

REMOVE

EXISTING 2"

HWS&R

SERVING

AC-14.

UNIT

WATER FLOW (GPM) PIPE SIZE (IN.)

POOL HX 75 3

NOTES:

POOL WATER HEAT EXCHANGER CONTROL VALVE: BASE BID INCLUDES REPLACING THEEXISTING SPOOL PIECE (PREVIOUS LOCATION OF 3-WAY HOT WATER CONTROL VALVE) ATTHE HEAT EXCHANGER WITH A NEW MODULATING 2-WAY CONTROL VALVE. THE NEW2-WAY CONTROL VALVE SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BYAUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PNEUMATIC COMPONENTS ARE NOTPERMITTED FOR ANY OF THE POOL HEAT EXCHANGER'S NEW CONTROLS. CONTRACTOR TOEITHER EXPAND DDC CONTROL PANEL, OR INSTALL NEW CONTROL PANEL, AS REQUIRED. PROVIDE 120-VOLT POWER FROM NEAREST ELECTRICAL PANEL, AND LOW-VOLTAGETRANSFORMERS FOR NEW CONTROL COMPONENTS. PROVIDE AND IMPLEMENT CONTROLSEQUENCES AS REQUIRED FOR NEW CONTROL VALVE TO BE FULLY OPERATIONAL TOMAINTAIN POOL WATER TEMPERATURE. CONTROL VALVE SIZE IS SHOWN FOR REFERENCEONLY. CONTRACTOR TO VERIFY PIPE & CONTROL VALVE SIZE IN FIELD. CONTRACTOR TORE-BALANCE HOT WATER FLOW TO POOL HEAT EXCHANGER AFTER INSTALLATION OF NEWCONTROL VALVE.

HW PUMP VFD CONTROL VIA DIFFERENTIAL PRESSURE: BASE BID ALSO INCLUDESINSTALLING DIFFERENTIAL PRESSURE SENSOR / TRANSMITTER IN PUMP P-8'S HOT WATERPUMPING / PIPING DISTRIBUTION SYSTEM, LOCATED 2/3 DISTANCE DOWN FURTHESTPIPING RUN FROM PUMP LOCATED IN BOILER ROOM. PRESSURE SENSOR / TRANSMITTERTO BE CONNECTED TO BUILDING DDC SYSTEM, AND MODULATE PUMP VFD TO MAINTAINCONSTANT DIFFERENTIAL PRESSURE WHEN 2-WAY CONTROL VALVES AT AC-14 AND THEPOOL HEAT EXCHANGER OPEN AND CLOSE. PROVIDE CONTROL PANELS, 120-VOLT POWER,TRANSFORMERS, PROGRAMMING, AND ALL OTHER COMPONENTS FOR A FULLY OPERATINGCONTROL SYSTEM. ALL WORK ASSOCIATED WITH THE ALERTON BUILDING DDC SYSTEMSHALL BE PERFORMED BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTONREPRESENTATIVE).

1/16" = 1'-0"

MECHANICAL FLOOR PLAN - WEST1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-1

03

.d

wg

je

sse

.vo

se

1/16"=1'-0"

M-104

JEV

RC

MECHANICAL FLOOR PLANAREA B

NORTH

M-104

A B C D

E F

G H

OLD JHS

M-103 M-104

1/4" = 1'-0"

D-WING MECHANICAL PLAN - WORK PART OF BASE BID2

M-104

AutoCAD SHX Text
AIR-HANDLING UNIT HOT WATER CONTROL VALVE REPLACEMENT - ADD ALTERNATE #1
AutoCAD SHX Text
POOL WATER HEAT EXCHANGER CONTROL VALVE REPLACEMENT - BASE BID

M-201

1

8 FT. MIN.

HIGH ROOF

CABLES, ANCHORS

AND TENSIONERS

28"Ø CBILA

316/304

28"Ø CBILA

316/304

16"Ø CBILA

316/304

4

5

°

ROOF

FLOOR

ROOF CURB

4"

(4 in)

PAD

M-201

2

RETURN TO TANK

CHECK

VALVE

GATE

VALVE

CHECK

VALVE

SUPPLY TO BURNERS

CHECK

VALVE

PRESSURE

GAUGES

W/ISOLATORS

BURNER

NOZZLE

GATE

VALVE

EXISTING

FUEL-OIL

TANK

FILTER

GATE

VALVE

CHECK

VALVE

VACCUUM OR COMPOUND

GAUGE W/ISOLATOR

OIL INLET

OIL RETURN

OIL

METERING

VALVE

FILTER

EXISTING FUEL-OIL PUMP

TRANSFER STATION

OIL INLET

OIL RETURN

OIL

METERING

VALVE

CHECK

VALVE

BACK PRESSURE VALVE

SET BELOW 3 PSI

BURNER

NOZZLE

STRAINER

PRESSURE

GAUGES

W/ISOLATORS

GATE

VALVE

GATE

VALVE

RELIEF

VALVE

FUEL

UNIT

FUEL

UNIT

VOLUME

CONTROL

BY-PASS

HWS

AV

2"

HW

S

HW

R

ET-3

ET-2

SHUT OFF

VALVE (TYPICAL)

PUMP P-3

BASE MTD

TTT

36"

MAX

T

TRIPLE

BASE MTD

PUMP P-8

FINISHED FLOOR

DUTY VALVE

(TYPICAL)

FINISHED FLOOR

SECONDARY

VFD DRIVE PUMP

SECONDARY

VFD DRIVE PUMP

HWR

8"

3"

3"

5"

5"

8"

8"

8"8"

6"

6"

ET-1

M-201

3

NOT TO SCALE

ET-4

PUMP P-4

BASE MTD

SECONDARY

VFD DRIVE PUMP

5"

5"

PUMP P-5 (STANDBY)

BASE MTD

SECONDARY

VFD DRIVE PUMP

6"

6"

PUMP P-6

BASE MTD

SECONDARY

VFD DRIVE PUMP

5"

5"

SHUT OFF

VALVE (TYPICAL)

PUMP P-7

BASE MTD

SECONDARY

VFD DRIVE PUMP

6"

6"

TRIPLE

DUTY VALVE

(TYPICAL)

BOILER #1

INLINE

PUMP BP-1

BOILER #2

INLINE

PUMP BP-2

BOILER #3

INLINE

PUMP BP-3

BOILER #4

INLINE

PUMP BP-4

BOILER #5

INLINE

PUMP BP-5

BOILER #6

INLINE

PUMP BP-6

8"8"

8"8"8"

DRAIN VALVE

(TYPICAL)

TEMPERATURE SENSOR

(TYPICAL)

HWS HWS

HWS HWS

HWS

HWS

4"

4" 4" 4" 4" 4" 4"

4" 4" 4" 4" 4"

SEE BASE MOUNTED PUMP

INSTALLATION DETAIL FOR ALL

SECONDARY PUMPS (TYP.)

SEE BASE MOUNTED PUMP

INSTALLATION DETAIL FOR ALL

SECONDARY PUMPS (TYP.)

SEE INLINE PUMP

INSTALLATION DETAIL

FOR ALL BOILER

PUMPS (TYP.)

SEE INLINE PUMP

INSTALLATION DETAIL

FOR ALL BOILER

PUMPS (TYP.)

AIR SEPARATOR. SEE AIR

ELIMINATION AND EXPANSION

TANK INSTALLATION DETAIL.

EXPANSION TANKS. SEE AIR

ELIMINATION AND EXPANSION

TANK INSTALLATION DETAIL.

1-1/2"

DCW 1-1/2"

1-1/2"

PRESSURE REDUCING VALVE ASSEMBLY.

SEE AIR ELIMINATION AND EXPANSION

TANK INSTALLATION DETAIL.

3"

5"

3" TO POOL HX & AC-14

HWS

HWS

3"

STRAINER (TYPICAL)STRAINER (TYPICAL)

HWS

6"

5"

5"

6"

5" TO OLD JUNIOR HIGH SCHOOL

5" TO BUILDING WINGS G & H

5" FROM POOL HX, AC-14, & OLD JUNIOR HIGH SCHOOL

8" COMBINED RETURN

6" TO BUILDING WINGS A THRU F

8"

1"

ONE-SHOT CHEMICAL FEEDER &

FILTER FEEDER. SEE CHEMICAL

FEEDER INSTALLATION DETAIL.

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-2

01

.D

WG

je

sse

.vo

se

N.T.S.

M-201

XXX

XXX

MECHANICAL DETAILS

AutoCAD SHX Text
BOILERS COMBINED FLUE VENTING DETAIL
AutoCAD SHX Text
FUEL OIL PIPING DIAGRAM - MULTIPLE BURNERS CONFIGURATION
AutoCAD SHX Text
HEATING BOILERS HOT WATER DIAGRAM (PRIMARY/SECONDARY LOOPS)

NOT TO SCALE

CENTRIFUGAL AIR SEPARATOR (LINE SIZE)

W/ STRAINER. SEE NOTE #2.

SEE NOTE #3.

HOSE END DRAIN VALVE W/ CAP. TYPICAL.

T. & P. RELIEF VALVE. (WHEN NOT

PROVIDED ON HEAT TRANSFER DEVICE).

SEE NOTE #4.

SYSTEM CONNECTION (CONNECT TO SIDE

OR BOTTOM OF MAIN HEADER)

CITY WATER MAKE-UP. REFER TO

WORK BY DIV. 22 FOR CONTINUATION.

REDUCER. (WHERE REQ'D.) TYPICAL.

FULL SIZE BYPASS W/ GLOBE

VALVE

PRESSURE REDUCING VALVE. (SET AT 4 PSIG

HIGHER THAN THE SYSTEM PRESSURE AT

THE HIGH POINT IN THE SYSTEM)

PRESSURE GAUGE

W/ NEEDLE VALVE. TYPICAL.

HIGH CAPACITY AUTOMATIC AIR VENT

W/ PETCOCK. TYPICAL.

AIR CHARGING VALVE. (PRESSURIZE DRY

TANK EQUAL TO FILL VALVE PRESSURE)

TO SUCTION HEADER

OF PUMPS

FROM SYSTEM

UNION OR FLANGE. TYPICAL.

FLOOR MOUNTED PRESSURIZED VERTICAL

EXPANSION TANK. (FIXED OR REPLACABLE

BLADDER TYPE). SEE NOTE #2.

4" HOUSEKEEPING

CONCRETE PAD.

FINISHED FLOOR

SHUT-OFF VALVE W/ TAG : "THIS VALVE TO

BE OPEN AT ALL TIMES, EXCEPT WHEN

DRAINING TANK OR FOR TANK

MAINTENANCE."

SEE NOTE #1

INSERT THIS TEE WHEN PARALLEL

TANKS ARE TO BE USED. REFER TO PLANS.

NOTES:

1. PIPING SHALL BE THE SAME SIZE AS THE TANK INLET CONNECTION, MINIMUM 1".

2. AIR SEPARATOR SHALL BE SUSPENDED FROM THE STRUCTURE ABOVE ON THREADED STEEL RODS AND SUPPORTS

AS REQUIRED. PROVIDE SEISMIC RESTRAINTS FOR THE AIR SEPARATOR AND EXPANSION TANK AS REQUIRED BY

LOCAL BUILDING CODE AND AS INDICATED IN THE SPECIFICATIONS AND ON THE CONTRACT DRAWINGS. INSTALL

THE AIR SEPARATOR AND THE TANK(S) AND THEIR RESPECTIVE COMPONENTS IN STRICT ACCORDANCE WITH THE

MANUFACTURER'S WRITTEN INSTALLATION INSTRUCTIONS.

3. INSTALL UNIT LEAVING ADEQUATE DISTANCE TO REMOVE STRAINER ON UNITS WITH A STRAINER.

4. IF THE SYSTEM FLUID IS A WATER AND GLYCOL MIXTURE, THEN PIPE THE THE RELIEF VALVE DISCHARGE TO THE

GLYCOL CHEMICAL FEED SYSTEM, OTHERWISE PIPE TO THE NEAREST FLOOR DRAIN AND TERMINATE WITH AN AIR

GAP FITTING. MINIMUM PIPE SIZE TO BE EQUAL TO THE RELIEF VALVE DISCHARGE.

DIV. 23. DIV. 22.

M-202

8

M-202

3

RESTRAINED SPHERICAL TYPE

ELASTOMER CONNECTOR. TYPICAL

CALIBRATED TRIPLE DUTY VALVE.

(SIZED FOR 1-3 PSI P.D. AT THE

DESIGN FLOW RATE)

A

NOT TO SCALE

Trerice

ISOLATION VALVE. BALL OR

BUTTERFLY TYPE. TYPICAL.

OSHA/ANSI COUPLER GUARD

PUMP & MOTOR WITH BASE PLATE GROUTED

& BOLTED TO CONCRETE INERTIA BASE.

CONCRETE HOUSEKEEPING

PAD - 4" MINIMUM

STRAINER BLOWDOWN.

TERMINATE NEAR FD.

FINISHED FLOOR

ADJUSTABLE SUPPORT FOOT

COMBINATION SUCTION

DIFFUSER & STRAINER

Trerice

9" INDUSTRIAL THERMOMETER

W/ 3/4" NPT WELL. TYPICAL.

MULTIPORT PRESSURE

INDICATOR (4-PORT)

SEE NOTE #2.

1/4" O.D. COPPER TUBING W/ COMP. FITTINGS

GALV. THREADED STEEL ROD SUPPORTED

FROM BUILDING STRUCTURE. REFER TO

PIPE HANGER INSTALLATION DETAILS FOR

ROD SIZES. SEE NOTES #1 & 3.

A

CONCRETE FILLED INERTIA BASE

1" MINIMUM

SPRING ISOLATORS. SEE NOTE #3.

NOTES:

1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING PUMP TO BUILDING STRUCTURE.

2. PROVIDE SPRING & NEOPRENE TYPE PIPE HANGERS PER SPECIFICATIONS AT ALL HANGER LOCATIONS WITHIN 50'-0", UP AND DOWN

STREAM, OF ALL PUMPS.

3. PROVIDE SEISMIC BRACING/RESTRAINTS AS REQUIRED BY CODE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

4. FOR CONDENSER WATER PUMPS ONLY: PROVIDE A LOW PRESSURE DROP, LARGE MESH (MINIMUM 1/4" MESH) 'Y' STRAINER ON THE

SUCTION SIDE. PROVIDE A FINE MESH 'Y' STRAINER ON THE PUMP DISCHARGE SIDE, BETWEEN THE DISCHARGE AND THE TRIPLE DUTY

TYPE BALANCING VALVE.

5. ALL VALVES & HYDRONIC SPECIALTIES (I.E. TRIPLE DUTY VALVES, STRAINERS, ISOLATION VALVES, ETC...) SHALL BE FULL SIZE OF THE

SYSTEM PIPING. PROVIDE A CONCENTRIC REDUCER AT THE PUMP DISCHARGE CONNECTION, AS REQUIRED.

FROM SYSTEM

A

SEE NOTE #1 & #7.

TO SYSTEM

SPRING AND NEOPRENE TYPE

VIBRATION ISOLATORS. TYPICAL FOR 2.

GALV THREADED STEEL ROD SUPPORTED FROM

BUILDING STRUCTURE. TYPICAL. SEE NOTES #2

& #3. FOR BOILER PUMPS BP-1 THRU BP-6,

PROVIDE SUPPORTS FROM FLOOR WITH

NEOPRENE ISOLATORS.

TRIPLE DUTY VALVE W/ POSITIVE SHUTOFF.

(SIZE FOR 1-3 PSI P.D. AT THE DESIGN FLOW

RATE)

MULTIPORT PRESSURE

INDICATOR (3-PORT)

NOTES:

1. PROVIDE FLANGES/UNIONS FOR REMOVAL OF PUMP. THE MECHANICAL CONTRACTOR SHALL COORDINATE.

2. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING PUMP TO BUILDING STRUCTURE.

3. PROVIDE SEISMIC BRACING AS REQUIRED BY CODE. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

4. THE MECH. CONTRACTOR IS RESPONSIBLE FOR INSTALLING MOTOR SUPPORTS ON INLINE PUMPS WHEN MOTORS ARE GREATER THAN 1/2

HP. MOTOR SUPPORTS SHALL BE PER MANUFACTURER'S RECOMMENDED INSTALLATION INSTRUCTIONS. MOTOR SUPPORT BRACKET

MUST BE MOUNTED IN SUCH A WAY AS TO NOT CREATE ANY STRESSES ON PUMP COMPONENTS. MOTOR SUPPORTS SHALL NOT BE SO

RIDIGDLY MOUNTED THAT IT LIMITS THE PUMPS ABILITY TO MOVE WITH PIPE EXPANSION MOVEMENT.

5. FOR CONDENSER WATER PUMPS ONLY: PROVIDE A FINE MESH 'Y' STRAINER ON THE PUMP DISCHARGE SIDE, BETWEEN THE DISCHARGE

AND THE TRIPLE DUTY TYPE BALANCING VALVE.

6. PROVIDE BALL VALVE FOR PIPING UP TO 2-1/2" AND BUTTERFLY TYPE VALVE FOR PIPING 3" AND GREATER.

7. ALL VALVES & HYDRONIC SPECIALTIES (I.E. TRIPLE DUTY VALVES, STRAINERS, ISOLATION VALVES, ETC...) SHALL BE FULL SIZE OF THE

SYSTEM PIPING. PROVIDE A CONCENTRIC REDUCERS AT THE PUMP CONNECTIONS, AS REQUIRED.

1/4" O.D. COPPER TUBING

W/ COMP. FITTINGS. TYPICAL.

9" INDUSTRIAL THERMOMETER

W/ 3/4" NPT WELL.

ISOLATION VALVE.

TYPICAL. SEE NOTE #6.

STRAINER WITH HOSE END

BLOW DOWN VALVE.

SEE NOTE #5.

A

SEE NOTE #5.

NOT TO SCALE

M-202

4

M-202

7

FLOW

BALL VALVE (TYP.)

1" PIPE (TYP.)

TO NEAREST FLOOR

DRAIN.

FROM HWS HEADER ON

DISCHARGE SIDE OF

PRIMARY LOOP PUMPS

SPRING-LOADED

SWING CHECK VALVE

(TYP.)

CHEMICAL

FEEDER

TANK

MANUAL AIR

VENT

GLOBE VALVE

FILL FUNNEL

NOT TO SCALE

M-202

11

NOT TO SCALE

STAINLESS STEEL COUNTER FLASHING.

ALUMINUM INSULATED

ROOF CURB. SEE NOTE #4.

VENTILATED ALUM. CURB EXTENSION.

FINISHED ROOF. SEE NOTE #3.

SEE NOTE #1

NOTES:

1. TOP OF STACK 8' MIN. ABOVE ROOF, EXCEPT WHERE THE STACK IS WITHIN 10' OF ANY PORTION OF THE BUILDING OR IS CONCEALED

WITHIN ARCHITECTURAL SCREENING, THE STACK MUST TERMINATE A MINIMUM OF 8' HIGHER.

2. PROVIDE WALL SUPPORT ASSEMBLY OR PLATE SUPPORT AT EACH FLOOR IN RISE. PROVIDE INTERMEDIATE SUPPORTS IN RISE EVERY

10'-0" MINIMUM. PROVIDE MEANS FOR EXPANSION BETWEEN FIXED SUPPORTS. PROVIDE A WALL GUIDE UPSTREAM OF ALL EXPANSION

JOINTS. DO NOT SECURE SUPPORTS, GUIDES, ETC... TO COMBUSTIBLE CONSTRUCTION. COORDINATE WITH MANUFACTURER.

3. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR EXACT ROOF CONSTRUCTION.

4. PROVIDE A MINIMUM OF 4" CLEARANCE BETWEEN THE OUTER STACK WALL AND THE INSIDE FACE OF THE ROOF CURB AND TO

COMBUSTIBLE MATERIALS. FOR ADDITIONAL ROOF CURB INSTALLATION INFORMATION, REFER TO ROOF MOUNTED EXHAUST FAN DETAIL.

5. RUN 1" CPVC DRAIN AND PITCH DOWN 2% IN THE DIRECTION OF FLOW. RUN DRAIN TO THE INLET SIDE OF THE ACID NEUTRALIZER

SYSTEM AT THE CONDENSING BOILER. TRAP HEIGHT EQUAL TO MAX. APPLIANCE OUTLET PRESSURE. SECURE DRAIN LINE TO

STRUCTURE ACCORDINGLY. MAINTAIN MAXIMUM HEADROOM BELOW PIPING - MIN. 7'-6".

6. PROVIDE GUY RING CABLE ATTACHMENTS WITH GUY WIRES AT 6'-0" INTERVALS. ALL MATERIALS, INCLUDING THE GUY RINGS, CABLE

CLAMPS, TURNBUCKLES, FASTENERS AND GUY WIRES SHALL BE STAINLESS STEEL AND LOAD RATED, SO THE STACK CAN BE CAPABLE OF

WITHSTANDING WIND LOADS INDICATED IN THE SPECIFICATIONS. ANY COMPONENTS NOT SUPPLIED BY THE STACK MANUFACTURER

SHALL BE PROVIDE BY THE MECHANICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL EMPLOY A STRUCTURAL ENGINEER TO

SIZE AND RATE ALL THE SUPPORTING COMPONENTS AND SUBMIT STAMPED DOCUMENTS, TO THE PROJECT ENGINEER OF RECORD, FOR

APPROVAL PRIOR TO INSTALLATION.

1" AIR SPACE

TO BOILER(S) OR

DRAFT FAN.

TRAPPED DRAIN.

SEE NOTE #5.

TEE W/ DRAIN

TEE CAP.

STAINLESS STEEL

STORM COLLAR.

PROVIDE 3 GUY WIRES (MIN.), EQUALLY

SPACED AROUND THE CIRCUMFERENCE OF

THE STACK. SEE NOTE #6.

TURNBUCKLE. SEE NOTE #6

SECURE GUY WIRE MOUNTING PLATE TO THE TOP OF

THE BUILDING STRUCTURAL STEEL OR CONCRETE

DECK. TYPICAL AT ALL CONNECTIONS. SEAL ALL

PENETRATIONS IN ROOF MEMBRANE. SEE NOTE #6.

4" CLEAR

APPLY SEALANT BETWEEN COUNTER FLASHING/STORM

COLLARS AND CASING. TYPICAL.

GUY RINGS.

SEE NOTE #6.

PROVIDE PLATE SUPPORT AT UNDERSIDE OF

ROOF OPENING. MECHANICAL CONTRACTOR TO

PROVIDE SUPPORT STEEL AS REQUIRED.

CLOSURE RING.

FOUR PIPE

DIAMETERS,

10" MAX.

HIGHEST POINT IN SYSTEM

NOT TO SCALE

M-202

10

1/4" TYPE "L" COPPER TUBE TO

NEAREST SUITABLE DRAIN

(AUTOMATIC VENTS ONLY)

MANUAL OR AUTOMATIC

AIR VENT

1/4" GAGE COCK

1/4" BRASS NIPPLE

REDUCER

INSULATION

PITCH UP

FLOW

NOTES:

1. REFER TO PIPE HANGER DETAIL FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT, PROVIDE MIN.

3/8" DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).

2. FOR PIPES UNDER 2" USE 1-1/2"x1-1/2"x1/4". FOR PIPES 2" AND LARGER USE 3"x3"x1/4".

3. EXPANSION SHIELDS SHALL BE ONLY USED IN CONC. SLABS OR BEAMS OF 4" MIN. DEPTH.

4. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR ACTUAL CONSTRUCTION TYPE.

5. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST CONCRETE STRUCTURE

WITH APPROPRIATE LOAD RATED FASTENERS. COORDINATE WITH THE PRECAST MANUFACTURER TO PROVIDE

THE CORRECT METHOD TO ADEQUATELY SECURE TO THE PRECAST CONCRETE STRUCTURE.

EXPANSION BOLTS.

TYPICAL. SEE NOTE #5.

CONCRETE FLOOR OR ROOF

SLAB SEE NOTE #4.

CLIP ANGLE

GALV. STEEL,

THREADED HANGER

ROD. TYPICAL. SEE

NOTE #1

ANGLE IRON SEE

NOTE #2

TURNBUCKLE

NUT AND WASHER

EACH SIDE. TYPICAL.

STEEL EXPANSION SHIELD FOR

EXISTING CONSTRUCTION.

SEE NOTE #3

PRECAST HOLLOW CORE

CONCRETE PLANK.

USE TOGGLE STYLE FASTENERS IN THE

PLANK CORES ONLY. SEE NOTE #5.

NOT TO SCALE

M-202

2

BACK TO BACK ANGLE IRON W/

SPACE BLOCKS 2 FT. ON CTR.

SEE NOTE #2

CONCRETE FLOOR

OR ROOF SLAB

STRUCTURAL STEEL OR OPEN

WEB STEEL JOISTS (TYP.)

C-CLAMP W/ RETAINING

CLIP & LOCKING NUT

SEE NOTE #5

SIDE BEAM CLAMP SEE

NOTE #5

HANGER ROD (TYP)

SEE NOTE #1

DOUBLE SIDED BEAM

CLAMP

TACK WELD IN PLACE

BOTH SIDES

NUT AND

WASHER

NUT AND

WASHER

NOTES:

1. REFER TO PIPE HANGER DETAIL FOR HANGER ROD SIZE. FOR CEILING SUSPENDED EQUIPMENT PROVIDE MIN. 3/8"

DIA. HANGER ROD (REFER TO MANUFACTURERS INSTALLATION INSTRUCTIONS).

2. FOR PIPES UNDER 2" USE A SINGLE 1-1/2"x1-1/2"x1/4" ANGLE IRON WITH C-CLAMP. FOR PIPES 2-1/2" AND LARGER

USE 3"x3"x1/4" ANGLE IRON BACK TO BACK AS SHOWN.

3. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS TO CONCRETE DECK DETAIL" FOR ATTACHING

HANGER RODS TO CONCRETE DECK.

4. REPAIR OF FIREPROOFING IN ORDER TO FACILLITATE THE INSTALLATION OF HANGER RODS IN EXISTING

CONSTRUCTION SHALL BE BY THE G.C.

5. USE OF C-CLAMPS AND SIDE BEAM CLAMPS IS LIMITED TO PIPING 2-1/2" AND UNDER.

NOT TO SCALE

M-202

1

INSULATION SHIELD, 12"

LONG (SEE NOTE #2)

NOTES:

1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR

ATTACHING HANGERS TO THE STRUCTURE.

2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM

AND PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.

3. ADJUSTABLE YOKE PIPE ROLL SHALL BE USED ON 4" AND 5" PIPING. ON ALL

PIPING 6" AND LARGER USE DUAL ROD PIPE ROLL.

HANGER ROD SCHEDULE

PIPE SIZE ROD SIZE MAX. ALLOWABLE SPACING

4"

5"

6"

8"

10"

12"

1/2" DIA.

1/2" DIA.

5/8" DIA.

5/8" DIA.

5/8" DIA.

5/8" DIA.

10'

10'

10'

10'

10'

10'

HANGER ROD

(SEE NOTE #1)

LOCKING NUT

AND WASHER

ADJUSTABLE YOKE PIPE

ROLL (SEE NOTE #3)

SUPPORT NUT

AND WASHER

INSULATION

PIPE

HIGH DENSITY

INSULATION 12" LONG

PIPE SADDLE

(SEE NOTE #2)

DUAL ROD PIPE ROLL

(SEE NOTE #3)

M-202

6

NOT TO SCALE

M-202

5

NOT TO SCALE

INSULATION SHIELD, 12"

LONG (SEE NOTE #2)

PIPE SADDLE

(SEE NOTE #2)

HANGER ROD

(SEE NOTE #1)

LOCKING NUT

AND WASHER

SUPPORT NUT

AND WASHER

CLEVIS HANGER

INSULATION

PIPE

HIGH DENSITY

INSULATION

12" LONG

HANGER ROD SCHEDULE

NOTES:

1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR

ATTACHING HANGERS TO THE STRUCTURE.

2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM

AND PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.

3. CLEVIS TYPE PIPE HANGER SHALL BE USED ON ALL PIPING 3" AND SMALLER.

HANGER ROD SPACING

PIPE SIZE

UP TO 2"

2-1/2" THRU 3"

ROD SIZE

3/8" DIA.

1/2" DIA.

PIPE SIZE MAX. ALLOWABLE SPACING

1"

1-1/4"

1-1/2"

2"

2-1/2"

3"

7'

8'

9'

10'

10'

10'

M-202

9

3/4" HANGER ROD

(SEE NOTE #1)

PIPE

PIPE ROLLER AND

ROLLER CHAIR (TYP.)

PIPE WITHOUT

INSULATION

LOCKING NUT AND

WASHER (TYP.)

SUPPORT NUT AND

WASHER (TYP.)

BOLT PIPE ROLLERS TO

CHANNEL OR ANGLE (TYP.)

MAX. SPAN 36"

3/4" HANGER ROD

(SEE NOTE #1)

INSULATION

PIPE

2" x 1 5/8" x 12 GA.

CHANNEL (SEE NOTE #3)

PIPE SADDLE

(SEE NOTE #2)

HIGH DENSITY

INSULATION 12" LONG

INSULATION SHIELD, 12"

LONG (SEE NOTE #2)

NOTES:

1. REFER TO "TYPICAL METHOD OF SECURING HANGER RODS DETAIL" FOR ATTACHING

HANGERS TO THE STRUCTURE.

2. PROVIDE INSULATION SHIELD OR PIPE SADDLE BASED ON THE PIPING SYSTEM AND

PIPE SIZE AS INDICATED IN THE SPECIFICATIONS.

3. TRAPEZE TYPE HANGER SHALL BE USED FOR A MAXIMUM 1000 LB. UNIFORM LOAD.

4. ABOVE DETAIL IS DIAGRAMMATIC ONLY AND CONTRACTOR SHALL COORDINATE

NUMBER OF PIPES REQUIRED/ TRAPEZE.

NOT TO SCALE

NOTES:

1. CHEMICAL FEEDER SHALL BE EQUAL TO NEPTUNE FILTER FEEDER MODEL FTF-5DB (5 GALLON CAPACITY) WITH BOTTOM DRAIN.

2. MOLYBDENUM CORROSION INHIBITOR (JAMESTOWN TECHNOLOGIES MOLYGARD 140) SHALL BE ADDED TO HEATING SYSTEM TO MAINTAIN

50-150 PPM MOLYBDENUM RANGE.

TO HWR HEADER ON

SUCTION SIDE OF

PRIMARY LOOP PUMPS

1" PIPE (TYP.)

HIGH PRESSURE

FLOW SIGHT

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-2

02

&

M

-2

03

.d

wg

je

sse

.vo

se

N.T.S.

M-202

JEV

RC

MECHANICAL DETAILS

AutoCAD SHX Text
AIR ELIMINATION AND EXPANSION TANK INSTALLATION
AutoCAD SHX Text
BASE MOUNTED PUMP INSTALLATION
AutoCAD SHX Text
INLINE PUMP INSTALLATION
AutoCAD SHX Text
CHEMICAL FEEDER INSTALLATION
AutoCAD SHX Text
BOILER STACK INSTALLATION
AutoCAD SHX Text
MANUAL / AUTOMATIC AIR VENT
AutoCAD SHX Text
TYPICAL METHODS OF SECURING HANGER RODS TO CONCRETE
AutoCAD SHX Text
TYPICAL METHODS OF SECURING HANGER RODS TO STEEL
AutoCAD SHX Text
ROLLER TYPE PIPE HANGER INSTALLATION
AutoCAD SHX Text
CLEVIS TYPE PIPE HANGER INSTALLATION
AutoCAD SHX Text
TRAPEZE PIPE HANGER INSTALLATION

M-203

2

NOT TO SCALE

SECURE TO THE PRECAST

CONCRETE TEE.

SEE NOTE #2. TYPICAL.

PREINSULATED SPIDER GUIDE W/ LOAD BEARING, HIGH

DENSITY, CALCIUM SILICATE INSULATION AT ALL GUIDE HOT

WATER LOCATIONS. SEE NOTE #3.

PIPE GUIDE SPLIT SLEEVE TYPEPIPE INSULATION

REFER TO SPECS.

SEE NOTE #4

BOLT TO SUPPORTS

AS REQUIRED.

PIPE

NOTES:

1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.

2. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST CONCRETE STRUCTURE

WITH APPROPRIATE LOAD RATED FASTENERS TO ACCOMMODATE TO FORCES OF THE PIPING SYSTEMS.

COORDINATE WITH THE PRECAST MANUFACTURER TO PROVIDE THE CORRECT METHOD TO ADEQUATELY SECURE

TO THE PRECAST CONCRETE STRUCTURE. WHEN THE STRUCTURAL STEEL MEMBER RUNS PERPENDICULAR TO

THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE LENGTH, ONE IN EACH CORE. WHEN THE STRUCTURAL

STEEL MEMBER RUNS PARALLEL TO THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE LENGTH - MIN. 8" O.C.

SEE NOTE #1.

3. REFER TO PIPING GUIDE ARRANGEMENT DETAIL FOR ADDITIONAL INFORMATION.

4. ALL SEAMS AND JOINTS IN INSULATION SHALL BE SEALED TO MAINTAIN A CONTINUOUS VAPOR BARRIER.

2"x2"x1/4"> FOR PIPES 2" & SMALLER

3"x3"x5/16"> FOR 2-1/2" & LARGER

WELD. TYPICAL.

PRECAST HOLLOW CORE

CONCRETE PLANK.

USE TOGGLE STYLE

FASTENERS IN THE

PLANK CORES ONLY.

SEE NOTE #2.

M-203

1

WELD SUPPORT ANGLE TO STRUCTURAL

STEEL. SEE NOTE #2. TYPICAL.

PREINSULATED SPIDER GUIDE W/ LOAD BEARING, HIGH

DENSITY, CALCIUM SILICATE INSULATION AT ALL GUIDE HOT

WATER LOCATIONS. SEE NOTE #3.

NOT TO SCALE

WELD (TYP)

STRUCTURAL

STEEL

2"x2"x1/4"> FOR PIPES 2" & SMALLER

3"x3"x5/16"> FOR 2-1/2" & LARGER

BOLT TO SUPPORTS

AS REQUIRED

PIPE

PIPE INSULATION REFER

TO SPECS. SEE NOTE #4

NOTES:

1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.

2. WELD ENTIRE LENGTH OF SUPPORT ANGLE WHERE SUPPORT ANGLE IS RUN PARALLEL TO STRUCTURAL STEEL.

3. ALL SEAMS AND JOINTS IN INSULATION SHALL BE SEALED TO MAINTAIN A CONTINUOUS VAPOR BARRIER.

4. REFER TO PIPING GUIDE ARRANGEMENT DETAIL FOR ADDITIONAL INFORMATION.

PIPE GUIDE SPLIT SLEEVE TYPE

M-203

4

NOT TO SCALE

INSULATION TO BE INSTALLED WITH

CONTINUOUS JOINTS THAT ARE

VAPOR PROOFED

2"x2"x1/4"> FOR PIPES 2" & SMALLER

3"x3"x5/16"> FOR 2-1/2" & LARGER

3/8" THICK PLATE FOR 2" PIPES & SMALLER

1/2" THICK FOR 2-1/2" PIPES & LARGER

NOTES:

1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS,

WELDS, & BOLTS.

2. THE MECHANICAL CONTRACTOR SHALL SECURE THE STEEL SUPPORTS TO THE PRECAST

CONCRETE STRUCTURE WITH APPROPRIATE LOAD RATED FASTENERS TO ACCOMMODATE TO

FORCES OF THE PIPING SYSTEMS. COORDINATE WITH THE PRECAST MANUFACTURER TO

PROVIDE THE CORRECT METHOD TO ADEQUATELY SECURE TO THE PRECAST CONCRETE

STRUCTURE. WHEN THE STRUCTURAL STEEL MEMBER RUNS PERPENDICULAR TO THE CORES,

PROVIDE FASTENERS DOWN THE ENTIRE LENGTH, ONE IN EACH CORE. WHEN THE STRUCTURAL

STEEL MEMBER RUNS PARALLEL TO THE CORES, PROVIDE FASTENERS DOWN THE ENTIRE

LENGTH - MIN. 8" O.C. SEE NOTE #1.

3. SEAL ALL SEAMS, JOINTS AND PENETRATIONS IN PIPING INSULATION AND MAINTAIN A

CONTINUOUS VAPOR BARRIER.

SECURE TO THE PRECAST

CONCRETE TEE.

SEE NOTE #2. TYPICAL.

PRECAST HOLLOW CORE

CONCRETE PLANK.

USE TOGGLE STYLE

FASTENERS IN THE

PLANK CORES ONLY.

SEE NOTE #2.

WELD. TYPICAL.

WELD. TYPICAL.

M-203

3

NOT TO SCALE

INSULATION TO BE INSTALLED WITH

CONTINUOUS JOISTS THAT ARE

VAPOR PROOFED.

2"x2"x1/4"> FOR PIPES 2" & SMALLER

3"x3"x5/16"> FOR 2-1/2" & LARGER

WELD SUPPORT ANGLE TO STRUCTURAL

STEEL. SEE NOTE #2. TYPICAL.

3/8" THICK PLATE FOR 2" PIPES & SMALLER

1/2" THICK FOR 2-1/2" PIPES & LARGER

NOTES:

1. CONTRACTOR TO SUBMIT SKETCH OF PROPOSED INSTALLATION INCLUDING SIZES OF MEMBERS, WELDS, & BOLTS.

2. WELD ENTIRE LENGTH OF SUPPORT ANGLE WHERE SUPPORT ANGLE IS RUN PARALLEL TO STRUCTURAL STEEL.

3. SEAL ALL SEAMS AND JOINTS IN PIPING INSULATION AND MAINTAIN A CONTINUOUS VAPOR BARRIER.

WELD. TYPICAL.

WELD. TYPICAL.

M-203

5

NOT TO SCALE

ANCHOR THE PIPING GUIDES TO

THE BUILDING STRUCTURE AND

SEISMICALLY BRACE. SEE NOTE #2.

PREINSULATED SPIDER GUIDE

PIPE GUIDE

HIGH DENSITY, CALCIUM SILICATE

INSULATION. SEE NOTE #1.

PIPE

STEEL SUPPORT ANGLES AS

REQUIRED

NOTES:

1. INSULATION THICKNESS SHALL BE AS INDICATED IN THE INSULATION SPECIFICATIONS FOR THE APPRORIATE

SERVICE.

2. SEISMIC BRACING SHALL NOT PASS THROUGH BUILDING SEISMIC AND/OR EXPANSION AND CONTRACTION

JOINTS. SEISMIC BRACING SHALL NOT CONNECT OR TIE TOGETHER DIFFERENT SIDES OR PARTS OF THE

BUILDING STRUCTURE. REFER TO THE SPECIFICATIONS AND THE SEISMIC DETAIL DRAWINGS FOR

ADDITIONAL INFORMATION.

3. MAX 2 IN. THICK HOLLOW CYLINDRICAL HEAVY DENSITY (MIN 3.5 PCF) GLASS FIBER UNITS JACKETED ON THE

OUTSIDE WITH AN ALL-SERVICE JACKET. LONGITUDINAL JOINTS SEALED WITH FACTORY APPLIED

SELF-SEALING LAP TAPE. TRANSVERSE JOINTS SECURED WITH BUTT TAPE SUPPLIED WITH THE PRODUCT.

THE ANNULAR SPACE BETWEEN THE INSULATED PENETRATING ITEM AND THE PERIPHERY OF THE OPENING

SHALL BE MIN 1/2 IN. TO MAX 1-1/2 IN. THE PIPE COVERING SHALL MEET THE ABOVE CRITERIA AND BEAR THE

UL CLASSIFICATION MARKING WITH A FLAME SPREAD AND SMOKE DEVELOPED INDEX AS NOTED IN THE

SPECIFICATIONS.

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-2

02

&

M

-2

03

.d

wg

je

sse

.vo

se

N.T.S.

M-203

JEV

RC

MECHANICAL DETAILS

AutoCAD SHX Text
PIPING GUIDE SECURED TO CONCRETE
AutoCAD SHX Text
PIPING GUIDE SECURED TO STEEL
AutoCAD SHX Text
PIPING ANCHOR SECURED TO CONCRETE
AutoCAD SHX Text
PIPING ANCHOR SECURED TO STEEL
AutoCAD SHX Text
PIPING GUIDE ARRANGEMENT

UNIT LOCATION MANUFACTURER SERVICESERIES, MODEL

TYPE GPM

HEAD

FT.

NPSH

FT.

EFFICIENCY

(%)

IMPELLER

DIA.

(INCH)

BHP MAX HP

PUMP

RPM

MOTOR

TRIPLE

DUTY

VALVE

TDV

PRESS.

DROP FT.

SUCTION

DIFFUSER

SUC. DIFF.

PRESS.

DROP FT.

REMARKS

ELECTRICAL HP

P-3 BOILER ROOM BELL & GOSSETT OLD JUNIOR HIGH SCHOOLE-1510, 4BD

BASE-MOUNTED 455 62 6.8 80.6 8.5 9.06 10.73 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4

P-4 BOILER ROOM BELL & GOSSETT OLD JUNIOR HIGH SCHOOLE-1510, 4BD

BASE-MOUNTED 455 62 6.8 80.6 8.5 9.06 10.73 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4

P-5 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS A-FE-1510, 4EB

BASE-MOUNTED 554 98 7.3 78.8 10.5 17.71 19.82 1750 460V - 3Ø 20 3DS-4S 6.3 GF-3 1.8

P-6 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS G-HE-1510, 4BD

BASE-MOUNTED 455 75 6.8 78.4 9.125 11.24 14.13 1770 460V - 3Ø 15 3DS-4S 4.2 FF-3 2.4

P-7 BOILER ROOM BELL & GOSSETT BUILDING SECTIONS A-FE-1510, 4EB

BASE-MOUNTED 554 98 7.3 78.8 10.5 17.71 19.82 1750 460V - 3Ø 20 3DS-4S 6.3 GF-3 1.8

P-8 BOILER ROOM BELL & GOSSETTPOOL HEAT EXCHANGER, AC-14 E-1510, 2BD

BASE-MOUNTED 110 80 4.4 66.1 8.75 3.38 5.37 1750 460V -3Ø 7.5 3DS-2S 4.7 DC-3 1.2

PB-1 BOILER ROOM BELL & GOSSETT

BOILER (B-1) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

PB-2 BOILER ROOM BELL & GOSSETT

BOILER (B-2) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

PB-3 BOILER ROOM BELL & GOSSETT

BOILER (B-3) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

PB-4 BOILER ROOM BELL & GOSSETT

BOILER (B-4) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

PB-5 BOILER ROOM BELL & GOSSETT

BOILER (B-5) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

PB-6 BOILER ROOM BELL & GOSSETT

BOILER (B-6) PUMP E-80, 4x4x7BINLINE 260 30 6.6 72.3 6.25 2.82 3.15 1750 460V - 3Ø 3 3DS-4S 1.4 - -

SYMBOL LOCATION SERVICE MANUFACTURER MODEL

PIPE SIZE (IN.)

OPER. WEIGHT

(LBS)

REMARKS

AS-1 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT RL-10F 102,052

NOTES:

1. INSTALL AND CONNECT HIGH CAPACITY AUTOMATIC AIR VENT AT TOP OF AIR SEPARATOR.

2. INSTALL HOSE END DRAIN VALVE AT BOTTOM OF AIR SEPARATOR.

UNIT LOCATION MANUFACTURER MODEL FUEL

BOILER DATA

FLUID DATA BLOWER POWER CONTROL

GAS

PRESSURE

(IWC)

OPERATING

WEIGHT (LBS)

REMARKS

TYPE BOILER HP

OIL INPUT

(GPH)

GAS INPUT

(MBH)

MAXIMUM

OUTPUT

(MBH)

MAX. THERMAL

EFFICIENCY

%

BOILER TURN

DOWN

MAX. WORKING

PRESSURE (PSI)

GPM

EWT (°F) LWT (°F)

VOLT PH AMPS BLOWER HP VOLT PH MIN. MAX.

B-1 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

B-2 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

B-3 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

B-4 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

B-5 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

B-6 BOILER ROOM CLEAVER BROOKS FLX HW 550 #2 FUEL OIL FLEXIBLE WATERTUBE 132 38 - 4.385 86 3:1 160 260 160 200 460 3 4.8 3 120 1 - - 7600

SYMBOL LOCATION SERVICE MANUFACTURER MODEL TYPE

VOLUME (GALS.) ACCEPTANCE (GALS.) HEIGHT (IN.) DIAMETER (IN.)

OPER. WEIGHT

(LBS)

REMARKS

ET-1 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000

VERTICAL

BLADDER - ASME

792.0 792.0 118 48 8164.0

ET-2 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000

VERTICAL

BLADDER - ASME

792.0 792.0 118 48 8164.0

ET-3 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000

VERTICAL

BLADDER - ASME

792.0 792.0 118 48 8164.0

ET-4 BOILER ROOM HOT WATER SYSTEM BELL & GOSSETT B-3000

VERTICAL

BLADDER - ASME

792.0 792.0 118 48 8164.0

NOTES:

NOTES:

1. PROVIDE INVERTER DUTY RATED MOTORS AND VARIABLE FREQUENCY DRIVES (SYSTEM PUMPS P-3, P-4, P-5, P-6, P-7, & P-8).

2. PUMP IS SELECTED TO PROVIDE A MOTOR THAT IS NON-OVERLOADING OVER ITS ENTIRE IMPELLER CURVE.

3. BOILER PUMPS TO BE CONTROLLED BY PACKAGED BOILER CONTROLS AND MONITORED BY BUILDING DDC SYSTEM. BOILER CONTROLS AND DDC SYSTEM TO

CONTROL BOILERS AND PRIMARY PUMPS TO MAINTAIN HOT WATER RESET SCHEDULE FOR SECONDARY WATER TEMPERATURE TO BUILDING BASED ON

OUTDOOR TEMPERATURE, INDOOR TEMPERATURE, HOT WATER SUPPLY TEMPERATURE TO THE BUILDING, AND HOT WATER RETURN TEMPERATURE FROM THE

BUILDING.

4. EXISTING PUMPS P-1 AND P-2 SHALL BE REMOVED AND NOT REPLACED.

3. HEAT-TIMER CONTROLS TO CONTROL BOILERS AND ASSOCIATED PUMPS. BUILDING DDC SYSTEM TO

CONTROL BOILER PUMPS IF HEAT-TIMER CONTROLS ARE UNABLE TO DO SO. BMS CONTRACTOR TO

COORDINATE ALL REQUIREMENTS WITH HEAT-TIMER CONTROLS TO PROVIDE ALL ADDITONAL

CONTROLS REQUIRED FOR A FULLY-FUNCTINING SYSTEM. BUILDING DDC SYSTEM TO ENABLE HOT

WATER SYSTEM, AND MONITOR EVERY AVAILABLE OUTPUT POINT FROM THE HEAT-TIMER CONTROL

SYSTEM. HEAT-TIMER CONTROLS AND DDC SYSTEM TO CONTROL BOILERS AND PRIMARY PUMPS TO

MAINTAIN HOT WATER RESET SCHEDULE BASED ON OUTDOOR TEMPERATURE. THE HOT WATER RESET

SCHEDULE IS TO BE OVERRIDDEN UPON A CALL FOR HOT WATER FROM THE POOL HEAT EXCHANGER. .

4. BURNER SHALL BE DUAL FUEL, FULLY-MODULATING. THE MECH. CONTRACTOR SHALL INSTALL IN

STRICT ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE U.L. GAS

TRAINS WITH ALL APPURTENANCES INCLUDING BUT NOT LIMITED TO: MAIN & PILOT - PRESSURE

REGULATORS, GAUGES & GAS COCKS, PILOT SOLENOID, HIGH & LOW GAS PRESSURE SWITCHES,

LEAKAGE TEST COCKS, ETC.

5. IN ADDITION PROVIDE: ELECTRIC IGNITION, ULTRA-VIOLET FLAME DETECTOR, ETC... ALL

ELECTRONIC PROGRAMMING CONTROL COMPONENTS AND ELECTRICAL DEVICES SHALL BE

FACTORY WIRED IN A UNIT MOUNTED CONTROL PANEL.

NOTES:

1. PROVIDE WITH STAINLESS STEEL DOUBLE-WALLED CHIMNEY SYSTEM TESTED IN ACCORDANCE WITH

UL 103.

2. PROVIDE HEAT TIMER MULTI-MOD CONTROLS WITH EXTENSION MODULES (EXM), BMS INTERFACE,

INTERNET REMOTE COMMUNICATION, AND ALL REQUIRED RELAYS, SENSORS, AND OTHER

COMPONENTS FOR A FULLY-FUNCTIONING SYSTEM.

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\H

VA

C\0

-C

urre

nt\M

-3

01

.D

WG

je

sse

.vo

se

N.T.S.

M-301

XXX

XXX

MECHANICAL SCHEDULES

AutoCAD SHX Text
WATER PUMP SCHEDULE
AutoCAD SHX Text
AIR SEPARATOR SCHEDULE
AutoCAD SHX Text
HOT WATER BOILERS SCHEDULE
AutoCAD SHX Text
EXPANSION TANKS SCHEDULE

CONTRACTOR SHALL BE RESPONSIBLE FOR ALL ELBOWS, TEES, DROPS, AND MISCELLANEOUS PIPING DUE TO ELEVATION CHANGES,

OBSTRUCTIONS, COORDINATION WITH OTHER TRADES, ETC. TO INSTALL A COMPLETE, FUNCTIONING, PLUMBING SYSTEM.

LP GAS PIPING (PROPANE) G

HOT WATER RECIRCULATION PIPING140°F

140°F HOT WATER PIPING 140°F TEMPERATURE

CONDENSATE DRAIN PIPING CD

GAS VALVE

BUTTERFLY VALVE

GAS PRESSURE REGULATOR

GAS SOLENOID VALVE

ALL PIPING IS TO BE RUN CONCEALED IN CEILINGS OR WALLS. PIPING IS TO BE EXPOSED ONLY WHERE NOTED ON DRAWINGS. IF

CONTRACTOR CANNOT RUN PIPING CONCEALED, NOTIFY ENGINEER IMMEDIATELY TO RESOLVE CONFLICT.

31.

35.

NO PIPING SHALL BE INSTALLED WITHIN STAIRS, STAIR WALLS, ELEVATOR MACHINE ROOMS, TRANSFORMERS VAULTS, ELECTRICAL

ROOMS OR OVER ELECTRICAL PANELS/EQUIPMENT. ONLY DEDICATED PLUMBING PIPING WILL BE ALLOWED WITHIN EACH OF THE

SPACES INDICATED ABOVE. COORDINATE THE LOCATION OF ALL PIPING WITH ALL OTHER TRADES, AND ADJUST AS NECESSARY

DOMESTIC WATER DROPS OR RISERS INSTALLED IN EXTERIOR WALLS, SHALL BE INSTALLED ON THE WARM SIDE OF THE BUILDING

INSULATION, AND THE LOCATION SHALL BE MADE INFILTRATION FREE.

INSTALL FLOOR MOUNTED EQUIPMENT, SUCH AS WATER HEATERS, STORAGE TANKS, ETC. ON A 4" HIGH CONCRETE HOUSEKEEPING

PAD. COORDINATE SIZE AND FINAL LOCATION OF ALL CONCRETE PADS WITH THE STRUCTURAL ENGINEER. PADS SHALL BE MINIMUM 6"

LARGER THAN THE EQUIPMENT IN BOTH HORIZONTAL DIRECTIONS.

ALL INDIRECT WASTE DRAINS SHALL BE PIPED TO FLOOR DRAINS, FUNNELS OR FIXED AIR GAP FITTINGS, THROUGH AIR GAP OR TO A

SINK DRAIN TAILPIECE.

COORDINATE ALL PLUMBING EQUIPMENT REQUIRING POWER, FOR EXACT LOCATION AND POWER REQUIREMENTS WITH THE ELECTRICAL

CONTRACTOR.

INSTALL TRAP PRIMERS FOR EACH INDIVIDUAL FLOOR DRAIN OR, AS A OPTION, CONTRACTOR MAY UTILIZED UTILITY DISTRIBUTION UNIT

FOR MULTIPLE DRAIN. CONNECT TRAP PRIMER TO NEAREST ACTIVE COLD WATER MAIN; PROVIDE ISOLATION VALVES AND EXTEND TO

FLOOR DRAIN.

1.

5.

8.

9.

7.

12.

11.

10.

6.

17.

16.

13.

14.

15.

20.

22.

21.

19.

18.

23.

PIPING DIRECTION OF FLOW

PIPING RISER UP

PIPING RISER DOWN

BRANCH/BOTTOM CONNECTION

DESCRIPTION

SOIL OR WASTE ABOVE FLOOR OR GRADE

SOIL OR WASTE BELOW FLOOR OR GRADE

COLD WATER PIPING

HOT WATER PIPING 110°F TEMPERATURE

TRAP PRIMER PIPING

HOT WATER RECIRCULATION PIPING

CHECK VALVE

BALL VALVE

TRAP

CLEANOUT DECKPLATE

UNION

CAP ON END OF PIPE

TRAP PRIMER VALVE

SAN

SAN

TP

SYMBOL

FLOOR DRAIN

POINT OF CONNECTION

3.

2.

4.

THE CONTRACTOR SHALL BECOME THOROUGHLY FAMILIAR WITH THE PROJECT DOCUMENTS OF ALL TRADES. THE DRAWINGS ARE

DIAGRAMMATIC AND SHOW THE GENERAL ARRANGEMENT OF EQUIPMENT AND PIPING. THE CONTRACTOR SHALL COORDINATE THE EXACT

LOCATION OF EQUIPMENT AND PIPING INSTALLATION WITH ALL TRADES BEFORE COMMENCING WORK.

THIS CONTRACT SHALL INCLUDE ALL THE NECESSARY PIPING, FITTINGS, TRANSITIONS ETC. AS NECESSARY TO INSTALL PLUMBING

SYSTEM, AND TO AVOID ANY CONFLICTS WITH OTHER TRADES AND THE BUILDING STRUCTURE.

REFER TO LATEST ARCHITECTURAL PLANS FOR ELEVATIONS, SECTIONS, DETAILS, MOUNTING HEIGHTS, LOCATION OF PLUMBING

FIXTURES. ALL HANDICAPPED DESIGNATED FIXTURES SHALL BE INSTALLED IN ACCORDANCE WITH ANSI AND ADA STANDARDS.

IT IS NOT THE INTENT OF THE DRAWINGS TO SHOW INDIVIDUAL BRANCH PIPING TO EACH PLUMBING FIXTURE; ONLY THE BRANCH PIPING

TO GROUPS OF FIXTURES IS INDICATED. THE ENTIRE PLUMBING SYSTEM SHALL BE FULLY OPERATIONAL AND READY FOR BENEFICIAL

USE BEFORE THE JOB IS CONSIDERED COMPLETE.

INSTALL WATER HAMMER ARRESTORS (WHA) AT ALL QUICK-CLOSING VALVES (FLUSH VALVES, SOLENOID VALVES, ETC:) THROUGHOUT

THE PLUMBING SYSTEM. WATER HAMMER ARRESTORS SHALL BE SIZED BASED ON SUPPLY FIXTURE UNITS PER PLUMBING DRAINAGE

INSTITUTE (PDI) STANDARDS AND INSTALLED PER MANUFACTURER'S RECOMMENDATIONS.

PIPE ALL CONDENSATE DRAINS FROM MECHANICAL EQUIPMENT COOLING COILS, BY GRAVITY (INTERIOR AIR HANDLING UNITS, FAN COIL

UNITS, ETC.) TO FLOOR DRAINS OR JANITOR'S SINKS THROUGH AN AIR GAP. EACH CONDENSATE DRAIN SHALL BE TRAPPED AT THE

EQUIPMENT DRAIN OUTLET, REFER TO TRAP DETAILS ON DRAWINGS. COORDINATE EXACT LOCATION WITH THE HVAC CONTRACTOR AND

ADJUST AS NECESSARY.

WHERE AN INACCESSIBLE CEILING IS INSTALLED (GYP BOARD OR EQUIVALENT), THE CONTRACTOR SHALL COORDINATE THE LOCATIONS

OF ACCESS PANELS FOR ALL VALVES, CLEANOUTS, ETC., REQUIRING ACCESS, WITH THE ARCHITECT, PRIOR TO INSTALLATION OF SUCH

DEVICES AND OTHER APPURTENANCES.

COORDINATE EXACT LOCATION OF ALL UNDERGROUND UTILITIES (WATER, GAS, SANITARY, ETC.) EXITING OR ENTERING THE BUILDING

WITH THE SITE CONTRACTOR AND UTILITY DRAWINGS. COORDINATE ALL FOUNDATION WALL PENETRATIONS AND INVERT ELEVATIONS

WITH THE GENERAL CONTRACTOR AND OR CONSTRUCTION MANAGER.

EVERY FIXTURE SHALL BE PROPERLY PIPED TO WATER, SANITARY, WASTE, AND VENT SYSTEMS. REFER TO THE PLUMBING SCHEDULES

ON MEP DRAWINGS FOR INDIVIDUAL PIPE SIZES TO EACH FIXTURE.

24.

25.

26.

27.

28.

29.

30.

32.

33.

34.

HOT WATER RECIRCULATING PUMP

BACKFLOW PREVENTER

TEMPERING VALVE

BALANCING VALVE

S

DO NOT SCALE DRAWINGS. CONTRACTOR SHALL VERIFY ALL DIMENSIONS & CONDITIONS IN THE FIELD AND SHALL NOTIFY THE

ENGINEER IMMEDIATELY OF ANY & ALL DISCREPANCIES.

IT IS NOT INTENDED THAT THE DRAWINGS SHOW EVERY PIPE, FITTING, RISE/DROP OR DETAIL. SYSTEM & COMPONENTS SHALL BE

INSTALLED ACCORDING TO THE INTENT AND MEANING OF CONTRACT DOCUMENTS AND IN ACCORDANCE WITH GOOD PRACTICE.

CONTRACTOR IS RESPONSIBLE TO PROVIDE COMPLETE AND OPERATIONAL SYSTEMS WITH FACILITIES AND SERVICES TO MEET

REQUIREMENTS INDICATED AND IN ACCORDANCE WITH APPLICABLE CODES AND ORDINANCES.

EQUIPMENT AND COMPONENTS HAVING EQUAL PERFORMANCE CHARACTERISTICS BY OTHER MANUFACTURERS MAY BE CONSIDERED,

PROVIDED DEVIATIONS IN DIMENSIONS, OPERATION AND OTHER CHARACTERISTICS DO NOT CHANGE DESIGN CONCEPT OR INTENDED

PERFORMANCE AS JUDGED BY THE ENGINEER. BURDEN OF PROOF OF EQUALITY OF PRODUCTS IS ON THE CONTRACTOR.

CONTRACTOR IS RESPONSIBLE FOR THE SAFEKEEPING OF HIS OWN PROPERTY ON THE JOB SITE. OWNER ASSUMES NO RESPONSIBILITY

FOR THE PROTECTION OF PROPERTIES AGAINST FIRE, THEFT AND ENVIRONMENTAL CONDITIONS.

CONTRACTOR IS RESPONSIBLE TO PROPERLY PROTECT OWNER'S PROPERTY AND EQUIPMENT FROM INJURY, AND DAMAGE TO SAME

SHALL BE REPLACED BY CONTRACTOR.

CONTRACTOR IS TO CLEAN JOB SITE DAILY AND REMOVE FROM THE PREMISES ANY DIRT AND DEBRIS CAUSED BY THE PERFORMANCE

OF THE WORK INCLUDED IN THIS CONTRACT.

ALL WORK TO BE PERFORMED IN A CLEAN AND WORKMANLIKE MANNER, CARE SHALL BE EXERCISED TO MINIMIZE ANY INCONVENIENCE

OR DISTURBANCE TO OTHER AREAS OF THE BUILDING WHICH ARE TO REMAIN IN OPERATION. ISOLATE CONSTRUCTION AREAS BY MEANS

OF TEMPORARY PARTITIONS AND/OR TARPS TO KEEP DUST AND DIRT WITHIN WORK AREA.

CONTRACTOR IS RESPONSIBLE TO PROPERLY SECURE AREAS OF CONSTRUCTION AT THE END OF EACH WORKING DAY.

EQUIPMENT AND PIPING TO BE INSTALLED IN ACCORDANCE WITH SEISMIC REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE.

CONTRACTOR IS RESPONSIBLE TO COORDINATE WITH ALL OTHER TRADES.

ALL EQUIPMENT SUPPORTS AND PIPE HANGERS TO BE CONNECTED FROM THE BUILDING STRUCTURE.

ALL NEW PENETRATIONS THRU RATED WALLS, FLOORS AND CEILINGS SHALL BE FIRESTOPPED AND SEALED TO MAINTAIN RATING.

REFER TO SPECIFICATION SECTION 07801.

PROVIDE ACCESS PANELS/DOORS FOR ALL CONCEALED PLUMBING ITEMS REQUIRING ACCESS, COORDINATE WITH DIVISION 8.

PROVIDE SHUTOFF VALVES AT ALL BRANCH PIPING TAKEOFFS.

ALL BRANCH WATER PIPES TO HAVE STOP VALVES AT EACH PLUMBING FIXTURE.

INSULATE EXPOSED WASTE, HOT AND COLD WATER PIPING UNDER HANDICAP LAVATORIES.

INSULATE COLD WATER, HOT WATER AND RECIRCULATION PIPING, CONDENSATE DRAIN, STORM PIPING AND ROOF DRAIN BODIES.

NON-POTABLE COLD WATER PIPING

NP

PUMPED DISCHARGED WASTE PIPINGPD

85°FTEPID WATER PIPING 85°F TEMPERATURE

FD

HT - HEAT TRACED PIPE

TMC - TEMPERATURE MAINTENANCE TRACED PIPE

PLUMBING LEGENDGENERAL NOTES

CIRCULATION PUMP SCHEDULE

TYPE MANUFACTURER MODEL REMARKSQTY.

PROPANE TANK SYSTEM NOTES

1. THE OUTSIDE PROPANE TANK SYSTEM INCLUDING REMOVAL OF EXISTING TANKS, INSTALLATION OF NEW TANKS SHALL BE DESIGNED AND INSTALLED BY AMERIGAS COMPANY,

DOMESTIC WATER HEATER SCHEDULE

TYPE MANUFACTURER MODEL REMARKSQTY.

MIXING VALVE SCHEDULE

TYPE MANUFACTURER MODEL REMARKSQTY.

PWH-1,

PWH-2,

PWH-3,

PWH-4

CYCLONE MXI COMMERCIAL WATER HEATER

MODEL No. BTH-500A

AO SMITH PROPANE

WATER HEATER

DOMESTIC WATER HEATER, 119 GAL STORAGE, 576

GPH RECOVERY AT 100 DEG. F., 33" DIAMETER, 75"

HIGH, APPROXIMATE SHIPPING WEIGHT 855 LBS.

(EACH)

4

MV POWERS INTELLISTATION MODEL LFIS150 LP DIGITAL TEMPERATURE REGULATING SYSTEM 1

WITHIN +/- 2 DEGREES F to ASSE 1017

CP-1,CP-2 TACO 2400-45 115V,3.6 AMPS,3450 RPM, 1/3 HP, 60 HZ 1 PH (EACH)2

LOCATED AT 268 ROUTE 80 IN KILLINGWORTH, CT 06419.

2. THE ENTIRE OUTSIDE PROPANE TANKS ALONG WITH ALL RELATED PIPING INSTALLATION SHALL BE IN ACCORDANCE WITH ALL LOCAL AND STATE REQUIREMENTS.

AMERIGAS SHALL PROVIDE ALL REQUIRED TESTING, APPROVALS, PERMITS AS REQUIRED AND READY FOR OWNER USE.

3. AMERIGAS SHALL PERFORM ALL WORK IN PHASES AND ENSURE THAT THE BUILDING PROPANE SUPPLY IS ALWAYS AVAILABLE AND

SHALL NEVER BE INTURRUPTED UNLESS APPROVED BY THE OWNER IN WRITING 72 HOURS PRIOR..

4. FOR A DESCRIPTION OF PROPANE TANK REMOVAL AND INSTALLATION PHASING SEE DRAWING P-201.

ET 1 WATTS MODEL No. DETA-100 ASME POTABLE WATER EXPANSION TANK

PROVIDED WITH AO SMITHGAS TRANE ASSEMBLY

PROVIDED WITH AO SMITH CONDENSATE

NEUTRALIZATION KIT

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

7p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

-0

01

.D

WG

je

sse

.vo

se

N.T.S.

P-001

AM

MB

PLUMBING NOTES, LEGENDS,SCHEDULES & ABBREVIATIONS

AutoCAD SHX Text
HWRP
AutoCAD SHX Text
NOTE: NOT ALL SYMBOLS MAY APPLY TO THIS PROJECT

BOILER #1 BOILER #2

3"C

W

3"HW

3"C

W

3"CW 4"CW 4"CW

3/4

"H

WR

(1

40

°)

1-1

/2

"H

W(1

40

°)

2"H

WR

3"H

W

4"C

W

3"G

3/4

"C

W

2-1/2"G2"G

1-1/2"G

1-1/2"G1-1/2"G

3/4

"H

WR

(1

40

°)

1-1

/2

"H

W(1

40

°)

3/4

"C

W

3/4

"C

W

3/4

"H

W

(1

40

°)

3/4"HWR(140°)

3/4"HW(140°)

3/4"CW

3/4"HWR(140°)

1"HW(140°)

3/4"CW

3/4"CW 3/4

"H

W(1

40

°)

3/4

"C

W

3/4

"C

W

3/4

"H

W

1"C

W

1"H

W(1

40

°)

2"C

W

6"CW 6"CW

6"CW

4"C

W

6"CW

6"C

W

EXISTING

P-1

EXISTING

WATER

HEATER

2"HW(140°)

2"HW(140°) 2"HW(140°)1"HW(140°)

2-1/2"CW

1-1/2"HW

2-1/2"CW

1-1/2"HW

2-1/2"CW

3/4"HW(140°)

2-1/2"CW

1-1/2"CW

2"H

WR

3"H

W(1

40

°)

3"C

W

ABANDONED 7,500 GALLON

HYDRO-PNEUMATIC TANK

3"G

2-1/2"CW

1-1/2"CW

EXISTING

WATER

HEATER

EXISTING

P-2

EXISTING

P-3

EXISTING

P-4

EXISTING

P-5

EXISTING

P-6

EXISTING

P-7

EXISTING

P-7

EXISTING

ELECTRICAL

GEAR

3"HW(140°)

3"HW(140°)

3"CW

3"CW

2"H

WR

2"HWR

2"HWR

3/4" BYPASS

(#1)

EXISTING PUMPS (TYP)

SEE DEMOLITION NOTE #3 THIS DRAWING

(#2)

SEE DEMOLITION NOTE #2 THIS DRAWING

EXISTING CW,HW,HWR PIPING TO REMAIN (TYP)

EXISTING CW,HW,HWR PIPING TO REMAIN (TYP)

EXISTING PLUMBING PIPING

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

SYSTEM PIPING TO REMAIN (TYP)

DEMOLITION NOTES (PHASE1)

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

EXISTING CIRCULATION VALVE

ASSEMBLY TO REMAIN IN USE

DURING DEMOLITION OF WATER

HEATER #1 (TYP FOR 2)

(SEE DEMOLITION NOTE #3)

1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS

OTHERWISE NOTED.

2. DISCONNECT AND REMOVE EXISTING WATER HEATER (#1) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, VALVES,

FITTINGS, CHECK VALVES, UNIONS, ETC AND CAP AT NEAREST VALVED MAIN CONNECTION.

3. EXISTING WATER HEATER (#2) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, CIRCULATION PUMPS, MIXING

VALVES, ETC. SHALL REMAIN AS IS AND OPERATIONAL UNTIL NEW WATER HEATERS AND RELATED COLD, HOT, AND HOT WATER RETURN

PIPING ARE INSTALLED AND FULLY OPERATIONAL.

4. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED

(TYP)

5. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)

6. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS

7. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR

8. DISCONNECT AND REMOVE ALL EXISTING WATER HEATER #1 SUPPORTS, CONCRETE PADS, ETC. OWNERS INSTRUCTIONS.

EXISTING 3" PROPANE GAS PIPE FROM

OUTSIDE PROPANE BULK STORAGE

TANKS TO REMAIN (TYP.)

2"G

(SHOWN FOR REFERENCE.

SEE MECHANICAL DWGS FOR

DETAIL). (TYP.)

CUT AND CAP CW PIPE (TYP.)

EXISTING MIXING VALVE

ASSEMBLY TO REMAIN IN USE

DURING DEMOLITION OF WATER

HEATER #1 (SEE DEMOLITION

NOTE #3)

CUT AND CAP HW PIPE (TYP)

EXISTING PIPING TO REMAIN (TYP.)

CUT AND CAP HW PIPE (TYP)

CUT AND CAP GAS PIPE

AFTER BOILER #2

REMOVED

PHASING NOTES FOR THE REPLACEMENT OF DOMESTIC WATER HEATERS

1. DISCONNECT EXISTING WATER HEATER #1 COMPLETELY AND CAP CONNECTING CW, HW, AND HWR PIPING

3. PROVIDE (4) PROPANE WATER HEATERS LOCATED WHERE WATER HEATER #1 WAS REMOVED

4. AFTER THE (4) PROPANE WATER HEATERS ARE INSTALLED, TESTED, AND OPERATIONAL, DISCONNECT AND REMOVE EXISTING WATER HEATER #2.

DISCONNECT AND REMOVE EXISTING WATER HEATER #2 COMPLETELY ALONG WITH ALL RELATED CIRCULATION PUMPS, MIXING VALVE, ETC.

2. MAINTAIN EXISTING WATER HEATER #2 OPERATIONAL ALONG WITH ALL RELATED CW,HW, HWR MIXING VALVE AND CIRCULATION PUMPS

GENERAL DEMOLITION NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL

FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL COORDINATE SHORT TERM

SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.

REMOVE GAS PIPING

AFTER BOILER #2

REMOVED.

REMOVE GAS PIPING

AFTER BOILER #1

REMOVED.

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

3/8" = 1'-0"

PLUMBING BOILER ROOM DEMOLITION PLAN (PHASE 1)1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

D-1

01

A

ND

P

D-1

02

.D

WG

je

sse

.vo

se

3/8"=1'-0"

PD-101

AM

MB

PLUMBING BOILER ROOMDEMOLITION PLAN - PHASE 1

PD-101

NORTH

BOILER

ROOM

3"C

W

3"HW

3"C

W

4"CW 4"CW

3/4

"H

WR

(14

0°)

1-1/2"H

W(1

40

°)

2"H

WR

3"H

W

4"C

W

3"G

3/4

"C

W

2-1/2"G

3/4

"H

WR

(1

40

°)

1-1/2

"H

W(14

0°)

3/4"C

W

3/4

"C

W

3/4"H

W

(14

0°)

3/4"HWR(140°)

3/4"HW(140°)

3/4"CW

3/4"HWR(140°)

1"HW(140°)

3/4"CW

3/4"CW 3/4"H

W(1

40

°)

3/4

"C

W

3/4"C

W

3/4"H

W

1"C

W

1"H

W(14

0°)

2"C

W

6"CW 6"CW

6"CW

4"C

W

6"CW

6"C

W

2"HW(140°)

2"HW(140°) 2"HW(140°)1"HW(140°)

2-1/2"CW

1-1/2"HW

2-1/2"CW

1-1/2"HW

2-1/2"CW

3/4"HW(140°)

2-1/2"CW

1-1/2"CW

3"C

W

3"G

2-1/2"CW

1-1/2"CW

EXISTING

WATER

HEATER

EXISTING

ELECTRICAL

GEAR

3"HW(140°)

3"CW

2"H

WR

2"HWR

3/4" BYPASS

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

DEMOLITION NOTES (PHASE 2)

DISCONNECT AND REMOVE EXISTING

MIXING VALVE ASSEMBLY

(SEE DEMOLITION NOTES #2)

ABANDONED 7,500 GALLON

HYDRO-PNEUMATIC TANK

1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS

OTHERWISE NOTED.

2. AFTER NEW WATER HEATERS AND RELATED COLD, HOT, AND HOT WATER RETURN PIPING ARE INSTALLED AND FULLY OPERATIONAL, DISCONNECT

AND REMOVE EXISTING WATER HEATER (#2) ALONG WITH ALL RELATED COLD, HOT, AND HOT WATER RETURN PIPING, VALVES, FITTINGS, CHECK

VALVES, UNIONS, ETC AND CAP AT NEAREST VALVE MAIN CONNECTION ONLY AFTER THE NEW PROPANE WATER HEATERS SYSTEM INCLUDING ALL

MIXING VALVE ASSEMBLY, CIRCULATION PUMPS, PIPING, VALVES, ETC. ARE INSTALLED, TESTED, AND APPROVED TO BE USED BY OWNER.

3. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED (TYP)

4. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)

5. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS

6. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM

PIPING TO REMAIN (TYP)

REMOVE EXISTING HOT

WATER VALVES AND

REPLACE WITH NEW (TYP.)

DISCONNECT AND REMOVE EXISTING

CIRCULATION PUMP ASSEMBLY (TYP FOR 2)

(SEE DEMOLITION NOTES #2)

CUT AND CAP 3" HW (110) PIPE

CUT AND CAP 1" HWR (140) PIPE

CUT AND CAP

2" HWR (140) PIPE

CUT AND CAP

2" HW (140) PIPE

PROPANE WATER HEATERS SHOWN

FOR REFERENCES ONLY (SEE

DRAWING P-101 FOR NEW WORK)

PHASING NOTES FOR THE REPLACEMENT OF DOMESTIC WATER HEATERS

1. DISCONNECT EXISTING WATER HEATER #1 COMPLETELY AND CAP CONNECTING CW, HW, AND HWR PIPING

3. PROVIDE (4) PROPANE WATER HEATERS LOCATED WHERE WATER HEATER #1 WAS REMOVED

4. AFTER THE (4) PROPANE WATER HEATERS ARE INSTALLED, TESTED, AND OPERATIONAL, DISCONNECT AND REMOVE EXISTING WATER HEATER #2.

DISCONNECT AND REMOVE EXISTING WATER HEATER #2 COMPLETELY ALONG WITH ALL RELATED CIRCULATION PUMPS, MIXING VALVE, ETC.

2. MAINTAIN EXISTING WATER HEATER #2 OPERATIONAL ALONG WITH ALL RELATED CW,HW, HWR MIXING VALVE AND CIRCULATION PUMPS

EXISTING 3" PROPANE GAS PIPE FROM

OUTSIDE PROPANE BULK STORAGE

TANKS TO REMAIN (TYP.)

PWH-1 PWH-2 PWH-3 PWH-4

GENERAL DEMOLITION NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE

OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION IS TO INSTALL A

TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH

BOILERS AT THE SAME TIME. CONTRACTOR RESPONSIBLE FOR INSTALLATION

SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME.

DOWNTIME MAY BE REQUIRED TO BE LIMITED TO WEEKENDS BY OWNER.

CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON

PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND

MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00 AND 02

SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL

INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF OF CEILING, BOILERS,

AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH

RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT PHASING. PHASING MUST

INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT

WHILE SCHOOL IS OCCUPIED WITH STUDENTS.

3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL

FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL COORDINATE SHORT TERM

SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

3/8" = 1'-0"

PLUMBING BOILER ROOM DEMOLITION PLAN PHASE 21

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

D-1

01

A

ND

P

D-1

02

.D

WG

je

sse

.vo

se

3/8"=1'-0"

PD-102

AM

MB

PLUMBING BOILER ROOMDEMOLITION PLAN - PHASE 2

PD-102

NORTH

BOILER

ROOM

2"C

W

3/4

"H

WR

(1

40

°)

1-1

/2

"H

W(1

40

°)

2"H

WR

3"H

W

4"C

W

3"G

3/4

"C

W

3/4

"H

WR

(1

40

°)

1-1

/2

"H

W(1

40

°)

3/4

"C

W

3/4

"C

W

3/4

"H

W

(1

40

°)

3/4"HWR(140°)

3/4"HW(140°)

3/4"CW

3/4"HWR(140°)

1"HW(140°)

3/4"CW

3/4"CW 3/4

"H

W(1

40

°)

3/4

"C

W

3/4

"C

W

3/4

"H

W

1"C

W

1"H

W(1

40

°)

2"C

W

6"CW 6"CW

6"CW

4"C

W

6"C

W

2"HW(140°) 2"HW(140°)1"HW(140°)

2-1/2"CW

1-1/2"HW

2-1/2"CW

1-1/2"HW

2-1/2"CW

3/4"HW(140°)

2-1/2"CW

1-1/2"CW

ABANDONED 7,500 GALLON

HYDRO-PNEUMATIC TANK

3"G

2-1/2"G

2-1/2"CW

1-1/2"CW

FOR CONTINUATION SEE

DRAWING P-102

6"CW

EXISTING

ELECTRICAL

GEAR

2" PROPANE GAS PIPE TO

WATER HEATERS (TYP.)

COORDINATE IN FIELD

EXACT PIPE LOCATION ,

ELEVATION, METHOD OF

SUPPORT, ETC. PRIOR TO

START OF WORK. (TYP.)

4"C

W4

"C

W

6"CW

2"HW(140°)

2-1/2"CW

1-1/2"HW

2"

G

2"

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

EXISTING PLUMBING SYSTEM PIPING TO REMAIN (TYP)

2"

2"

G

G

GGGGGG

G G

PROVIDE (4) TANK TYPE WATER

HEATERS COMPLETE WITH VALVES,

UNIONS, CHECK VALVE, ETC. AS PER

MANUFACTURERS RECOMMENDATION.

COORDINATE EXACT LOCATION IN

FIELD PRIOR TO START WORK. MAKE

SURE THAT ADEQUATE CLEARANCES

ARE MAINTAINED FROM EXISTING

ELECTRICAL EQUIPMENT, PANELS,

HVAC EQUIPMENT ETC. ALSO

COORDINATE EXACT WATER HEATER

LOCATION WITH HVAC CONTRACTOR

AND ELECTRICAL CONTRACTOR FOR A

COMPLETE PIPING LAYOUT.

PROVIDE 4" HIGH HOUSEKEEPING PAD

FOR WATER HEATERS. COORDINATE

EXACT SIZE WITH EQUIPMENT

PROVIDED PRIOR TO START WORK.

COORDINATE IN FIELD EXACT

LOCATION OF PAD TO MAKE SURE

THAT EXISTING FLOOR DRAINS, PIPE

CLEANOUTS, TRENCH DRAINS ETC.

ARE MAINTAINED CLEAR. (TYP.)

3"

1"

4"

2"

CONNECT 2" PROPANE

PIPE TO EXISTING CAPPED

CONNECTION.

EXISTING ELECTRICAL GEAR TO

REMAIN. LOCATE WATER HEATERS MIN

5' AWAY FROM THIS GEAR.

CONSTRUCTION NOTES

1. ALL EXISTING DOMESTIC, COLD, HOT, HOT WATER RETURN PIPING, VALVES, SUPPORTS, INSULATION, EQUIPMENT, ETC. TO REMAIN UNLESS

OTHERWISE NOTED.

2. PROVIDE A COMPLETE DOMESTIC WATER HEATER SYSTEM TANK TYPE AO SMITH CYCLONE COMPLETE WITH ALL RELATED COLD, HOT, AND

HOT WATER RETURN PIPING , VALVES FITTINGS, PROPANE PIPING, FILTERS, STRAINERS, CHECK VALVES, UNIONS, ETC AND CAP AT NEAREST

MAIN CONNECTION ONLY AFTER THE NEW PROPANE WATER HEATERS SYSTEM INCLUDING ALL MIXING VALVE ASSEMBLY, CIRCULATION PUMPS,

PIPING, VALVES, ETC. ARE INSTALLED, TESTED, AND APPROVED TO BE USED BY OWNER.

3. ALL EXISTING DOMESTIC CW, HW, HWR, SYSTEMS DISTRIBUTION PIPING SHALL REMAIN OPERATIONAL AS IS UNLESS OTHERWISE NOTED (TYP)

4. ALL EXISTING EQUIPMENT, SHUTOFF VALVES, HANGERS, SUPPORTS, CHECK VALVES, ETC. SHALL REMAIN UNLESS OTHERWISE NOTED (TYP)

5. ENTIRE BUILDING DOMESTIC WATER SYSTEM SHALL ALWAYS BE MAINTAINED ACTIVE WITHOUT INTERRUPTIONS

6. ANY DOMESTIC WATER SYSTEM SHUTDOWNS OR ANY INTERRUPTIONS OF SYSTEM SHALL BE APPROVED IN WRITING 72 HOURS PRIOR

7. NEW DOMESTIC HOT WATER SYSTEM MUST BE FULLY OPERATIONAL BY AUGUST 24, 2018.

8. CONTRACTOR TO SNAKE, JET, AND VERIFY OPERATION ALL EXISTING FLOOR DRAIN WITHIN BOILER ROOM.

NOTE:

FOR PIPING LAYOUT IN THIS AREA SEE PROPANE DOMESTIC

WATER HEATERS MIXING VALVE AND CIRCULATION PUMPS

PIPING DETAIL SEE DETAIL ON DWG P-201

MIXING VALVE ASSEMBLY COMPLETE

WITH VALVES, UNIONS, CHECK VALVE,

ETC. AS PER MANUFACTURERS

RECOMMENDATION. MIXING VALVE

MUST BE CONNECTED TO THE

ALERTON BUILDING DDC SYSTEM.

DDC SYSTEM TO MONITOR AND

CONTROL ALL AVAILABLE POINTS.

PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS

WITH MECHANICAL CONTRACTOR AND

CONTROLS CONTRACTOR (BACNET

VS MODBUS, ETC.). INSTALL AT AN

ELEVATION 3-4 FEET ABOVE FLOOR.

MV

CIRCULATING PUMP CP-2(140 DEGREES)

COMPLETE WITH AQUASTAT, GAUGES,

ETC. AS PER MANUFACTURERS

RECOMMENDATION. MOUNT AT MAX.

5FT ABOVE FINISHED FLOOR FOR

ACCESS. PUMP MUST BE CONNECTED

TO THE ALERTON BUILDING DDC

SYSTEM. PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS WITH

MECHANICAL CONTRACTOR AND

CONTROLS CONTRACTOR. INSTALL AT

AN ELEVATION 3-4 FEET ABOVE FLOOR.

CIRCULATING PUMP CP-1(110 DEGREES)

COMPLETE WITH AQUASTAT, GAUGES,

ETC. AS PER MANUFACTURERS

RECOMMENDATION. MOUNT AT MAX.

5FT ABOVE FINISHED FLOOR FOR

ACCESS. PUMP MUST BE CONNECTED

TO THE ALERTON BUILDING DDC

SYSTEM. PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS WITH

MECHANICAL CONTRACTOR AND

CONTROLS CONTRACTOR. INSTALL AT

AN ELEVATION 3-4 FEET ABOVE FLOOR.

CP-2

CP-1

2"

4"

3" HW (110°)

3"

1"

2"

2"

PWH-1 PWH-2 PWH-3 PWH-4

ET

EXPANSION TANK SIZED IN

COMPLIANCE WITH WATER HEATER

MANUFAACTURER GUIDELINES

NOTES:

ADD ALTERNATE #2 INCLUDES THE REPLACEMENT OF ALL HOT AND COLD WATER PIPINGWITHIN THE BOILER ROOM, NOT INDICATED FOR REPLACEMENT AS PART OF THE BASE BID.THIS INCLUDES THE REPLACEMENT OF ALL COLD WATER, HOT WATER (110 DEG. F), HOTWATER (140 DEG. F), HOT WATER RETURN (110 DEG. F), AND HOT WATER RETURN (140DEG. F) PIPING AND ISOLATION VALVES WITHIN THE BOILER ROOM. CONNECT TO EXISTINGPIPING AT LOCATIONS OF WALL AND CEILING PENETRATIONS WHERE PIPING LEAVES THEBOILER ROOM. INCLUDE INSULATION OF ALL NEW PIPING.

1" HWR (140°)

2" HWR (110°)

2" HW (140°)

PLUMBING CONTRACTOR TO PURCHASE OPTIONAL MODEL ICC

CONTROL MODULE TO CONNECT DOMESTIC WATER HEATERS TO THE

ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR AND

CONTROL ALL AVAILABLE POINTS. PLUMBING CONTRACTOR TO

COORDINATE ALL REQUIREMENTS WITH MECHANICAL CONTRACTOR

AND CONTROLS CONTRACTOR (BACNET VS MODBUS, ETC.).

GENERAL NOTES:

1. PROPOSED PHASING NOTED ON DESIGN DRAWINGS IS PRESENTED AS ONE POSSIBLE OPTION, AND IS AN EXAMPLE ONLY. ANOTHER POSSIBLE OPTION

IS TO INSTALL A TEMPORARY BOILER DURING THE PROJECT TO ALLOW REPLACEMENT OF BOTH BOILERS AT THE SAME TIME. CONTRACTOR

RESPONSIBLE FOR INSTALLATION SCHEDULE TO MINIMIZE SYSTEM DOWNTIME TO ONE DAY MAXIMUM AT A TIME. DOWNTIME MAY BE REQUIRED TO BE

LIMITED TO WEEKENDS BY OWNER. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON PHASING.

2. HAZARDOUS MATERIALS ABATEMENT IS AN INTEGRAL PART OF THIS PROJECT, AND MUST OCCUR/START PRIOR TO PHASE 1 WORK. SEE DIVISION 00

AND 02 SPECIFICATIONS, INCLUDING REPORT FROM FUSS & O'NEILL, FOR ADDITONAL INFORMATION AND REQUIREMENTS REGARDING ABATEMENT OF

OF CEILING, BOILERS, AND FLUE. CONTRACTOR TO SUBMIT FULL PROJECT SCHEDULE WITH RECOMMENDATIONS ON PHASING, INCLUDING ABATEMENT

PHASING. PHASING MUST INCLUDE TIME REQUIRED TO OBTAIN VARIANCE FROM STATE TO ALLOW ABATEMENT WHILE SCHOOL IS OCCUPIED WITH

STUDENTS.

3. BOILER PLANT AND DOMESTIC HOT WATER HEATERS SHALL REMAIN OPERATIONAL FOR ENTIRE DURATION OF PROJECT. CONTRACTOR SHALL

COORDINATE SHORT TERM SYSTEM SHUT-DOWNS WITH OWNER IN ADVANCE.

4. ALL NEW EQUIPMENT (BOILERS, PUMPS, DOMESTIC HOT WATER HEATERS, DOMESTIC HOT WATER RECIRCULATION PUMPS, DOMESTIC HOT WATER

MIXING VALVES, ETC.) SHALL BE CONNECTED TO THE ALERTON BUILDING DDC SYSTEM BY AUTOMATED BUILDING SYSTEMS, INC. (ALERTON). PROVIDE

A NEW COMPUTER WORKSTATION OR LAPTOP COMPUTER AND INTERFACE IN BOILER ROOM TO ALLOW FULL OPERATION OF ALL EQUIPMENT, ADJUST

SETPOINTS, ETC. PNEUMATIC COMPONENTS ARE NOT PERMITTED FOR ANY NEW CONTROLS. CONTRACTOR TO EITHER EXPAND DDC CONTROL

PANEL(S), OR INSTALL NEW CONTROL PANEL(S), AS REQUIRED. PROVIDE 120-VOLT POWER AS REQUIRED FROM NEAREST ELECTRICAL PANEL, AND

LOW-VOLTAGE TRANSFORMERS FOR NEW CONTROL COMPONENTS. CONTRACTOR IS RESPONSIBLE FOR A FULLY-FUNCTIONING CONTROL SYSTEM.

5. CONTRACTOR TO ACID WASH BOILER ROOM FLOOR AND EPOXY PAINT AT END OF PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

RELOCATE EXISTING FLOOR DRAIN SO IT DOESN'T

CONFLICT WITH NEW CONCRETE PAD

EXISTING FLOOR

DRAIN (TYP OF 7)

EXISTING FLOOR

DRAIN (TYP OF 7)

RELOCATE EXISTING FLOOR

DRAIN SO IT DOESN'T CONFLICT

WITH NEW CONCRETE PAD

3/8" = 1'-0"

PLUMBING BOILER ROOM PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

-1

01

.D

WG

je

sse

.vo

se

3/8"=1'-0"

P-101

AM

MB

PLUMBING BOILER ROOM PLAN

P-101

NORTH

BOILER

ROOM

AutoCAD SHX Text
REPLACEMENT OF ALL EXISTING HOT AND COLD WATER PIPING WITHIN BOILER ROOM - ADD ALTERNATE #2

3"G

A

S

E

X

I

S

T

I

N

G

F

U

E

L

O

I

L

T

A

N

K

FOR CONTINUATION

SEE DRAWING P-101

CONNECT PROPANE PIPING FROM

(3) 1,000 GALLON TANKS TO EXISTING

TANK PIPING AND SUPPLY THE 3"

EXISTING 3" PROPANE PIPING UNDERGROUND TO REMAIN. (TYP.)

PROVIDE (3) 1,000 GALLON STORAGE PROPANE

TANKS COMPLETE WITH SUPPORTS, PIPE

CONNECTIONS, REINFORCED CONCRETE SUPPORT

BASE IN COMPLIANCE WITH MANUFACTURERS

RECOMMENDATIONS. CONNECT PROPANE PIPING

FROM THESE TANKS TO EXISTING TANK PIPING AND

RECONNECT TO EXISTING 3" PROPANE SUPPLY

PIPE TO INSIDE MECHANICAL ROOM (COORDINATE

ALL WORK IN FIELD PRIOR TO START OF

CONSTRUCTION WITH LOCAL FIRE MARSHAL

REQUIREMENTS).

EXISTING 500 GAL. CAPACITY

L.P. GAS TANK MOUNTED ON

CONCRETE PAD ON GRADE

TO REMAIN. SEE PHASING

NOTES FOR THE DEMOLITION

OF TANK #2.

BUILDING MAIN WITH REGULATOR

PROPANE TANKS PHASING NOTES

1. INSTALL NEW 1,000 GALLON TANK #2.

2. CONNECT TANK #2 TO EXISTING 3" PROPANE MAIN WITH

REGULATOR TO THE BUILDING.

3. DISCONNECT AND REMOVE EXISTING 500 GALLON

TANK #1.

4. INSTALL NEW 1,000 GALLON TANKS #3 IN THE SAME

#1

#2

#3

#4

LOCATION AS THE REMOVED 500 GALLON TANK #1.

5. INSTALL NEW 1,000 GALLON TANK #4.

6. CONNECT PROPANE PIPING FROM TANK #2, TANK #3, AND #4

AS ONE SYSTEM TO SUPPLY THE EXISTING 3" MAIN AND REGULATOR

TO BUILDING.

BOLLARD (TYP.)

PROPANE TANKS GENERAL NOTES

1. ALL TANK INSTALLATION AND REMOVALS SHALL BE PROVIDED BY

AMERIGAS CO., INCLUDING ALL PIPING, VALVES, SUPPORTS, PERMITS,

INSPECTIONS, TESTING, ETC READY FOR USE BY OWNER.

2. AMERIGAS CO. SHALL PROVIDE REMOVAL AND DISPOSING OF THE

EXISTING 500 GALLON TANK #1.

3. CONTRACTOR TO PROVIDE CONCRETE PAD UNDER PROPANE TANKS.

4. CONTRACTOR TO PROVIDE 6-FOOT HIGH CHAIN-LINK FENCE WITH

GREEN PRIVACY SLATS / SCREENING AND LOCKABLE GATE. FENCE TO

SURROUND ALL TANKS AND PROVIDE 3 FEET CLEARANCE ON ALL

SIDES.

5. CONTRACTOR TO PROVIDE BOLLARDS 4-FEET ON CENTER ON

EXTERIOR SIDE OF FENCE TOWARD PARKING LOT / DRIVEWAY AS

SHOWN.

3'-6"

3'-6"

ABOV

E

FIN. G

RADE

6"

6"

3'-0"

18" DIA

STEEL BOLLARD

1NTS

FINISH GRADE

AT PAVEMENTS

SLOPE CONCRETE

AWAY FROM BOLLARD

1/2" R

FINISH GRADE AT

PLANTED AREAS

IN PAVED AREAS HOLD

TOP OF FOOTING 6"

BELOW FIN. GRADE

CAST-IN-PLACE

CLASS 'A' CONCRETE

FOOTING

GRAVEL BASE

6"Ø GALVANIZED STEEL PIPE ASTM

A53 (STD. WEIGHT) FILLED WITH

CONCRETE, PRIME AND PAINT

BLACK (SEE NOTES)

1/8" = 1'-0"

PLUMBING PARTIAL SITE PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

-1

02

.D

WG

je

sse

.vo

se

1/8"=1'-0"

P-102

AM

MB

PLUMBING PARTIAL SITE PLAN

NORTH

P-102

SITE

AREA

AutoCAD SHX Text
CONCRETE DOME
AutoCAD SHX Text
NOTES: 1. CONTRACTOR SHALL SUBMIT SHOP DRAWING FOR APPROVAL. 2. BOLLARD SHALL BE PRIMED WITH A BOLLARD SHALL BE PRIMED WITH A RUST INHIBITING PRIMER AND PAINTED WITH A HEAVY DUTY EXTERIOR ENAMEL.

Finished Floor

EXPANSION

TANK (ET)

BUILDING COLD WATER

SUPPLY.

(FOR CONT. SEE DWG P-101)

BUILDING HOT WATER

RETURN (140)

(FOR CONT. SEE DWG P-101)

MV

MECHANICAL ROOM

PIPE T & P TO

OPEN DRAIN

PIPE T & P TO

OPEN DRAIN

PIPE T & P TO

OPEN DRAIN

G G

PIPE T & P TO

OPEN DRAIN

#1 #2

EXISTING 3" PROPANE PIPE UNDERGROUND TO REMAIN (TYP)

(3) NEW 1,000 GALLON PROPANE TANKS PROVIFDED BY AMERIGAS.

BUILT -IN CONDENSATE NEUTRALIZATION UNIT (TYP.)

4" HIGH HOUSEKEEPING PAD

POWERS INTELLISTATION

DIGITAL WATER TEMPERING AND

RECIRCULATION SYSTEM ASSEMBLY

FACTORY ASSEMBLED

LOCATE HOT WATER CIRCULATION.

PUMP ASSEMBLY APPROX 5'-ABOVE

FINISH FLOOR FOR ACCESS. (TYP.)

NOTE: FOR WATER HEATER

VENTING REFER TO

MECHANICAL DRAWINGS

EXISTING 500 GALLON PROPANE TANK

ASSEMBLY DISCONNECTED AND

REMOVED BY AMERIGAS CO.

EXISTING 3" PROPANE GAS MAIN

AND AMERIGAS CO. PRESSURE

REGULATOR ASSEMBLY TO REMAIN

(TYP)

EXISTING 500 GALLON PROPANE TANK TO REMAIN

DURING PHASE 1 CONSTRUCTION.

DISCONNECT AND REMOVE AFTER PHASE 2 TANK IS

INSTALLED, TESTED AND APPROVED.

PROPANE TANK PHASING

1. INSTALL NEW 1,000 GALLON TANK (2).

2. CONNECT TANK #2 TO EXISTING 3" MAIN

3. REMOVE EXISTING 500 GALLON TANK.

4. INSTALL NEW 1,000 GALLON TANK #2, #3, #4

5. CONNECT ALL TANKS TO 3" BUILDING SUPPLY

2"

A

3"

HC R

TO BUILDING (110) FOR CONT. SEE DWG P-101(TYP)

3"

(110°)

2" (140°)

2" 1"

1 1/2" 1 1/2" 1 1/2"

3"

DRIP LEG (TYP.)

1 1/2"

4" 4"

2"

BUILDING HOT WATER

RETURN (110)

(FOR CONT. SEE DWG P-101)

1"

B

1 1/2"1 1/2"1 1/2"1 1/2"

B

PROVIDE 1

1

2

" PROPANE GAS PIPE TO WATER

HEATER INTAKE MANIFOLD. ADJUST AND SET

EXISTING GAS PRESSURE REGULATOR LOCATED

NEXT TO THE OUTSIDE PROPANE TANK SUCH THAT

THE INLET GAS PRESSURE TO EACH WATER

HEATER IS 8-10"WC. COORDINATE THE REGULATOR

ADJUSTMENT WITH PROPANE GAS COMPANY

-AMERIGAS.

NOTES

A

1"

G

GGG

DIAL TYPE

PRESSURE GAUGE

(0-100 PSIG)

PIG TAIL (TYP)

PLUG VALVE (TYP)

STRAINER

BALL VALVE

IN-LINE CIRCULATING PUMP (SEE

PUMP SCHEDULE)

AQUASTAT FOR CONTROL

OF PUMP

UNION

CHECK VALVE

FOR CONTINUATION AND SIZE,

SEE FLOOR PLAN

NOT TO SCALE

P-201

3

HANGER ROD

LOCKING NUT

ADJUSTABLE CLEVIS

HANGER

INSULATION

PIPE

INSULATION PROTECTION

SADDLE

POLYSTYRENE RIGID FOAM

INSULATION N18" LONG.

LAP PIPE INSUL. TO

POLY INSUL.

PIPE HANGER

16" LONG x 20 GA.

GALVANIZED STEEL

NINSULATION SADDLE

NOT TO SCALE

P-201

4

NOTE: FOR SEISMIC SUPPORT SYSTEM

DESIGN CRITERIA REFER TO PLUMBING

SPECIFICATIONS

#4

3"

G

TO BUILDING (140) FOR CONT. SEE DWG P-101(TYP)

HWR(110)

1"

1 1/2"

1 1/2"

1 1/2"

1 1/2"

3"

3"

3"

BUILT-IN GAS TRAIN PROVIDED BY MANUFACTURER (TYP.)

G

G

CW

3"

3"

1"

GG

GAS

VALVE

(TYP.)

GAS COCK (TYPICAL)

UNION (TYPICAL)

PIPE SIZE PER

FLOOR PLAN

LOCATE VENT 10'-0" AWAY

FROM ALL MECHANICAL

INTAKES AND /OR

WINDOWS.

VENT DEVICES SEPARATELY

THRU ROOF. SIZE PER

MANUFACTURER'S

REQUIREMENTS.

GAS PRESSURE REGULATOR. REDUCE

GAS PRESSURE FROM 5 lb GAS TO

0.50 lbs. (14" W.C.) OR PER EQUIPMENT

REQUIREMENTS

PRESSURE GAUGE (TYPICAL)

INDICATE PRESSURE:

0-10 LBS.

WATER COLUMN:

0-48 INCHES

ROOF

NOT TO SCALE

P-201

5

3"3"3"

3"

PROPANE TANK SUPPORT

PROVIDED BY AMERIGAS CO.

SHOWN FOR REFERENCE ONLY

(TYP)

PROVIDE VENT PIPE FROM

EACH WATER HEATER

REGULATOR IN

COMPLIANCE WITH

MANUFACTURERS

RECOMMENDATIONS (TYP

FOR 4)

NOTE: ACCORDING TO AO SMITH THE REQUIRED PROPANE GAS PRESSURE AT EACH HEATER

GAS TRANE CONNECTION IS 8 - 10 " WC.

AMERIGAS CO. WILL MODULATE THEIR EXISTING PROPANE GAS REGULATOR LOCATED

NEXT TO THE OUTSIDE STORAGE TANKS IN ORDER TO PROVIDE THE REQUIRED PRESSURE

TO EACH DOMESTIC WATER HEATER. COORDINATE CONNECTION AND THE REQUIRED GAS PRESSURE

TO EACH WATER HEATER WITH AMERIGAS CO. IN FIELD PRIOR TO FINAL GAS CONNECTION

TO WATER HEATERS AND ACTIVATION OF PROPANE GAS SYSTEM.

#3

NOTE: ALL EXISTING FLOOR DRAINS

SHALL REMAIN.

COORDINATE IN FIELD EXACT LOCATION

AND SIZE THE PAD AS PER

MANUFACTURER RECOMMENDATION

MIXING VALVE ASSEMBLY MUST BE

INSTALLED IN FULL COMPLIANCE WITH

MANUFACTURERS

RECOMMENDATIONS. MANUFACTURER

SHALL ALSO INSPECT AND APPROVE

INSTALLATION PRIOR TO START OF

SYSTEM.

1. FOR ALL WATER HEATERS INTAKE AND EXHAUST VENTING, SEE MECHANICAL

DRAWINGS.

2. WATER HEATERS SHALL BE PROGRAMMED TO OPERATE INDIVIDUALLY OR ALL

TOGETHER DURING TIMES OF PEAK DEMAND.

3. FOR DOMESTIC HOT WATER HEATERS, PLUMBING CONTRACTOR TO PURCHASE

OPTIONAL MODEL ICC CONTROL MODULE TO CONNECT DOMESTIC WATER

HEATERS TO THE ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR

AND CONTROL ALL AVAILABLE POINTS. PLUMBING CONTRACTOR TO COORDINATE

ALL REQUIREMENTS WITH MECHANICAL CONTRACTOR AND CONTROLS

CONTRACTOR (BACNET VS MODBUS, ETC.).

4. MIXING VALVE AND RECIRCULATION PUMPS MUST BE CONNECTED TO THE

ALERTON BUILDING DDC SYSTEM. DDC SYSTEM TO MONITOR AND CONTROL ALL

AVAILABLE POINTS. PLUMBING CONTRACTOR TO COORDINATE ALL

REQUIREMENTS WITH MECHANICAL CONTRACTOR AND CONTROLS CONTRACTOR

(BACNET VS MODBUS, ETC.).

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

07

\P

LU

MB

\0

-C

urre

nt\P

-2

01

.D

WG

je

sse

.vo

se

N.T.S.

P-201

AM

MB

PLUMBING DETAILS

NTS

PROPANE STORAGE TANKS PIPING SCHEMATIC2

P-201

NTS

PROPANE DOMESTIC WATER HEATER PIPING DETAIL1

P-201

AutoCAD SHX Text
IN-LINE CIRCULATING PUMP DETAIL
AutoCAD SHX Text
FLOW
AutoCAD SHX Text
CLEVIS HANGER WITH SADDLE DETAIL
AutoCAD SHX Text
AO SMITH PROVIDED PROPANE GAS PRESSURE REGULATOR INSTALLATION DETAIL
AutoCAD SHX Text
1 1/2"
AutoCAD SHX Text
G
AutoCAD SHX Text
1 1/2"
AutoCAD SHX Text
G

11,LP

ELECTRICAL GENERAL NOTES

DESCRIPTIONABBREVIATIONS

ELECTRICAL ABBREVIATIONSELECTRICAL LEGEND

ELECTRICAL DEMOLITION NOTES

1. UNLESS OTHERWISE INDICATED, FURNISH AND INSTALL A COMPLETE AND OPERATIONAL ELECTRICAL

SYSTEM INCLUDING ALL NECESSARY MATERIAL, LABOR, AND EQUIPMENT.

2. ELECTRICAL PLANS AND DETAILS, AND ONE LINE DIAGRAMS SHOW THE GENERAL LOCATION AND

ARRANGEMENT OF THE ELECTRICAL SYSTEM. THEY ARE DIAGRAMMATIC AND DO NOT SHOW ALL

CONDUIT BODIES, CONNECTORS, BENDS, FITTINGS, HANGERS, AND ADDITIONAL PULL AND JUNCTION

BOXES WHICH THE CONTRACTOR MUST PROVIDE TO COMPLETE THE ELECTRICAL SYSTEM.

3. ALL EQUIPMENT AND MATERIAL SHALL BE LABELED AND LISTED, AND INSTALLED IN ACCORDANCE WITH

THEIR LISTING.

4. THE CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS AND ARRANGE FOR ALL REQUIRED

INSPECTIONS IN ACCORDANCE WITH STATE GOVERNING AUTHORITIES.

5. ALL WORK SHALL BE DONE WITH LICENSED WORKMEN IN ACCORDANCE WITH STATE GOVERNING

AUTHORITY.

6. THE TERM "INDICATED" SHALL MEAN "AS SHOWN ON CONTRACT DOCUMENTS (SPECIFICATIONS,

DRAWINGS, AND RELATED ATTACHMENTS)".

7. THE TERM "SIZE" SHALL MEAN ONE OR MORE OF THE FOLLOWING: "LENGTH, CURRENT AND VOLTAGE

RATING, NUMBER OF POLES, NEMA SIZE, AND OTHER SIMILAR ELECTRICAL CHARACTERISTICS".

8. THE TERM "SPACE" ON PANELBOARD AND SWITCHBOARD SCHEDULES SHALL MEAN "PROVIDE SPACE TO

INSTALL THE NUMBER OF POLES AND SIZE OF THE PROTECTIVE DEVICE INDICATED WITH ALL THE

NECESSARY BUS AND FITTINGS TO INSTALL THE DEVICE AT SOME FUTURE DATE".

9. COORDINATE ELECTRICAL WORK WITH OWNER.

10. COORDINATE ELECTRICAL WORK WITH OTHER DIVISIONS OF THIS PROJECT.

11. BEFORE SELECTING MATERIAL AND EQUIPMENT, AND PROCEEDING WITH WORK, INSPECT AREAS WHERE

MATERIAL AND EQUIPMENT ARE TO BE INSTALLED TO INSURE SUITABILITY, AND CHECK NEEDED SPACE

FOR REPLACEMENT, CLEARANCES AND INTERCONNECTIONS.

12. BEFORE CUTTING OR DRILLING INTO BUILDING ELEMENTS INSPECT AND LAYOUT WORK TO AVOID

DAMAGING STRUCTURAL ELEMENTS AND BUILDING UTILITIES.

13. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE ANSI/NFPA 70 2014

EDITION.

14. THE DEFINITION OF ELECTRICAL TERMS USED SHALL BE AS DEFINED IN THE NATIONAL ELECTRICAL

CODE.

15. TYPICAL MOUNTING HEIGHTS OF DEVICES SHALL COMPLY NECA 1-2010.

16. ELECTRICAL CONTRACTOR SHALL SEAL ALL ELECTRICAL PENETRATIONS THROUGH FIRE AND SMOKE

RATED PARTITIONS WITH FIRE RATED MATERIAL EQUAL TO 3M FIRE BARRIER SEALANT CP 25WB+ AS A

MINIMUM. MATERIAL SELECTION SHALL BE BASED ON RATING OF PARTITION PENETRATED.

17. FURNISH AND INSTALL MEANS OF DISCONNECTION FOR ALL MOTORIZED EQUIPMENT IN ACCORDANCE

WITH NEC, SECTIONS 422-III AND 430-IX.

1. ELECTRICAL DEMOLITION PLANS ARE DIAGRAMMATIC AND DO NOT DEPICT ENTIRE SCOPE OF WORK.

ADDITIONAL WORK RELATED TO DEMOLITION MODIFICATIONS SHOULD BE EXPECTED. THE CONTRACTOR

SHALL PROVIDE LABOR AND EQUIPMENT TO COMPLETELY REMOVE ALL EQUIPMENT REQUIRED AND IN

SEQUENCE WITH PROJECT PHASING PLANS.

2. PRIOR TO BID, CONTRACTOR TO INSPECT SITE AND IDENTIFY ANY EXISTING CONDITIONS THAT WILL

AFFECT THE WORK TO BE PERFORMED. IF ANY LATENT HAZARDOUS MATERIALS ARE NOTICES OR

SUSPECTED, CONTRACTOR SHALL NOTIFY OWNER IMMEDIATELY AND WAIT FOR FURTHER INSTRUCTIONS

BEFORE STARTING/ RESTARTING ANY WORK IN PROJECT AREA. THE OWNER IS RESPONSIBLE FOR THE

REMOVAL OR ABATEMENT OF ANY/ALL ASBESTOS-LADEN MATERIALS PRIOR TO THE CONTRACTOR

COMMENCING WITH HIS WORK.

3. WHERE THE REMOVAL OF ANY DEVICE, FIXTURE, AND/OR EQUIPMENT INTERRUPTS THE CONTINUITY OF

AN EXISTING (TO REMAIN) CIRCUIT, PROVIDE ALL CONNECTIONS AND CIRCUITRY NECESSARY TO

MAINTAIN EXISTING CIRCUIT CONTINUITY.

4. WHERE BOXES REMAIN AFTER REMOVAL OF FIXTURES AND ELECTRICAL DEVICES FROM EXISTING (TO

REMAIN) CONSTRUCTION, PROVIDE BLANK COVER FOR EACH BOX.

5. EXACT LOCATION OF ALL EXISTING (TO REMAIN OR TO BE RELOCATED) MATERIAL SHALL BE

ESTABLISHED AND VERIFIED IN FIELD.

6. REMOVAL OF ANY ELECTRICAL MATERIAL SHALL INCLUDE THE REMOVAL OF ALL CONTROL,

CONDUCTORS, AND CONDUIT (WHERE PRACTICAL) ASSOCIATED WITH MATERIAL, UNLESS OTHERWISE

NOTED.

7. REFER TO MECHANICAL AND PLUMBING PLANS FOR EQUIPMENT TO BE DEMOLISHED. REMOVE ALL

STARTERS, DISCONNECTS, AND ASSOCIATED WIRING FOR EQUIPMENT U.O.N.

A AMPERES

AC ALTERNATING CURRENT (60 HZ)

AF AMP-FRAME

AFF ABOVE FINISHED FLOOR

AT AMP-TRIP

AWG AMERICAN WIRE GAUGE

C CONDUIT

DWG DRAWING

EMT ELECTRICAL METALLIC TUBING

EQUIP EQUIPMENT

EX EXISTING TO REMAIN

FL FLOOR

FLA FULL LOAD AMPS

FT FEET

GFI GROUND-FAULT CIRCUIT-INTERRUPTER

HP HORSEPOWER

KA KILO AMPERE

Kcmils THOUSAND CIRCUIT MILLS

KV KILOVOLT

KW KILO VOLT-AMPERE

MCA MINIMUM CIRCUIT AMPS

MCB MAIN CIRCUIT BREAKER

MLO MAIN LUG ONLY

MOP MAXIMUM OVERCURRENT PROTECTION

N/A NOT APPLICABLE

NEC NATIONAL ELECTRIC CODE

N.T.S. NOT TO SCALE

P POLE

PH PHASE

RECPT RECEPTACLE

RGS RIGID GALVANIZED STEEL CONDUIT

RM ROOM

SCR SHORT-CIRCUIT RATING

TYP TYPICAL

UL UNDERWRITER'S LABORATORY

U.O.N. UNLESS OTHERWISE NOTED

UTIL UTILITY

V VOLTS

VA VOLT-AMPERES

W WATTS

WP WEATHERPROOF

XFMR TRANSFORMER

% PERCENT

# NUMBER

' FEET

" INCHES

E-001 ELECTRICAL NOTES, LEGENDS, ABBREVIATIONS, AND DETAILS

ED-101 ELECTRICAL BOILER ROOM DEMOLITION PLAN

E-101 ELECTRICAL BOILER ROOM POWER PLAN

E-102 ELECTRICAL BOILER ROOM LIGHTING PLAN

ELECTRICAL DRAWING LIST

J

GFI

SURFACE MOUNTED PANELBOARD

BRANCH CIRCUIT POWER WIRING

BRANCH CIRCUIT HOME RUN (ARROW INDICATES PANEL AND CIRCUIT NUMBER)

FUSED DISCONNECT SWITCH

VARIABLE FREQUENCY DRIVE WITH INTEGRAL DISCONNECT

JUNCTION BOX

DUPLEX RECEPTACLE OUTLET WITH GROUND-FAULT CIRCUIT-INTERRUPTER

MOTOR

EMERGENCY SHUT-OFF FOR BOILERS

PENDANT LIGHT FIXTURE

CARBON MONOXIDE DETECTOR

DESCRIPTION

SYMBOL

EPO

CO

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

08

\0

-C

urre

nt\B

OIL

ER

P

LA

NT

\E

-0

01

.D

WG

je

sse

.vo

se

N.T.S.

E-001

J.P.

B.P.

ELECTRICAL NOTES, LEGENDS,ABBREVIATIONS, AND DETAILS

BOILER #2

BOILER #1

ELECTRICAL DEMOLITION NOTES:

1. ALL PUMPS SHOWN ON PLANS ARE TO BE REMOVED. REFER TO

MECHANICAL AND PLUMBING PLANS FOR EXACT LOCATION. REMOVE

ALL ASSOCIATED WIRING, DISCONNECTS/ STARTERS, CONDUIT AND

HANGERS BACK TO SOURCE IN THEIR ENTIRETY UNLESS

OTHERWISE NOTED.

2. REFER TO MECHANICAL AND PLUMBING PLANS FOR PHASING OF

DEMOLITION.

CAST IRON

BOILER

P-1 P-2 P-3P-4 P-5 P-6

P-7P-8

15KVA

TX

30KVA

TX

"EBR"

/

"EBR1"

"BR"

/

"BR1"

"BR""BR"

"MD01"

EX

EX

EX

EXEXEX

EX

ELECTRICAL DEMOLITION KEY NOTES:

REMOVE EXISTING DISCONNECT/ STARTER, AND WIRE.

UNDERGROUND CONDUIT TO BE REUSED.

REMOVE ALL ASSOCIATED ELECTRICAL IN THEIR ENTIRETY. THIS

INCLUDES BUT IS NOT LIMITED TO DISCONNECT, CONDUIT, WIRE,

HANGERS, ETC.

REMOVE ALL LIGHTING AND ALL ASSOCIATED CIRCUITRY IN ITS

ENTIRETY (INCLUDING SOURCE BREAKER(S)) UNLESS OTHERWISE

NOTED. LIGHTING SHOWN IS APPROXIMATE ONLY.

1

1111111

1

2

2

2

2

CIRC. PUMP

2

CIRC. PUMP

2

EXISTING WALL

MOUNTED FIXTURE TO

REMAIN.

3

3

NOTES:

ADD ALTERNATE #3 INCLUDES THE REPLACEMENT OF THE EXISTING 500 KVATRANSFORMER SERVING THE OLD JUNIOR HIGH SCHOOL. INCLUDE ALL COSTS ASSOCIATEDWITH REMOVING THE EXISTING TRANSFORMER AND INSTALLING THE NEW TRANSFORMER.ANY BUILDING CONSTRUCTION REMOVED FOR THE REMOVAL OR INSTALLATION (CMUWALLS, DOORS AND/OR DOOR FRAMES, STAIRWAY RAILINGS, PIPING, CONDUIT,CONTROLS, ETC. COORDINATE SCHEDULE OF WORK WITH CONTRACTORS INSTALLING NEWPLUMBING AND HVAC SYSTEMS WITHIN THE BOILER ROOM TO ELIMINATE REMOVING ANYNEW PLUMBING OR HVAC COMPONENTS, AND TO MINIMIZE REMOVAL OF ANY EXISTINGCOMPONENTS.

EXISTING 500 KVA

TRANSFORMER TO BE

REPLACED AS PART OF

ADD / ALTERNATE #3

EXIST.

500

KVA

TX

3/8" = 1'-0"

ELECTRICAL BOILER ROOM DEMOLITION PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

08

\0

-C

urre

nt\B

OIL

ER

P

LA

NT

\E

D-1

01

.d

wg

je

sse

.vo

se

3/8"=1'-0"

ED-101

J.P.

B.P.

ELECTRICAL BOILER ROOMDEMOLITION PLAN

ED-101

NORTH

BOILER

ROOM

AutoCAD SHX Text
REPLACEMENT OF TRANSFORMER SERVING OLD JUNIOR HIGH SCHOOL - ADD ALTERNATE #3

NEW WORK NOTES:

1. PROVIDE CIRCUITING AS SHOWN TO NEW MOTORS. REFER TO

MOTOR CIRCUIT SCHEDULE FOR WIRE, DISCONNECT, AND CIRCUIT

BREAKER SIZES.

2. REFER TO MECHANICAL AND PLUMBING PLANS FOR PHASING OF

NEW WORK AND LOCATIONS OF ALL EQUIPMENT.

P-3

B-1

BP-1

BP-2

BP-3BP-6

BP-5

BP-4

EQUIPMENT SOURCE PANEL BRANCH CIRCUIT

DISCONNECT STARTER

MOUNTING

LOAD

TYPE FURNISHED INSTALLED RATING TYPE FURNISHED INSTALLED HP FLA MCA MOP V PH

PUMPS

P-3 EBR3#10, #10G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3

P-4 BR3#10, #10G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3

P-5 BR3#10, #10G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 20 27 34 60 480 3

P-6 EBR3#10, #10G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 15 21 27 40 480 3

P-7 EBR3#10, #10G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 20 27 34 60 480 3

P-8 BR3#12, #12G, 3/4"C

- DIV.23 DIV.26 COMBO VFD DIV.23 DIV.26 SURFACE 7.5 11 14 20 480 3

BOILER PUMPS

BP-1 BR3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BP-2 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BP-3 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BP-4 BR3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BP-5 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BP-6 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

BOILERS

B-1 BR3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

B-2 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

B-3 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

B-4 BR3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

B-5 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

B-6 EBR-B3#12, #12G, 3/4"C

- DIV.23 DIV.23 - - - - - 3 4.8 6 15 480 3

WATER HEATERS

WH-1 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1

WH-2 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1

WH-3 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1

WH-4 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - - 5 7 15 120 1

CIRC. PUMPS

CP-1 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - .25 5.8 8 15 120 1

CP-2 BR12#12, #12G, 3/4"C

FUSED DIV.26 DIV.26 20AT/30AF - - - - .25 5.8 8 15 120 1

B-2

B-3

B-6

B-5

B-4

BOILER 1

BOILER 2

BOILER 3

BOILER 4

BOILER 5

BOILER 6

P-8

P-4 P-5 P-6 P-7

P-8

VFD

P-3

VFD

P-4

VFD

P-5

VFD

P-6

VFD

P-7

VFD

EXISTING EMERGENCY PANELBOARD "EBR"

I-T-E, 480Y/277V, 3PH, 4W, 150A MCB, 14KAIC

MOUNTED ON TOP

EXISTING EMERGENCY PANELBOARD "EBR1"

I-T-E, 208Y/120V, 3PH, 4W, 50A MCB, 10KAIC

MOUNTED ON BOTTOM

EXISTING NORMAL PANELBOARD "BR"

I-T-E, 480Y/277V, 3PH, 4W, 225A MLO,

14KAIC, MOUNTED ON TOP

EXISTING NORMAL PANELBOARD "BR1"

I-T-E, 208Y/120V, 3PH, 4W, 100A MCB,

10KAIC, MOUNTED ON BOTTOM

EXISTING NORMAL PANELBOARD "BR"

I-T-E, 480Y/277V, 3PH, 4W, 400A MLO, 14KAIC

EXISTING NORMAL PANELBOARD "BR"

I-T-E, 480Y/277V, 3PH, 4W, 600A MCB, 14KAIC

EX.15KVA

TX

EX. 30KVA

TX

EXISTING PANELBOARD "MD01"

208Y/120V, 3PH, 4W, MLO,

FED FROM "BR1" (40A/3P)

J

CONTROLS

J

CONTROLS

J

CONTROLS

J

CONTROLS

J

CONTROLS

J

CONTROLS

EPO

EPO

NEW PANELBOARD "EBR-B"

100A, 480Y/277V, 3PH, 4W,

MLO, 14KAIC.

ELECTRICAL NEW WORK KEY NOTES:

EXTEND CONDUIT FROM FLOOR AND CONNECT TO NEW VFD MOUNTED

TO WALL. CONTRACTOR TO CONNECT VFD TO PUMP.

CONTRACTOR TO RUN NEW WIRE IN EXISTING CONDUIT FROM

EXISTING PANELBOARD TO NEW VFD AND PUMP LOCATION. REFER TO

MOTOR CIRCUIT SCHEDULE FOR WIRE SIZE. CONTRACTOR TO

PROVIDE NEW CIRCUIT BREAKERS AND ALL NECESSARY MOUNTING

HARDWARE IN EXISTING PANELS.

CONTRACTOR TO FURNISH AND INSTALL DISCONNECT, CONDUIT, AND

WIRE TO SOURCE PANEL SHOWN ON MOTOR CIRCUIT SCHEDULE.

CONTRACTOR TO PROVIDE NEW CIRCUIT BREAKERS AND ALL

NECESSARY MOUNTING HARDWARE IN EXISTING PANELS.

CONTRACTOR TO FURNISH AND INSTALL PANELBOARD AND FEEDER

FROM EXISTING EMERGENCY PANELBOARD "EBR" TO LOCATION

SHOWN. 4#1, #8G, 1-1/2"C. CONTRACTOR TO FURNISH AND INSTALL

100A/3P CIRCUIT BREAKER IN EXISTING I-T-E PANELBOARD "EBR". AND

ALL NECESSARY MOUNTING HARDWARE.

CONTRACTOR TO PROVIDE NEW 15A/1P CIRCUIT BREAKERS IN

SOURCE PANEL SHOWN FOR 120V BOILER CONTROLS. PROVIDE

2#12, #12G, 3/4"C TO LOCATION.

CONTRACTOR TO PROVIDE NEW 20A/1P CIRCUIT BREAKER IN

SOURCE PANEL SHOWN FOR 120V FUTURE MECHANICAL CONTROLS.

PROVIDE 2#12, #12G, 3/4"C TO LOCATION.

CEILING MOUNTED CARBON MONOXIDE DETECTOR / SENSOR.

CONNECT CARBON MONOXIDE DETECTOR / SENSOR TO BUILDING FIRE

ALARM SYSTEM AS A SEPARATE ZONE. ALARM SHALL ACTIVATE A

SUPERVISORY SIGNAL AT THE MAIN FIRE ALARM CONTROL PANEL AND

ANY REMOTE ANNUNCIATORS. ALARM SHALL NOT ACTIVATE THE

BUILDING EVACUATION ALARM.

1

2

PANELBOARD "EBR-B"

VOLTAGE : 480 ENCLOSURE TYPE: INDOOR

PHASES, WIRES:3 ɸ 4 W

MOUNTING: SURFACE

MINIMUM BUS CAPACITY (A):

100 A

AIC RATING (A):14 KAIC

MAIN O.C. DEVICE (A):

MLO LOCATION: BOILER ROOM

CKT

NO

A P DESCRIPTION BRACH CIRCUIT LOAD

PHASE LOADS (KW)

LOAD BRANCH CIRCUIT DESCRIPTION A P

CKT

NO

A B C

1 15 3 BP-2 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT BP-5 15 3 2

3 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 4

5 - - - - 1.33 2.66 1.33 - - - - 6

7 15 3 B-2 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT B-5 15 3 8

9 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 10

11 - - - - 1.33 2.66 1.33 - - - - 12

13 15 3 BP-3 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT BP-6 15 3 14

15 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 16

17 - - - - 1.33 2.66 1.33 - - - - 18

19 15 3 B-3 SEE MOTOR CIRCUIT 1.33 2.66 1.33 SEE MOTOR CIRCUIT B-6 15 3 20

21 - - - SCHEUDLE 1.33 2.66 1.33 SCHEUDLE - - - 22

23 - - - - 1.33 2.66 1.33 - - - - 24

25 20 1 LIGHTING2#12, #12G, 3/4"C

1.40 1.40 0.00 - SPACE - - 26

27 - - SPACE - 0.00 0.00 0.00 - SPACE - - 28

29 - - SPACE - 0.00 0.00 0.00 - SPACE - - 30

CONNECTED LOAD PHASE

TOTALS (KW)

12.04 10.64 10.64

TOTAL CONNECTED LOAD (KW):

33.32

NOTES:

1,3,5,

EBR-B

7,9,11,

EBR-B

2,4,6,

EBR-B

8,10,12,

EBR-B

14,16,18,

EBR-B

20,22,24,

EBR-B

13,15,17,

EBR-B

19,21,23,

EBR-B

4, EBR1

2, EBR1

6, EBR1

8, EBR1

222222

3

3

3

3

3

BR1

BR1

4

4

CP-1

CP-2

3

3

WH-1

3

WH-2

3

WH-3

3

WH-4

3

5

5

5

5

5

5

5

TO BOILER CONTROL

PANELS. 2#12, #12G,

3/4"C (TYP.)

J

BR1

6

6

NOTES:

ADD ALTERNATE #3 INCLUDES THE REPLACEMENT OF THE EXISTING 500 KVATRANSFORMER SERVING THE OLD JUNIOR HIGH SCHOOL. INCLUDE ALL COSTS ASSOCIATEDWITH REMOVING THE EXISTING TRANSFORMER AND INSTALLING THE NEW TRANSFORMER.ANY BUILDING CONSTRUCTION REMOVED FOR THE REMOVAL OR INSTALLATION (CMUWALLS, DOORS AND/OR DOOR FRAMES, STAIRWAY RAILINGS, PIPING, CONDUIT,CONTROLS, ETC. COORDINATE SCHEDULE OF WORK WITH CONTRACTORS INSTALLING NEWPLUMBING AND HVAC SYSTEMS WITHIN THE BOILER ROOM TO ELIMINATE REMOVING ANYNEW PLUMBING OR HVAC COMPONENTS, AND TO MINIMIZE REMOVAL OF ANY EXISTINGCOMPONENTS.

EXISTING 500 KVA

TRANSFORMER TO BE

REPLACED WITH NEW

TRANSFORMER AS PART

OF ADD / ALTERNATE #3

CO

CO

7

7

7

3/8" = 1'-0"

ELECTRICAL BOILER ROOM PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

08

\0

-C

urre

nt\B

OIL

ER

P

LA

NT

\E

-1

01

.D

WG

je

sse

.vo

se

3/8"=1'-0"

E-101

J.P.

B.P.

ELECTRICAL BOILER ROOMPOWER PLAN

E-101

NORTH

BOILER

ROOM

AutoCAD SHX Text
MOTOR CIRCUIT SCHEDULE
AutoCAD SHX Text
REPLACEMENT OF TRANSFORMER SERVING OLD JUNIOR HIGH SCHOOL - ADD ALTERNATE #3

A1 A1 A1 A1 A1 A1

A1A1

A1

A1

A1 A1 A1 A1

A1 A1 A1 A1

A1

A1 A1

A1A1

A1A1

A1

A1

A1

A1

A1

A1

A1 A1

A1

A1

A1

A1

A1

A1

A1

A1A1

A1A1

A1

NEW WORK LIGHTING NOTES:

1. CONTRACTOR TO ALIGN LIGHTING ACCORDING TO LOCATIONS OF NEW MECHANICAL EQUIPMENT. DO NOT

PLACE IN WORKING SPACE FOR MECHANICAL SYSTEMS. MOVE LIGHTING AROUND IN FIELD TO AREAS WHICH

WILL LIGHT UP AREAS APPROPRIATELY. LOCATIONS SHOWN ON PLANS ARE ONLY APPROXIMATE. VERIFY EXACT

LOCATIONS TO BE INSTALLED IN THE FIELD.

2. CONTRACTOR TO INSTALL A NEW 20A/1P BREAKER IN EMERGENCY PANEL EBR-B FOR LIGHTING (277V).

3. HEIGHTS OF LIGHT FIXTURES TO BE VERIFIED IN THE FIELD. FIXTURES SHALL BE HIGHER OR LOWER IN AREAS

WHERE EXCESSIVE PIPING AND OTHER MECHANICAL SYSTEM ARE LOCATED. FIXTURES SHALL BE

APPROXIMATELY 12'-0" A.F.F. WHERE POSSIBLE.

4. CIRCUITING SHOWN IS SHOWN FOR DIAGRAMMATIC PURPOSES ONLY. CONTRACTOR TO VERIFY EXACT PATH

FOR CONNECTIONS. CONTRACTOR TO USE RIGID PIPE WITH WIRE BETWEEN FIXTURES.

S

3

25,EBR-B

NEW PANELBOARD "EBR-B"

100A, 480Y/277V, 3PH, 4W,

MLO, 14KAIC.

S

3

3/8" = 1'-0"

ELECTRICAL BOILER ROOM LIGHTING PLAN1

95 LITTLE CITY ROAD

HIGGANUM, CT 06441

HADDAM-KILLINGWORTH

HIGH SCHOOL

CHECKED BY:

DRAWN BY:

SHEET:

DATE:

SCALE:

DTC PROJECT NUMBER:

BID DOCUMENT SET

20 NOV., 2017

17137-107

KEY PLAN

DRAWING NO.

NO. DATE ISSUED FOR

REVISIONS

2321 Whitney Avenue - Hamden Center II - Hamden CT 06518

Ph: 203 239 4200 Fax: 203 234 7376

www.teamdtc.com

BOILER PLANT UPGRADES

No

v 2

0, 2

01

7 a

t 7

:4

8p

m

P:\2

01

7\1

71

37

H

KH

S B

oile

r &

L

ig

htin

g U

pg

ra

de

s\1

08

\0

-C

urre

nt\B

OIL

ER

P

LA

NT

\E

-1

01

.D

WG

je

sse

.vo

se

3/8"=1'-0"

E-102

J.P.

B.P.

ELECTRICAL BOILER ROOMLIGHTING PLAN

E-102

NORTH

BOILER

ROOM

LIGHT FIXTURE SCHEDULE

TYPE

BASIS OF DESIGN DESCRIPTION LUMEN LAMPS REMARKS

ALL NECESSARY MOUNTING HARDWARE, BRACKETS, CHAINS, ETC. SHALL BE PROVIDED. VERIFY IN FIELD MOUNTING HEIGHTS FROM CEILING.

2.

1.

NOTES:

ALL COLORS AND FINISHES SHALL BE VERIFIED BY THE OWNER.

A1

UNV

31W LED

PHILIPS DAY-BRITE

FSI440L840-UNV-DIM

4'-0" UTILITY STRIP FIXTURE.

1, 2

VOLTAGE

2000