Blowdown Quantity Calculation

Embed Size (px)

Citation preview

  • 8/16/2019 Blowdown Quantity Calculation

    1/1

    IJT BLOW DOWN QUANTITY CALCULATIONEWS - 024/0

    Sheet 01 of 01

    1. Boiler Steaming capacity at MCR TPH E

    2. Solids content in feed water

    (Refer feed water quality from contract) ppm S3. Maximum permitted concentration of solids in

     boiler water ppm C

    4. Continuous blow down rate as percentage of

    evaporation rate

    B1 = S X 100 = X 100

      C - S - .

    % B1

    5. Continuous blow down quantity

     W2 = E x B1 X1000 = X X 1000.

      100 100 Kg/hr W2

    6. Water content of boiler m3  V

    7. Duration of intermittent blowdown (1/2 hour) hrs d

    8. Interval between completion of one blow downoperation and completion of the next (8 hrs.) hrs. t

    9. Intermittent blow down rate as percentage of

    evaporation rate

    B2 = 100 x t x S x V .

      d x (C x V - 0.5 x S x E x (t-d) - V x S)

    = 100 x x x .

     x ( x - 0.5x x x( - )- x )

    % B2

    10. Quantity of boiler water discharged during each

    intermittent blow down

    Q = E x t x S x V .

      C x V - 0.5 x S x Ex (t-d) - V x S

    = x x x .

     x - 0.5 x x x ( - )- x m3 Q

    11. Concentration of solids in boiler water on

    completion of intermittent blowdown

    C1= C - (t-d) x S x E

      V

    = - ( - )x x .

    ppm C1

    12. Average intermittent blow down rate as

    percentage of evaporation rate

    B A = Q x 100 = x 100

      t x E x

    % B A

    Project : Contract No. : Rev. No. :

    Prepared by : Approved by : Date :