57
BITUMEN STABILISED MATERIALS Recycling Technology Update tellenbosch Kim Jenkins AAPA Delegation from Australia University of Stellenbosch 5 th September 2011

BITUMEN STABILISED MATERIALS Recycling Technology Update

  • Upload
    hua

  • View
    42

  • Download
    3

Embed Size (px)

DESCRIPTION

BITUMEN STABILISED MATERIALS Recycling Technology Update. Kim Jenkins AAPA Delegation from Australia University of Stellenbosch 5 th September 2011. tellenbosch. Outline. Developments of ISAP WG2 Cold Recycling Global perspective – CR research - PowerPoint PPT Presentation

Citation preview

Page 1: BITUMEN STABILISED MATERIALS Recycling Technology Update

BITUMEN STABILISED MATERIALS

Recycling Technology Update

tellenbosch

Kim Jenkins

AAPA Delegation from AustraliaUniversity of Stellenbosch

5th September 2011

Page 2: BITUMEN STABILISED MATERIALS Recycling Technology Update

Outline• Developments of ISAP WG2 Cold

Recycling• Global perspective – CR research• Application of research to improve

technology• Manuals, specifications, guidelines• Overcoming barriers to recycling• Future needs for research

Page 3: BITUMEN STABILISED MATERIALS Recycling Technology Update

Minutes from TRB 2010: ISAP TC Asphalt Pavement and Environment• WG1 on Recycling (Chantal de la Roche)

WG1 WG2Hot Recycling-RAP Cold Recycling-RAP (Peter Sebaaly) (Kim Jenkins)

Page 4: BITUMEN STABILISED MATERIALS Recycling Technology Update

Purpose of ISAP WG2• Global interface for needs analysis

regarding cold recycling• Coordinate research by sharing findings

and technological developments• Promote CR technology by:

– Coordinate publications, guidelines, specifications

– Create a database of research/ project data– Gather & share info on enviro & sustainability

Page 5: BITUMEN STABILISED MATERIALS Recycling Technology Update

ISAP WG2 Members

3

2

14

3

1

9

TOTAL = 32

Page 6: BITUMEN STABILISED MATERIALS Recycling Technology Update

Focus of WG2 discussions• Research focus areas (Global)

– Laboratory– Field (APT and LTPP)

• Key findings and developments– Mix design– Structural design– Specifications

• Publications, documents and manuals

Page 7: BITUMEN STABILISED MATERIALS Recycling Technology Update

Activities of WG2 in 2010Meet at Conferences

• Meeting and workshop at EATA (European Asphalt Technology Association) Conference, Parma, Italy on 11th June 2010

• Regional Workshop at MRC (Malaysia Roads Conference) Kuala Lumpur, Malaysia on 9th October 2010

Page 8: BITUMEN STABILISED MATERIALS Recycling Technology Update

Programme: WG2 Regional EU Workshop in Parma

• Workshop structure with 6 presenters– Global perspective on Cold Recycling– USA: UC Davis– Italy: Pisa & Anconna Uni - France: LCPC– Asia : Chang’an Univ SE Asia: Malaysia– Africa: Practitioner and Researcher

• Global representation• Broad research perspective, projects

Page 9: BITUMEN STABILISED MATERIALS Recycling Technology Update

Programme: WG2 Regional Asian Workshop in KL

• Workshop structure with 4 presenters– Global perspective on Cold Recycling

and feedback from Parma– China: RIOH (Research Inst)– Thailand: Road authority– Malaysia: Contractor HCM /R&D

• Regional representation• More applications, less research

Page 10: BITUMEN STABILISED MATERIALS Recycling Technology Update

Use of RAP Worldwide (2005)

COUNTRY• South Africa• France• Australia• Netherlands• USA• Germany• Japan

RAP in HMA• < 5%• 13%• 50%• 75%• 70%• 82%• 99%

CAPSA 2007

Page 11: BITUMEN STABILISED MATERIALS Recycling Technology Update

Re-use of asphalt in Europe (2009)

Country Available RAP (ton)

Re-used HOT (%)

Re-used COLD (%)

%New HMA production

Germany 14 * 106 82 18 60Spain 2.25 * 106 8 4 3.5Italy 14 * 106 18 2France 6.5 * 106 13 < 2 < 10Norway 0.59 * 106 7 26 8Netherland 3 * 106 75 63

(source: Molenaar)

Page 12: BITUMEN STABILISED MATERIALS Recycling Technology Update

Changing Technologies helps Environment

Page 13: BITUMEN STABILISED MATERIALS Recycling Technology Update

Emissions at the Chimney

Page 14: BITUMEN STABILISED MATERIALS Recycling Technology Update

Material procurement Graded crushed stone (GCS) Mj / t 50 HMA manufacture Mj / t 30 Cement Mj / t 70 Bitumen Mj / t 60 Material haulage Mj / t km 1

Construction activity Milling 1 Mj / t 5 In situ recycling / stabilising Mj / t 10 Processing aggregate layer Mj / t 66 Ditto per m² for 150mm thick layer Mj / m² 10 Compacting and finishing layer 2 Mj / m² 10 HMA paving and compaction Mj / t 20

Energy consumed (Mj)

Material procurement / Construction activity Unit

Table 3. Energy consumed in procuring materials and in executing primary construction activities

ENERGY

CONSUMPTION

70006000

Page 15: BITUMEN STABILISED MATERIALS Recycling Technology Update

200

600

400

OPTION 1 OPTION 2 OPTION 3

WHOLE OF LIFE ENERGY & COSTMJ / m²

OPTION 4

40

120

80

US$ / m²

$

MJ

$ $

$

MJ

MJ

MJ

Page 16: BITUMEN STABILISED MATERIALS Recycling Technology Update

Concrete and Masonry Recycling

• Re-use and recycling of e.g. concrete and masonry rubble is at embarrassing low level

• Some countries are really front runners; in the Netherlands 90% of the concrete/masonry rubble is recycled as base course for roads

• Much can be gained

Page 17: BITUMEN STABILISED MATERIALS Recycling Technology Update

Lots of talk but how much action?

Page 18: BITUMEN STABILISED MATERIALS Recycling Technology Update

Way forward of WG2Synthesis of Global Research and

PublicationsFOCUS AREA

1.Research2.Mix Design3.Structural design4.Construction & QC

RESPONSIBILITY

• D Jones• K Jenkins• G Tebaldi & F Long• D Collings

“State of the Art”??

Page 19: BITUMEN STABILISED MATERIALS Recycling Technology Update

Is this going anywhere?

- Where are the challenges in research? - How to manage these challenges?

Page 20: BITUMEN STABILISED MATERIALS Recycling Technology Update

Pioneers

InventorsArtists

So where can new tech go wrong? …remember 3 P’s of Innovation

Pirates

Rather stolen than poorly invented

Passengers

Hitchhikers

Commercialise

Passion

Page 21: BITUMEN STABILISED MATERIALS Recycling Technology Update

How to address the recycling needs (manage the process)

1. Awareness2. Acquiring knowledge3. Develop the tools4. Implementation

Page 22: BITUMEN STABILISED MATERIALS Recycling Technology Update

13Australia

105 East EuropeRussia

15Middle East

31Africa

189North America

243West Europe

51Latin America

Cold Recycler and Soil Stabilizer WR 2500 / S / SKWorldwide distribution

104Asia

Page 23: BITUMEN STABILISED MATERIALS Recycling Technology Update

59Australia

163Asia

191 East EuropeRussia

15Middle East

83Africa

187Latin America

321North America

427West Europe

Cold Recycler and Soil StabilizerWR 2000, WR 2400, WR 2500 / S / SK - Worldwide distribution

Page 24: BITUMEN STABILISED MATERIALS Recycling Technology Update

1. Awareness: Issues to address• Barriers to Cold Recycling of RA?• Distress mechanisms (rutting, fatigue,

durability)?• Key areas for future research to address

needs– High percentage RA– Appropriate tests– Lab versus field behaviour

• Harmonisation of mix & structural design• Global research cooperation?

Variabilit

y

Page 25: BITUMEN STABILISED MATERIALS Recycling Technology Update

Findings-short term ageingPen vs. time for (80/100) foam

Twagira

Field relevance??

Page 26: BITUMEN STABILISED MATERIALS Recycling Technology Update

BSM -emulsion versus -foam

Who is the custodian of strategic research?

• Emulsion: Koch/Sem, Akzo Nobel, Colas, Mead Westvaco

• Foam: Recycler suppliers (Wirtgen, Bomag etc)…who else?

Awareness ☻☻☻☻☻

ISAP WG2 Cold Recycling

Page 27: BITUMEN STABILISED MATERIALS Recycling Technology Update

2. Acquiring knowledge• Universities and Research Institutes• Research initiatives

– Laboratory research– Accelerated Pavement Testing– LPTT

• International Cooperation? (WG2)• Database of research?

Page 28: BITUMEN STABILISED MATERIALS Recycling Technology Update

CuringField moisture versus time

Moloto (BSM-emulsion)

APT LAB

LTPP

Page 29: BITUMEN STABILISED MATERIALS Recycling Technology Update

Mr (field) versus cure

N7 PSPA Mr Analys is over 7 Months

0500

1000150020002500300035004000

0 50 100 150 200 250

Tim e (days)

Mr (

MPa

)

B1-B3 B4-B6 Poly. (B4-B6)

PSPA

LAB

APT

LTPP

Page 30: BITUMEN STABILISED MATERIALS Recycling Technology Update

BSM Modulus (back analysis)

Τομέας ΜΣΥ-ΕΜΠ Μάιος 2005

Min

Max

Aver

design

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

0 6 12 18 24 30 36 42 48 54

Months

Mod

ulus

[M

Pa]

Loizos et al

Foamed mix – Greek Highway

CU

RIN

G!!

If it were fatigue

Page 31: BITUMEN STABILISED MATERIALS Recycling Technology Update

Pavement Analysis: stresses/strains

Asphalt

BSM

Cemented

Subgrade

e

s1

s3

sveev

Mr asp

Mr base

Mr s’base

Mr s/g

Critical parameters

Page 32: BITUMEN STABILISED MATERIALS Recycling Technology Update

What are others’ analyses finding?

Theyse

Page 33: BITUMEN STABILISED MATERIALS Recycling Technology Update

New LTPP Sections • Very limited background info

– Mix designs?– As built details?

• BSM-emulsion all on CTSBs• BSM-foam all on granular• Some new LTPP sections planned

– Same materials, subgrade, climate– Cement, emulsion, foam binders

Acquire knowledge ☻☻☻☻☻

Page 34: BITUMEN STABILISED MATERIALS Recycling Technology Update

3. Develop the ToolsLevel 1 – Mix Design Tests

100mm f

ITS

BSM Binder Content

ITSdry

ITSwet

BSM2Min ITSdry

Min ITSwet

Min BC

Page 35: BITUMEN STABILISED MATERIALS Recycling Technology Update

Vibratory Compaction Hammer

Rear View of Frame

Vibrating Hammer

Mould

Zero LineSleeve

Base Plate

Steel Rod

Side of Mould

Vibratory Hammer

Wooden base

To prepare specimens

Kelfkens

Page 36: BITUMEN STABILISED MATERIALS Recycling Technology Update

Compaction time (vibratory)Phase Level 1 Level 2 Level 3

Test ITS ITS UCS Triaxial

Foot f 100mm 150mm 150mm 150mm

Height 65mm 95mm 125mm 300mm

Layers 1 2 2 5

Surchg 5 kg 10 kg 10 kg 10 kg

Foam 10 sec 25 sec 25 sec 25 sec

Emuls 10 sec 15 sec 15 sec 15 sec

Com

p Ti

me

Page 37: BITUMEN STABILISED MATERIALS Recycling Technology Update

Influence of Active Filler

Strength and flexibility

0

100

200

300

400

500

600

700

800

0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3Cement : Foamed Bitumen Ratio

Stra

in-a

t-bre

ak

0

500

1000

1500

2000

2500

3000

3500

4000

Unc

onfin

ed C

ompr

essi

ve

Stre

ngth

(kPa

)

Foamed bitumen, StrainCement, Strain*Foamed bitumen, UCS Cement, UCS*

* Cement treated with 2 percent cement and no foamed bitumen. Values plotted at an arbitrary ratio of 1.25 for 2 percent cement and 1.2 for 1 percent cement. CSIR

eb

C1 to C4

Cement < 1%

Page 38: BITUMEN STABILISED MATERIALS Recycling Technology Update

Triaxial Testing

Page 39: BITUMEN STABILISED MATERIALS Recycling Technology Update

Effect of using BSMt

s

Shear stress

Normal stress

C = Cohesion

f Friction angle

Higher Cohesion

Effect of Binder Unbound

BSM

Page 40: BITUMEN STABILISED MATERIALS Recycling Technology Update

New “Simple triaxial”

Page 41: BITUMEN STABILISED MATERIALS Recycling Technology Update

Research Triaxial Test RTT versus Simple Triaxial Test STT

0200400600800

100012001400

0.0 1.0 2.0 3.0 4.0 5.0

Strain [%]Ap

plie

d St

ress

[kPa

]

RTTSTT

0200400600800

10001200

0.0 1.0 2.0 3.0 4.0

Strain [%]

Appl

ied

Stre

ss [k

Pa]

RTTSTT

BSM Crushed Hornfels with 3.3% Emulsions3 =50 kPa and 1% Cement s3 = 200 kPa and 0% Cem

Page 42: BITUMEN STABILISED MATERIALS Recycling Technology Update

BSM Classification ito Shear Properties

Cohesion (kPa)

> 250

100 – 250

50 – 100

Angle of Internal Friction (º)

> 40

30 to 40

< 30

Equivalent BSM Class

BSM 1

BSM 2

BSM 3

Page 43: BITUMEN STABILISED MATERIALS Recycling Technology Update

Fatigue?

Page 44: BITUMEN STABILISED MATERIALS Recycling Technology Update

Fatigue: Crushed stone + 25% RAP

HMA Base 2000MPa

Page 45: BITUMEN STABILISED MATERIALS Recycling Technology Update

HVS Tests: CIPR with Foamed Bitumen in Cape

Town

Water induction into 2.3% foamed bitumen stabilised base

PERMEABILITY

Page 46: BITUMEN STABILISED MATERIALS Recycling Technology Update

From HVS TestingAfter 10 million 80kN axle load repetitions

250mm foamed bitumen stabilised base

35mm HMA binder layer

150mm crushed stone subbase

Sand subgrade

18mm Novachip surfacing

Time, traffic

No water ingressWater ingress

Effective modulus

Steady stiffness

Constant stiffness

No cracking 6mm rutting

Page 47: BITUMEN STABILISED MATERIALS Recycling Technology Update

Lab APT

00.5

11.5

22.5

33.5

0 200 400 600 800 1000

MMLS Load reps

Rut

dep

th (m

m)

2%E 0%C2%E 1%C2%F 0%C

Page 48: BITUMEN STABILISED MATERIALS Recycling Technology Update

Durability: New, Improved Tests- Untreated Material Properties - Moisture sensitivity tests

Moisture Induction Sensitivity Test MIST

(Twagira)

Page 49: BITUMEN STABILISED MATERIALS Recycling Technology Update

Effect of moisturet

s

Shear stress

Normal stress

CCohesion

f Friction angle

Lower Cohesion

Effect of Moisture

Page 50: BITUMEN STABILISED MATERIALS Recycling Technology Update

BSM Classification ito Moisture Resistance

Retained Cohesion (%)> 75

60 – 75

50 – 60

< 50

Equivalent BSM ClassBSM 1

BSM 2

BSM 3

Unsuitable

Develop Tools ☻☻☻☻☻

Page 51: BITUMEN STABILISED MATERIALS Recycling Technology Update

Implementation

Keep your eyes on the road

Page 52: BITUMEN STABILISED MATERIALS Recycling Technology Update

Materials Classification BSMs- Similar to granular

Test or Indicator Samples G4 G5 G6 G7

Test Limits for Material Class

G4 G5 G6 G7

Cumulative Certainty for Material Class

DCP Penetration 12 0.13 0.29 0.06 0.00

FWD Stiffness 67 0.26 0.32 0.11 0.00

Grading Analysis 3 0.37 0.34 0.11 0.00

% Passing 0.075 3 0.43 0.37 0.11 0.00

Plasticity Index 5 0.46 0.47 0.11 0.00

California Bearing Ratio 2 0.49 0.54 0.16 0.03

Relative Moisture Content 4 0.52 0.57 0.19 0.00

Outcome: Material is most likely a G5 design equivalent

Confidence: Confidence of the assessment is medium. For structural rehabilitation, it is recommended that the sample size and number of test indicators be increased.

BSM1 BSM2 BSM3 BSM1 BSM2 BSM3

Page 53: BITUMEN STABILISED MATERIALS Recycling Technology Update

Materials ClassificationExample: ITS

10th Percentile Value = 80

90th Percentile Value =190

Area = Relative certainty that material is a DE-BSM3 based on this test

DE-BSM1> 175

DE-BSM2135 to 175

DE-BSM395 to 135

Not suitable< 95

Median Value=120

0.15 0.48 0.32 0.060.02 0.07 0.05 0.01

Certainty that falls in class

Adjusted for test certainty factor

Page 54: BITUMEN STABILISED MATERIALS Recycling Technology Update

Cumulative CertaintyTest Limits Cumulative Certainty

Test No BSM1 BSM2 BSM3 NSuit BSM1 BSM2 BSM3 NSuit

DCP 10 0.0 0.07 0.03 -P0.075 12 0.15 0.07 0.03 -FWD 58 0.23 0.26 0.03 -

PI 10 0.23 0.26 0.06 0.21Moisture 7 0.27 0.29 0.06 .021Grading 10 0.27 0.33 0.34 0.25Cohesio

n10 0.27 0.49 0.38 0.26

Friction A

11 0.30 0.60 0.4 0.26

Ret. Coh.

16 0.30 0.62 0.43 0.37

Page 55: BITUMEN STABILISED MATERIALS Recycling Technology Update

118 MPa

6. Calculate Layer ELTS Values

118 MPa

4. Adjust for cover (118 MPa)

Design: Pavement Number1. Material Classes

2. Determine subgrade stiffness (140 MPa)3. Adjust for climate (126 MPa)

CBR 7-15%

180 mm G6

200 mm C4

150 mm BSM2

150 mm G7

5. Assign modular ratio’s and max stiffness

MR = 1.8, EMax = 180

MR = 3, EMax = 400

MR = 2, EMax = 450

7. Layer PN = thickness * ELTS

8. PN = layer PN

6. ELTS = min (Esupport * MR , Emax)

ELTS = min(212,180)ELTS = 180

ELTS = 400Thickness Adj = 0.4

ELTS = 450BCF = 0.7

www.bitstab.roadrehab.com

Page 56: BITUMEN STABILISED MATERIALS Recycling Technology Update

Design Guides

Implementation ☻☻☻☻☻

Page 57: BITUMEN STABILISED MATERIALS Recycling Technology Update

Research needs Perseverance!!