Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
C FLOORING WORK
1 Handling, lift ing & fixing of ceramic ti les of specifiedsize, approved shade and make forFlooring at all
levels & heightsover a cement mortar (1:4) bed of
20 mm thickness including cutting wherever
required, laying slope whereever required,making
recesses/drops at the shower area, making Hole for
traps, pipes, comode & electric box, cladding, copla,
V groove cutting & polishing, joint filling with
pigments of matching colour including cleaning,
curing, tools complete in all respect as per drawing
and specifications and as directed and to the
satisfaction of the Project Manager (Including all but
excluding the cost of grey cement & tiles to be
issued by CMGL).Sqm 5881 223 131 1463
2 Handling, lift ing & fixing of ceramic ti les of specified
size, approved shade and make forDado at all
levels & heightsover a cement mortar (1:3) bed of
15 mm thickness including cutting wherever
required, making Hole for traps, pipes, comode &
electric box, cladding, copla, V groove cutting &polishing, joint filling with pigments of matching
colour including cleaning, curing, tools complete in
all respect as per drawing and specifications and as
directed and to the satisfaction of the Project
Manager (Including all but excluding the cost of grey
cement & tiles to be issued by CMGL).Sqm 2750 233 640750
3 Handling, lift ing & fixing of ceramic ti les of specified
size, approved shade and make forSkirting
(100mm high) at all levels & heightsover a cement
mortar (1:4) bed of 12 mm thickness including
cutting wherever required, making Hole for traps,
pipes, comode & electric box, cladding, copla, V
groove cutting & polishing, joint filling with pigments
of matching colour including cleaning, curing, tools
complete in all respect as per drawing and
specifications and as directed and to the satisfaction
of the Project Manager (Including all but excluding
the cost of grey cement & tiles to be issued by
CMGL).RM 6365 40 254600
4 Handling lifting cutting & laying/fixing Marble (of
7/22/2019 Blank BOQ - Finishing
2/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
5 Handling, lifting, cutting & laying/fixing Marble (of
approved shade) tiles & slabs at all levels in
Skirting (100mm high) with a layer of white
cement slurry over cement mortar base (CM 1:4)
of 12mm thick, finished to all shapes (curved orstraight) and filling the joints with matching colour
pigment including making Hole for traps, pipes,
comode & electric box, cladding, copla, V groove,
cutting, polishing, grinding and cleaning with acid as
per drawings, curing etc. as per specifications and
directions of the Project Manager (Including all but
excluding the cost of grey cement & marble).RM 2000 55 110000
6 Handling, lift ing & fixing of ceramic & vitrified ti les ofspecified size, approved shade and make for
Skirting (150mm high) at all levels & heightsover
a cement mortar (1:4) bed of 12 mm thickness
including cutting wherever required, making Hole for
traps, pipes, comode & electric box, cladding, copla,
V groove cutting & polishing, pointing with pigments
of matching colour including cleaning, curing, tools
complete in all respect as per drawing and
specifications and as directed and to the satisfaction
of Project Manager (Including all but excluding the
cost of grey cement & tiles to be issued by CMGL).RM 1148 40 45900
7 Handling, lift ing & fixing of vitrif ied t iles of specif ied
size, approved shade and make for corridor floor at
all levels & heightsover a cement mortar (1:4) bed
of 20 mm thickness including cutting wherever
required, making Hole for traps, pipes, comode &
electric box, cladding, copla, V groove cutting &
polishing, pointing with pigments of matching colour
including cleaning, curing, tools complete in allrespect as per drawing and specifications and as
directed & to the satisfaction of the Project Manager
(Including all but excluding the cost of grey cement
& tiles to be issued by CMGL).SQM 1450 233 337734
8 Handling, lift ing & fixing of ceramic ti les of specified
size, approved shade and make forCorridorwall
opp. lift well at all levels & heightsover a cement
mortar (1:3) bed of 15 mm thickness including
cutting wherever required, making Hole for pipes,
dedectors, electric box, cladding, copla, V groove
cutting & polishing, pointing with pigments of
7/22/2019 Blank BOQ - Finishing
3/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
9 Handling, li fting, cutting and laying/fixing pre-
polished Granite (of approved shade) over RCC
kitchen counter at all levels & heights, over cement
mortar base (CM 1:4) of 20mm thick, finished to all
shapes (curved or straight), making Hole for traps,pipes, electric box, cutting openings for Kitchen sink,
Cladding, copla, V groove cutting & polishing and
filling the paper joints with matching colour pigment,
curing etc as per drawings, specifications direction &
satisfaction of the Project Manager (Including all but
excluding the cost of granite and grey cement).
Sqm 226 385 87106
9A Handling, lift ing, cutting and laying/f ixing pre-polished Granite (of approved shade) over vertical
cuddapah stone at all levels & heights, by groove
cutting in brick masonary, inserting granite min. 1",
jamming by cement mortar & fixing by araldite on
the top edge of the cudappah stone, finished to all
shapes (curved or straight), making Hole for traps,
pipes, electric box, cutting openings for Kitchen sink,
Cladding, copla, V groove cutting & polishing and
filling the paper joints with matching colour pigment,
curing etc as per drawings, specifications direction &
satisfaction of the Project Manager (Including all butexcluding the cost of granite and grey cement).
Sq.m R.O. 385
9B Handling, lift ing, cutting and laying/f ixing vertical
cuddapah stone at all levels & heights as supports
for kitchen counter, by groove cutting in brick
masonary, inserting stone min. 1", jamming by
cement mortar, finished to all shapes (curved or
straight), making Hole for traps, pipes, electric box,
cutting openings for Kitchen sink, Cladding, copla, Vgroove cutting & polishing and filling the paper joints
with matching colour pigment, curing etc as per
drawings, specifications direction & satisfaction of
the Project Manager (Including all but excluding the
cost of cuduppah stone and grey cement).
Sq.m R.O. 385
10 Handling, lift ing and laying/fixing pre-polished
Granite (of approved shade) skirting/facia at all
levels & heights of ki tchen counter, with a uniformlayer of araldite and POP on top of granite for
holding till araldite dries, finished to all shapes
(curved or straight) making Holes, Cladding, copla,
7/22/2019 Blank BOQ - Finishing
4/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
11 Handling, lifting and laying/fixing flamed Granite (of
approved shade) at all levels & heights on vertical
surface of corridor wall, with a uniform layer of
araldite and POP on top of granite for holding til l
araldite dries, finished to all shapes (curved or straight) making Holes, Cladding, copla, V groove
cutting & polishing and fill ing the paper joints with
matching colour pigment, as per drawings,
specifications, direction & to the satisfaction of the
Project Manager (Including all but excluding the cost
of granite). SQM 125 400 50000
12 Handling, lifting & Fixing of door sills (Marble /
Granite / Jaisalmir Stone) of varying width from
65mm to 360mm as required in floor at all levelswith cement mortar (1:4) of 20mm thick and a layer
of white cement slurry including cutting, polishing,
curing etc. complete as per the direction of the
Project Manager, including all but excluding the cost
of cement & stone Rm 747 42 31364
13Handling, lifting & Fixing of Kota Stone in stair case
over a cement mortar (1:4) bed of 20mm thickness
including pointing with pigments of matching colour
etc. complete as per the direction of the Project
Manager, excluding the cost of grey cement & kota
stone supplied by CMGL. Sqm 36 315 11261
14Handling, lifting & Fixing of broken tiles in deck level
over a cement mortar (1:4) bed of 20mm thickness
including pointing with pigments of matching colour,
breaking of tiles etc. complete as per the direction of
the Project Manager, excluding the cost of grey
cement & tiles supplied by CMGL. Sqm 105 263 27615
15Handling, lifting & Fixing of Jaisalmir Stone coping
on stair case railing over a cement mortar (1:4) bed
of 20mm thickness including pointing with pigments
of matching colour, cutting & finishing to all shapes
(curved or straight) etc. complete as per the
direction of the Project Manager, excluding the cost
of grey cement & stone supplied by CMGL. Sqm 30 263 7890
16 Providing and laying IPS flooring in stair case, deck,
ramp including finishing, with red oxide pigment as
required etc all complete as per the directionof the
7/22/2019 Blank BOQ - Finishing
5/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
a) For A, B, C type flat Flat R.O. 4000
b) For D & Duplex type flat Flat R.O. 8000
TOTAL (C) 3,741,987
D DOOR WORK / FALSE CEILING / ALUMINUM FRAMES
1Handling, lifting and Fixing of main door (panelled)
made of 2nd class Teak wood having single leaf at
all levels including fixing all accessories like brass
handle on both side, door stopper, buffer, hinges,
godrej tribolt lock etc. including polishing complete,
as per the direction & to the satisfaction of the
Project Manager including supply of S.S. screws but
excluding cost of accessories & main door No 98 1060 103350
2
Handling, lift ing & Fixing of internal f lush doors of
different sizes at all levels including fixing all
accessories like hinges, buffer, cylindrical locks,
supply & application of two coats of synthetic
enamel paint (ICI/Berger/Asian Paint make) over
two coats of primer complete as per the direction of
the Project Manager, including supply of S.S. screw
but excluding cost of accessories & flush door. No 600 580 348000
3 Handling, lift ing & fixing of balcony doors fully glazed
(2 shutters) of different sizes at all levels including
fixing all accessories like hinges, SS handle, tower
bolt, buffer, supply & application of two coats of
synthetic enamel paint ( ICI/Berger/Asian Paint
make) over two coats of primer complete as per thedirection of the Project Manager, including supply of
S.S. screws but excluding cost of glass, accessories
& door shutters.No 138 620 85560
3A Handling, lift ing & fixing of balcony doors fully glazed
(3 shutters) of different sizes at all levels including
fixing all accessories like hinges, SS handle, tower
bolt, buffer, supply & application of two coats of
synthetic enamel paint ( ICI/Berger/Asian Paintmake) over two coats of primer complete as per the
direction of the Project Manager, including supply of
S.S. screws but excluding cost of glass, accessories
7/22/2019 Blank BOQ - Finishing
6/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
b Supply of 5mm thick clear Modi float glass including
wooden beading of good quality and same as that of
the door wood quality and to the satisfaction of the
Project Manager (overall area of door shutter shall
be measured) Sq.m. 523 350 183050
5 Handling, lifting and Fixing of fire door (flush door)
at all levels with accessories like hinges, lock, door
closure, supply & application of two coats of
synthetic enamel paint (ICI/Berger/Asian Paint
make) over two coats of primer complete, as per the
direction of the Project Manager, including supply of
S.S. screw but excluding cost of accessories & flush
door. No 34 580 19720
6 Handling, lifting and Fixing of Electrical panel door
(teak wood or marbau) at all levels with accessories
like hinges, lock, buffer, supply & application of two
coats of synthetic enamel paint (ICI/Berger/Asian
Paint make) over two coats of primer complete, as
per the direction of the Project Manager, including
supply of S.S. screw but excluding cost of
accessories & door. No 34 580 19720
7 Supplying, handling lifting and fixing of Teak woodmoulding (size 50mm x 12.5mm ) all around the
door frames including polishing at all levels &
heights as per the direction and satisfaction of the
Project Manager. (Sample of moulding to be
approved by CMGL) RM 530 88 46640
8 Supplying, handl ing, li fting and fixing of Badam
wood or equivalent approved moulding (size 50mm
x 12.5mm ) all around the door frames including two
coats of synthetic enamel paint over a coat of primerat all levels and heights as per the direction &
satisfaction of the Project Manager. RM 5019 65 326219
9 Providing & fixing PHE duct covering with frame,
shutter, moulding etc. complete (9mm ply & frame
75mm X 50mm) as per the drawing and direction of
the Project Manager in "B" type flat kitchen and
Dining area (size 850mm X 600mm approx.) and
Duplex area as per site requirement with supply 7
application of 2 coats of synthetic enamel paint over
a coat of approved primer. Nos. 40 800 32000
10 FALSE CEILING
7/22/2019 Blank BOQ - Finishing
7/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Unit
No. DESCRIPTION UNIT QTY Rate Amount
10b Providing and fixing to the required profile and
shape with 12mm thick POP board suspended from
the RCC ceiling with 18 gauge T,U & L galvanized
sections spaced at 600 mm c/c both ways. Entire
work to be finished smooth and painted with 2 coatsof white cement primer and 2 coats of paint of
approved shade & brand. Entire work shall be of
high quality finish and shall be as per direction & to
the satisfaction of the PM.
Sqm 978 585
OR
10c Providing and fixing to the required profile and
shape with 6mm thick E board suspended from the
RCC ceiling with 18 gauge T,U & L galvanized
sections spaced at 600 mm c/c both ways. Entirework to be finished smooth and painted with 2 coats
of white cement primer and 2 coats of paint of
approved shade & brand. Entire work shall be of
high quality finish and shall be as per direction & to
the satisfaction of the PM.
Sqm 978 600 586950
11 Supplying & Fixing of anodized aluminum frame
(Section - 2" X 1") of size 420mm X 620mm with
taper clips, 4mm thick pin head glass, in electrical
rooms including sealing the joints with siliconsealant from outside as per the direction of the
Project Manager (sample to be approved by
CMGL). Nos 204 500 102000
12 Providing and fixing anodized aluminum frame
(section 2"X1") for approx. opening size of 700mm X
800mm of AC cutout including supply & fixing of
4mm thick pin head opaque glass with silicon
sealant from outside for water proofing etc.
complete as per the direction of the ProjectManager and sample approved. Nos 286 780 223275
13 Fixing of Flush Door at the entrance of flat at all
levels inlcuidng lifting on temporary basis for
security reasons with all f it tings like hinge, hatch
bolt, screws etc. complete including supply as per
the direction of the EIC (Flush door to be supplied
by CMGL) No. R.O. 240
14 Dismantling of the temporary doors, returnig thedoors to CMGL store and repairing the frames with
wooden piece and putty so as to give a smooth neat
fi i h b f fi i th t k i d
7/22/2019 Blank BOQ - Finishing
8/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
9/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
10/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
11/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
12/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
13/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
14/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
15/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
16/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
17/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
18/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
19/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Ph III (T II)
7/22/2019 Blank BOQ - Finishing
20/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Phase III (Tower II) M/ K P j t P t Ltd
7/22/2019 Blank BOQ - Finishing
21/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Phase III (Tower II) M/s Kancon Projects Pvt Ltd
7/22/2019 Blank BOQ - Finishing
22/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Phase III (Tower II) M/s Kancon Projects Pvt Ltd
7/22/2019 Blank BOQ - Finishing
23/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Phase III (Tower II) M/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
24/36
( )
Finishing worksM/s. Kancon Projects Pvt. Ltd.
Phase III (Tower II) M/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
25/36
( )
Finishing worksj
Phase III (Tower II) M/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
26/36
Finishing works
Phase III (Tower II)
Fi i hi kM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
27/36
Finishing works
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
28/36
Finishing works
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
29/36
Finishing works
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
30/36
Finishing works
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
31/36
s g o s
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
32/36
g
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
33/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
34/36
Phase III (Tower II)
Finishing worksM/s. Kancon Projects Pvt. Ltd.
7/22/2019 Blank BOQ - Finishing
35/36
7/22/2019 Blank BOQ - Finishing
36/36
HILAND PARK - A PROJECT OF CALCUTTA METROPOLITAN GROUP LTD.
COMPARATIVE STATEMENT OF PACKAGES (PHASE III FINISHING)
Sr. No. Description Rahul Beria Amal
Mukherjee
Base
Construction
Base Proposed Unit
Construction
Kanjilal &
Co.
S.K. Plaza SPCL
1 Brickwork, Plastering, Painting etc 0 0 0 0 0 0 0 0
2a Fabrication works (Building) 3,399,805 2,724,014 2,763,947 1,983,111 2,301,718 2,120,734 1907530 2,471,219
2b Fabrication works (Lift shaft) 585,000 585,000 1,323,750 585,000 1,170,000 900,000 900,000 585,000
3 Flooring works 3,517,958 4,035,972 3,741,987 3,741,987 5,653,845 5,214,408 4,298,501 5,727,053
4 Wood Work 1,984,283 2,209,740 2,027,580 2,144,574 3,117,885 11,624,635 2,000,215 11,135,467
9,487,046 9,554,725 9,857,264 8,454,672 12,243,448 19,859,777 9,106,246 19,918,739
11,464,068 1,402,592