    1. Concreting of Plain Flooring 2 men pour 1.2

    2. Concreting of Reinf. Flooring 2 men pour 0.84

    3. Concreting of Column & Beam 2 men pour 0.50

    4. Finishing of Flooring (rough) 2 men finishes

    5. Finishing of CHB Joints 2 men finishes6. Plastering of CHB 2 men plaster

    7. Laying of CHB 2 men lay 100

    8. Breaking old RC Flooring 2 men break 0.3

    9. Laying of glazed tile 4"x4" 2 men lay 100

    10. Laying of glazed tile 6"x6" 2 men lay 72

    11. Installation of Water Closet 2 men install 1

    12. Installation of Lavatory 2 men install 1

    13. Installation of G.I. Sheets 32"x8" on Steel Frames 2 men install 11

    14. Installation of G.I. Sheets 32"x8" on Wooden Frames 2 men install 20

    15. Installation of G.I. Sheets 32"x12" on Steel Frames 2 men install 10

    16. Installation of G.I. Sheets 32"x12" on Wooden Frames 2 men install 15

    17. Fabricating and Installation of Gutter Downspout, Ridge roll 2 men fab. Install18. Installation of G.I. Pipe 1/2 x 20" 2 men install 20

    19. Installation of Doors and Window Jamp 1 men install 3

    20. Installation of Door (Complete of Hinges and Knob) 1 men install 2

    21. Fabrication of Doors (Excluding Planning of Frames) 1 men make 3

    22. Planning Rough Lumber (Including Allignment) 1 man Plane 48

    23. Planning Rough Lumber (No Allignment) 1 man Plane 120

    24. Installation of Plywood Board 2 men install 15

    25. Installation of Wooden Post 2 men install 96

    26. Installation of Wood Jalousies Windows 1 men install 18.75

    I. Earth Works:

    a. Excavation 1.82 man hours/cu.m.

    b. Backfill 1.34 man hours/cu.m.

    II. Form Works:

    a. Footing, grade, 2.5 man hours/sq.m.

    column

    b. Beams, bond beams, 2.8 man hrs./sq.m.

    floor slab

    c. Roof beams & bond 3.01 man hrs./sq.m.

    beams

    d. Roof slab 3.34 man hrs./sq.m.

    e. Retaining Walls 2.4 man hrs./sq.m.

    f. Stairs & Landing 2.48 man hrs./sq.m.

    Labor EstimateActivities

    CONSTRUCTION WORK CAPACITIES IN M

  • 8/12/2019 Board Room Conferrence Table

    2/13

    g. Form oil application 6 man hrs./sq.m.

    III. Reinforcement:

    a. Reinforcement of 9 man hours/100 kilos

    footing up to roofing

    b. Grade Slab EWP 13 man hours/100sq.m.

    c. Floor membrane 15 man hours/100sq.m.d. Roof beams & bond 2.88 man hours/cu.m.

    beams

    e. Stairs 2.6 man hours/cu.m.

    f. Roof Slab 2.91 man hours/cu.m.

    g. Curing (water) 2 man hours/day for 7 days

    h. Equipment:

    1 Vibrator 16 min./cu.m.

    2 Crane 4 cu.m./man hour

    FORMWORKSMANHOURS PER SQUARE METER

    ITEMS

    Carpenter Laborer

    1. Continous Wall Type (CHB) 0.70 0.40 1.10

    2. Foundation on Pile Caps 1.50 0.65 2.15

    3. Grade Beam or FTB 0.75 0.40 1.15

    4. Walls Ground to 8 ft. high 1.10 0.72 1.82

    5. Walls 8 ft. to 16 ft. high 1.21 0.78 1.99

    6. Walls 16 ft. to 20 ft. high 1.35 0.90 2.25

    7. Columns 1.22 0.80 2.028. Beams & Girders 1.90 1.22 3.12

    9. Elevated Slabs (word shores) 1.15 1.16 2.31

    10. Elevated Slabs (adjusted shores) 0.70 0.90 1.60

    SCAFFOLDINGLENGTH

    Erect Dismantle Total Erect

    1 to 2 Section Long 1.20 0.35 1.55 1.40

    3 to 5 Section Long 0.75 0.5 1.25 0.85

    6 section or more long 0.65 0.35 1.00 0.75

    1. Common Excavation (Manual) 6.00 MH/cu.m.

    2. Common Excavation (Machine) 0.50 MH/cu.m.

    3. Hook Excavation (Manual & Machine) 8.00 MH/cu.m.

    4. Structural Backfill (Manual) 5.00 MH/cu.m.

    Dism

    1.

    0.

    0.

    UNIT MANHOURS ITEM OF WORK

    MANHOURS

    Total

    1 or 2 Section High More than

  • 8/12/2019 Board Room Conferrence Table

    3/13

    5. Structural Backfill (Machine) 2.00 MH/cu.m.

    6. Hauling Spoils 1.00 MH/cu.m.

    7. Trenching by Hand 6.00 MH/cu.m.

    8. Trenching by Machine 0.20 MH/cu.m.

    9. Piping Installation

    CONCRETE FOUNDATION AND ELEVATED CONCRETE UNIT MANHOURS

    1. GRADE MEMBER

    Formwork 2.54 MH/sq.m.

    Concreting 8.54 MH/sq.m.

    Rebar Works 0.07 MH/sq.m.

    Finishing 0.40 MH/sq.m.

    2. SUSPENDED MEMBER

    Formwork 3.28 MH/sq.m.

    Concreting 16.70 MH/sq.m.

    Rebar Works 0.08 MH/sq.m.

    Finishing 0.80 MH/sq.m.

    Excavation 1.35 cu.m./man day

    Backfill 3.87 cu.m./man day

    Disposal of spoils 4.70 cu.m./man day

    Formworks 2.70 cu.m./man day

    Steelworks 10.00 kg./man day

    Concreting 0.91 cu.m./man dayFinishing 11.80 cu.m./man day

    CHB Zocalo wall 2.40 sq.m./man day

    Ground floor slab (concreting) 1.00 cu.m./man day

    6 mm 0.222 0.2827 1.332 1.665 1.998

    10 mm 0.616 0.7854 3.696 4.62 5.544

    12 mm 0.887 1.131 5.322 6.6525 7.983

    16 mm 1.577 2.011 9.462 11.8275 14.193

    20 mm 2.463 3.142 14.778 18.4725 22.167

    25 mm 3.848 4.919 23.088 28.86 34.632

    28 mm 4.827 6.1575 28.962 36.2025 43.443

    32 mm 6.305 8.0425 37.83 47.2875 56.745

    36 mm 7.98 10.179 47.88 59.85 71.82

    FORMULAS TO FIND APPROXIMATE NUMBER OF NAILS REQUIRED

    83.79 95.

    50.6835 57.

    66.2025 75.

    25.8615 29.

    40.404 46.

    9.3135 10.

    16.5585 18.

    2.331 2.6

    6.468 7.3

    MISCELLANEOUS LABOR OUTPUT

    PHILIPPINE STANDARD WEIGHT OF REINFORCING BARSNominal

    diameter

    Unit Wt.

    kg./meter

    Nominal

    sectional

    6.00m

    kilograms

    7.50m

    kilograms

    9.00m

    kilograms

    10.50m kilograms 12.00m kilo

  • 8/12/2019 Board Room Conferrence Table

    4/13

    Number of Pounds (12d + 60d, framing) = d/6 x BF/100

    Number of Pounds (2d to 12d, sheating) = d/4 x BF/100

    where

    d = size of desired nail in pennies

    BF = total board feet to be nailed

  • 8/12/2019 Board Room Conferrence Table

    5/13

    cu.m. concrete/day

    cu.m. conc./day

    cu.m. conc./day

    72 sq.m./day

    420 pcs./day8 sq.m./day

    pcs./day

    cu.m./day

    pcs./day

    pcs./day

    set water closet/2 days

    set Lav./1 1/2 day

    sheets/day

    sheets/day

    sheets/day

    sheets/day

    5 sheets: 32"x8" G.I. sheets/daylights/day

    pcs. 2"x5"x16" or 40 bd.ft./day

    pcs. Door/day

    pcs./day

    bd.ft./day

    bd.ft./day

    sheets 4'x8'/day

    bd.ft./day

    sq.ft/day

    88.88889

    AN HOURS

  • 8/12/2019 Board Room Conferrence Table

    6/13

    Total

    2.40

    1.45

    1.15

    antle

    0

    0

    0

    Sec. High

  • 8/12/2019 Board Room Conferrence Table

    7/13

    76

    24

    66

    56

    176

    44

    24

    64

    92

    grams

  • 8/12/2019 Board Room Conferrence Table

    8/13

  • 8/12/2019 Board Room Conferrence Table

    9/13

    Project: PROPOSED BOARD ROOM CONFERENCE TABLE

    Location: 2nd. Floor Board Room, Main Office, Pilar Street, Zamboanga City

    Project Description:

    d. Painting Works

    Scope of Works:

    Non - Engineering Basic Cost

    Supervision

    Engineering Basic Cost

    I. Mobilization

    II. Carpentry Works

    III. Office Equipment

    IV. Painting Works

    V. Demobilization

    Cost of Project: Php247,179.07

    ITEM

    NO.UNIT QTY. UNIT COST

    1 - Engineering Assistant days 21 524.00

    Direct Cost

    I. lot 1 5,000.00

    Direct Cost

    II.

    a. Materials:

    19mm. thk. x 1.20m. x 2.40m. Marine Plywood shts. 10 1,898.75

    * 6mm. Thk. X 1.20m. X 2.40m. Marine Plywood shts. 2 575.75

    8 pcs. - 1" x 1" x 8' Lauan Wood, S4s (wood nosing) bd.ft. 5 37.00

    2" Finishing Nail kgs. 3 85.00

    1 1/2" Finishing Nail kg. 1 85.00

    400mm. Length Drawer Rolling Slide sets 40 64.75

    White Wood Glue gal. 1 490.00

    Rugby gals. 2 515.00

    Upholstery Cloth ln.m. 6 142.00

    Drawer Handle sets 20 37.00

    Drawer Lock sets 20 116.00

    b. Labor:

    4 - Carpenters days 6 366.00

    2 - Laborers days 6 317.00

    Direct Cost

    a Mate ials

    ENGINEERING BASIC COST

    MOBILIZATION

    CARPENTRY WORKS

    1. Fabrication of Five (5) Units Office Tables

    2. Fabrication of Twelve (12) Units Conferrence Table

    1. Fabrication of Five (5) Units Office Tables

    2. Fabrication of Twelve (12) Units Conference Table

    Supply & Delivery of Five (5) Units Office Chair

    D E S C R I P T I O N

    NON - ENGINEERING BASIC COST

    SUPERVISION

    Republic of the Philippines

    ZAMBOANGA CITY WATER DISTRICT

    Pilar Street, Zamboanga City

    a. Fabrication of Twelve (12) Units Conference Table

    b. Fabrication of Five (5) Units Office Tables

    c. Supply & Delivery of Five (5) Units Office Chair

  • 8/12/2019 Board Room Conferrence Table

    10/13

    2" Finishing Nail kgs. 5 85.00

    1 1/2" Finishing Nail kg. 1 85.00

    400mm. Length Drawer Rolling Slide sets 24 64.75

    White Wood Glue gal. 1 490.00

    Drawer Handle sets 12 37.00

    Drawer Lock sets 12 116.00

    b. Labor:

    4 - Carpenters days 10 366.00

    2 - Laborers days 10 317.00

    Direct Cost

    III.

    Office Chair/ Low back and seat molded foam cushion, lockable tilting units 5 4,600.00

    mechanism, polyurethane or polypropylene armrest, five legged and black

    leatherette back and nylon twin caster pneumatic height adjustment

    Direct Cost

    IV. PAINTING WORKS

    a. Materials

    #120 Sand Paper Water Proof pcs. 14 11.00

    2" Paint Brush pcs. 4 36.75

    1" Paint Brush pcs. 4 13.75

    Lacquer Thinner gal. 1 462.25 Paint Thinner gals. 2 390.00

    Acrylic Solvent Based Primer gals. 5 820.000

    Acrylic Solvent Based Putty Filler gals. 4 506.000

    Acrylic Solvent Based Top Coat White gals. 10 1,040.55

    Acrylic Solvent Based Reducer gals. 4 384.75

    Tinting for acrylic base solvent finish paint:

    Raw Sienna (1/4L) cans 2 96.75

    Black (1/4L) cans 2 96.75

    Thalo Blue (1/4L) cans 2 96.75

    Toluodine Red (1/4L) cans 2 96.75

    Burt Umber (1/4L) cans 2 96.75

    Baby Roller w/ Tray pcs. 2 130.00

    b. Labor:

    2 - Painters days 6 366.00

    2 - Laborers days 6 317.00

    Direct Cost

    V. DEMOBILIZATION lot 1 5,000.00

    Direct Cost

    Sizing Requirements

    Note: *All sizes referred herein should mean commercially available measurements with tolerance of +

    Summary of Manpower:

    7 - Skilled Workers

    2 - Unskilled Workers

    Supply & Delivery of Five (5) Units Office Chair

    OFFICE EQUIPMENT

  • 8/12/2019 Board Room Conferrence Table

    11/13

    PROPOSED BOARD ROOM CONFERENCE TABLE 2ND FLOOR, BOARD ROOM, MAIN OFFICE, PILAR ST., ZAMBOANGA C

    Stations :

    Length :

    ITEM ESTIMATED DIRECT

    NO. COST

    NON - ENGINEERING BASIC COST

    21 days 11,004.00Php 10% 10% 20%

    ENGINEERING BASIC COST

    I. Mobilization 1 lot 5,000.00Php 10% 10% 20%

    II. Carpentry Works

    1. Fabrication of Office Tables 5 units 41,274.00Php 10% 10% 20%

    2. Fabrication of Conference Table 12 units 69,544.75Php 10% 10% 20%

    III. 5 units 23,000.00Php 10% 10% 20%

    IV. Painting Works 7 days 29,090.25Php 10% 10% 20%

    V. 1 lot 5,000.00Php 10% 10% 20%

    TOTAL

    DATE PREPARED:

    January 20, 2014

    Prepared by: Designed by: Checked & Reviewed by:

    FELIXBERTO R. CAARE, JR., RMP EDITO M. BAUTISTA, JR. MARIE CLAIRE C. BONGO

    Researcher/ Analyst A Senior Engineer A - C.E. Principal Engineer C

    Planning & Design Division Planning & Design Division Planning & Design Division

    Approved by: Recommending Project Implementation: Approved

    EFREN C. SALVACION ALNULFO A. ALFONSO LEONARD

    Officer - In - Charge Department Manager C General M

    Engineering Department Maintenance Department

    Demobilization

    Office Equipment

    (7) (8)

    Supervision

    (1) (2) (3) (4) (5) (6)

    IN PERCENT

    OCM PROFIT %

    APPROVED BUDGET FOR THE C

    Project Name and Location

    DESCRIPTION QUANTITY UNIT

    MARK-UPSTOTA

  • 8/12/2019 Board Room Conferrence Table

    12/13

    R DAYS

    UNIT

    COST

    (13)

    (12)/(3)

    704.26Php

    6,720.00Php

    11,094.45Php

    7,789.01Php

    6,182.40Php

    5,585.33Php6,720.00Php

    CHMENT "A"

  • 8/12/2019 Board Room Conferrence Table

    13/13

    PROJECT : PROPOSED BOARD ROOM CONFERENCE TABLELocation : 2nd. Floor Board Room, Main Office, Pilar Street, Zamboanga City

    Project Cost :

    Project Duration : TWENTY (20) Calendar DaysManpower Requirements : 9 Manpower (1-Engineering Assistant, 4 -Carpenters, 2 -Painters, 2 -Laborers)

    NON-ENGINEERING BASIC ITEMS

    SUPERVISION 5.98% # # # # # # #

    ENGINEERING BASIC ITEMS

    I. MOBILIZATION 2.72% # #

    II. CARPENTRY WORKS1. Fabrication of Five (5) Units Office Tables 22.44% # # # # # #

    2. Fabrication of Twelve (12) Units Conferrence Table 37.81%

    III. OFFICE EQUIPMENT 12.51%

    IV. PAINTING WORKS 15.82%V. DEMOBILIZATION 2.72%

    TOTAL PROJECT COST 100%

    CASH OUTLAY REQUIREMENT

    TARGETED COMPLETION THIS PERIOD

    COMMULATIVE COMPLETION TO DATE

    Prepared by: Reviewed & Checked by: Submitted by: Approved

    FELIXBERTO R. CAARE, JR. RMP MARIE CLAIRE C. BONGO MARLI P. ACOSTA-DE FIESTA EFREN C.

    Researcher/Analyst A (J.O.) Principal Engineer C Officer-In-Charge Officer - In

    Planning & Design Division Planning & Design Division Planning & Design Division Engineerin

    RecommendingProject Implementation: Approved for Project Implementation:

    ARNULFO A. ALFONSO LEONARDO REY D. VASQUEZ

    Department Manager General Manager

    Maintenance Department

    C A

    39,097.30PhP6,720.00PhP

    247,179.07Php

    6,720.00PhP

    55,472.26PhP93,468.14PhP

    30,912.00PhP

    14,789.38PhP

    Republic of the Philippines

    ZAMBOANGA CITY WATER DISTRICTPilar St., Zamboanga City

    GANTT CHART

    247,179.07Php

    Work Item Amounts % Perfected