2
BLAZING STAR 2 WIND FARM CONSTRUCTION 414 Nicollet Mall Minneapolis, MN 55401 xcelenergy.com | © 2020 Xcel Energy Inc. | Xcel Energy is a registered trademark of Xcel Energy Inc. | 20-03-417

BLAZING STAR 2 - Xcel Energy Portfoli… · Construction Construction will start this month on a 7.5 mile, 115 kilovolt transmission line (see map) that will deliver the electricity

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BLAZING STAR 2 - Xcel Energy Portfoli… · Construction Construction will start this month on a 7.5 mile, 115 kilovolt transmission line (see map) that will deliver the electricity

BLAZING STAR 2WIND FARM CONSTRUCTION

414 Nicollet Mall Minneapolis, MN 55401

xcel

ener

gy.c

om |

© 2

020

Xce

l Ene

rgy

Inc.

| X

cel E

nerg

y is

a r

egis

tere

d tr

adem

ark

of X

cel E

nerg

y In

c. |

20-0

3-4

17

Page 2: BLAZING STAR 2 - Xcel Energy Portfoli… · Construction Construction will start this month on a 7.5 mile, 115 kilovolt transmission line (see map) that will deliver the electricity

CSAH 18

CSAH 17

MNTH 19

CS

AH

4

CR

-101

CR

-102

CR

-104

150t

h A

ve.

160t

h A

ve.

330th St.

320th St.

300th St.

290th St.

BLAZING STAR 1

BLAZING STAR 2

North Branch Yellow Medicine River

Blazing Star 1Substation

Blazing Star 2Substation

170t

h A

ve.

340th St.

Substations

Transmission Line

Blazing Star 1

Blazing Star 2

TRANSMISSIONLINE ROUTE

Transmission Line ConstructionConstruction will start this month on a 7.5 mile, 115 kilovolt transmission line (see map) that will deliver the electricity generated from the wind farm to the electric grid. The steel, single-pole transmission line will run the 7.5 miles between the Blazing Star 1 Substation west of Steep Bank Lake and the Blazing Star 2 Substation west of Ivanhoe.

Construction Timeline • Transmission line construction:

Begins March 2020

• Wind farm access road construction: Begins Spring 2020

• Underground collection cable installation: Begins Spring 2020

• Construction of wind turbine foundations: Begins Summer 2020

• Delivery of wind towers and components: Begins Summer 2020

• Wind turbine installation: Begins Summer 2020

• Wind farm fully operational: December 2020

Contact UsIf you have questions or comments, please contact the Blazing Star hotline at 507.387.9600 or [email protected]. The latest project information is available on the project website at xcelenergy.com/BlazingStar.

BLAZING STAR 2WIND FARM CONSTRUCTION

Construction will start this spring on Xcel Energy’s Blazing Star 2 wind project in Lincoln County. Once road restrictions are removed, crews will start building access roads to turbine sites and will use specialized machinery to bury 96 miles of underground collection cable. Landowners may also see ATV’s driving crane path routes this spring.

Several roads within the project area will be upgraded prior to the start of turbine foundation construction. Large trucks will also start delivering turbine parts this summer. Please use extra caution when driving on area roads this spring and summer because of the heavy truck traffic.

When complete, the 100 turbines powering the 200-megawatt project will supply enough carbon-free, renewable energy to power nearly 105,000 homes. Wind is a clean, renewable resource and continues to be a growing part of our transition to providing customers carbon-free electricity. Blazing Star 1 and 2 wind projects will deliver more emissions-free power, lease payments to landowners, local jobs in the area, and tax revenue for local governments.

Xcel Energy and our contractors are taking extra precautions to stay safe and healthy during the COVID-19 illness, including limiting visitors on job sites. We ask you to please call ahead prior to visiting the project office. You can reach us at 507.387.9600 or by emailing [email protected]. To learn more about Xcel Energy’s response to COVID-19 visit our website at xcelenergy.com/covid-19_response.