Information Technology Solutions BESPOKE DESIGN Each installation is designed to meet specific client requirements with full computer simulation used to prove all designs. ENERGY EFFICIENCY As approved Carbon Trust Consultants, we will ensure that the system energy performance is optimised to produce lower operational costs. PROJECT CDM AND MANAGEMENT Our engineers and consultants will ensure that all aspects of the design and installation are fully compliant and all relevant permissions and safety requirements are fully adhered to. MCS ACCREDITED ESP is an accredited installer, approved under the Government’s Micro-generation Certification Scheme. CARBON TRUST ESP are approved Carbon Trust Energy and Biomass Consultants. The Engineering Support Partnership Ltd, 13 Quay Level, St Peters Basin, Newcastle upon Tyne, NE6 1TZ. Tel: 0845 519 5912 www.espprojects.com CASE STUDY 1MWe BIOMASS CHP - STILLINGTON

Biomass Power Generation

  • Upload
    esp-ltd

  • View
    214

  • Download
    1

Embed Size (px)

DESCRIPTION

2MWe biomass power generation scheme

Citation preview

Page 1: Biomass Power Generation

Information Technology Solutions

BESPOKE DESIGN

Each installation is

designed to meet specific client

requirements with full computer

simulation used to prove all

designs.

ENERGY EFFICIENCY

As approved Carbon Trust

Consultants, we will ensure that

the system energy performance is

optimised to produce lower

operational costs.

PROJECT CDM AND

MANAGE MENT

Our engineers and consultants will

ensure that all aspects of the

design and installation are fully

compliant and all relevant

permissions and safety

requirements are fully adhered to.

MCS ACCREDITED

ESP is an accredited installer,

approved under the Government’s

Micro-generation Certification

Scheme.

CARBON TRUST

ESP are approved Carbon Trust

Energy and Biomass Consultants.

The Engineering Support Partnership Ltd, 13 Quay Level, St Peters Basin, Newcastle upon Tyne, NE6 1TZ. Tel: 0845 519 5912 www.espprojects.com

CASE STUDY 1MWe BIOMASS CHP - STILLINGTON

ESP has undertaken proof of concept reporting for the proposed biomass drying facility at Stillington in County Durham. The scheme has been developed in response to a growing demand for biomass products and utilises steam from a 5MW biomass CHP scheme to provide a biomass drying facility which will produce high quality wood chip at 20% MC for use within local biomass boilers. The electricity produced through a steam turbine on the site will export power to national grid and will attract renewable obligation certificates. The scheme will also enable local producers of wood chip to use the facility to dry their own products, such as round wood and straw. The scheme is expected to create local employment and will provide a regional resource of good quality wood chip, which will enable the expansion of the biomass heat market both within the public and private sectors.

• Feedstock and market assessment

• GQCHP assessment

• Steam and process sizing

• Plant design and budget costing

• Income forecasting through RHI and export and ROC mechanisms.