4
BIOPARC 3 laboratories designed to meet your needs Innovation Le Parc d’

BIOPARC plaquette aurelie anglais v4 · BIOPARC 3 : Boost your development in an environment of excellence BIOPARC 3 has been designed to rationalize space and technical functionalities

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BIOPARC plaquette aurelie anglais v4 · BIOPARC 3 : Boost your development in an environment of excellence BIOPARC 3 has been designed to rationalize space and technical functionalities

BIOPARC 3laboratories designed to meet your needs

InnovationLe Parcd’

Page 2: BIOPARC plaquette aurelie anglais v4 · BIOPARC 3 : Boost your development in an environment of excellence BIOPARC 3 has been designed to rationalize space and technical functionalities

BIOPARC 3 :Boost your development in an environment of excellence

BIOPARC 3 has been designed to rationalize space and technical functionalities. Each laboratory can be converted into a chemistry or biology lab. A safety shower is installed within each laboratory, while a gas bottle storage area will be provided outside each module.

The interiors are streamlined and uncluttered, and are surrounded by transparent and opalescent glass walls to reveal the heart of the building.

While the north facing part of the building is transparent, the wall becomes opalescent over the concrete facings and the south-facing facade highlights the technical features of the air-intake openings. The design of the shell is thus in perfect harmony with the simplicity of the interior, while capturing the rigour and discipline of scientifi c research.

the project The construction of a building for laboratories and offi ces with a fl oor area of 3103 m² (3340 ft²), to add to 2 already-completed buildings with a total area of 4500 m² (48400 ft²), constructed as part of the BIOPARC program.

main features5 levels, facing North to SouthWater/water heat pump heating system, cold-beam cooling systemEnergy performance: BBC low energy (excluding shell).

the program 3103 m2 (33400 ft²) of lab and offi ce fl oorspace - 8 units of ca.

250 m2 (2690 ft²) - Solvent storage bunker with 28 units, incl.

1 for R12 (infl ammable) and and 1 for R11/T (methanol) products.

the ChallengesTo provide immediate availability of the facilities on the Innovation Park meeting the requirements of young biotech companies. The site is part of, Alsace Biovalley, the Competitiveness Cluster, which has a worldwide reputation for therapeutic innovation.

Page 3: BIOPARC plaquette aurelie anglais v4 · BIOPARC 3 : Boost your development in an environment of excellence BIOPARC 3 has been designed to rationalize space and technical functionalities

Specifi c features for lab tables

• The following services are included:

Utilities: individual utility feeds in each module (cold water,

purifi cation, electricity, telephone, etc.)

• Not included:

Lab tables and equipments such as sinks, electrical outlets, etc.

Connections to utilities

Specifi c features for fume cupboards

• The following services are included:

Utilities: individual utility feeds in each module (cold water,

purifi cation, electricity, telephone, etc.)

Exhaust-air compensation:

Blown-air ventilation system

Preheating of blown air by a heat source (heat pump)

Air supply directly to modules

Energy metering

Balancing dampers (valves for bringing in fresh air and adjusting

the blower fan).

• Not included (cost charged to the future occupants):

Fume cupboards and terminal fi ttings such as sinks, electrical

outlets, etc.

Connections to utilities

Exhaust ventilation ducts up to the technical roof

Exhaust motors with variable speed drive, to be fi tted on the roof

The supply of a 0-10V signal for adjusting air compensation.

BIOPARC 3 features

specifi c equipments

- Rational, easily-accessible, ground-level equipment rooms.

This layout separates the Air Processing Units (APU) from the fume

cupboard exhausts in the roof. The following common services are

located on the ground level:

• Meeting rooms

• Toilets and washrooms

• Central cleaning service-room

- Architecturally showcased process.

The transparent glass exterior highlights the APUs, bringing the

ground level to life and showcasing the activity within the building.

- Secure access to technical services through a service area

allowing access to the bunker, equipment rooms and to the central

vertical traffi c hub and the elevator.

- Rigourous and rational fl oor map

• North-facing laboratories for constant natural light, without

overheating or heat radiation.

• Modules can be grouped 2 by 2 on each fl oor.

• Footprint optimised by the program’s vertical design.

• Enhanced security for laboratories starting from the fi rst fl oor.

• Technical roofi ng designed to accommodate fume cupboard

exhausts with easy and secure access.

• Validated low-energy (BBC) design.

a highly effi cient environmental profi le

VERY VERY EFFICIENTEFFICIENT

X X X X X X

EFFICIENTEFFICIENT X X X

STANDARDSTANDARD X X X X X

AIMSAIMS C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14

Re

lati

on

be

twe

en

th

e b

uil

din

g

an

d its

en

viro

nm

en

tIn

teg

rate

d c

on

str

ucti

on

pro

du

cts

, sys

tem

s a

nd

pro

cess

es

Co

nstr

ucti

on

pro

ject

wit

h l

ow

e

nvi

ron

me

nta

l im

pa

ct

En

erg

y m

an

ag

em

en

t

FAMILIES

Manage building impact on the external environment

ECO-CONSTRUCTION

ECO-MANAGEMENT COMFORT HEALTH

Wa

ter

ma

na

ge

me

nt

Acti

vity

wa

ste

ma

na

ge

me

nt

Su

sta

ina

bil

ity

of

en

viro

nm

en

tal

pe

rfo

rma

nce

Tem

pe

ratu

re a

nd

hu

mid

ity

Aco

usti

cs

Vis

ua

l co

mfo

rt

Olf

acto

ry c

om

fort

Sa

nit

ary

qu

ali

ty

Air

qu

ali

ty

Wa

ter

qu

ali

ty

Create a healthy, comfortable external environment

Page 4: BIOPARC plaquette aurelie anglais v4 · BIOPARC 3 : Boost your development in an environment of excellence BIOPARC 3 has been designed to rationalize space and technical functionalities

How to fi nd BIOPARC 3 ?

WWW.PARC-INNOVATION.STRASBOURG.EUCONTACT : Matthieu BERG

Tel : +33 (0)3 88 37 88 88 - e-mail : [email protected]

Entzheim

IllkirchGraffenstaden

Tram

Rhin

e

Pfimlin bridge

To NancyEurope bridge

To Paris - MetzLuxembourg

Place del'Étoile

To Colmar - MulhouseLyon - Suisse

N 4

D 392

B 35

A 35

N 83

N 83

D 46

8

Cana

l

D 400

Germany

Germany

Strasbourg Rhin

Parc d'innovation

InnovationLe Parcd’

BIOPARC 3 is a project managed by

co-financed by

BIOPARC 3

• Pho

tos

pag

e 2

and

page

3 :

AEA

Arc

hite

ctes

.