BNI GO GREENGreen Banking and Energy
Financing
Delivered by Leonard Panjaitan (Manager Corporate Sustainability) at IESR Dialogue, Jakarta 03 July 2012
1
CONTENTS
2
2. BNI’s Approach toward Green Banking
3. The Achievement
1. The Background
CONTENTS
3
1.The Background
The Background: Cadangan dan Produksi Energi Indonesia
4Sumber: Kementerian ESDM
NO NON FOSSIL ENERGYRESOURCES
(SD)INSTALLED
CAPACITY (KT)RATIO KT/SD
(%)
1 2 3 4 5 = 4/3
1 Hydro 75,670 MW 5,705.29 MW 7.54
2 Geothermal 29,038 MW 1,189 MW 4.10
3 Mini/Micro Hydro 1,013.5 MW 462.0 MW 46.0
4 Biomass 49,810 MW 1,618.40 MW 3.25
5 Solar Energy 4.80 kWh/m2/day 13.5 MW -
6 Wind Energy 3 – 6 m/s 1.87 MW -
7 Uranium3.000 MW
(e.q. 24,112 ton) for 11 years*)
30 MW(Thermal)
1.00
*) only in Kalan – West Kalimantan
NO FOSSIL ENERGY RESOURCES(SD)
RESERVES(CAD)
RATIO SD/CAD
(%)
PRODUCTION(PROD)
RASIO CAD/PROD
(YEAR)*)
1 2 3 4 5 = 4/3 6 7 = 4/6
1 Oil (billion barrel) 56.6 7.99 **) 14 0.346 23
2 Gas (TSCF) 334.5 159.64 51 2.9 55
3 Coal (billion ton) 104.8 20.98 18 0.254 83
4 Coal Bed Methane/CBM (TSCF) 453 - - - -
*) with assumption there is no new found**) Cepu Block is included
Komitmen RI untuk Mengurangi Emisi CO2
5
Forestry, Peat Land, Agriculture
680 million Ton
Energy Sector 30 million Ton
Waste 48 million Ton
Industry and Transportation
9 million Ton
Through the development of new renewable energy and implementing energy conservation by all sectors
President Commitment on G-20 Pittsburgh and COP15
To reduce the GHG Emission in 2020
26%(767 mln Ton)
41%Own
effortsOwn efforts and
international support
CONTENTS
6
2. BNI’s Approach toward Green Banking and Energy
BNI’s Compass of Sustainability (Alan Atkisson)
7
BNI’s fourth Mission: Meningkatkan Kepedulian dan Tanggungjawab terhadap Lingkungan dan Sosial
(To improve environmentally and socially corporate responsibility)
BNI’s Corporate Sustainability Organization
8
Corporate Secretary (General Manager)
President Director
Head of Corporate Sustainability
Head of Partnership and CSR Programs
Manager of Partnership and CSR
Manager Corporate Sustainability
VP Corporate Sustainability
Analysts Analysts
Assistant Administration
BNI’s Corporate Sustainability/Green Banking Strategy
9
BusinessNon Business
Inte
rnal
Ext
erna
l
Capacity
Building
Networking
Green attitu
de
CSR
Green lending
Green fundin
g
PKBL
Product developme
nt
Branding/ sponsorshi
p Cross sellin
g
SOP
PKBL/CSR Policy BNI
10
MICRO FINANCING
KESEJAHTERAAN
MASYARAKAT
Program Kemitraan
“Corporate Social Responsibility”
Bina Lingkungan
1. Pendidikan 2. Kesehatan 3. Lingkungan4. Korban bencana alam 5. Prasarana & sarana6. Sarana ibadah
1. Penyaluran kredit untuk pengembangan produk unggulan Daerah
2. Industri kreatif
3. Ketahanan Pangan
3. Capacity Building
PKBL
Elemen:
Masyarakat sekitar, LSM,
Lembaga,
Kampus, Sekolah
Pemberdayaan Masyarakat dan Filantropi (Community Development)
KAMPOENG BNIHUTAN KOTA, ENERGI RAMAH LH, POJOK BNI
CONTENTS
11
2. BNI’s Achievement
BNI Energy Financing: Commercial Scheme - 2011
12
A. Big Corporate Project (Total: 6 Perusahaan)
Jenis Industri Kredit (Rp)Efisiensi Energi 4.000.000.000 Daur Ulang (Plastik) 13.903.505.000 Pertanian Organik (Pupuk Organik) 3.167.840.944 Properti Ramah Lingkungan Pemanfaatan Limbah : a. Limbah Air (IPAL) 4.289.080.500 b. Limbah Padat 8.715.949.239 Alat & Produk Bersih 8.179.859.379 Perdagangan Rongsokan 1.235.000.000 Alat Pengendalian Pencemaran 2.191.333.340 Electroplating 343.601.319 Total 46.026.169.721
B. SME Project (Total: 26 Perusahaan)
Company Maximum Credit Currency Type of Business Location Additional information
Musim Mas, PT 227IDR Billion Biodiesel (Renewable Energy) Batam
Certified RSPOMusim Mas, PT 1.712,505 IDR Billion Palm Oil (Sustainable Agribusiness) Riau and Sumut
Poso Energy, PT 707IDR Billion Hydro Energy (Renewable Energy) Poso Sulteng 3 x 65 MW
Harvestindo International, PT 20IDR Billion Recyling Products Pasar Kemis Tangerang Dacron Products
Dizamatra Powerindo Sibayak, PT 7,052USD Million
Geothermal Power Plant (Renewable Energy) Sibayak Sumut 2 x 5 MW
Geodipa, PT 103,058USD MillionGeothermal Power Plant (Renewable Energy) Patuha Jawa Barat 1 x 55 MW
Kartanegara Energi Perkasa, PT 104USD Million Gas Power Plant (Clean Energy) Senipah Kutai - Kaltim 2 x 41 MW
C. Investasi BNI di METI melalui Fund Manager PT. Insight Investment sebesar Rp. 26 Miliar
BNI Energy Financing: CSR Scheme- 2011
13
1. Pico Hydro di Kab. Cianjur (Partner:IIEE)
Project Cost: Rp. 200 juta
2. Biogas di Sumba (Partner: HIVOS)
Project Cost: Rp. 190 juta and will be increased
Pipeline 2012• Biomass di Buleleng (Partner: IIEE, USAID ICED)• Biogass di Sumba, Jawa Timur (Partner: HIVOS)
Penyaluran Bina Lingkungan BNI: The Opportunity for Environment/Energy
14
BNI’s Triple Bottom Line 2011
15
People
Planet
Profit
Sustainability Viable
Opportunities and Challenges: Akses Energi untuk Masyarakat
16
Opportunities:1. Masih banyak lokasi untuk
pembangkit listrik atau pemanfaatan energi swadaya masyarakat yang perlu digarap
2. Dana CSR/PKBL masih banyak tersedia di perbankan atau BUMN lain.
3. Potensi ekonomi lokal/desa akan tergarap dengan adanya elektrifikasi desa
4. Pendidikan dan kesehatan juga akan lebih baik dengan adanya elektrifikasi atau energi yang bersih/renewable
Challenges:1. Bank belum banyak mendapatkan
informasi mengenai unelectrified area yang perlu didanai via CSR (LSM atau elemen masyarakat pro-aktif beri masukan/informasi).
2. LSM atau lembaga lain perlu waktu relatif lama untuk melakukan feasibility study/pendekatan masyarakat.
3. Perlu partner yang tepat bagi Bank untuk melakukan pembangunan elektrifikasi desa, termasuk sisi ekonomi, pendidikan dan kesehatan.
Renewable and Clean Energy: Pico Hydro, PLTG, PLTPB
17
BNI’s Programs and Activities in Brief
18
THE ENDS: Our Future
19