BNF Technology Inc. - DCS HMI Replacement- On-Line Monitoring Center for Nuclear Power Plants

19

ARIDES(Advanced Real-time Information DEployment Solution)

DCS HMI Solution for safe and effective operation of power plants

HMI solution for Nuclear Industry•More than 30 years experiences specialized in Nuclear Power Plants•Monitoring and control for nuclear power plants

HMI solution for Coal-fired and Gas-fired power plants•Monitoring and control for Coal-fired Power Plants•Monitoring and control for Combined-Cycle, Combined Heat andPower Plants

Upgrading legacy DCS HMI•Solving the problem caused by legacy DCS HMI and low performancehistorian

•Upgrading GE Mark V - 16 Systems•Upgrading GE EX2000 - 30 Systems•Upgrading SIEMENS SPPA-T2000 or TXP - 2 Systems•Upgrading ABB Procontrol P13, P42 - 7 Systems•Upgrading MHI MIDAS 8000 - 1 System

DCS HMI Solution - ARIDES

2

Project Overview

Project Title

- On-Line Monitoring and Early Warning System for 24 Nuclear Power Units

Project Scope

- Build up the central monitoring center in the headquarter and research institute

- Real-time data acquisition for 24 nuclear units

- Centralize data from different sources into a single place

- Build up the predictive early warning system for 24 nuclear units

Project Duration

- Dec.26th, 2014 ~ May. 30th, 2016

<On-line Monitoring Center in the research center and headquarter>

3

This is what our client expected to see

Effective Resource Management

Reducing operation &

maintenance cost

Improving operation environment

and business process

• By monitoring and analyzing a

whole power units in the

headquarter, managing and

planning resources timely and

effective • By reinforcing accuracy of

predictive diagnosis and analysis

with the specialized members, and

doing proper actions in advance,

reduce operation & maintenance

cost

• Improving operating environment

and business process by 24X7

specialized monitoring in a single

place

• Planning and managing optimized

processes by minimizing

information gaps between all

people of the headquarter and

plant sites

• Making a right decision in a timely

manner

Benefits

Client’s Expectations

4

Our project scope was to- Collect and archive real-time data from 24 nuclear units by the PRISM system

(Data from DCS, Vibration Monitoring System, - Centralize the data in a single place - Provide various applications to monitor and analyze the field data- Deploy the cyber security solution for enhanced network security

Unit 1

Unit 2

Unit 3

Unit 4

Unit 24

The Research Center The Headquarter

….

PRISM Client Suit- Pre-Engineered Functions : Easy to Use- Process Mimics- Various types of analytic tools - Various types of reports- Excel Add-in program- Script Engine

Gateway and PRISM Server- Data Scanning time is as same as data acquisition

system or OPC server- Archive max 500,000 points data in a single server

without any data loss- Quick to retrieve years of historical data within few

minutes

The Project Scope

5

We successfully deployed and are currently maintaining

- The predictive early warning solution at 24 nuclear power units

Unit 1

Unit 2

Unit 3

Unit 4

Unit 24

The Research Center The Headquarter

….

What PHI Identify in advance- Sensor Failure- Transmitter Failure- Communication Failure- Potential Equipment Failure-Improper process operation

PHI system- Automatically modeling operation patterns of each critical equipment by the most optimized plant condition in the past

- Early warning for potential failures- Monitoring plant conditions with index- Various analytic tools to analyze causes of problem

Power Plant Predictive Analytics

BNF Technology North America Contact:

LPR Global, Inc.

Mikah Lee

1-416-423-5590

[email protected]