17
Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning and Architecture

Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Embed Size (px)

Citation preview

Page 1: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Bishop GormanCatholic High School

Las Vegas, NevadaHigh School

New Construction / Additions AwardKGA Architecture

2008 Exhibition of School Planning and Architecture

Page 2: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Bishop Gorman Catholic High School

Page 3: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Interior - Main LobbyCommunity Environment:

From the inception of design, the intent of the new campus was to have areas that could host after hours functions. To facilitate this, the main lobby is situated between the gymnasium and theater which allows access to the event venues while securing the remainder of the school.

Page 4: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Interior - TheaterCommunity Environment - Continued

Furthermore, the event venues have been intentionally oversized to not only provide more than enough space for school functions, but also allow the school to host community and regional events. They include a theater with 350 seats, black box theater, gymnasium with 1,700 seats, an auxiliary gymnasium with 350 seats, and a football stadium with 2,900 seats.

Page 5: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exterior - Gael CourtyardLearning Environment:

The facility is comprised of three main buildings: an administration building, chapel, and the education and event building, all grouped around four distinct courtyards. These courtyards offer a protective, calming environment in which to fully engage in the educational experience, while separating purely educational areas from more public spaces.

The religious center of the school is a unique, multi-function chapel. Bisected by a movable partition, the space can function as a two hundred seat chapel and a fully functional classroom, or be opened up to a full three hundred seats.

Page 6: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Interior - LibraryLearning Environment - Continued

The Library and Commons, the two centers of daily life, are strategically located in the center of the complex. The library houses both traditional and technologically advanced methods to broaden the educational experience. The Commons is for meals and socialization.

Page 7: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exterior - Christ The Teacher TowerPhysical Environment:

Successful integration of traditional Catholic themes and religious iconography in a 21st century contemporary context has created an enduring framework for future campus life. The new campus has reinvigorated the students and faculty, with the architecture reaffirming the educational philosophy developed over decades at the original campus.

Page 8: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exterior - Student Drop OffPhysical Environment - Continued

Architectural materials enhance religious connotations within the schools arid climate context. Stone cladding at major entrances evoke the surrounding desert landscaping and convey a sense of permanence. Interior light fixtures augment natural day lighting and reflect the latest in lighting technology.

Page 9: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exterior - Pillars Of FaithPlanning Process:

Principally funded by private donations, the length of time from design inception to Phase I completion was extended over a number of years. Furthermore, the design process continued during construction, making continuity in the overall design imperative. Numerous concepts rooted in the schools 54 year history was designed into the new campus. As a result, the design process morphed into an extended collaborative process including not only the administration and faculty, but also alumni and major donors.

Page 10: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exterior - Display CasePlanning Process - Continued

Page 11: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exhibition of School Planning and Architecture 2008 Project Data

Submitting Firm : KGA ArchitectureProject Role ArchitectProject Contact Craig ForrestTitle ArchitectAddress 4495 South Polaris AvenueCity, State or Province, Country Las Vegas, Nevada, USAPhone 702.367.6900

Joint Partner Firm: n/aProject Role n/aProject Contact n/aTitle n/aAddress n/aCity, State or Province, Country n/aPhone n/a

Other Firm: n/aProject Role n/aProject Contact n/aTitle n/aAddress n/aCity, State or Province, Country n/aPhone n/a

Construction Firm: J. A. Tiberti Construction Co., Inc.Project Role ContractorProject Contact Tito TibertiTitle PresidentAddress 1806 Industrial RoadCity, State or Province, Country Las Vegas, Nevada 89102Phone 702.248.4000

Page 12: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Exhibition of School Planning and Architecture 2008 Project Details

Project Name  Bishop Gorman Catholic High SchoolCity  Las VegasState  Nevada

District Name Private Catholic School owned by the Roman Catholic Diocese of Las Vegas

Supt/President  Dr. Richard Facciolo, C.A.O.Occupancy Date  9/2007

Grades Housed  9-12

 

Capacity(Students)  1200 studentsSite Size (acres)  36 acresGross Area (sq. ft.)  226,114 square feetPer Occupant (pupil)  188 square feet gross/net please indicate  

 

Design and Build?  yesIf yes, Total Cost:  $93,000,000

Includes: design, build, landscape architecture, interior design

 

If no,  n/aSite Development: n/aBuilding Construction: n/aFixed Equipment: n/a

Other: n/a

 

Total:  n/a

Page 13: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Supporting/Supplemental Files/Images

Exterior - Arts CourtyardExterior - G Tower

Page 14: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Supporting/Supplemental Files/Images

Exterior - StadiumInterior - Main Gym

Page 15: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Supporting/Supplemental Files/Images

Interior - Boardroom

Interior - Admin Lobby

Page 16: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Supporting/Supplemental Files/Images

Interior - Chapel

Interior - Chapel Cross

Page 17: Bishop Gorman Catholic High School Las Vegas, Nevada High School New Construction / Additions Award KGA Architecture 2008 Exhibition of School Planning

Supporting/Supplemental Files/Images

Interior - Classroom Corridor

Interior - Classroom