Date of Meeting: April 15, 2016 # 1 BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM SUBJECT: Loudoun County Additions for the Update of TransAction, the Long Range Transportation Plan for NVTA ELECTION DISTRICT: Countywide CRITICAL ACTION DATE: June 23, 2016 1 STAFF CONTACTS: Robert S. Brown, Transportation and Capital Infrastructure Lou Mosurak, Transportation and Capital Infrastructure Kathleen Leidich, Transportation and Capital Infrastructure Joe Kroboth, III, Transportation and Capital Infrastructure PURPOSE: To develop a list of projects to be submitted in the summer of 2016 to the Northern Virginia Transportation Authority (NVTA) for inclusion in the updated TransAction Long Range Transportation Plan. RECOMMENDATIONS: Staff recommends that the Transportation and Land Use Committee (TLUC) recommend to the Board of Supervisors (Board) approval of projects for inclusion in the NVTA TransAction Long Range Transportation Plan, as shown in Attachments 1 and 3. BACKGROUND: In 2013, the General Assembly passed HB 2313 creating a dedicated revenue source for funding transportation projects through the Northern Virginia Transportation Authority (NVTA). Thirty percent of the funds, referred to as local funds, are distributed to the qualifying jurisdictions using a formula based method. The remaining 70 percent funds are available to qualifying jurisdictions on a competitive basis to implement regional transportation projects. One of the criteria for eligibility to receive the 70 percent regional funds is that the transportation projects for which funding is sought must be included in NVTA’s long range transportation plan, today known as TransAction. Revenues from HB 2313 generate an estimated $300 million annually in local and regional transportation funding to Northern Virginia. To date, Loudoun County (including the Town of Leesburg) has been awarded $101.64 million. On April 15, 2015 the Board of Supervisors directed staff to apply for FY 2017 NVTA regional funds in the amount of $37 million for the Route 7 / 1 Submissions are anticipated to NVTA by mid-July 2016.

BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

Date of Meeting: April 15, 2016

# 1 BOARD OF SUPERVISORS

TRANSPORTATION AND LAND USE COMMITTEE ACTION ITEM

SUBJECT: Loudoun County Additions for the Update of TransAction, the Long Range Transportation Plan for NVTA

ELECTION DISTRICT: Countywide

CRITICAL ACTION DATE: June 23, 20161

STAFF CONTACTS: Robert S. Brown, Transportation and Capital Infrastructure Lou Mosurak, Transportation and Capital Infrastructure Kathleen Leidich, Transportation and Capital Infrastructure Joe Kroboth, III, Transportation and Capital Infrastructure

PURPOSE: To develop a list of projects to be submitted in the summer of 2016 to the Northern Virginia Transportation Authority (NVTA) for inclusion in the updated TransAction Long Range Transportation Plan.

RECOMMENDATIONS: Staff recommends that the Transportation and Land Use Committee (TLUC) recommend to the Board of Supervisors (Board) approval of projects for inclusion in the NVTA TransAction Long Range Transportation Plan, as shown in Attachments 1 and 3.

BACKGROUND: In 2013, the General Assembly passed HB 2313 creating a dedicated revenue source for funding transportation projects through the Northern Virginia Transportation Authority (NVTA). Thirty percent of the funds, referred to as local funds, are distributed to the qualifying jurisdictions using a formula based method. The remaining 70 percent funds are available to qualifying jurisdictions on a competitive basis to implement regional transportation projects. One of the criteria for eligibility to receive the 70 percent regional funds is that the transportation projects for which funding is sought must be included in NVTA’s long range transportation plan, today known as TransAction.

Revenues from HB 2313 generate an estimated $300 million annually in local and regional transportation funding to Northern Virginia. To date, Loudoun County (including the Town of Leesburg) has been awarded $101.64 million. On April 15, 2015 the Board of Supervisors directed staff to apply for FY 2017 NVTA regional funds in the amount of $37 million for the Route 7 /

1 Submissions are anticipated to NVTA by mid-July 2016.

Page 2: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

Item 1, Review of Projects for the Update of TransAction Transportation and Land Use Committee

April 15, 2016 Page 2

Battlefield Parkway interchange as the candidate. The FY 2017 call for projects by NVTA is the last call for projects until TransAction is updated.

In August 2015, NVTA embarked on a major update to TransAction. The updated plan – to be known as TransAction (A Transportation Action Plan for Northern Virginia) – is anticipated to be adopted in late summer/early fall of 2017 (website is http://nvtatransaction.org/). Once adopted, TransAction will provide a multi-modal guide for transportation investments in Northern Virginia and will be the mechanism through which over $1 billion will be allocated to regional transportation improvements for fiscal years FY 2018 - FY 2023. Following the TransAction update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which the 70 percent regional funds would be allocated on a competitive basis to Northern Virginia jurisdictions for only projects included in TransAction.

At the March 17, 2016, Board Business Meeting, NVTA and Department of Transportation and Capital Infrastructure (DTCI) staff provided an overview of the TransAction update process. DTCI staff indicated that a wide range of transportation projects should be included in TransAction to ensure eligibility for consideration of 70 percent regional funding in forthcoming years. As an initial recommendation, DTCI staff noted that all roadways and interchanges currently identified in the Countywide Transportation Plan (CTP) that are not constructed to their ultimate planned conditions be submitted to NVTA for inclusion in TransAction. DTCI recommended that the item be forwarded to the April 15, 2016 TLUC meeting to allow for additional time for staff to identify other projects, including transit and bicycle/pedestrian projects included in the adopted Capital Improvements Program (CIP), for inclusion in TransAction. The Board voted 9-0 to forward the item to TLUC, with Supervisor Volpe indicating that she would be accepting suggestions from other Board members regarding specific projects to be included up through the April 15, 2016 TLUC meeting.

Staff from the Department of Transportation and Capital Infrastructure (DTCI) has identified and reviewed all projects in the Countywide Transportation Plan (CTP) and the recently approved CIP (FY 2017) that are not currently in TransAction to determine if there are other projects that should be included in the update (Attachments 1 and 2). To determine if any new projects should be added to TransAction, DTCI will appear before TLUC to discuss the update and will be available for questions. DTCI recommends that the BOS use the adopted CTP and recently approved CIP as the list of projects for Loudoun County to include in the update of TransAction.

ISSUES: The update of TransAction is significant as all projects funded by the NVTA with the 70 percent regional revenues must be in NVTA’s long-range transportation plan. TransAction is only updated approximately every four years and currently there is no process at NVTA for annual amendments. This meeting will provide TLUC members to an opportunity ask questions about the projects and the process, as well as provide an opportunity for Supervisors to discuss projects that may not be included in our list and want them to be considered. At this time DTCI staff is recommending an additional project be added to this list that is included in the CTP for planning and is listed in the recently adopted FY 2017 CIP (Attachment 3), but has not previously been identified as a specific project for the update of TransAction. The project is the construction of a roundabout at the intersection of Routes 9 and 287 and other safety improvements (as in the Town

Page 3: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

Item 1, Review of Projects for the Update of TransAction Transportation and Land Use Committee

April 15, 2016 Page 3

of Hillsboro) along this corridor to be considered as a single Route 9 Corridor Project. Last year, when the County submitted projects for funding under a new VDOT program referred to as HB-2, the roundabout project was included, but did not score high enough to be funded. The CTP identifies a “Corridor Plan and Safety Improvement Program” for the Route 9 Corridor, and DTCI recommends the Board add this as a specific project for inclusion in the update of TransAction.

FISCAL IMPACT: The adopted Capital Improvement Program (CIP) for FY 2017 - FY 2022 lists many road projects, representing the County’s proportion of regional revenues collected during the six-year period that the County anticipates partial or full funding coming from NVTA’s 70 percent regional funds. NVTA regional funds are applied for and awarded on a competitive basis. If the County projects proposed for NVTA 70 percent regional funding in the CIP do not receive the requested funding awards from NVTA, then projects may need to be delayed, project funding re-allocated, or alternate funding identified to fund high priority transportation projects in the CIP.

ALTERNATIVES: The TLUC may recommend including some or all of the projects in the CTP or CIP, and/or additional projects as suggested by the TLUC, for inclusion in the TransAction Plan.

DRAFT MOTIONS:

1. I move that the Transportation and Land Use Committee recommend to the Board ofSupervisors that the projects included in Attachments 1 and 3 be submitted to the NorthernVirginia Transportation Authority (NVTA) for inclusion in the update to the TransAction LongRange Transportation Plan.

OR

2. I move and alternate motion.

ATTACHMENTS:

1. List of projects that are in the current CTP and CIP that could be funded through NVTA2. Map of the CTP projects that are not currently under construction or completed3. Route 9 Corridor Improvement Safety Projects (from the approved FY 2017 CIP)

Page 4: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

1

ROADWAYS THAT ARE IN THE CTP THAT HAVE NOT BEEN CONSTRUCTED TO THE

ULTIMATE CONDITION AND COULD BE NVTA ELIGIBLE

1. VA Route 7 - Harry Byrd Highway / East Market Street

VA Route 1582 (Algonkian Parkway)/VA Route 1902 (Atlantic

Boulevard) interchange west to VA Route 7/US Route 15 (Leesburg

Bypass) interchange

Ultimate Condition Description U8M. Limited access median divided urban arterial. Additional grade-

separated interchanges beyond Existing Condition at VA Route 2020

(Ashburn Village Boulevard), VA Route 659 (Belmont Ridge Road)

and Battlefield Parkway. All at-grade access is terminated. Study of

alternative uses (e.g., HOV, bus lanes) to be considered for between

VA Route 28 (Sully Road) and VA Route 7/US Route15 (Leesburg

Bypass) when facility is expanded to Ultimate Condition.

2. VA Route 7 - Harry Byrd Highway

VA Route 7 Business (West Market Street) interchange west to VA

Route 9 (Charles Town Pike) interchange

Ultimate Condition Description R8M. Limited access median divided rural arterial. Additional g r a d e -

separated interchange beyond Existing Condition at White Gate Place.

All at-grade access is terminated.

3. VA Route 7 Bypass - Harry Byrd Highway

Ultimate Condition Description R6M. Limited access median divided rural arterial. Additional

g r a d e - separated interchanges beyond Existing Condition at VA

Route 690 (Hillsboro Road) and west of Round Hill at VA Route 7

Business (West Loudoun Street)/VA Route 1320 (Evening Star Drive).

Location of the VA Route 690 interchange to be determined by further

study and in consultation with the Town of Purcellville and VDOT.

Location of the western Round Hill interchange and six-lane transition

to be determined by further study and in consultation with the Town of

Round Hill and VDOT.

4. VA Route 7 - Leesburg Bypass

VA Route 267 (Dulles Greenway) interchange west and north to VA

Route 7 Business (West Market Street) interchange

Ultimate Condition Description U6M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 267 (Dulles Greenway), US Route 15 (South

King Street), and VA Route 7 Business (West Market Street).

ATTACHMENT 1

Page 5: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

2

5. VA Route 7/US Route 15 - Leesburg Bypass

VA Route 7 (East Market Street) interchange south and west to VA

Route 267 (Dulles Greenway) interchange

Ultimate Condition Description U6M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 7 (East Market Street) and at VA Route 267

(Dulles Greenway). Sycolin Road to cross over the bypass; existing

intersection/at-grade access to/from Sycolin Road terminated.

6. US Route 15 – James Monroe Highway / South King Street

VA Route 704 (Harmony Church Road) north to VA Route 7/US Route

15 (Leesburg Bypass)

Ultimate Condition Description U4M. Controlled access median divided urban arterial. Grade-

separated interchange at VA Route 7/US Route 15 (Leesburg Bypass).

Improvements will be constructed in conformance with the Heritage

Resource Policies of the CTP and the Scenic Areas and Corridor

Policies of the Revised General Plan and the Heritage Preservation Plan.

7. VA Route 28 - Sully Road (Darrell Green Boulevard)

Fairfax County line north to VA Route 606 (Old Ox Road)

Ultimate Condition Description U10M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 267 (Dulles Toll/Access Road) and VA Route

606 (Old Ox Road). Study of alternative uses (e.g., HOV, bus lanes) to

be considered when facility is expanded to Ultimate Condition.

8. VA Route 28 - Sully Road (Darrell Green Boulevard)

VA Route 606 (Old Ox Road) north to VA Route 7 (Harry Byrd

Highway)

Ultimate Condition

Description U8M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 606 (Old Ox Road), VA Route 846 (Sterling

Boulevard), VA Route 625 (Waxpool Road/Church Road), VA Route

1793 (Nokes Boulevard) and VA Route 7 (Harry Byrd Highway). Partial

northbound interchange to eastbound Warp Drive. Study of alternative

uses (e.g., HOV, bus lanes) to be considered when facility is expanded

to Ultimate Condition.

Page 6: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

3

9. US Route 50 - John Mosby Highway Fairfax County line to Northstar Blvd.

Ultimate Condition Description U6M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 2200 (Tall Cedars Parkway), VA Route 2201

(South Riding Boulevard), VA Route 606 (Loudoun County Parkway),

VA Route 606 Extended (Arcola Boulevard/West Spine Road), and VA

Route 659 Relocated (Northstar Boulevard). Grade-separated

o p t i o n s to be explored at VA Route 609 (Pleasant Valley Road). All

at-grade access is terminated. Functionality of planned interchanges

within the of the planned limited access corridor between VA Route 606

(Loudoun County Parkway) and VA Route 659 Relocated (Northstar

Boulevard) to be reviewed by a later study. Design speed determined

by VDOT and DTCI.

10. US Route 50 - John Mosby Highway

VA Route 659 Relocated (Northstar Boulevard) west to Lenah Loop

Road

Ultimate Condition Description R4M. Controlled access median divided rural arterial. Grade-

separated interchange at VA Route 659 Relocated (Northstar

Boulevard). Refer to VDOT Road Design Manual for median crossover

spacing requirements. Left and right turn lanes required a t all

intersections. Design speed determined by VDOT and DTCI.

11. US Route 50 - John Mosby Highway

Lenah Loop Road west to Village of Aldie

Ultimate Condition Description R2. Local access undivided rural arterial. Traffic calming measures

implemented in accordance with the US Route 50 Traffic Calming

Project. Roundabouts at VA Route 860 (Watson Road), the US Route

15/50 Connector (Howsers Branch Drive), and US Route 15 (James

Monroe Highway). In Transition Policy Area

12. US Route 50 - John Mosby Highway

Village of Aldie west to Middleburg Town Limits

Ultimate Condition Description R2. Local access undivided rural arterial. Traffic calming measures

implemented in accordance with the US Route 50 Traffic Calming

Project. Left and right turn lanes provided where required for safety.

13. VA Route 209 - Innovation Avenue

VA Route 28 (Sully Road) east to Fairfax County line

Ultimate Condition Description U6M. Controlled access median divided urban collector. Road to be

realigned along northern boundary of Dulles World Center site

Connection to VA Route 605 (Rock Hill Road) in Fairfax County.

Refer to Note G on the CTP Map for additional information regarding

this roadway.

Page 7: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

4

14. VA Route 267 - Dulles Greenway

VA Route 267 (Dulles Airport Access/Toll Road) northwest to VA

Route 7/US Route 15 (Leesburg Bypass)

Ultimate Condition

Description R8M. Limited access median divided rural arterial. Toll road.

Additional grade-separated interchange beyond Existing Condition at

westernmost VA Route 625 (Sycolin Road) crossing and partial

westbound interchange between Crosstrail Boulevard and Battlefield

Parkway. 60 mph or greater design speed.

Secondary Roads

15. VA Route 605 - Rock Hill Road

VA Route 606 (Old Ox Road) south west to future VA Route 868

(Davis Drive)

Ultimate Condition Description U2. Local access undivided urban collector. Road to be realigned to

connect with future VA Route 868 (Davis Drive). Design speed

determined by VDOT and DTCI. Refer to Note G on the CTP Map for

additional information regarding this roadway.

16. VA Route 606 - Loudoun County Parkway

VA Route 606 (Old Ox Road) at VA Route 842 (Arcola Road/future

Arcola Boulevard) intersection south to US Route 50 (John Mosby

Highway), following existing VA Route 606 alignment

Ultimate Condition Description U8M. Limited access median divided urban arterial. Grade-

separated interchanges at VA Route 606 (Old Ox Road) and US

Route 50 (John Mosby Highway). Additional grade-separated options

to be explored at other existing intersections along . Study of

alternative uses (e.g., HOV, bus lanes) to be considered when

facility is expanded to Ultimate Condition

17. VA Route 606 - Loudoun County Parkway

US Route 50 (John Mosby Highway) south to VA Route 620

(Braddock Road)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Grade-

separated interchange at US Route 50 (John Mosby Highway).

18. VA Route 606 - Loudoun County Parkway (formerly Tri-County Parkway)

VA Route 620 (Braddock Road) south to Fairfax County Line

Ultimate Condition Description R6M. Controlled access median divided urban collector. Will follow

portions of VA Route 613 (Ticonderoga Road) and VA Route 621 (Bull

Run Post Office Road) alignments.

Page 8: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

5

19. VA Route 606 - Old Ox Road

Fairfax County Line/Herndon Town Limits west to VA Route 28 (Sully

Road) interchange

Ultimate Condition Description U6M. Controlled access median divided urban co l l ec to r . Grade-

separated interchange at VA Route 28 (Sully Road).

20. VA Route 606 - Old Ox Road

VA Route 28 (Sully Road) interchange west to VA Route 267 (Dulles

Greenway) interchange

Ultimate Condition Description U6M. Limited access median divided urban arterial. Grade-separated

interchanges at VA Route 28 (Sully Road) and VA Route 267 (Dulles

Greenway). Local access, interchange locations and ultimate alignment

to be determined by a later study with consideration of adjacent

development/stakeholders. Study of alternative uses (e.g., HOV, bus

lanes) to be considered when facility is expanded to Ultimate Condition.

21. VA Route 606 - Old Ox Road

VA Route 267 (Dulles Greenway) interchange south to VA Route 607

(Loudoun County Parkway)

Ultimate Condition

Description

U6M. Limited access median divided urban arterial. Additional grade-

separated interchanges beyond Existing and Interim Conditions at VA

Route 645 Extended (Westwind Drive) and at VA Route 607 (Loudoun

County Parkway). Local access, interchange locations and ultimate

alignment to be determined by a later study with consideration of

adjacent development/stakeholders. Study of alternative uses (e.g.,

HOV, bus lanes) to be considered when facility is expanded to Ultimate

Condition. Design speed determined by VDOT and DTCI.

22. VA Route 607 - Loudoun County Parkway

VA Route 1050 (George Washington Boulevard) south to VA Route

625 (Waxpool Road)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Grade-

separated interchange at VA Route 7 (Harry Byrd Highway).

23. VA Route 607 - Loudoun County Parkway

VA Route 625 (Waxpool Road) south to VA Route 267 (Dulles

Greenway) interchange

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Grade-

separated interchange at VA Route 267 (Dulles Greenway).

Page 9: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

6

24. VA Route 607 - Loudoun County Parkway

VA Route 267 (Dulles Greenway) interchange west and south to VA

Route 606 (Old Ox Road) (near existing VA Route 842 (Arcola

Road/future Arcola Boulevard)/VA Route 606 (Old Ox Road)

intersection)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Grade-

separated interchanges at VA Route 267 (Dulles Greenway) and at VA

Route 606 (Old Ox Road).

25. VA Route 609 - Pleasant Valley Road

Quarry Road (US Route 50 North Collector Road) south to Fairfax

County Line

Ultimate Condition Description U4. Local access undivided urban collector. Grade-separated options

to be explored at US Route 50 (John Mosby Highway).

26. VA Route 620 - Braddock Road

Fairfax County Line west to VA Route 659 Relocated (Northstar

Boulevard)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

27. VA Route 621 - Evergreen Mills Road

VA Route 606 (Loudoun County Parkway) northwest to Existing VA

Route 659 (Belmont Ridge Road)

Ultimate Condition Description U4. Local access undivided urban collector. Left and right turn lanes

required at major intersections.

28. VA Route 621 - Evergreen Mills Road

VA Route 621 Relocated (Shreveport Drive) northwest to Battlefield

Parkway

Ultimate Condition Description R4M. Controlled access median divided rural collector. .

29. VA Route 621 - Evergreen Mills Road

Battlefield Parkway north and west to US Route 15 (South King Street)

Ultimate Condition Description U4. Local access undivided urban collector.

30. VA Route 625 - Church Road

VA Route 1902 (Atlantic Boulevard)/VA Route 868 (Davis Drive)

west to VA Route 28 (Sully Road) interchange

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 28 (Sully Road).

Page 10: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

7

31. VA Route 625 - Waxpool Road / Farmwell Road

VA Route 1036 (Pacific Boulevard) west to VA Route 641 (Ashburn

Road)

Ultimate Condition Description U6M. Controlled access median divided urban collector. .

32. VA Route 625 - Sycolin Road

VA Route 659 (Belmont Ridge Road) northwest to Battlefield Parkway

Ultimate Condition Description U4M. Controlled access median divided urban collector. Grade-

separated interchange at westernmost crossing of VA Route 267 (Dulles

Greenway). Road to be realigned north of the Sycolin Creek bridge to

accommodate planned runway extension at Leesburg Executive Airport.

. Left and right turn lanes required a t all intersections.

33. VA Route 634 / VA Route 634 Extended - Moran Road/Belfort Park Drive

VA Route 789 (Lockridge Road) northeast to VA Route 868 (Davis

Drive)

Ultimate Condition Description U4. Local access undivided urban collector. Will follow a new

alignment east of VA Route 1036 (Pacific Boulevard) intersection with

a bridge over VA Route 28 (Sully Road) to VA Route 636 (Shaw

Road). Will continue east of VA Route 636 (Shaw Road) to VA Route

868 (Davis Drive) following east-west of existing Cedar Green Road

alignment.

34. VA Route 636 - Shaw Road

VA Route 209 (Innovation Avenue) north to VA Route 606 (Old Ox

Road)

Ultimate Condition

Description U4. Local access undivided urban collector. Left and right turn lanes

required at major intersections. Refer to Note G on the CTP Map for

additional information regarding this roadway.

35. VA Route 636 - Shaw Road

VA Route 606 (Old Ox Road) north to VA Route 634 Extended

(Moran Road/Belfort Park Drive)

Ultimate Condition Description U4. Local access undivided urban collector.

36. VA Route 639 Relocated - Willard Road

Washington Dulles International Airport property south to US Route 50

(John Mosby Highway) (opposite VA Route 2200 (Tall Cedars

Parkway))

Ultimate Condition Description U4M. Controlled access median divided urban collector. Grade-

separated interchange at US Route 50 (John Mosby Highway); Willard

Road to be relocated east of existing roadway between Quarry Road (US

Route 50 North Collector Road) and US Route 50 to align with VA

Route 2200 (Tall Cedars Parkway) interchange. .

Page 11: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

8

37. VA Route 641 - Ashburn Road

VA Route 1061 (Russell Branch Parkway) south to VA Route 647

(Stubble Road), just north of the Village of Ashburn

Ultimate Condition

Description U4. Local access undivided urban collector.

38. VA Route 641 - Ashburn Road

Beaverdam Run bridge south to VA Route 640 (Waxpool Road)

Ultimate Condition Description U4. Local access undivided urban collector.

39. VA Route 643 Extended - Shellhorn Road

VA Route 607 (Loudoun County Parkway) east to VA Route 789

(Lockridge Road)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

40. VA Route 645 - Croson Lane

VA Route 659 (Belmont Ridge Road) east to Existing VA Route 772

(Old Ryan Road)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

41. VA Route 645 Extended - Westwind Drive/Ladbrook Drive

Broad Run south to VA Route 606 (Old Ox Road)

Ultimate Condition Description U4. Local access urban collector. Bridge over Broad Run. Grade-

separated interchange at VA Route 606 (Old Ox Road).

42. VA Route 653 - Cochran Mill Road

Russell Branch Parkway southwest to VA Route 625 (Sycolin Road)

Ultimate Condition Description U4. Local access undivided urban collector. Between Sycolin Creek

and VA Route 625 (Sycolin Road) to be realigned to avoid floodplain

and will intersect Sycolin Road to the south of the existing Cochran

Mill Road/Sycolin Road intersection.

43. VA Route 653 Relocated - Crosstrail Boulevard

VA Route 7 (East Market Street) interchange (opposite VA Route 773

(River Creek Parkway)) southwest to the VA Route 267 (Dulles

Greenway) interchange

Ultimate Condition

Description U6M. Controlled access median divided urban collector. Grade-

separated interchanges at VA Route 7 (East Market Street) and at VA

Route 267 (Dulles Greenway). .

Page 12: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

9

44. VA Route 653 Relocated - Crosstrail Boulevard

VA Route 267 (Dulles Greenway) interchange west to VA Route 621

(Evergreen Mills Road)

Ultimate Condition Description U4M. Controlled access median divided urban collector. Road to align

with existing Grade-separated interchange at VA Route 267 (Dulles

Greenway).

45. VA Route 659 - Belmont Ridge Road

VA Route 2401 (Riverside Parkway) south to VA Route 7 (Harry Byrd

Highway)

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 7 (Harry Byrd Highway).

46. VA Route 659 - Belmont Ridge Road

VA Route 7 (Harry Byrd Highway) south to VA Route 645 Croson

Lane

Ultimate Condition Description U4M. Controlled access median divided urban arterial. Grade-

separated interchanges at VA Route 7 (Harry Byrd Highway) and VA

Route 267 (Dulles Greenway).

47. VA Route 659 – Belmont Ridge Road

VA Route 645 (Croson Lane) south to VA Route 659 Relocated

(Northstar Boulevard)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Refer t o

VDOT Road Design Manual for median crossover spacing

requirements.

48. VA Route 659 - Belmont Ridge Road

VA Route 659 Relocated (Northstar Boulevard) south to VA Route 621

(Evergreen Mills Road)

Ultimate Condition Description U4/ U4M. Controlled access undivided and divided urban collector.

Four-lane undivided (U4) section north of VA Route 772 (Ryan Road);

four-lane divided (U4M) section south of VA Route 772 (Ryan R o a d ).

49. VA Route 659 - Gum Spring Road (VA Route 606 Extended / West Spine

Road)

VA Route 620 (Braddock Road) south to Prince William County Line

Ultimate Condition Description R4M. Controlled access median divided rural collector. .

Page 13: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

10

50. VA Route 659 Relocated - Northstar Boulevard

VA Route 659 (Belmont Ridge Road) just south of VA Route 645 (Croson Lane) intersection south to VA Route 620 (Braddock Road)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Grade-

separated interchange at US Route 50 (John Mosby Highway). . 60

mph design speed.

51. VA Route 659 Relocated - Northstar Boulevard

VA Route 620 (Braddock Road) south to Prince William County Line

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Will follow

portions of VA Route 705 (Lightridge Farm Road) alignment. Road to

connect with an extension of the VA Route 234 Bypass in Prince

William County.

52. VA Route 742 - Poland Road

VA Route 2201 (South Riding Boulevard) east and south to VA

R o u t e 2200 (Tall Cedars Parkway)

Ultimate Condition Description U4. Local access undivided urban secondary road. VA Route 742 will

be realigned to connect with Defender Drive; existing VA Route 742

(Poland Road)/US Route 50 (John Mosby Highway) intersection will be

closed and access to US Route 50 terminated when US Route 50

becomes limited access.

53. VA Route 772 - Ryan Road

VA Route 607 (Loudoun County Parkway) west to VA Route 659

Relocated (Northstar Boulevard)

Ultimate Condition Description U6M. Controlled access median divided urban collector.

54. VA Route 772 - Ryan Road

VA Route 659 Relocated (Northstar Boulevard) west to VA Route 621

(Evergreen Mills Road)

Ultimate Condition Description R4. Local access undivided rural collector.

55. VA Route 773 - River Creek Parkway

Fort Evans Road/VA Route 2401 (Riverside Parkway) south to VA

Route 7 (East Market Street) interchange (opposite VA Route 653

Relocated (Crosstrail Boulevard))

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 7 (East Market Street).

Page 14: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

11

56. VA Route 775 - Relocation Drive

VA Route 606 (Old Ox Road) northeast to VA Route 1036 (Pacific

Boulevard)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

57. VA Route 789 - Lockridge Road

VA Route 606 (Old Ox Road) north to VA Route 1071 (Prentice Drive)

Ultimate Condition Description U4M. Controlled access median divided urban collector. Provides

access to the planned Route 606 Metrorail station.

58. VA Route 789 Extended – Lockridge Road West

VA Route 1071 Extended/Route 789 Extended (Prentice Drive) north

to VA Route 640 (Waxpool Road)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

59. VA Route 846 - Sterling Boulevard

VA Route 28 (Sully Road) interchange northeast to VA Route 868

(Davis Drive)

Ultimate Condition Description U6M. Controlled access median divided urban arterial. Median

crossovers will not increase from Existing Condition.

60. VA Route 1036 - Pacific Boulevard (VA Route 28 West Collector Road)

VA Route 28 (Sully Road) at VA Route 209 (Innovation Avenue)

interchange west and north to VA Route 606 (Old Ox Road)

Ultimate Condition Description U6M. Controlled access median divided urban collector. .

61. VA Route 1050 - George Washington Boulevard

VA Route 1061 (Russell Branch Parkway) north and west to VA Route

1052 (Riverside Parkway) in University Center

Ultimate Condition Description U4. Local access undivided urban collector. Bridge over VA Route 7

(Harry Byrd Highway) between the VA Route 28 and the Loudoun

County Parkway (VA Route 607) interchanges. Left and right turn lanes

required at all intersections.

62. VA Route xxxx – Prentice Road (existing segment)

Pacific to Lockridge

Ultimate Condition Description U4. Controlled access urban collector.

63. VA Route 1061 - Russell Branch Parkway (VA Route 7 South Collector Road)

VA Route 1036 (Pacific Boulevard) west to VA Route 901 (Claiborne

Parkway)

Ultimate Condition Description U6M. Controlled access median divided urban collector.

Page 15: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

12

64. VA Route 1071 Extended/VA Route 789 Extended – Prentice Drive

VA Route 789 (Lockridge Road) west over Broad Run to VA Route

789 Extended (Lockridge Road West)

Ultimate Condition U4M. Controlled access median divided urban collector.

Description

65. VA Route 1071 Extended – Prentice Drive

VA Route 789 Extended (Lockridge Road West) southwest t o

Greenway Transit Connector (Metro Center Drive)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

66. VA Route 1320 - Evening Star Drive (Round Hill North Collector Road)

VA Route 7 Business (East Loudoun Street) north and west to VA

Route 719 (Woodgrove Road)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

67. VA Route 1793 - Nokes Boulevard

VA Route 1902 (Atlantic Boulevard) west to VA Route 28 (Sully

Road) interchange

Ultimate Condition

Description U6M. Limited access median divided urban collector. Grade- separated interchange at VA Route 28 (Sully Road).

68. VA Route 1950 - Smith Switch Road

VA Route 625 (Waxpool Road/Farmwell Road) north and east to VA

Route 2150 (Gloucester Parkway)

Ultimate Condition Description U4. Local access undivided urban collector.

69. VA Route 2020 Extended – Ashburn Village Boulevard

VA Route 2401 (Riverside Parkway) south to VA Route 7 (Harry Byrd

Highway)

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 7 (Harry Byrd Highway).

70. VA Route 2150 - Gloucester Parkway

VA Route 28 (Sully Road) interchange west to VA Route 607

(Loudoun County Parkway)

Ultimate Condition Description U6M. Limited access median divided urban collector. Grade-

separated interchange at VA Route 28 (Sully Road). .

Page 16: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

13

71. VA Route 2200 - Tall Cedars Parkway (US Route 50 South Collector Road)

VA Route 659 Relocated (Northstar Boulevard) west to Lenah Loop

Road

Ultimate Condition

Description R2. Local access undivided rural collector.

72. VA Route 2201 - South Riding Boulevard

Quarry Road (US Route 50 North Collector Road) south to VA Route

742 Extended (Defender Drive/Poland Road)

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at Route 50 (John Mosby Highway).

73. VA Route 2298 (Formerly VA Route 772 Relocated) - Mooreview Parkway

VA Route 267 (Dulles Greenway) interchange (opposite VA Route 772

(Ashburn Village Boulevard)) west and south to VA Route 607

(Loudoun County Parkway)

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 267 (Dulles Greenway). To be

constructed as a four-lane divided (U4M) section from VA Route 645

(Croson Lane) south to Existing VA Route 772 (Old Ryan Road) to

function as a six-lane divided (U6M) facility in tandem with Old Ryan

Road.

74. VA Route 2400 - Lansdowne Boulevard

VA Route 2401 (Riverside Parkway) south to VA Route 7 (Harry Byrd

Highway) interchange

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchange at VA Route 7 (Harry Byrd Highway).

75. VA Route 2401 - Riverside Parkway (VA Route 7 North Collector Road)

VA Route 607 (Loudoun County Parkway) west to VA Route 659

(Belmont Ridge Road/Upper Belmont Place)

Ultimate Condition Description U6M. Controlled access median divided urban collector.

76. Airport Area Connector

Battlefield Parkway south to VA Route 653 Relocated (Crosstrail

Boulevard) just east of VA Route 267 (Dulles Greenway)

Ultimate Condition Description U4M. Local access median divided urban collector. .

Page 17: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

14

77. Arcola Boulevard (VA Route 606 Extended / West Spine Road)

VA Route 606 (Old Ox Road) and VA Route 607 (Loudoun County

Parkway) (near existing VA Route 842 (Arcola Road)/VA Route 606

(Old Ox Road) intersection) south and west to US Route 50 (John

Mosby Highway)

Ultimate Condition Description U6M. Controlled access median divided urban collector. Grade-

separated interchanges at VA Route 607 (Loudoun County Parkway) and

at US Route 50 (John Mosby Highway). US Route 50 interchange to be

located approximately 1,000 feet east of the Existing VA Route 659

(Gum Spring Road)/US Route 50 intersection.

78. Battlefield Parkway

Fort Evans Road south and west to US Route 15 (South King Street)

(opposite Meade Drive)

Ultimate Condition Description U6M. Local access median divided urban collector. Grade-separated

interchange at VA Route 7 (East Market Street) and at VA Route 267

(Dulles Greenway).

79. Claude Moore Avenue

Existing VA Route 772 (Old Ryan Road) to VA Route 607 (Loudoun

County Parkway)

Ultimate Condition Description U3/ U4. U3 section between Existing VA Route 772 (Old Ryan Road)

and Centergate Drive; U4 section between Centergate Drive and VA

Route 607 (Loudoun County Parkway). Local access undivided urban

collector.

80. Centergate Drive

Claude Moore Avenue to Moorefield Boulevard

Ultimate Condition Description U3. Local access undivided urban collector. Left and right turn

l a n e s required at major intersections. .

81. Foley Branch Boulevard (formerly Dulles South Boulevard)

VA Route 606 (Loudoun County Parkway) (approximately 2,300 feet

south of VA Route 620 (Braddock Road)) west to VA Route 659

Relocated (Northstar Boulevard) (approximately 2,000 feet north of the

Prince William County Line)

Ultimate Condition Description R4M. Controlled access median divided rural collector.

82. Glascock Boulevard (US Route 50 North Collector Road)/Dulles South

Parkway

VA Route 606 (Loudoun County Parkway) west to VA Route 659

Relocated (Northstar Boulevard)

Ultimate Condition Description U6M. Controlled access median divided urban collector.

Page 18: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

15

83. Glascock Boulevard (US Route 50 North Collector Road)/Midnight Run Drive

VA Route 659 Relocated (Northstar Boulevard) west to Lenah Loop

Road

Ultimate Condition Description R2. Local access undivided rural collector. Left and right turn lanes

required at all intersections.

84. Greenway Loop Road (Barrister Street)

VA Route 643 Extended (Shellhorn Road) north to VA Route 1071

Extended/789 Extended (Prentice Drive)

Ultimate Condition Description U4M. Controlled access median divided urban collector.

85. Greenway Transit Connector (Metro Center Drive)

Moorefield Boulevard in Moorefield Station to VA Route 643

(Shellhorn Road), including Transit Connector Bridge over VA Route

267 (Dulles Greenway)

Ultimate Condition Description U2. Local access undivided urban collector. Transit Connector Bridge

over VA Route 267 (Dulles Greenway) to be a maximum of 46 feet in

width...

86. Greenwood Drive (Round Hill)

VA Route 719 (Main Street/Woodgrove Road) east to VA Route 1320

(Evening Star Drive)

Ultimate Condition Description R2. Local access undivided rural collector. Left and right turn lanes

recommended at major intersections.

87. High Street Extended (Round Hill)

VA Route 719 (Main Street) west and south to VA Route 7 Business

(West Loudoun Street)

Ultimate Condition Description R2. Local access undivided rural collector. Left and right turn lanes

recommended at major intersections.

88. Lenah Loop Road

VA Route 621 (Evergreen Mills Road) south to Glascock Boulevard

(US Route 50 North Collector Road)

Ultimate Condition Description R2. Local access undivided rural collector. May incorporate portions

of existing VA Route 616 (Fleetwood Road) alignment.

89. Lenah Loop Road

Glascock Boulevard (US Route 50 North Collector Road) south to V A

Route 2200 (Tall Cedars Parkway) (US Route 50 South Collector Road)

Ultimate Condition

Description U4. Local access undivided urban collector. May incorporate portions

of existing VA Route 600 (Lenah Road) alignment.

Page 19: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

16

90. Lenah Loop Road

VA Route 2200 (Tall Cedars Parkway) south and east VA Route 659

Relocated (Northstar Boulevard)

Ultimate Condition Description R2. Local access undivided rural collector.

91. Moorefield Boulevard

VA Route 772 Relocated (Mooreview Parkway) (opposite Dulles

Greenway Eastbound Off-Ramp) southeast to VA Route 607 (Loudoun

County Parkway) (opposite VA Route 645 Extended (Westwind Drive))

Ultimate Condition Description U3/ U4 - U3 section between Beth Street and Centergate Drive;

U4 section between VA Route 772 Relocated (Mooreview Parkway) and

Beth Street, and between Centergate Drive and VA Route 607 (Loudoun

County Parkway). .

92. Purcellville VA Route 7 North Collector Road

Eastern Purcellville JLMA Boundary (east of VA Route 287 (Berlin

Turnpike)) west to VA Route 690 (Hillsboro Road)

Ultimate Condition

Description U4. Local access undivided urban collector.

93. Quarry Road (US Route 50 North Collector Road)

VA Route 609 (Pleasant Valley Road) west to VA Route 2201 (South

Riding Boulevard)

Ultimate Condition Description U4. Controlled access median divided urban collector. Will follow

existing Route 873 (Wade Drive) alignment.

94. Russell Branch Parkway (Leesburg)

VA Route 653 (Cochran Mill Road) west to Trailview Boulevard

Ultimate Condition Description U4. Local access undivided urban collector.

Page 20: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Transit Buses

Project Description This project procures buses in support of the County’s transit services. The first bus acquisition schedule was approved by the Board of Supervisors in FY 2004, when the first 22 buses were purchased. With the arrival of Phase I of the Silver Line to Wiehle Avenue, the County is transitioning to less expensive transit style buses, according to the County's Transit Development Plan, to provide connections to Metrorail. Transit buses will transport passengers to the most convenient Metrorail Stations on the Silver Line, initially in Fairfax County. Bus service will further transition to feeder service to Metrorail Stations within Loudoun County when they open for service in 2019. At least half of the funding for planned bus acquisitions will come from State Capital Assistance grant funding. The County will procure two transit buses in FY 2017. The program’s operations and maintenance expenses are funded through a combination of fare revenues, State operating assistance, and gasoline tax revenues. Funding Plan The transit bus acquisition program is funded through a combination of State Capital Assistance grants, cash proffers and excess prior year transit bus fee revenues.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities - - - - - - - - - -

Preliminary Engineering - - - - - - - - - -

Construction - - - - - - - - - -

Other 32,523 1,000 1,000 1,000 1,000 1,000 1,000 6,000 4,000 42,523

Total Cost 32,523 1,000 1,000 1,000 1,000 1,000 1,000 6,000 4,000 42,523

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads 335 - - - - - - - - 335

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing 6,859 - - - - - - - - 6,859

Proffers (Cash) 4,160 500 - - - - - 500 - 4,660

State Capital Assistance 18,065 500 500 500 500 500 500 3,000 2,000 23,065

CMAQ - - - - - - - - - -

RSTP - - - - - - - - - -

Revenue Sharing - - - - - - - - - -

NVTA 70% (Regional) 1,860 - - - - - - - - 1,860

NVTA 30% (Local) - - - - - - - - - -

Transit Fees - - 500 500 500 500 500 2,500 2,000 4,500

Local Gasoline Tax 1,244 - - - - - - - - 1,244

Proceeds from Sale of Land - - - - - - - - - -

Federal Funding - - - - - - - - - -

Total Financing 32,523 1,000 1,000 1,000 1,000 1,000 1,000 6,000 4,000 42,523

11-7111-7111-7111-71

Page 21: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Leesburg Park and Ride Lot

Project Description This project provides for the design and construction of a minimum of 300 space surface park and ride lot on a site to be acquired near the Town of Leesburg, as recommended in the County’s transit plans. Current Status This project is currently in land acquisition phase. Funding Plan This project is funded using cash proffers, NVTA 70% regional funds, and NVTA 30% local funds. NVTA 70% regional funds are applied for and awarded on a competitive basis. All proposed uses of NVTA regional funding on County road projects are subject to award of the funding to the County by NVTA. All proposed uses of NVTA 30% funds are subject to allocation of the funding to the County by NVTA.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities 2,000 - - - - - - - - 2,000

Preliminary Engineering 500 - - - - - - - - 500

Construction - 1,490 - - - - - 1,490 - 1,490

Other - - - - - - - - - -

Total Cost 2,500 1,490 - - - - - 1,490 - 3,990

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads - - - - - - - - - -

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing - - - - - - - - - -

Proffers (Cash) 1,500 - - - - - - - - 1,500

State Capital Assistance - - - - - - - - - -

CMAQ - - - - - - - - - -

RSTP - - - - - - - - - -

Revenue Sharing - - - - - - - - - -

NVTA 70% (Regional) 1,000 - - - - - - - - 1,000

NVTA 30% (Local) - 1,490 - - - - - 1,490 - 1,490

Total Financing 2,500 1,490 - - - - - 1,490 - 3,990

Operating Impact ( $ in 1000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total

O&M - - 31 31 31 32 124

Total Impact - - 31 31 31 32 124

11-7211-7211-7211-72

Page 22: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Metro Station Area Pedestrian Improvements

Project Description This project provides for sidewalks, shared-use trails, crosswalks, and intersection improvements to improve pedestrian access to the Silver Line Metro Stations (Route 606 and Route 772) in Loudoun County.

Funding Plan This project is funded using CMAQ funds.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities - - - - - - - - - -

Preliminary Engineering - - - - - - - - - -

Construction - - - - - - 5,400 5,400 6,600 12,000

Other - - - - - - - - - -

Total Cost - - - - - - 5,400 5,400 6,600 12,000

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads - - - - - - - - 6,600 6,600

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing - - - - - - - - - -

Proffers (Cash) - - - - - - - - - -

State Capital Assistance - - - - - - - - - -

CMAQ - - - - - - 5,400 5,400 - 5,400

RSTP - - - - - - - - - -

Revenue Sharing - - - - - - - - - -

NVTA 70% (Regional) - - - - - - - - - -

NVTA 30% (Local) - - - - - - - - - -

Transit Fees - - - - - - - - - -

Local Gasoline Tax - - - - - - - - - -

Proceeds from Sale of Land - - - - - - - - - -

Federal Funding - - - - - - - - - -

Total Financing - - - - - - 5,400 5,400 6,600 12,000

11-7411-7411-7411-74

Page 23: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Western Loudoun Park and Ride Lot

Project Description This project provides for the construction of a minimum 250 space surface park and ride lot on a site acquired in the western portion of the County. Funding Plan This project is funded using CMAQ funds.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities - - - - - - - - - -

Preliminary Engineering - 675 - - - - - 675 - 675

Construction - 3,146 - 150 - - - 3,296 - 3,296

Other - - - - - - - - - -

Total Cost - 3,821 - 150 - - - 3,971 - 3,971

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads - - - - - - - - - -

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing - - - - - - - - - -

Proffers (Cash) - - - - - - - - - -

State Capital Assistance - - - - - - - - - -

CMAQ - 3,821 - 150 - - - 3,971 - 3,971

RSTP - - - - - - - - - -

Revenue Sharing - - - - - - - - - -

NVTA 70% (Regional) - - - - - - - - - -

NVTA 30% (Local) - - - - - - - - - -

Total Financing - 3,821 - 150 - - - 3,971 - 3,971

Operating Impact ( $ in 1000s) FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total

O&M - - 26 26 26 26 104

Total Impact - - 26 26 26 26 104

11-7711-7711-7711-77

Page 24: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

U4

"M

"M

"M

"M

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

XX

X

XX

X

XXX

X

X

X

X

X

X

X

X

X

X

X

*##

*##

*##

*##

*##

*## *##*##

*##*##

*##*## *##

*##

*## *##

*##*##*##*##

*##*##*##*## *##

*##*##

*##*## *## *##*##

*## *##*## *##*##

*## *##*##*## *##*## *## *##

*## *##*## *##

*## *## *##*##*##

*##*##

*##*##*##

*##

*##*##

*##*##*##*##

*##

*##*##

*## *## *##

*## *##

*##*##

*##

*##*##

*##*##*##

*##*## *##*##*##

*##*## *##

*## *##*##

*##*##

*##*## *##

*##

*##*## *##*##

*## *##*##*##*##

*##*##*##

*## *## *##

*## *##*##*##

*## *##

*##*##

*##

*##*##

*##*##

*##*##*##

*##

*##*##

*##*## *##

*##*##

*##*##*##*##*## *##

*##

*##*##

*##

*##

*## *##*## *##

*##

*##

*##*##

*##

*##

*##

*##

*##

*##

*##

*##

*##

*##

U10

M

R8M

R8M

U8M

U6M*

U8M

U6M*

U4M

U6M

U6M

U4M

U6M

U6M

U4M

U4M

U 6M

U4M

R6M

U6M

U6M

U4M

U6M

U6M

U6M

U4M

U6M

U4M

U6M

U6M

U6M

U6M

U4M

R6M

U6M

U4M

U4M

U6M

U4M

U4M

U4M

R4M

R4M

U4

U4

R2

R4M

R4M

U4

U4

U4M

U4M

U4M

U4

R4M

R4M

R2

R2

U4

U4

U4M

U4M

U4

U4M

U4M

U4M

U4

U4

R2

U4M

U4M

R2

R4M

U4M

R4

U4M

R2

U4M

U2

U4

U4M

U4M

U4

R2

U4M

U4M

U4

U4M

U4M

U4M

U4M

U4

U4

U4M

U4M

U4

U4 M

U4M

U4

U4

U4M

U4M

U4M

U2

R4M

U4M

U4M

U4M

U4M

U4

U4M

R4M

U4

R4M

U6M

U4

U6M

U4

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2R2

R2

R2

R2

R2

R2

U2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

U2

R2

R2

R2

R2

R2

R2

U2

U2

R2

R2

R2

U2

R2

R2

R2

R2

MO

UN

TAI N

RD

SIL

CO

TT

SPR

ING

S

RD

HILLS

BORO

RD

LENAHLO

OP

RD

MO

UN

TAIN

RD

ALG

ON

KIA

NPK

WY

DU

LLES

GR

EE

NW

AY

WIL

LIS

VILL

E

RD

ATL A

NTI

C

COUNTRYSID

EBLVD

POLAND RD

NO

RTH

STA

RBLV

D

SY

CO

L INR

D

MI LL

ER

EDWARDS FERRYRD

HIG

HST

BATTLEF

I ELD

PK

WY

BE

LMO

NTR

IDG

E

RD

SULL

YR

D

WO

OD

GR

OV

ER

D

LOU

DO

UN

CHARLES

TOW

N

PKE

JAM

ES

MO

NR

OE

HW

Y

LOYA

LTY

RD

BER

LIN

T PK

E

HA

RP

ER

S

FER

RY

RD

HARMONY

CHURCH

RD

LIME

KILNRD

EV

ER

GR

EE

NM

ILLS

RD

ST.

CH

AR

L ES

TOW

N

PK E

A IRM

ONT

HARRY

BYRD

HWY

OLD

OX

RD

GR

EENG

ARDEN

RD

DU

LLES

GREENWAY

IRISH

CORNER

RD

E. COLONIAL HWY

SNICKERSVILLE

TPKE

ALGONKIAN

PKWY

RTE 7 NORTH COLLECTOR RD

CLA

RK

ES

GA

PR

D

W. COLONIALHWY

BE

RLI

N

TPK

E

TAYLO

RS

TOW

N

RD

BRADD

OC K

RD

JOHN

MOSBY

HWY

PURCELLVILLE S.COL

RD

EDGEWATER

ST

LOUD

OU

NC

O.

PKW

Y

AIR

POR

TA

RE

AC

ON

N

STERLING

BLVD

BRADDOCK

RD

COC

HR

AN

M ILL

RD

S.K

ING

ST

HAM

ILTO

NST

ATIO

N

RD

BE

LMO

NT

RI D

GE

RD

PO

TOM

AC

VIEW RD

HARRYBYRD

HWY

E.LOUDOUN ST

STON Y POINTRD

SU

LLY

R

D

HARRYBYRD

HWY

E. MAIN S T

MILLVILLE

RD

SMIT

HSW

ITCH

RD

ASH BURN FARMP

K

WY

JAM

ES

MO

NR

OE

HW

Y

JOHNMOSBY

HWY

DUL

LES

ACCESS RD

SP

RI N

G

CR

OS

ST

RA

ILBLV D

SYCOLIN

RD

HAR

RY

BYRD

HWY

SHR EV E PORT DR

DULLES WEST BLVD

CREIGHTONRD

EVER

GR

EE

N

SO

UT

H32N

DS

T

BE

LMO

NT

RI D

GE

RD

MO RA

N

RD

FOLEY BRANCH BLVD

RUSSEL

L

QUA RRY RD

LEES

BU

RG

BY P

REL OC

ATI O

ND

R

E.MARKET

ST

JOHN

MO SBYHWY

PKWY

BROADLANDS

BLVD

LOU

DO

UN

CO

.P

KW

Y

E VEN

ING

STAR DR

FORTEVANS

RD

BATTLEFIELD PKWY

WAXPOOL

RD

BLV

D

WOODLANDRD

HARRY BYRDHW

Y

O

L D OX RD

CROSON LA

LEESBURG BYP

JOHN MOSBY HWY

CAS

CAD

ES

GR

EE NWAY

RIVERSIDE

SH

AW

RD

DR

GLEN

ND

R

LEN

AH

LOO

P

RDN

OR

THST

ARB

LVD

CHURCHRD

INNOVATION

AVE

JEFFERSON PK E

PAC

IFIC

TALL

CEDARS

PKWY

RYAN

RD

FARM WELL RD

HAYRD

PK

WY

ROC

KHI

LLRD

AS

HB

URN

VILL

AG

EB

LVD

RU

S

S E LL BRAN C HPKWY

CLA

IBO

RN

E

HARRYBYRD H WY

P KWY

W. MAIN ST

LOU

DO

UN

CO

.P

KW

Y

CASC

ADES

PK WY

SHELLHOR

N

RD )

JAM

ES

MO

NR

OE

HW

Y

PK

WY

NOKES

BE

RLI

N

TPKE

GLOUCESTER PKWY

KIN

CA

IDB

LVD

DAV

IS

DR

POTOMA C V IEWR D

AS

HB

UR

NR

D

LOVETTSVILLE

RD

R IVER

WY NRIDGE

BLVD

CEDARS

PKW

Y

BLV

D

HOWSERS

WIL

LAR

DR

D

HO

PE

PK

WY

BLVD

PLE

ASAN

T

RD

(GREEN

-

DU

LLES

VAL L

EYRDSO

UTH

RI

DI

N G

TALL

PK W Y

PKW

Y DR

MO

OR

EV

IEW

PK

W

Y

LANS

DO

WN

E

R2

R2

CLA

IBO

RNE

GLOU

CES

TER

PKW

Y

CIT

YC

EN

TER

PA

LISADE

BLVD

S U G A R L A N DRD

U4

BLV

D

BLV

D

WE

STW

IND

MI L

LS

RD

U4M

U6

M

R2

U8M

U8M

U8M

U8M

EAST GATEVIEW DR

R8M

U4MU4M

R8M

R6M

U6M

CIDER

MILL RD

U4

U4

U4

R2 U6M

U4M

U4M

U4M

(RT

606

EX

T/W

ES

TS

PIN

ER

D)

POLANDRD

BRANCHDR

ARCOL A

CLAUDEM OOREAVE

MOOREFIELD

BLVD

CEN TER- GATE DR

WAXPO OL

RD

TRURO PARISH

D

R

U6M

CRE E KP KW

Y

R2

MI L

L TO

WN

RD

U3

FAULKNER

PKWY

LOOP

WAY

BA R R IS T ER

ST

CO

.

U6M

*

SH

AW

RD

RD

GU

M

(RT

606

EX

T/

WE

ST

SP

INE

RD

)

GU

M

SP

RIN

GR

D

B RAN

CH

P KWY

TRAIL

VIEW BLVD

NO RTH FO RK RD

LIN

CO

L N

RD

RD

LINCOLN

WAT

ERM

ILL

RD

RD

RD

RD

B LOOMFIE L D

FO

GG

Y

BO

TT

OM

RD

AIR

MO

NT

FOXCRO

FT

RD

RD

FO

XC

ROFT

ST .

LOU

IS

RD

LOU

IS

RD

SNICKERSVILLE

TPKE

R6M

U4M

R2

U4

Montgomery County, MD

Frederick County, MD

Jeffe

rson

Cou

nty,

WV

Clarke County,

VA

Fauquier County, VA

Prince WilliamCounty, VA

Potomac River

Fairfa

x Count

y,VA

Innovation CenterRail Station

")I

")D

")J

DR

ROUNDHILL PURCELLVILLE

HAMILTON

LEESBURG

LOVETTSVILLE

MIDDLEBURG

WASHINGTON DULLESINTERNATIONAL AIRPORT

HILLSBORO

Dulles AirportRail Station

Rte 606Rail Station

Rte 772Rail Station

Meters0

1,000

2,000

3,000

4,000

REVISED 2030COUNTYWIDE

TRANSPORTATIONPLAN

ULTIMATE CONDITIONADOPTED

JUNE 15, 2010AMENDED THROUGH NOVEMBER 12, 2015

1. Planned roadway alignments shown are conceptual and subject to further engineering. Alignments will be further refined aspart of the planning process and through the land development application process.2. For information on specific transportation policies, see the Countywide Transportation Plan.3. For additional information concerning specific roadways, see the Planning Guidelines for Major Roadways, Appendix 1 for theTransportation Plan.4. Reference Town Plans for specific roadways and their elements within town limits.5. The Freeway network will be considered for further study of alternate lane operations which may include the dedication of high-occupancy vehicle and/or express busway use when new lanes are added.

A. The alignments and other design characteristics of Crosstrail Boulevard and Cochran Mill Road will be studied in consultationwith the Town of Leesburg and VDOT.B. Edwards Ferry Road will be studied for alternate typical sections in consultation with the Town of Leesburg and VDOT and withconsideration of historic and scenic resources.C. Location of the Route 7/Route 690 Interchange to be determined by a later study in consultation with the Town of Purcellvilleand VDOT. A Western Collector Road is being considered in this vicinity by the Town of Purcellville as part of it ongoing planningefforts. County consideration of this proposed facility is pending completion of the Town Plan.D. Local access, interchange locations and ultimate alignment of Route 606 between Route 28 and Loudoun County Parkway tobe determined by later study with consideration of adjacent development/stakeholders.E. Location of the Western Round Hill Route 7 Interchange and six lane transition to be determined by a later study inconsultation with the Town of Round Hill and VDOT.F. Grade separated options at the intersection of Route 50 and Route 609 to be explored by a later study.G. The planned road network in the area bounded by the Dulles Toll Road, Route 28, Route 606 and the Fairfax County line wasdetermined in coordination with Fairfax County and the Town of Herndon. The planned road network was incorporated into theCountywide Transportation Plan as part of CPAM 2009-0001, Route 28 Keynote Employment Policies.H. Mooreview Parkway to be constructed as a U4M section between Croson Lane and Old Ryan Road to function as a U6Msection in tandem with the parallel segment of Old Ryan Road.I. Grade separated and/or rotary options at the intersection of US Route 15 (Leesburg Bypass) and US Route 15 Business (NorthKing Street) to be explored by later study.J. Functionality of planned interchanges within the Route 50 limited access corridor between Loudoun County Parkway and NorthStar Boulevard to be reviewed by later study.

Virginia

Location Map

®

TRANSIT ELEMENTS

ROADWAY ELEMENTSLEGEND

YESNO

CTP ROADSBUILT TO

ULTIMATE CONDITION

2030 PLANNED

0 1 2 3Miles

EXISTING POWER LINES

Suburban Policy Area Communities, Transition Policy Area and Town Joint LandManagement Areas (JLMA) are shown with shaded backgrounds.

PLANNED METRORAIL STATIONSPROPOSED METRORAIL ALIGNMENT

W&OD TRAIL

ULTIMATE ROADWAY GEOMETRY

U4M

U = URBAN (Curb & Gutter)R = RURAL (Shoulder & Ditch)M = MEDIAN DIVIDED2 3 4 6 8 10 = TOTAL # OF LANES

VIRGINIA SCENIC BYWAY*##

EXISTING/PLANNED INTERCHANGE (NOT BUILT)X EXISTING/PLANNED INTERCHANGE (BUILT)

R EXISTING/PLANNED ROUNDABOUT

*## PROPOSED SCENIC BYWAY

GENERAL NOTES:

SITE SPECIFIC NOTES:

Refer to Appendix 1 for Right-of-Way Widths

"M

U4M

U4M

U4

LOC

KR

I DG

ER

D

LOC

KRI D

GE

RD

PRENTICEDR

U4

GEORGE WASH INGTO

N

B L VD

WES

T

BLVD

U4M

X

Page 25: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Route 9/ Route 287 Roundabout

Project Description This project provides for the design, right-of-way acquisition and construction of intersection improvements on Route 9 at Route 287. Traffic movements and accident history at the intersection will be evaluated and appropriate improvements recommended as part of this project. Based on current information available, it is envisioned that a roundabout intersection will be recommended for this location. County staff is coordinating with VDOT to plan for improvements to this intersection.

This road is being designed and constructed to VDOT standards and will become part of the VDOT system for maintenance.

Current Status The intersection is currently signalized and experiences significant congestion. The right-of-way is narrow and significant environmentally sensitive areas are in the project vicinity. A draft report presenting design alternative was completed by VDOT in August 2015. Design alternatives are still under review.

Funding Plan This project is funded in a future fiscal year.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities - - - - - - - - - -

Preliminary Engineering 1,228 - - - - - - - - 1,228

Construction - - - - - - - - 10,750 10,750

Other - - - - - - - - - -

Total Cost 1,228 - - - - - - - 10,750 11,978

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads - - - - - - - - - -

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing - - - - - - - - - -

Proffers (Cash) 228 - - - - - - - - 228

State Capital Assistance - - - - - - - - - -

CMAQ - - - - - - - - - -

RSTP - - - - - - - - - -

Revenue Sharing - - - - - - - - 5,375 5,375

NVTA 70% (Regional) - - - - - - - - - -

NVTA 30% (Local) 1,000 - - - - - - - 5,375 6,375

Transit Fees - - - - - - - - - -

Local Gasoline Tax - - - - - - - - - -

Proceeds from Sale of Land - - - - - - - - - -

Federal Funding - - - - - - - - - -

Total Financing 1,228 - - - - - - - 10,750 11,978

11-4811-4811-4811-48

ATTACHMENT 3

Page 26: BOARD OF SUPERVISORS TRANSPORTATION AND LAND USE … · update in 2017, NVTA would call for applications for its inaugural Six-Year Funding Program (FY 2018 - FY 2023) through which

FY 2017 Proposed Budget

Loudoun County, Virginia Transportation

Town of Hillsboro Traffic Calming and Pedestrian Safety

Project Description Each year, the County solicits capital project funding requests from Towns within the County for facilities: 1. owned by, or located within, the Town but operated by the County; or 2. for local pedestrian/transportation related improvements that benefit the County. As a capital expense, the funding for the projects is shown in the County’s CIP. This project provides state revenue sharing and NVTA 30% local funding in FY 2018 for the following project in the Town of Hillsboro:

Route 9 Traffic Calming and Pedestrian Safety Project This request is to construct traffic calming and pedestrian safety improvements along Route 9 in the Town of Hillsboro between Route 690 and Stoney Point Road. The entire project will include complete reconstruction of Route 9 in Hillsboro, two roundabouts and the addition of underground storm water drainage facilities and burial of overhead utilities – which must be constructed within the same narrow right-of-way as the water lines and wastewater pipes.

With the requested funding, undergrounding of utilities and installation of storm water facilities can be done simultaneously with the drinking water and wastewater pipe installation beneath Route 9, along with the installation of surface traffic calming measures, sidewalks, and safe on-street parking.

Funding Plan This project is funded using state revenue sharing and NVTA 30% local funds. All proposed uses of NVTA 30% local and state revenue sharing funding are subject to funding allocation to the County by NVTA and VDOT, respectively.

Prior 6 Year Future Project

Capital ($ in 1000s) Alloc. FY 2017 FY 2018 FY 2019 FY 2020 FY 2021 FY 2022 Total FY's Total

Right of Way & Utilities - - - - - - - - - -

Preliminary Engineering - - - - - - - - - -

Construction - - - - - - - - - -

Other - - 4,800 - - - - 4,800 - 4,800

Total Cost - - 4,800 - - - - 4,800 - 4,800

Local Tax Funding - - - - - - - - - -

Local Tax Funding - Roads - - - - - - - - - -

Fund Balance - - - - - - - - - -

General Obligation Bonds - - - - - - - - - -

Lease Revenue Financing - - - - - - - - - -

Proffers (Cash) - - - - - - - - - -

State Capital Assistance - - - - - - - - - -

CMAQ - - - - - - - - - -

RSTP - - - - - - - - - -

Revenue Sharing - - 1,900 - - - - 1,900 - 1,900

NVTA 70% (Regional) - - - - - - - - - -

NVTA 30% (Local) - - 2,900 - - - - 2,900 - 2,900

Transit Fees - - - - - - - - - -

Local Gasoline Tax - - - - - - - - - -

Proceeds from Sale of Land - - - - - - - - - -

Federal Funding - - - - - - - - - -

Total Financing - - 4,800 - - - - 4,800 - 4,800

11-6611-6611-6611-66