Biological Assessment Introduction Kern River Channel Maintenance Project December 2020 City of Bakersfield Water Resources Department Page 1-3 Figure 1-1 Regional Map, Kern River Channel Maintenance Project, Bakersfield, Kern County, California PN: SPK-2020-00880 HARNEY B Project Location 0 Miles 100 0 Ensenada

Biological Assessment Introduction

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Biological Assessment Introduction

Biological Assessment Introduction

Kern River Channel Maintenance Project December 2020

City of Bakersfield Water Resources Department Page 1-3

Figure 1-1 Regional Map,

Kern River Channel Maintenance Project, Bakersfield, Kern County, California

PN: SPK-2020-00880

HARNEY B

Project Location

0 Miles 100 0 Ensenada

Page 2: Biological Assessment Introduction

Biological Assessment Introduction

Kern River Channel Maintenance Project December 2020

City of Bakersfield Water Resources Department Page 1-4

Figure 1-2 Project Vicinity Map,

Kern River Channel Maintenance Project, Bakersfield, Kern County, California

PN: SPK-2020-00880

Srow Rd

iii C

~ e

~

C j [l

< t

~

.,

iii "' C

~ 1 an Rd

i

-Rosedale•Hwy-@ -----

Soddu,;, Rd

<ii

I C:J Action Area/Li ·t I m1 of Excavation .

C -" I, 0 C w

Sulhvan Rd

Nonega Rd

KmlDt1eyer Rd

c---~Rosedole Hw --#.i;4•--

Stockd.Jle H~y

n0\

't <

" I

Paroma Ln

h1'eachlm Rd

JohrGOn Rd

Fronller t-tgh

School

H.1geman Rd

il! C _., :;;

flcllart Rd

Srow Rd

" < .l<

Rosedale Hwy __ ._Pr"'~ om."::' !:h~ll:~•=• ---------~I~--~ "Im Ave

Bnmroll Rd

Lt n.,. River High

w., R~~1 Section 7 1ver ·"Y

River Section a 1 Sect1on19 .j ', _/~/?=-="'"-

I-:'~~--StockdJ 1: H~y

\~ Cahtomaa ,. Un,..•r!lly

Bakers! Id

CJm1ro l,\.:d&.J

11. ll rg Ave

~ ,on

!l Oal-..1Golf4.

!. Counlry

> Club

! While Ln ~

"' Tevl

""'' ~ 0 !l "

'!!

" "' i > " E

~ J

~ l> 0

Go "' v,i,g. Harr

Sloe lo Count!) Club

&m.-Jale Counlry Club

~ ,. i

WhlJ,-•Ln

Or, tuc.181--0

1<6

0

i a:

, .;,,J,l •HO

........ High

S<hool

f Id

ii

J

Panun.1 Ln

Ber~hlre Rd

" :z:

0 <ii

~ u :i

North H,gh

• hool

iii

\\bodrow A~

Rive~

Roberts Ln Se ./tio} 1 1ver ,

2 -~

BE'lle T r

Val 'f Plam Mal

..

Btood.JJt: Ln

Terr.ice Wily ;i a. <J)

Kem County Fas

i5 ~1irg Ave Grounds I.I

:c < /l

,p

ulh ~ H,gh r

School ~ -"'~

fJINt3Y, Rd iii ~

~

M Cu!chen Rd C ii

Hosk1rg Rd G<>lden

Vatl•y Hgh hool

J 1 • F:1rm

~1-"K,o Rd

____ \.

iii :i: VJ

Walts Dr

E P~nz Rd

JJ Soull' Ro

0 Co .....

U111vers1ty Av~

Co l QI /Jwc

Center SI

Potomac Ave

\/irg no Ave

E Bn..11'0~ge Ln

E ?aroma ln

Page 3: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-47

Figure 5B-1 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bak ersfie Id, California

Aquatic Resources Im pact Map

I • • ...._ Im pac!Area (568.9 Acres)

L..I AA SA(858.4Acres)

- Ingress/Eg ress

Upland Ha:iitat Impacts (Total Acres: 127.1) D Bank (Acres: 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OH\111111 (Total Acres: 312.2) La custri n e/Lak e (Acres: 25 .6)

Rive rine (Acres : 286.6)

Vlktlan d waters I mp acts (Total Acres: 55.3) Forested Weiland (Acres : 28 .3)

Fres hwater Em ergent Wetland (Acres: 13.4)

- Freshwater Shrub (Acres : 13.6)

Drainage structure

♦ Culvert Pipe

0 200 0

Feet

200

Coord inate System: NAO 1983 StateP lane Californ ia V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Co ni c Datum: North American 1983

Service Layer Credit s: 8 ource: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESIA irbus OS' USDA, US GS, AeroG RID, IG N, and the G 18 User

Community UAV O rthomo saic Co llected January 2021

Created on 03130121 Made in accordance with the Updated Map an d

Drawing Standards for the 8 outh Pacific Division Regulato ry Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 4: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-48

Figure 5B-2 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bak ersfie Id, California

Aquatic Resources Im pact Map

:, •• ~ lmpa ctArea (568.9 Acres)

C:J AR SA(858 .4Acres)

- Ingress/Egress

Upland H~itat Impacts (Total Acres: 127.1) D Bank (Acres: 24.5)

- Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wdland waters Impacts - OH\111111 (Total Acres: 312.2) L..a custrine/Lak e (Acres : 25 .6)

Riverine (Acres : 286.6)

Vlktlan d waters I mp acts (Total Acres: 55.3) F crest ed Welland (Acres : 28.3)

Freshwater Emer gent Wetland (Acres : 13 .4)

- Freshwater Sh rub (Acres : 13.6)

0 200 0

Feet

200

Coor dinate System: NAO 1983 StateP lane Californ ia V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Co ni c Datum: North Amer ican 1983

Service Layer Credit s: 8 our ce: Esri, M axar, GeoEye, Earthstar Geographic s, CNESIA irbus OS' USDA, US GS, AeroG RID, IG N, and th e G 18 User

Community UAV O rthomosaic Co llected January 2021

Created on 03130121 Made in accordance with the Updated Map and

Drawing Standards for the 8 outh Pa cifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 5: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-49

Figure 5B-3 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bak ersfie Id, California

Aquatic Resources Im pact Map

:, •• ~ lmpa c!Area (568.9 Acres)

c::J AA SA(858.4Acres)

- Ingress/Eg ress

Upland H~itat Impacts (Total Acres: 127.1) D Bank (Acres: 24.5)

- Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wdland waters Impacts - OH\111111 (Total Acres: 312.2) L..a custrine/Lake (Acres: 25 .6)

Riverine (Acres : 286.6)

Vlktlan d waters I mp acts (Total Acres: 55.3)

Forested Welland (Acres: 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres: 13.6)

0 200 0

Feet

200

Coor dinate System: NAO 1983 StateP lane Californ ia V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Co ni c Datum: North Amer ican 1983

Service Layer Credit s: 8 ource: Esri, M axar, GeoEye, Earthstar Geographic s, CNESIA irbus OS' USDA, US GS, AeroG RID, IG N, and the G 18 User

Community UAV O rthomo saic Co llected January 2021

Created on 03130121 Made in accordance with the Updated Map and

Drawing Standards for the 8 outh Pa cifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 6: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-50

Figure 5B-4 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bak ersfie Id, California

Aquatic Resources Im pact Map

:, •• ~ lmpactArea (:568.9 Acres)

c::::I AA SA(8:58.4Acres)

- Ingress/Egress

Upland H(Eitat Impacts (Total Acres: 127.1) D Bank (Acres: 24.:5)

- Riparian (Acres : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wl11and waters Impacts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres: 2:5 .6)

Riverine (Acres: 286.6)

wetland waters Impacts (Total Acres: 55.3) Forested Weiland (Acres : 28 .3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres: 13.6)

Flow structure

- Concrete Weir

- - sto ne Weir

0 200 0

Feet

200

Coor dinate System: NAO 1983 StateP lane Californ ia V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Co ni c Datum: North Amer ican 1983

Service Layer Credit s: 8 ource: Esri, M axar, GeoEye, Earthstar Geographic s, CNESIA irbus OS' USDA, US GS, AeroG RID, IG N, and the G 18 User

Community UAV O rthomo saic Co llected January 2021

Created on 03130121 Made in accordance with the Updated Map and

Drawing Standards for the 8 outh Pa cifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 7: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-51

Figure 5B-5 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • ~ Impact Area (568.9 Acres)

AA SA(858.4Acres)

- Ing ress/Egress

Upland H(Eitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acres : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25.6)

Riverine (Acres : 286.6)

\IIA!tland waters Impacts (Total Acres: 55.3)

Fo rested Wetland (Acres : 28 .3)

Freshwater Emergent Wetland (Acres : 13.4)

- Freshwater Shrub (Acres : 13.6)

Flow stru cture

- stone Weir

200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Conic Datum: North American 1983

Service Layer Cred~s: Source: Esri, M axar, Geo Eye, Earthstar Geographic s, CNES/A irbus DB, USDA, USGS, AeroGRID, IGN, and the GIB User

Community UAV o rthomosaic Collected January 2021

Created on 03/30/21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kr istoffer Law, Lucas Knox Quad Knopf, Inc.

Page 8: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-52

Figure 5B-6 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

... -... ..... ..... ., ..

..... ..... ,..-

,.-· .. -t ♦ _.,,

1/' ... _.,, ♦

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• • ImpactArea (568.9 Acres)

c:JAR SA(858.4Acres)

Upland Ha>itat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJ>acts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 9: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-53

Figure 5B-7 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 3

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• • ImpactArea (568.9 Acres)

c:JAR SA(858.4Acres)

Upland Ha>itat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJ>acts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 10: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-54

Figure 5B-8 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

I I

Remov 4 - Fre _._---,_, __ .. :..

- 4 -- 0

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • ~ lmpactArea (568.9 Acres)

c:=.AA SA(858.4Acres)

Upland Haiitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non WBland waters lmJlacts - OH\111111 (Total Acres: 312.2) L3 custrine/Lake (Acres: 25 .6)

Riverine (Acres : 286.6)

'\Mrtland Waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- stone Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esri, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 11: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-55

Figure 5B-9

Aquatic Resources Impacts Map Kern River Channel Maintenance Project, Bakersfield, California

Kern River

Section 4 ••

/ /

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c:::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ic an 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosa ic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 12: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-56

Figure 5B-10 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern Rive r Section 4

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 13: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-57

Figure 5B-11 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 5

moval Ar - Freshw - ·3 -- 2.1

K ern River Section 4

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres: 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested W etland (Acres: 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane Californ ia V Fl PS 0405 (US Feet)

Projection : Lambert Conformal Conic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Co llected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pac ifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 14: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-58

Figure 5B-12 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

R Area -ec 10n - Bank -13 -- 0.26 Acres

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • .. • • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetl and (Acres: 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 15: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-59

Figure 5B-13 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

WESTSIDE PKWY EOFF TO P~OHAWK

~ - ~ ~~ ,. - - - - - ~ -< - ' 1-. -- -~---- _L_-+ -----

Redistribuli Section 6 -- 1 -- 17 . ..;;.5;;...o...;..;..;;.""

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • • impact Are a (568.9 Acres) .. -c::J AA SA(858.4Acres)

- Ingress/Egress

Upland H~itat Impacts (Total Acres: 127.1) CJ Bank (Acres : 24.5)

- Riparian (Acres : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5) Non Wetland waters Impacts - OHV\lill (Total Acres: 312.2)

L.a custrine/Lake (Acres : 25.6)

River ine (Acres : 286.6)

W:rtland waters Impacts (Total Acres: 55.3) Forested WeUand (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13.4)

- Freshwater Shrub (Acres : 13.6)

200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Conic Datum: North American 1983

Service Layer Cred~s: Source: Esri, M axar, Geo Eye, Earthstar Geographic s, CNES/A irbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User

Community UAV o rthomosaic Collected January 2021

Created on 03/30/21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11 , 2019

By : Kr istoffer Law, Lucas Knox Quad Knopf, Inc.

Page 16: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-60

Figure 5B-14 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 6

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • • lmpactArea (568.9 Acres) .. -c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 17: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-61

Figure 5B-15 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 18: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-62

Figure 5B-16 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 6

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 19: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-63

Figure 5B-17 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 6

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • • 1mpaclArea (568.9 Acres)

AA SA(858.4Acres)

- Ingress/Egress

Upland Hmitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acres : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wftland waters Impacts - OH\lllul (Total Acres: 312.2) l..a custrine/Lake (Acres : 25 .6)

Riverine (Acres: 286.6)

V'ktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Orai nage Structure

♦ Culvert Pipe

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 20: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-64

Figure 5B-18 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

I Kern River

Section6

--~ 1;1'\) liil

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • ~ Impact Area (568.9 Acres)

AA SA(858.4Acres)

Upland Haiitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5) Non Wetland waters Impacts - OH\111111 (Total Acres: 312.2)

L3 custrine/Lake (Acres: 25 .6)

Riverine (Acres : 286.6)

'\Mrtland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- Concrete Weir

-- stone Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection : Lambert Conformal Conic Datum: North Amer ic an 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosa ic Co llected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 21: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-65

Figure 5B-19 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 7

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• • ImpactArea (568.9 Acres)

c:JAR SA(858.4Acres)

Upland Ha>itat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJ>acts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 22: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-66

Figure 5B-20 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

n Area -iverine cres

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~••• imp act Are a (568.9 Acres)

c::JAR SA(858.4Acres)

Upland Ha>itat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Ripari an (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJ>acts - OH\111111 (Total Acres: 312.2) L.acustrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conforma l Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and the G IS User

Commun ity UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 23: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-67

Figure 5B-21 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 7

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 24: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-68

Figure 5B-22 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

. _ __ ,. . ., :. 11' ·

Kern River Section 7

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esri, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 25: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-69

Figure 5B-23 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

K ern River

Section 7

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 26: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-70

Figure 5B-24 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River

Section 8

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

I • • .. • lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3)

Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 27: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-71

Figure 5B-25 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Re

Removal Section 8 -

- ,t -- 0.3

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~••~ Impact Area (568.9 Acres)

c::::J AA SA("858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Ripari an (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OHV\ti/1 (Total Acres: 312.2) L.a custrine/Lake (Acres: 25 .6)

Riverine (Acres : 286.6)

\IIArtland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- Concrete Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G 18 User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 28: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-72

Figure 5B-26 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

--

stributi on Area ion 9 - Riverin -- 1 8. 4

Kern River

Section 9

Removal Area - Section 9 -Ripa rian - 5

-- 0.14 Acres

Removal Area -Sect ion 9 - Bank - 3 -- 6.31 Acres

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •.~ lmpactArea (568.QAcres)

AA SA('858.4Acres)

- Ingress/Egress

Upland H<ilitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acr es : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OHV\ti/1 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'\Mrtland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- Concrete Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection : Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esri, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 29: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-73

Figure 5B-27 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

tribution Area -n 9 - Riverine 18. 46 Acres

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~••• impact Area (568.9 Acres)

c::JAR SA(858.4Acres)

Upland Ha>itat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJ>acts - OH\111111 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacific Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 30: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-74

Figure 5B-28 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c::JAA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 31: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-75

Figure 5B-29 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c:::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosa ic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 32: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-76

Figure 5B-30 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c:::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosa ic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 33: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-77

Figure 5B-31 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c:::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosa ic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 34: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-78

Figure 5B-32 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

1 • • 1mpaclArea (568.9 Acres)

AA SA(858.4Acres)

- Ingress/Egress

Upland Hmitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acres : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wftland waters Impacts - OH\lllul (Total Acres: 312.2) l..acustrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

V'ktland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28 .3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Orai nage Structure

♦ Culvert Pipe

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conforma l Con ic Datum: North American 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and the G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 35: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-79

Figure 5B-33 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

,,-· ,,. _,ii

.... ... ,.. ,.-· ♦ ,.,, .,, ,.,-

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map 1 • • lmpactArea (568.9 Acres)

AA SA(858.4Acres)

- Ingress/Egress

Upland H<t>itat Impacts (Total Acres: 127.1) CJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters lmJlacts - OHV\ti/1 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25.6)

Riverine (Acres: 286.6)

\llktland waters Impacts (Total Acres: 55.3) Forested Welland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13.4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- Concrete Weir

Drainage structure

♦ Culvert Pipe

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geog raphic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 36: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-80

Figure 5B-34 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

I Remova ection 1 -

-3--1.66~cres

Ke rn River

Sect ion 11

.,,, ,., .. ~ ,,. .. ,,,,,

at-k

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •.~ lmpactArea (568.QAcres)

AA SA('858.4Acres)

- Ingress/Egress

Upland H<ilitat Impacts (Total Acres: 127.1) D Bank (Acres : 24.5)

Riparian (Acr es : 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OHV\ti/1 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'\Mrtland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

- Concrete Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conformal Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosai c Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.

Page 37: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-81

Figure 5B-35 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~ •• ~ lmpactArea (568.9 Acres)

c::JAR SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres : 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wit land waters Impacts - OHVl.till (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

'11\Anland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres : 28.3)

Freshwater Emergent Wetland (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conforma l Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esr i, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus OS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Luca s Knox Quad Knopf, Inc.

Page 38: Biological Assessment Introduction

Aquatic Resources Delineation Report On-Site Aquatic Resources

Kern River Channel Maintenance Project April 2021

City of Bakersfield Page 5-82

Figure 5B-36 Aquatic Resources Impacts Map

Kern River Channel Maintenance Project, Bakersfield, California

PN: SPK-2020-00880

Kern River Maintenance Project Bakersfield, California

Aquatic Resources Impact Map

~••~ Impact Area (568.9 Acres)

c::::J AA SA(858.4Acres)

- Ingress/Egress

Upland Haiitat Impacts (Total Acres: 127.1) LJ Bank (Acres: 24.5)

Riparian (Acres: 102.6)

Aquatic Resources Impacts (Total Acres: 367.5)

Non Wetland waters Impacts - OHV\ti/1 (Total Acres: 312.2) L.a custrine/Lake (Acres : 25 .6)

Riverine (Acres : 286.6)

\IIArtland waters Impacts (Total Acres: 55.3) Forested Wetland (Acres: 28 .3)

Freshwater Emergent Wetla nd (Acres : 13 .4)

- Freshwater Shrub (Acres : 13.6)

Flow structure

-- stone Weir

0 200 0

Feet

200

Coordinate System: NAO 1983 StateP lane California V Fl PS 0405 (US Feet)

Projection: Lambert Conforma l Con ic Datum: North Amer ican 1983

Service Layer Cred~s: Source: Esri, M axar, GeoEye, Earthstar Geographic s, CNESfA irbus DS, USDA, US GS, AeroG RID, IG N, and th e G IS User

Community UAV O rthomosaic Collected January 2021

Created on 03f30J21 Made in accordance with the Updated Map and

Drawing Standards for the South Pacifi c Division Regulatory Program, as amended on January 11, 2019

By: Kristoffer Law, Lucas Knox Quad Knopf, Inc.