7
BLM Issues Michael D. Londe, Ph.D. Geodesist, DOI - BLM

BLM Issues

  • Upload
    tori

  • View
    25

  • Download
    0

Embed Size (px)

DESCRIPTION

BLM Issues. Michael D. Londe, Ph.D. Geodesist, DOI - BLM. Recognition. We can see the need for development of a 3-D datum that will support modern positioning technologies. - PowerPoint PPT Presentation

Citation preview

Page 1: BLM Issues

BLM Issues

Michael D. Londe, Ph.D.Geodesist, DOI - BLM

Page 2: BLM Issues

Recognition

• We can see the need for development of a 3-D datum that will support modern positioning technologies.

• We recognize the need for improvements in the geoid to support the use of GNSS in height transfer. BLM projects that require accurate elevations have difficulty in finding existent and consistent BMs close to projects.

Page 3: BLM Issues

Concerns

• Is there truly a need to define a totally new datum or is this a chance to do neat science? What would the conversion to a geocentric datum gain us? We have not seen convincing arguments on this.

• BLM has the need to tie past, present, and future surveys and mapping projects together.

• Will the tools be developed and available in a timely fashion to transform between datums? It will not do us any good to have a datum with transformation tools promised for later.

Page 4: BLM Issues

Concerns

• New coordinates will be introduced for the CORS this year. Is this the first of many changes by 2018?

• Datum creep. What are the magnitudes of the changes in the CORS positions. We have not received clear answers on this. How well can we relate surveys tied to NAD 83 (CORS96) to control based on the new coordinates?

Page 5: BLM Issues

Concerns

• It took more than a decade for the BLM to convert GIS data to NAD 83.

• There was not a budget, personnel, or resources for that conversion. If anything the situation will be worse this time around.

• If the magnitude of the proposed changes are approximately 2 meters we heard yesterday it might not make sense to transform.

Page 6: BLM Issues

Requirements

• We need a stable horizontal and vertical datum referenced to a specific epoch (s) where practical.

• We need the transformation tools to move positions between the realizations of NAD 83, WGS 84, ITRF, and the various vertical datums. It is not practical to store raw observations and recompute.

Page 7: BLM Issues

Requirements

• Transformation tools need to be available at the time of release of the datum and not at a promised future date.

• Better explanations and more transparency on proposed changes.